MWWTP Effluent FM Surge & Transient Design Build Services - Charles County, Maryland

This is a Design-Build Request for Proposals (RFP) issued by Charles County Government for the Mattawoman Wastewater Treatment Plant (MWWTP) Effluent Filters, Force Main Surge, and Transient design and construction services. The project involves designing and constructing a new 40-foot diameter standpipe with spiral staircase, platform, piped overflow, overflow swale, influent, effluent and bypass vaults, new ductile iron pipe, fittings, valves, sump pumps, drainage systems, electrical and instrumentation components, and pavement and yard restoration. The RFP was released July 8, 2026, with a mandatory pre-proposal meeting on July 30, 2026 (registration deadline July 29, 2026), an optional site visit on August 13, 2026 at 5310 Hawthorne Road, La Plata, Maryland, and a questions submission deadline of August 20, 2026. Sealed proposals are due electronically through the County's eProcurement Portal by October 1, 2026 at 11:00 AM. The contract term extends 690 consecutive calendar days from the Notice to Proceed date, with the design phase not to exceed 270 consecutive calendar days and the construction phase not to exceed 420 consecutive calendar days from construction start to substantial completion. Award will be made to one qualified Design-Build firm following evaluation by an evaluation committee.

Pricing shall be submitted on the County's Cost Proposal Form with all cost columns fully completed and rounded to the nearest whole cent, with no hidden costs and all prices including profit, overhead, equipment, and transportation. A five percent (5%) Bid Bond from a Maryland-licensed surety is required at proposal submission. Upon contract award, the successful contractor must provide Performance and Labor & Material Payment Bonds in the amount of 100% of the contract price. The project has a Minority and Women-Owned Business Enterprise (MWBE) subcontractor goal of 33.96%, and prevailing wage rates apply as this County-financed project exceeds $500,000. The Design-Build Project Manager must have a minimum of 15 years of related experience including three completed projects over $2,000,000 each at municipal wastewater treatment plants rated 5 MGD or greater, with at least one design-build project. The Design Manager and all engineering discipline leads must hold current Maryland Professional Engineer or Architect licenses with minimum 10-15 years of relevant experience. The Construction Project Manager and Construction Superintendent each require minimum 10 years of experience with three completed projects exceeding $2,000,000 each. Lead design and construction firms must each demonstrate a minimum of three completed projects after January 1, 2015, valued over $2,000,000, with at least one design-build project. The standpipe manufacturer must have minimum 10 years of experience and 10 welded steel standpipes in successful service for 10 years; the tapping and linestop manufacturer must have minimum 10 years of experience with two linestops on equal or larger pipelines of the same material within the past eight years.

View the file

Other files

File Type Posted
828058genHarf.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

27-002

MWWTP EFFLUENT FM SURGE & TRANSIENT DESIGN

BUILD SERVICES (UN 1282)

Charles County Government

200 Baltimore Street

La Plata, MD 20646

RELEASE DATE: July 8, 2026

RESPONSE DEADLINE: October 1, 2026, 11:00 am

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/charlescountymd

Charles County Government

MWWTP Effluent FM Surge & Transient Design Build Services (UN

1282)

I. INTRODUCTION

II. PROPOSAL INSTRUCTIONS

III. TECHNICAL PROPOSAL SUBMISSION CONTENT

IV. ORIGINAL PROPOSAL SUBMISSION CONTENT

V. PROPOSAL EVALUATION PANEL AND CRITERIA

VI. AWARD AND CONTRACT FORMATION

VII. DESIGN GENERAL PROVISIONS

VIII. CONSTRUCTION GENERAL PROVISIONS

IX. SPECIAL PROVISIONS

X. PROPOSAL ITEM DESCRIPTIONS

XI. PROPOSAL SUBMITTALS

XII. COST PROPOSAL FORM

XIII. INSURANCE

XIV. PREVAILING WAGE

Attachments:

A - Appendix A - Scope of Work - 260708

B - Appendix B - Transient Specifications - 260708

C - Appendix C - Transient Set Drawings - 260708

D - Appendix D - Transient Geotechnical Report - 260708

E - Appendix E - Bypass Approved Shop Drawings - 260708

F - Appendix F - Record Drawings - 260708

G - Appendix G - Project Close Out Documents - 260708

H - Appendix H - Sample Contract - 260708

I - Appendix I - Performance Labor Bonds - 260708

Title: MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282) #27-002

1. INTRODUCTION

1.1. Summary

The County Commissioners of Charles County are hereby requesting sealed proposals from qualified firms to design and construct an upgrade to the Effluent Filters and associated structural, mechanical equipment, piping, and accessories for a

Wastewater Treatement Plant located in Charles County, MD.

The primary purpose of the Project is for the Design and Construction of a new standpipe with separate influent and effluent pipes that join with the existing force main. This Project will construct a new 40-ft. diameter standpipe with spiral staircase, platform, piped overflow, overflow swale, influent, effluent and bypass vaults, new ductile iron pipe, fittings, valves, and miscellaneous improvements such as sump pumps and drainage, electrical and instrumentation and pavement and yard restoration. The Design-Build Teams will be required to provide complete turn-key services for the Project including design, permitting, furnishing and installing and equipment, testing and start up, contract close out to provide a complete and fully functioning system.

