Voter Machine Warehouse Elevator Addition – Technical Specifications
This is a technical specifications document for the County of Delaware, Pennsylvania's Voter Machine Warehouse Elevator Addition project (eDPW-081226)-2. The project scope encompasses an Alteration Level II to an existing two-story commercial warehouse building, which includes the installation of a service elevator, repairs and/or addition of an exterior window, interior floor and wall modifications, and removal of an existing two-story freight lift. The specifications document provides detailed requirements for elevator installation, including hoistway dimensions, equipment specifications, safety features, and compliance with applicable codes and standards. The document establishes the technical parameters that bidders must follow to ensure the elevator addition meets all functional and safety requirements for the warehouse facility.
The specifications detail mechanical and electrical requirements for the elevator system, including power supply, control systems, door mechanisms, and safety devices. All work must comply with Pennsylvania Building Code, National Elevator Safety Code, and applicable local ordinances. The document specifies construction standards for the hoistway enclosure, floor reinforcement requirements, and integration with existing building systems. Bidders are required to provide equipment that meets or exceeds the outlined specifications, and any deviations must be submitted for approval by the County. The specifications serve as the binding technical document that will govern the installation and final acceptance of the elevator addition project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS & SPECIFICATIONS
FOR
CONTRACT NO. eDPW-081226
Voting Machine Warehouse Elevator Addition
Issued For Bidding June 18th, 2026
Prepared for:
The County of Delaware Department of Public Works Government Center Building
201 West Front Street Media, PA 19063
Prepared by:
NORR
One Penn Center
1617 JFK Boulevard, Suite 1600 Philadelphia, PA 19103 norr.com
Delaware County Council:
Richard R. Womack, Chair Christine A. Reuther, Vice Chair
Dr. Monica Taylor Elaine Paul Schaefer
Joanne Phillips
06-18-2026
Prepared by the County of Delaware Department of Public Works Issue
Voting Machine Warehouse Elevator 000101-1 Table of Contents
VOTING MACHINE WAREHOUSE ELEVATOR ADDITION
ISSUED FOR BIDDING, JUNE 18TH, 2026
Project Manual Table of Contents
Division 00 – Procurement and Contract Requirements
000101 - Table of Contents
Section A Invitation for Bids Section B Instructions to Bidders Section C Proposal Form Section D Insurance Requirements Section E Bid Guarantee Section F Consent/Agreement of Surety Section G Non-Collusion Affidavit Section H Ordinance of Financials Section I Public Works Diversity Goals Resolution Section J Ordinance 2022-7 Executed Section K Contractor Qualification Statement, AIA Form A305-2020 Section L Form of Contract Section M Bonds
• Labor & Materials Bond
• Maintenance Bond
• Performance Bond Section N Waiver of Liens Section O Statement of Surety Section P General Conditions Section Q Special Conditions Section R Standard Specifications Section S Special Provisions Section T Non-Discrimination/Sexual Harassment Clause
Appendix A1 Application and Certificate of Payment, AIA Document G702/CMa Appendix A2 Continuation Sheet, AIA Document G703 Appendix A3 Change Order, AIA Document G701/CMa Appendix A4 Certificate of Substantial Completion, AIA Document G704/CMa Appendix A5 Contractor’s Affidavit of Release of Leans, AIA Document G706A Appendix A6 Consent of Surety to Final Payment, AIA Document G707 Appendix A7 Contractor’s Qualification Statement, AIA Document A305 Appendix B1 Pennsylvania Prevailing Rate Determination Appendix B2 Bidder Checklist Appendix O Political Contribution Disclosure Form
Division 01 – General Requirements
011000 - Summary 012000 - Price and Payment Procedures 012300 - Alternates
012500 - Substitution Procedures
Voting Machine Warehouse Elevator 000101-2 Table of Contents
013000 - Administrative Requirements
013216 - Construction Progress Schedule 013553 - Security Procedures 014000 - Quality Requirements
014100 - Regulatory Requirements
014216 - Definitions
014533 - Code-Required Special Inspections and Procedures 015000 - Temporary Facilities and Controls 016000 - Product Requirements
016116 - Volatile Organic Compound (VOC) Content Restrictions 017000 - Execution and Closeout Requirements
017419 - Construction Waste Management and Disposal
017610 - Temporary Protective Coverings
017800 - Closeout Submittals
017900 - Demonstration and Training
Division 02 – Existing Conditions
024100 - Demolition
Division 03 – Concrete
033000 - Cast-in-Place Concrete 033511 - Concrete Floor Finishes
Division 04 - Masonry
042000 - Unit Masonry
Division 05 – Metals
