832170renoHabc.pdf

PDF 183 KB Posted

Attached to
Vacant Unit Renovations - 1 Unit at Westport
Solicitation number
PUR-1806-26
Issued by
Baltimore City, Maryland

About this file

This is an Invitation for Bid (IFB PUR-1808-26) issued by the Housing Authority of Baltimore City (HABC) for the renovation of a vacant unit located at 2411 Maisel Court in Baltimore, Maryland. The project encompasses comprehensive renovation work including general construction, bathroom and kitchen upgrades, mechanical and plumbing repairs, electrical work, doors and windows installation, painting and drywall repair, and flooring installation. Specific work items include removal of trash and existing appliances, installation of roll shades and closet shelving, replacement of exhaust fans and toilets, installation of new cabinetry and countertops, supply and installation of a range hood and kitchen sink, electrical upgrades including switches, receptacles, smoke detectors, and LED light fixtures, interior door installation, and installation of luxury vinyl flooring with baseboards and trim throughout the unit. A mandatory site visit is scheduled for Tuesday, July 14, 2026 at 11:00 a.m. at 2411 Maisel Court, with Trent Marshall (443-992-0539) serving as the contact person. Bids must be submitted via Bonfire by 2:00 p.m. EST on Tuesday, July 21, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with a completion deadline of 30 calendar days from the Notice to Proceed.

The contractor must provide all labor, materials, supervision, equipment, insurance, and permits including a Unit of Occupancy (U&O) permit. All work must comply with federal, state, and local regulations, including the EPA Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules and the applicable General Wage Decision (MD20260061). The successful bidder must comply with HABC's Service Contracts Insurance Requirements, name HABC as additionally insured, and provide certified copies of insurance policies prior to contract execution. HABC reserves the right to reject any or all bids, waive minor irregularities, make single or multiple awards, or cancel the solicitation at any time. The bid sheet requires bidders to complete their name, address, telephone number, and have an authorized official sign and date the submission. No specific budget amount is listed in the document; bidders must fill in their total bid amount on the bid sheet.

View the file

Other files

File Type Posted
832165itHabc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Housing Authority of Baltimore City Invitation for Bid

PUR-1808-26

Renovation of 2411 Maisel CT

Bid Sheet

The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations.

2411 Maisel CT

General:

1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit.

2. Supply and Install roll shades in all windows

3. Remove all existing appliances and range hood

4. Install closet shelving/closet rod as necessary

5. Paint interior handrail in stairwell of unit

6. Final Cleaning of Entire Unit to Make Ready for Occupancy.

Bathrooms:

1. Replace Each Exhaust Fan bathroom

2. Supply and Install Vanity Cabinet w/ Vanity Bowl and faucet

3. Supply and install one (1) new 16-inch elongated toilets and toilet seats

4. Supply Install one (1) New Medicine Cabinet with Mirror

5. Supply Install one(1) sets bathroom Accessories, Non-UFAS

6. Supply and Install new bathtub, Install 12x12 Grey Stone Ceramic tile up to ceiling

7. Supply and Install Delta Tub Faucet

Kitchen:

1. Supply and Install kitchen cabinet base and wall cabinets

2. Supply and Install Postformed Wilsonart Black Granite Laminate countertops

3. Supply and Install Broan #4100 range hood

4. Supply and Install Black backsplash behind stove

5. Supply and install single bowl stainless steel kitchen sink and faucet

Mechanical / Plumbing:

1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks.

2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit

3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) run snake through sink in kitchen and Bathroom drainpipes

Electrical:

1. Supply and Install all Switches / Receptacles, GFI’s, Blanks, Cable and/AC cover plates. (White)(No

Jumbo/regular size)

2. Check Electric Service Panel for Gaps/Missing Breakers/Doors.

3. Supply and Install smoke Detector / 10 Year Lithium in each bedroom and Smoke & Co combination in other areas

4. Supply and Install All new light fixtures in Bedrooms, Hallways, Dinning room, and Kitchen with LED Integrated light fixtures

Doors & Windows:

1. Supply and Install interior doors and hardware throughout unit

Painting/Drywall Repair:

1. Supply all materials to Paint the Entire Units to Include:

• Walls and ceilings shall be painted with two finish coats eggshell latex.