1.2. Background

The Mattawoman Wastewater Treatment Plant (MWWTP) is rated for an average daily flow of 20 million gallons per day. In

2020, a major Project to improve he effluent pump station occurred. During this Project, the Design peak flow of the effluent pump station increased to 60 mgd. Treated effluent is pumped two miles through 54-inch diameter, 50-year old prestressed concrete cylinder pipe (PCCP) before transitioning to gravity flow for final discharge into the Potomac River.

The County experiences transient surges in their effluent force main when effluent pumps turn on and off, causing the intermediate high point air release valve (ARV) located approximately 7,000 ft. from the pump station to actuate. With the recent increase to design peak flow, the County is concerned that future transient surges caused by cyclical pump operation or multiple pump trips may damage the existing force main and ARV.

1.3. Contact Information

The Purchasing Representative identified below is the SOLE POINT OF CONTACT at Charles County Government for this procurement. All communication between the Offeror and Charles County Government shall be with the Purchasing

Representative until a fully executed contract is delivered to the Contractor. Offerors or any of their authorized representatives may not initiate contact with Charles County Government or County Consultants other than the Contact identified below, for any reason during the bidding process or prior to full contact execution. Any communication outside this process may result in disqualification.

Latasha Minor Senior Procurement Specialist 200 Baltimore St La Plata, MD 20646 Email: minorl@charlescountymd.gov Phone: (301) 645-0659

Department:

DPW - Capital Project Management

1.4. Timeline

NOTE: Times and dates are subject to change due to extenuating circumstances, including inclement weather. Offerors may obtain

County operating status by calling 301-645-0600 (meeting times cannot be verified at this number) or by referring to County operations status updates on the Charles County Government website at http://www.CharlesCountyMD.gov.

Release Project Date July 8, 2026 mailto:minorl@charlescountymd.gov tel:(301)645-0659 http://www.charlescountymd.gov/

Pre-Proposal Meeting Registration

Deadline

July 29, 2026, 12:00pm

Firms must register in advance to attend the pre-proposal meeting via the County's eProcurement

Portal RSVP Manager.

Pre-proposal meeting will occur virtually/teleconference, unless otherwise specified.

Firms that have registered timely will receive participation instructions.

If multiple attendees from your firm will be attending the meeting, please have each individual complete the eProcurement Portal RSVP Manager process.

Pre-Proposal Meeting (Non-Mandatory)

(Non-Mandatory)

July 30, 2026, 11:00am

Pre-proposal meeting will occur virtually/teleconference, unless otherwise specified.

Firms that register timely and via the County's eProcurement Portal RSVP Manager will receive participation instructions.

The attendance roster will be published on the

County's eProcurement Portal.

Site Visit (Non-Mandatory) (Non-

Mandatory)

August 13, 2026, 9:00am

The site visit is optional. All attendees must sign-in and sign-out. Firms are strongly encouraged to arrive fifteen (15) minutes early to ensure gated site access and to complete the check-in process. The

Site Visit shall start promptly at the time specified.

Those who arrive late may not be admitted at the

County's sole discretion. Due to safety restrictions at the site, all visitors proceeding to the site location are recommended to wear steel-toed shoes/boots.

RSVP not required.

The site visit address is 5310 Hawthorne Road, La

Plata, MD 20646. Report to Building #1B to sign in.

Question Submission Deadline August 20, 2026, 12:00pm

Questions shall be submitted via the eProcurement

Portal Question & Answer feature prior to the due date and time specified. The County will not provide responses to questions received after the deadline.

Proposal Submission Deadline October 1, 2026, 11:00am

2. PROPOSAL INSTRUCTIONS

2.1. Proposal Submission Conditions

Charles County Government is accepting electronic proposal submissions. Offerors shall create a FREE account with OpenGov

Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, click on

"Draft Response" and follow the instructions to submit the electronic proposal via the County's eProcurement Portal.

Proposals shall be submitted by the date and time specified. Late proposals will not be accepted. Submission, modification, or withdrawal of proposals after the due date/time will not be considered.

It is the Offerors’ sole responsibility to ensure that proposals are delivered via County's eProcurement Portal. Offerors shall give yourself adequate time to submit a response. Any technical difficulties or uncertainty with the submittal process will not be cause for accepting a response that was not submitted timely. The County is only accepting electronic submittals. Delivery methods by courier, in-person hand delivered, United States Postal Service, United Parcel Service or Federal Express, and other methods of delivery shall not be accepted. Any proposals not received timely will not be considered.

Proposals shall be valid and irrevocable for a minimum of one hundred eighty(180) days from the due date.

An Offeror may submit only (1) proposal in response to this RFP. Any offeror who submits a response to this request as a the

Prime Contractor (whether Lead Design Firm or Lead Construction Firm) is prohibited from being included in any role in another firm's proposal (joint venture, subcontractor, etc). Multiple responses under any of the aforementioned situations will result in a rejection of all responses of all the firms involved.

Offerors shall monitor the County's eProcurement Portal for schedule changes issued via addendum.

2.2. Solicitation Events

A. Pre-Proposal Meeting Registration Deadline: Refer to the Timeline section for date, time, location, participation and registration requirements. Pre-proposal meeting will occur virtually/teleconference, unless otherwise specified. Firms that have registered timely will receive participation instructions.

B. Pre-Proposal Meeting: Pre-proposal meeting will occur virtually/teleconference, unless otherwise specified. Firms that registered timely will receive participation instructions. Refer to the Timeline section for date, time, and location, participation, and registration requirements. The attendance roster will be published on the County's eProcurement

Portal.

C. Site Visit: Refer to the Timeline section for date, time, location, participation and registration requirements. The attendance roster will be published on the County's eProcurement Portal

D. Last Day for Questions: The County will not provide responses to questions received after the deadline to submit questions specified in the Timeline section.

E. Proposal Submission Deadline: Refer to the Timeline section for the date and time proposals must be received by.

Offerors must have an account or create a FREE account with OpenGov Procurement to submit a proposal.

2.3. Offeror Certification of Acceptance

By submitting a proposal in response to this RFP, the Offeror certifies their acceptance of all terms and conditions set forth within this document, which will be made a part of the final contract documentation. All work, if any, shown on the contract drawings, specifications, and reports referenced in the RFP or any Appendices is made part of this solicitation package.

2.4. Incurring Costs

The County is not liable for any costs incurred by the Offeror prior to full execution of the contract.

2.5. Additions/Modifications to Solicitation Forms

Modifications of or additions to the Cost Proposal Form or any other County form may be cause for rejection of the proposal, however, the County reserves the right to decide, on a case by case basis, in its sole discretion, whether or not to reject such a https://procurement.opengov.com/signup https://procurement.opengov.com/portal/charlescountymd/projects/268896 https://procurement.opengov.com/portal/charlescountymd/projects/268896 https://procurement.opengov.com/portal/charlescountymd/projects/268896 https://procurement.opengov.com/portal/charlescountymd/projects/268896 https://procurement.opengov.com/portal/charlescountymd/projects/238556 https://procurement.opengov.com/portal/charlescountymd https://procurement.opengov.com/portal/charlescountymd/projects/268896/document?section=2591139 proposal as nonresponsive. As a precondition to proposal acceptance, the County may, in its sole discretion, request that the Offeror withdraw or modify any such modifications or additions which do not affect quality, quantity, price, or delivery.

2.6. Alternate Offers

Offerors must bid only one (1) product and one (1) price per proposal item even though they feel they can offer more than one item that will meet the specifications. Offeror must determine for themselves which to offer. If an Offeror submits more than one (1) product and/or more than one (1) price for a given proposal item or items, it may be cause for the proposal items or items being bid upon to be considered non-responsive and rejected.

2.7. "Or Equal" Interpretations

Identification of an item by manufacturer’s name, trade name, catalog number, or reference is intended to be description but not restrictive in that it is used for the purpose of describing the type, style, quality, performance and minimum specifications of the product desired, and shall not be interpreted to mean the only acceptable product. Proposals on other makes and/or models will be considered provided in the Cost Proposal Form what is being proposed and forwards with the proposal complete descriptive literature indicating the character of the article being offered and addressing all specifications of this solicitation.

The County reserves the right to accept or reject, in its sole discretion, items offered as an “equal”.

2.8. Offeror Investigation

Prior to submitting a proposal, each Offeror shall make all investigations and examinations necessary to ascertain all conditions and requirements affecting the full performance of the contract and to verify any representations made by the County that the

Offeror will rely upon. No pleas of ignorance of such conditions and requirements resulting from failure to make such investigations and examinations will relieve the successful Offeror from its obligation to comply in every detail with all provisions and requirements of the contract documents or will be accepted as a basis for any claim whatsoever for any monetary consideration on the part of the successful Offeror.

2.9. Sole Point of Contact

The Purchasing Representative identified in the Introduction section is the SOLE POINT OF CONTACT at Charles County

Government for this procurement. All communication between Offerors and Charles County Government shall be with the

Purchasing Representative until a fully executed contract is delivered to the Contractor. Offerors or any of their authorized representatives may not initiate contact with Charles County Government or County Consultants other than the Contact identified on the Introduction section, for any reason during the bidding process or prior to full contact execution. Any communication outside this process may result in disqualification.

2.10. Questions

All inquiries/questions concerning technical or bidding information shall be directed via OpenGov Procurement Question &

Answer feature prior to the due date and time specified in the Introduction section . In the event an Offeror has multiple questions, each question must be submitted individually. Please include the section number and title for each question, if applicable. All questions submitted and answers provided will be electronically distributed to offerors following this solicitation on the County's eProcurement Portal. The County will not provide responses to questions submitted after the due date and time specified in the Introduction section. The person submitting the request will be responsible for its prompt delivery. Questions and answers are provided for informational purposes only and are not part of any resulting contract from this solicitation.

2.11. Addenda and Supplements

In the event that it becomes necessary to revise any part of this solicitation, or if additional information is necessary to enable the

Offeror to make an adequate interpretation of the provisions of this solicitation, a supplement to the solicitation will be issued. The

Offeror shall acknowledge in their proposal, the receipt of all addenda, supplements, amendments, or changes to the solicitation that were issued by the County. Oral statements made by County personnel shall not bind the County in any manner whatsoever and cannot be used to protest or otherwise challenge any aspect of this solicitation or subsequent agreement.