• Kitchen and bathroom walls & ceilings, and all doors, wood windows and wood trim shall receive a semi-gloss final finish coat.

• The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management.

• Paint shall be Sherwin Williams “Pro-Mar 200” in HABC Antique White color (or brand of equal color, finish, durability, etc.).

• The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint

Renovation, Repair and Painting (RRP) Program Rules.

Flooring:

1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit, Item Description-

PELICAN 7x48 ITEM# VTRHDPELICA7x48 SKU# 1004 343 811

2. Supply and Install all stair treads and risers

3. Supply and install 4” baseboards and 3/4 quarterRound shoe molding and caulk throughout unit.

Total Bid Amount: $________________

Site Visit is Tuesday, July 14, 2026 @ 11am, starting at 2411 Maisel Ct. Contact person is Trent Marshall 443-992-0539.

Notes:

• Contractor must be in compliance with Attachment- 2 General Decision Number: MD20260061, Modification No. 0, Date of Modification 05/18/2026.

• The Successful Bidder must be in compliance with Attachment-3 HABC Service Contracts-

Insurance Requirements (A through C), and upon notification of award, must name the Housing Authority as additionally insured as related to work performed under this contract.

• Contractors and their respective staff are required to have photo ID while working on HABC sites.

• Contractor will always be responsible for protecting the work area or site and maintaining it in a safe condition.

• Contractor shall always keep work area or sites free from accumulation of excess debris.

• Upon completion of the work, or at the end of the day, whichever is less, Contractor shall leave all work areas secured.

• Contractor shall be aware that children, elderly, and the disabled may be present at work area or site.

• Contractor is solely responsible for the security of all equipment, material and premises during the performance of the work.

Attachment - 1 HABC Service Contracts- Insurance Requirements Attachment - 2 General Wage Decision - MD20220061 Dated 05/18/2026.

Attachment - 3 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier

Covered Transactions Attachment – 4 Form HUD-5370-EZ General Contract Conditions for Small Construction/Development Contracts Attachment - 5 Section 3 Clause Attachment - 6 Section 3 Requirements

Fix completion date of 30 days upon NTP date:

Name, Address and Telephone Number of Bidder

Printed Name and Title of Authorized Official of Bidder

Signature of Authorized Official of Bidder Date

Please complete the appropriate information, sign and return via Bonfire by 2:00 p.m. EST on Tuesday July 21, 2026.

AWARD OF CONTRACT

Contract Award: HABC will analyze bids and award a requirements contract to the lowest responsive and responsible bidder. In addition, HABC reserves the right to take any of the following actions without liability to any bidder:

(1) HABC may: (a) reject any and all bids received; (b) waive any minor irregularities or technicalities in bids received;

(c) make a single award or multiple awards to more than one (1) bidder for supply of all or any combination of the items delineated in Attachment 1; (d) accept any item or combination of items bid unless precluded elsewhere in the solicitation; (e) amend this solicitation as permitted by applicable law at any time during the solicitation process; or (f) cancel this solicitation in its entirety or any portion thereof at any time during the solicitation process including after award. HABC's reservation of rights shall in no way affect the formation of a contract upon written notice of award by HABC to the successful bidder. If multiple awards are made, the intent shall be to make awards which, at the sole determination of HABC, are in its best interest, based on HABC’s needs and requirements. HABC makes no guarantees as to amount of award, if any.

(2) HABC may reject any bid as unacceptable if it is materially unbalanced as to the prices for the various items of work to be performed. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

Term of Contract: The Contractor proposes to substantially complete all the work within Thirty (30) calendar days after issuance of the Notice to Proceed. Signature: ________________________________

Proof of Insurance: The successful bidder shall furnish to HABC a certified copy of the policy or policies covering all work as required in the contract, as evidence that the insurance required is maintained and in force for the entire duration of the contract. HABC may, at its sole discretion, immediately cancel the contract award without prior notice to the successful bidder upon any failure to submit any of the required Certificates of Insurance or any other document required under the IFB. Any and all existing agreements between HABC and the successful bidder shall immediately become null and void upon such cancellation without liability to such bidder. (see attached Service Contract – Insurance Requirements)

Invitation for Bid
PUR-1808-26
Renovation of 2411 Maisel CT
Bid Sheet
AWARD OF CONTRACT

File details come from the government source that posted it. Updated .