Any interpretation, correction, changes to the solicitation will be made only by addendum duly issued and will be posted on the County’s eProcurement Portal found at www.CharlesCountyMD.gov. Any and all addenda issued prior to the proposal due date/time shall become a part of the contract documents and shall be covered in the Offeror’s proposal prices, unless an alternate schedule is presented by addendum. It is the responsibility of the Offeror to check the County's eProcurement Portal as frequently as necessary to obtain all updates and addenda to the solicitation.

https://procurement.opengov.com/portal/charlescountymd/projects/268896/document?section=2591139 https://procurement.opengov.com/portal/charlescountymd/projects/268896/document?section=2591133 https://procurement.opengov.com/portal/charlescountymd/projects/268896/document?section=2591133 https://procurement.opengov.com/portal/charlescountymd/projects/268896/document?section=undefined https://procurement.opengov.com/portal/charlescountymd/projects/268896 https://procurement.opengov.com/portal/charlescountymd/projects/268896 https://procurement.opengov.com/portal/charlescountymd/projects/268896/document?section=undefined https://www.charlescountymd.gov/ https://procurement.opengov.com/portal/charlescountymd/projects/268896

2.12. Ability to Perform

Offeror shall have the capability to perform classes of work contemplated, having sufficient capital to execute the work properly within the specified time. The County reserves the right to request any additional information, utilize references not provided by a

Offeror, and validate any information provided by an Offeror by any means deemed necessary by the County for the purpose of determining the Offeror’s ability to perform the services described herein.

2.13. Errors

Any errors in computations may be corrected during the County’s review of the proposal. The County shall not be responsible for

Offeror computation errors contained on the Cost Proposal Form. All values contained on the Cost Proposal Form remain the responsibility of the Offeror. Where the unit price and the extension price are at variance, the unit price will prevail. In the event that the unit price is not provided, the unit price shall be the extended price divided by the quantity. Errors on any forms submitted remain the sole responsibility of the Offeror.

2.14. County Rights/Disclaimers

The County exclusively reserves the right, but is not limited to the following actions:

A. Reject any or all proposal submissions;

B. Issue a new RFP;

C. Cancel, modify, or withdraw the RFP;

D. Issue addenda, supplements, and modifications to this RFP;

E. Modify the RFP process (with appropriate notice to offerors as described herein);

F. Appoint an Evaluation Committee and evaluation teams to review proposal submissions, G. Approve or disapprove the use of particular subcontractors and/or substitutions and/or changes in proposal submissions;

H. Revise and modify, at any time before the Proposal Due to County date, the factors it will consider in evaluating proposal submissions and to otherwise revise or expand its evaluation methodology. If such revisions or modifications are made, the County will publish an addendum. The County may extend the RFP due date if such changes are deemed by the

County, in its sole discretion, to be material and substantive;

I. Seek or obtain data from any source that has the potential to improve the understanding and evaluation of the RFPs;

J. Disqualify any team that changes its Proposal Submission without County written approval;

K. Retain ownership of all materials submitted in hard-copy and/or electronic format.

2.15. Rejection of Quotes/Bids/Proposals

The County exclusively reserves the right, but is not limited to the following actions:

A. Evidence of collusion among offerors.

B. Lack of competency revealed by financial statements, experience, equipment statements, or other factors.

C. Lack of responsibility as shown by past work, judged from the standpoint of workmanship as submitted or from previous experience with the offeror.

D. Default on a previous similar contract for failure to perform.

E. Being delinquent in payments due to Charles County Government.

F. Exceptions or exclusions to the requirements of the solicitation.

G. Failure to be in “Good Standing” with the State of Maryland.

H. Previous substandard performance on a County contract.

I. Failure to perform properly or to complete, in a timely manner, contracts of a similar or comparable nature, or if investigation shows the offeror unable or unlikely to perform the requirements.

J. Failure to furnish information requested by the County.

The County reserves the right to reject any/all proposals, to waive irregularities and/or informalities in any proposal, and to make award in any manner, consistent with law, deemed in the best interest of the County.

2.16. Good Standing Requirements

In order to be eligible for award, Offerors shall meet the following conditions prior to contract award:

A. Their firm is not debarred, suspended, or otherwise ineligible for participation in government procurement by the federal government, the State of Maryland, or any other state, county, or municipal government.

B. All payments to Charles County Government have been paid and are not delinquent.

C. Their firm is in “good standing” with the State of Maryland Department of Assessments and Taxation.

2.17. Restrictions

An individual or a person that employs an individual who the County utilized in the drafting of specifications, an invitation for bids, a request for quotes, or a request for proposals for a procurement may not submit a quote, bid, or proposal for that procurement, or assist or represent another person, directly or indirectly, who is submitting a quote, bid, or proposal for the procurement. A proposal from such an individual or entity will be rejected.

The following is a list of consultant(s) and/or sub-consultant(s) that have received monetary compensation under a contract with the County as the prime consultant to develop this Request for Proposals.

• GDH, Inc

In addition, the County Ethics Committee administers the provisions of the County Ethics Code, including §170 of the Charles

County Code that contains various restrictions on participating in County procurements.

2.18. Notifications

Legal notice given by the County to the Offeror shall be sent to the Offeror's contact information provided in the County's eProcurement Portal. Notice given by the County by any of the following:

A. A communication delivered by MAIL shall be deemed as having been received by the addressee three (3) business days after the date of mailing.

1. UPS or FedEx or other delivery service; or

2. USPS first class postage mail; or

3. USPS certified, or

4. USPS registered mail.

B. A communication delivered by email shall be deemed as having received by the addressee the same day the email was sent.

2.19. Negotiations

The County may negotiate contract terms, price, statement of work, or other conditions that results in the most advantageous outcome for the County. In the event an agreement satisfactory to the County cannot be negotiated, the County may terminate negotiation and move to another Offeror.

2.20. Performance and Payment Bonds

A Performance Bond and Labor & Material Payment Bond in the amount of one hundred percent (100%) of the contract price will be required for this project and contract, from sureties licensed to do business in the State of Maryland and satisfactory to the

County and shall be submitted to the County at the time of contract execution by the Bidder within the timeframes required herein.

Premiums for the bonds described above shall be paid by the Contractor. Bonds shall contain a provision that it shall not be cancelled, non-renewed or materially altered without at least ninety (90) days written prior notice to the County.

2.21. Prevailing Wage

All County financed construction projects exceeding $500,000 are subjected to the prevailing wages rates as outlined in this solicitation. The prevailing wage rates provided in the document are subject to change. The wage determination active on the date the Notice to Proceed is issued shall apply to the project.

2.22. Prevailing Wage Reporting

The County utilizes web-based prevailing wage reporting software. All contractors and subcontractors are required to submit certified payrolls and labor compliance documentation using this software. Use of the software will involve data entry of weekly payroll information that is acceptable to the County. The software has interface capability with many payroll and accounting software programs that may streamline data entry. Software licensing and training will be provided by the County.

2.23. Prohibition of Discrimination in County Procurement

Charles County is committed to ensuring that Minority and Women-Owned Business Enterprises are provided equal opportunity to participate in the County's procurement and contracting processes. Any instances of overt or perceived discrimination should immediately be reported to the MWBE/DBE Compliance Manager.

Per Resolution 2023-13, Section 8, Item 4.1, the SLMBE Programs Division is authorized to investigate such complaint. An investigation may also be initiated based solely on a finding of a significant statistical disparity from the Annual Aspirational

Goal or contract/project goal(s), as detailed herein. The details of any investigation, including findings, shall be recorded and maintained by the SLMBE Programs Division.

All Contractors must cooperate with any investigations or audits conducted by authorized entities to assess compliance with anti-discrimination laws and policies. Non-compliance may result in sanctions, including but not limited to contract termination, suspension, or debarment from future contracts.

Certification of Compliance

By submitting a response to this solicitation, the Contractor agrees not to engage in any discriminatory practices and affirms that it has implemented policies and/or procedures to prevent discrimination in its operations. The Contractor further agrees to provide evidence of such policies/procedures upon request.

Reporting Discrimination

Discrimination in any form is strictly prohibited in Charles County. Charles County staff, prime contractors, subcontractors, or any individuals otherwise engaged in the procurement process are strictly prohibited from discriminating against any business or individual based on, but not limited to the following: race, color, religion, sex, sexual orientation, gender identity, gender expression, national origin, age, disability, marital status, political affiliation, veteran status, or any other characteristic protected by applicable law. Legitimate denial of a bid or not being selected for a procurement opportunity is not considered discrimination.

If anyone is a victim of discrimination, in any form, a request must be submitted to the MWBE/DBE Compliance Manager.

Anyone submitting a discrimination complaint must submit a complaint using the “MWBE Discrimination Reporting Form”.

You can request a form from the MWBE/DBE Compliance Manager. Any individual or firm discriminating against another could face any of the following penalties including, but not limited to: sanctions, contract termination, suspension, and/or debarment from future contracts. If necessary, the case can also be referred to the County Attorney and/or the County Administrator for further action.

Notification of Accusation and/or Finding of Discrimination

Once a discrimination complaint is received by the Purchasing Division and the MWBE/DBE Compliance Manager, the accused will be notified in writing that they; a) have been accused of discrimination, b) will have an opportunity to provide a defense against the accusation; c) must comply with all requests from investigators; d)are prohibited from taking any adverse actions against an accuser; and e) have a right to appeal a finding of discrimination.

3. TECHNICAL PROPOSAL SUBMISSION CONTENT

Cost information shall not be included in the Technical Proposal.

3.1. Technical Proposal Instructions

At a minimum, each technical proposal shall include the following items in the stated order; all pages shall be numbered; using font size of eleven (11) point or larger, printable one sided on 8.5” x 11” size paper and all the listed components must be included.

Do not provide references to other section/tabs, documents or websites for the information required; information should be specifically included in the RFP response. Technical proposals which do not include all components or use the proper format may be considered non-responsive and therefore not reviewed or considered for award.

Provide a Table of Contents with the specified tabs, page numbers, and content below for each tab.

3.2. Tab 1 - Cover Letter

The cover letter shall not exceed two (2) pages and shall include the following:

a. Names, main role and license or certification information of the Project Team (including the Lead Construction Firm and Lead

Design Firm), and other firms that are now being committed to the Offeror/Design-Builder.

b. The primary and secondary individual contacts for the Project Team (including the Lead Construction Firm and Lead Design

Firm) with addresses, phone numbers, and e-mail addresses where all communications from the County should be directed to.

3.3. Tab 2 - Organizational Structure

The Offeror shall provide an organization chart both graphically and in narrative format, that provides a description of the Offeror’s proposed organizational structure for this project including subconsultants and subcontractors. The organizational chart shall depict the relationship of its key personnel roles to that of the Principal and other key members of the management team. The organizational chart shall provide the names and affiliations of the proposed staff for each position on the chart. This section shall not exceed four (4) pages including the organizational chart. Primary roles that should be identified include at a minimum:

a. Design-Build Project Manager.

b. Design Manager.

c. Civil Design Lead.

d. Mechanical Design Lead.

e. Architectural Design Lead.

f. Structural Design Lead.

g. Electrical Design Lead.

h. Construction Project Manager.

i. Construction Superintendent.

j. Subconsultants and Subcontractors.

Information to be provided in this section shall include:

* Professional, relevant qualifications of each team member.

* Role and responsibility of each team member.

* Office location and number of years employee has worked with their current firm and any previous firms.

* Available time (in percentage) that each team member may commit to these services.

3.4. Tab 3 - Project Team Key Personnel Qualifications

The Offeror shall submit two (2) page resumes indicating the minimum experience required for each Key Personnel position identified below.

Resumes which shall be submitted as follows:

a. Individual Name and Position Title.

b. Professional Background.

c. Current and Past Relevant Employment.

d. Education.

e. Certification(s).

f. List of Relevant projects, including at minimum:

* Client name.

* Project description.

* Role of the individual.

* Project actual or expected completion date.

* Construction dollar value.

* Size of facility (average MGD).

Submission of these names constitutes a commitment to use these individuals if the Offeror is selected, and changes may be made only with the prior written consent of the County.

Project Team Key Personnel Qualifications:

1. Design-Build Project Manager

Have a minimum of fifteen (15) years of related experience, including overseeing a minimum of three (3) completed projects involving major process equipment, electrical, and control systems, with construction value over two million dollars ($2,000,000) for each project, at municipal water or wastewater treatment plants with rated capacity of five (5) mgd or greater is required. At least one of the projects used to meet this experience requirement must be a design-build project. Emphasize Design-Build experience. Possession of a DBIA Design-Building Processional certification is recommended, but not required. “Completed” means accepted and final payment issued by the Owner.

2. Design Manager

Possesses a current Maryland Professional Engineer license and a minimum of fifteen (15) years of related experience, including overseeing a minimum of three (3) completed design projects involving major process equipment, electrical, and control systems, with construction value over two million dollars ($2,000,000) for each project, at municipal wastewater treatment plants with rated capacity of five (5) mgd or greater. “Completed” means accepted and final payment issued by the Owner.

3. Engineering Discipline Leads

Each engineering discipline lead shall possess a current Maryland Professional Engineer or Architect license and a minimum of ten (10) years of related experience in design of municipal water or wastewater treatment plants with rated capacity of five (5) mgd or greater. The following discipline leads shall be included at a minimum: Civil, Mechanical, Structural, Architectural, Electrical.

4. Construction Project Manager

Possesses a minimum of ten (10) years of related experience, including overseeing a minimum of three (3) completed construction projects involving major process equipment, electrical, and control systems, with construction value over two million dollars

($2,000,000) for each project, at municipal wastewater treatment plants with a rated capacity of five (5) mgd or greater.

“Completed” means accepted and final payment issued by the Owner.

5. Construction Superintendent'

Possesses a minimum of ten (10) years of related experience, including overseeing a minimum of three (3) completed construction projects involving major process equipment, electrical, and control systems, with construction value over two million dollars

($2,000,000) for each project, at municipal water or wastewater treatment plants with rated capacity of five (5) mgd or greater.

“Completed” means accepted and final payment issued by the Owner.

6. Subconsultants and Subcontractors

For proposed subconsultants and subcontractors, provide the name of each company, the office location, contact name and telephone number, and the services to be provided. Subconsultants and major subcontractors to be utilized in the execution of the project must be clearly identified with services to be provided within the organizational structure. Provide relevant qualifications for up to five projects for each subconsultant and major subcontractor proposed as part of this project team. Projects listed should demonstrate prior successful teaming with the Offeror. Linestop subcontractor shall meet special minimum requirements as listed in Appendix A - Scope of Work.

Reference Section 9.2 Business Relationships for information regarding the subcontractor role in this Project. The Prime

Contractor will be held solely responsible for the performance and quality of workmanship for all subcontractors.

Experience and reference requirements of the two main subcontractors:

a. Standpipe manufacturer -> minimum of 10 years of experience, minimum of 10 welded steel standpipes of equal or greater capacity in successful services for 10 years.

b. Tapping and Linestop manufacturer -> minimum of 10 years of experience, minimum of two linestops on pipelines of equal size or larger and the same material within the past eight years.

3.5. Tab 4 - Experience - Lead Design Firm Experience/Qualifications

The Offeror/Design-Builder must demonstrate their experience with detailed descriptions. Information that is not detailed or relevant will not be considered acceptable. Consideration will only be given to projects completed under the prospective Lead

Design Firm’s current name with current principals, unless otherwise approved by the County. This section shall not exceed six (6) pages.

The Offeror must have demonstrated design experience working on projects of similar scope and complexity including:

a) A minimum of three (3) completed detailed design projects major process equipment, electrical, and control systems, with construction valued over two million dollars ($2,000,000) for each project, at municipal wastewater treatment plants with rated capacity of five (5) mgd or greater. “Completed” means accepted and final payment issued by the Owner.

b) At least one of the projects used to meet this experience requirement must be a design-build project.

c) If design experience used to meet this requirement is from a Subcontractor, note Subcontractor’s relationship to the Offeror and detail all prior working experience together.

d) All submitted reference projects shall have been completed after January 1, 2015.

e) For each reference project, provide the following information at a minimum:

i. Owner’s name.

ii. Owner’s contact person name, address, telephone number, and email address.

iii. Title and description of the project.

iv. Description of the services provided.

v. Role and responsibility of proposed staff.

vi. Completion date.

vii. Engineer’s opinion of probable cost vs actual construction cost.

viii. Engineer’s estimated project schedule vs actual project schedule.

ix. Change order history, including reasons for additional cost and/or duration.

3.6. Tab 5 - Experience - Lead Construction Firm Experience/Qualifications

The Offeror/Design-Builder must demonstrate their experience on comparable projects with detailed descriptions. Information that is not detailed or relevant will not be considered acceptable. Consideration will only be given to projects completed under the prospective Lead Construction Firm’s current name, unless otherwise approved by the County. This section shall not exceed six

(6) pages.

The Offeror must have demonstrated construction experience working on projects of similar scope and complexity including:

a) A minimum of three (3) completed construction projects with major process equipment, electrical, and control systems, with construction contract value over two million dollars ($2,000,000) for each project, at municipal water or wastewater treatment plants with rated capacity of five (5) mgd or greater. “Completed” means accepted and final payment issued by the Owner.

b) At least one of the projects used to meet this experience requirement must be a design-build project.

c) Consideration will only be given to projects performed under the lead construction firm’s current name with current principals, unless otherwise approved by the County.

d) Offerors must submit a copy of their valid Maryland Contractor’s license or demonstrate their ability to acquire a valid Maryland

Contractor’s license prior to award of the contract.

e) All submitted reference projects shall be completed after January 1, 2015.

f) For each reference project, provide the following information at a minimum:

i. Owner’s name.

ii. Owner’s contact person name, address, telephone number, and email address.

iii. Title and description of the project.

iv. Description of the services provided.

v. Role and responsibility of proposed staff and subcontractors.

vi. Completion date

vii. Initial cost vs actual construction cost.

viii. Initial schedule vs actual project schedule.

ix. Change order history, including reasons for additional cost and/or duration.

3.7. Tab 6 - Technical Approach/Proposed Concept

a) Technical Narrative of Planned Improvements not to exceed five (5) pages.

b) Innovation and Value Engineering Concepts not to exceed three (3) pages.

c) Preliminary Process Flow Schematic.

d) Preliminary Hydraulic Profile and associated calculations for the standpipe and effluent force main based on the design criteria stated herein. The Preliminary Hydraulic Profile shall indicate the water surface elevation (and therefore the freeboard) within the standpipe.

e) Preliminary Design Drawings with Drawing List.

f) Proposed temporary effluent force main bypass written approach during construction.

g) Proposed Equipment List (including manufacturer and model number).

h) Catalog Cuts for Proposed Major Equipment.

i) Preliminary Process & Instrumentation Diagram (P&ID).

j) Preliminary Process Control Narratives.

k) Proposed materials of construction for all major construction materials including, but not limited to, foundations, supports, platforms, stairs, ladders, guardrails, pipes, valves, vaults and hatches.

l) Proposed finish schedule for all new standpipe surfaces, vault surfaces, and equipment.

m) Clarify any equipment items which may require early release prior to 100% design and detail why.

3.8. Tab 7 - Proposed Schedule

a) Provide a single proposed schedule including design and construction durations based on an assumed design Notice to Proceed date of July 15, 2026, through Substantial Completion. The assumed Notice to Proceed Date is for evaluation purposes only.

b) Proposed design schedule shall not exceed two hundred seventy (270) consecutive calendar days, inclusive of obtaining required permits for construction.

c) Include proposed dates for all required design submittals and permit applications. All interim and final permit submittals shall be shown on the schedule along with assumed permit review durations. In no case shall permit review durations be less than eight

(8) weeks for County agencies and twelve (12) weeks for State agencies.

d) Design submittals shall follow a 60%/90%/100% format.

e) Allow at least two (2) weeks following each design submittal before a design review meeting is scheduled.

f) Construction should be anticipated following receipt by the County of 100% Design Submission including signed/sealed design documents incorporating all comments from the 90% County review and receipt of all approved permits required for construction.

g) Construction shall start no later than two hundred seventy (270) consecutive calendar days from the Notice to Proceed, following completion of the design phase and receipt of all necessary permits. Proposed construction schedule shall not exceed four hundred twenty (420) consecutive calendar days from start of construction to Substantial Completion.

h) Schedule shall include all required construction tasks in sufficient detail to demonstrate a thorough understanding of project approach.

i) Schedule shall indicate fabrication release dates for critical equipment.

j) Schedule shall include sufficient time for testing and startup activities.

k) Schedule shall include programming if necessary.

l) Schedule shall clearly indicate Critical Path to Substantial Completion.

3.9. Tab 8 - Ability to Manage Construction Safety Risk

a) Approach for anticipating, recognizing, eliminating/mitigating, and proactively managing and controlling safety risks during construction not to exceed three (3) pages.

b) Detail safety resources and plans specific to this project not to exceed two (2) pages. Note: a formal Site-Specific Safety Plan will be requested following Notice to Proceed.

c) Safety history not to exceed two (2) pages. Include at a minimum Experience Modification Rating (EMR), Total Recordable

Incident Rate (TRIR).

3.10. Tab 9 - Additional Items

Other information you deem relevant.

4. ORIGINAL PROPOSAL SUBMISSION CONTENT

Any information identified as “Confidential” shall be noted by reference and appended to the Proposal Submission. Each item identified as “Confidential” shall be accompanied by an explanation. Refer to Public Information Act/Confidentiality Notice section.

A complete original proposal package shall include all information and forms identified on the County’s eProcurement Portal, including but not limited to:

4.1. Original Proposal Instructions

The original proposal shall be considered the items listed in this Section. All forms must be completed. signed, and submitted.

Indicate "NA" on the form if it is "Not Applicable" and sign and date it. Original proposals which do not include all components or use the proper format may be considered non-responsive and therefore not reviewed or considered for award.

4.2. Cost Proposal Form

Proposal pricing shall be submitted on the Cost Proposal Form. All cost columns of the table shall be fully completed to be able to submit a proposal response. All pricing shall be rounded to the nearest whole cent (e.g. $.01). There shall be no hidden costs.

Prices shall include all profit, overhead, equipment, transportation cost, etc. An Offeror may only submit one (1) Cost Proposal

Form in response to this solicitation. Each item on the form shall contain only one value. “Or Equal” items, if applicable, shall be noted on the Cost Proposal Form.

4.3. Vendor Disclosure Form

This form shall be completed in legible ink or typewritten and signed.

4.4. Bid Bond

A five percent (5%) Bid Bond from a surety licensed to do business in the State of Maryland and satisfactory to the County shall accompany the proposal or the proposal will not be considered. The County may accept certified check, or bank

Cashier’s/Treasurer’s Check if submitted to the Purchasing Division office prior to the due date and time for proposals in a sealed envelope specifying the name of the offeror and solicitation number on the front of the sealed package. Certified checks or bank

Cashier’s/Treasurer’s Check shall be submitted as follows:

Purchasing Representative – Bid Bond

Charles County Government

Purchasing Division – Room B130

200 Baltimore Street

La Plata, MD 20646

Bid Bonds shall have the accompanying Power of Attorney. Bid securities shall be returned promptly after the County and the selected Offeror have executed the contract, or, if no Offeror’s proposal has been selected within one hundred-twenty (120) consecutive calendar days after the date of the opening of proposals, upon the demand of the Offeror at any time thereafter, as long as the Offeror has not been notified of acceptance of his proposal. The Offeror, to whom the contract shall have been awarded, shall be required to execute the contract in accordance with the terms and conditions herein. If the Offeror selected for award fails or refuses to execute the contract and/or fully comply with requirements of this solicitation their bid security shall be forfeit to the

County as liquidated damages in accordance with the terms and conditions contained herein.

4.5. Reference Form

Offeror shall be required to complete and submit the County provided Experience Form. A qualified Offeror must have requisite experience for the work as described in the Special Provisions and must be actively engaged as a legal entity in this field for a period of no less than ten (10) years at the due date for quote/bid/proposal. Offerors shall demonstrate their experience on the Experience Form. Offerors shall provide no less than number six (6) projects completed within the past number ten (10) years of equal or greater magnitude, as deemed acceptable by the County at its sole discretion, as specified in Item A below. All blank spaces of the form shall be fully completed in legible ink or typewritten.

https://procurement.opengov.com/portal/charlescountymd/projects/268896/document?section=2591139 https://procurement.opengov.com/portal/charlescountymd/projects/268896/document?section=2591139

Experience shall be that of the prime contractor unless otherwise specified. Experience of subcontractors may not be used as experience of the prime. The County shall accept experience of subcontractor only in those areas specified otherwise, if applicable.

As applicable: On-going service contracts for the services specified may be considered a “Completed” project if the base term of the contract has been fully completed, purchase orders issued and tasks fully completed during the contract term, and the contract renewed by the issuing agency. Each Offeror is solely responsible for providing any and/or all information/documents demonstrating completion and/or requested by the County in order to confirm the validity of references provided.

A. Provide at a minimum references that demonstrate the Prime Contractor's experience managing the following:

1. Lead Construction Firm Experience: A minimum of three (3) completed representative projects that demonstrates the Offeror's experience in all of the following areas:

The Design-Builder must demonstrate their experience on comparable projects with detailed descriptions. Information that is not detailed or relevant will not be considered acceptable. Consideration will only be given to projects completed under the prospective Lead Construction Firm’s current name, unless otherwise approved by the County. The Offeror must have demonstrated construction experience working on projects of similar scope and complexity including:

a) A minimum of three (3) completed construction projects with major process equipment, electrical, and control systems, with construction contract value over two million dollars ($2,000,000) for each project, at municipal water or wastewater treatment plants with rated capacity of five (5) mgd or greater. “Completed” means accepted and final payment issued by the Owner.

b) At least one of the projects used to meet this experience requirement must be a design-build project.

2. Lead Design Firm Experience: A minimum of three (3) completed representative projects that demonstrates the Offeror's experience in all of the following areas:

The Design-Builder must demonstrate their experience on comparable projects with detailed descriptions. Information that is not detailed or relevant will not be considered acceptable. Consideration will only be given to projects completed under the prospective Lead Construction Firm’s current name, unless otherwise approved by the County. The Offeror must have demonstrated construction experience working on projects of similar scope and complexity including:

a) A minimum of three (3) completed construction projects with major process equipment, electrical, and control systems, with construction contract value over two million dollars ($2,000,000) for each project, at municipal water or wastewater treatment plants with rated capacity of five (5) mgd or greater. “Completed” means accepted and final payment issued by the Owner.

b) At least one of the projects used to meet this experience requirement must be a design-build project.

4.6. Minority and Women-Owned Business Enterprise (MWBE) Program - MWBE

Mandatory Goals or Good Faith Effort (GFE)

Forms shall be completed in legible ink or typewritten and signed. Proposals submitted without a COMPLETED MWBE

Compliance Plan Forms or Good Faith Effort (GFE) forms may be rejected as non-responsive by the County.

Offerorss can contact the Economic Development Department by email at mwbe@meetcharlescounty.com for questions related to the County's MWBE program.

T…