051200 - Structural Steel Framing 053100 - Steel Deck 055133 – Metal Ladders
Division 06 - Wood, Plastics, and Composites
061053 - Miscellaneous Rough Carpentry
Division 07 – Thermal and Moisture Protection
071300 - Sheet Waterproofing 072100 - Foam Board Insulation 075400 - Thermoplastic Membrane Roofing 078400 – Firestopping 079200 – Joint Sealants
Division 08 – Openings
081113 - Hollow Metal Doors and Frames
Voting Machine Warehouse Elevator 000101-3 Table of Contents
Division 09 – Finishes
092116 - Gypsum Board Assemblies 099123 - Interior Painting
Division 14 – Conveying Equipment
142100 - Electric Traction Elevators
Division 21 – Fire Suppression
210500 - Common Work Results for Fire Suppression 210553 - Identification for Fire Suppression Piping and Equipment 211100 - Facility Fire-Suppression Water-Service Piping 211300 - Fire-Suppression Sprinkler Systems
Division 22 – Plumbing Piping
220517 - Sleeves and Sleeve Seals for Plumbing Piping 220529 - Hangers and Supports for Plumbing Piping and Equipment 220553 - Identification for Plumbing Piping and Equipment 221005 - Plumbing Piping 221006 - Plumbing Piping Specialties 221429 - Sump Pumps
Division 23 – Heating, Ventilating, and Air-Conditioning (HVAC)
230529 - Hangers and Supports for HVAC Piping and Equipment 230553 - Identification for HVAC Piping and Equipment 230593 - Testing, Adjusting, and Balancing for HVAC 230719 - HVAC Piping Insulation 232113 - Hydronic Piping 232114 - Hydronic Specialties 233100 - HVAC Ducts and Casings 233300 - Air Duct Accessories 233423 - HVAC Power Ventilators
Division 26 – Electrical
260505 - Selective Demolition for Electrical 260519 - Low-Voltage Electrical Power Conductors and Cables 260526 - Grounding and Bonding for Electrical Systems 260529 - Hangers and Supports for Electrical Systems
260533.13 - Conduit for Electrical Systems
260533.16 - Boxes for Electrical Systems 260548 - Vibration and Seismic Controls for Electrical Systems 260553 - Identification for Electrical Systems 260583 - Wiring Connection 262726 - Wiring Devices 262813 - Fuses
Voting Machine Warehouse Elevator 000101-4 Table of Contents
262816.13 - Enclosed Circuit Breakers
262816.16 - Enclosed Switches 262913 - Enclosed Controllers 265100 - Interior Lighting
Division 28 – Electronic Safety and Security
284600 - Fire Detection and Alarm
Prepared by the County of Delaware Department of Public Works IFB 03-04-2026
Voting Machine Warehouse Elevator 1 Invitation for Bids
Advertisement
Sealed bids will be received through PennBid™ by Delaware County for The VOTING MACHINE WAREHOUSE ELEVATOR ADDITION, until 11:00 AM, prevailing time, on August 12th, 2026.
All documents and solicitations details are available online anytime at no cost at PennBid™ (https://pennbid.procureware.com). Note, PennBIDTM assesses a fee to the bidder who is issued the award. Click on the “Solicitations” and “View” tabs.
Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same.
The Project represents an Alteration Level II to an existing two story commercial warehouse building. The alteration will include the addition of a service elevator, repairs to/addition of an exterior window and interior floor and walls, and removal of an existing two story freight lift.
Bids must be submitted unconditionally. No bidder may withdraw bid within SIXTY (60) days after the scheduled closing time for receipt of bids.
The Owner reserves the right to waive any informalities, or to reject any or all bids.
Voting Machine Warehouse Elevator 2 Invitation for Bids
CONTRACT
Invitations for Bids for
The undersigned Delaware County Council will receive sealed bids electronically through PennBidTM until 11:00AM, on August 12th,2026, for the VOTING MACHINE
WAREHOUSE ELEVATOR ADDITION.
Failure to accompany this bid with an appropriate bid security noted above will automatically disqualify the bidder.
The contractor shall list related experience with appropriate references and complete the attached AIA Document A305 and submit with bid. In addition, the bidder shall submit with his bid a written statement describing his Apprentice Training Program and Affirmative Action Program. In accordance with the County of Delaware Ordinance No 2022-7.
All documents and solicitation details are available and open to public inspection at PennBidTM (https://pennbid.procureware.com). Click on the “Solicitations” and “View” tabs. The bidder who is awarded the contract will be required to pay a fee to PennBidTM.
The names of those who have secured plans/specifications may be obtained at PennBidTM.
The Project represents an Alteration Level II to an existing two story commercial warehouse building. The alteration will include the addition of a service elevator, repairs to/addition of an exterior window and interior floor and walls, and removal of an existing two story freight lift.
All workmen performing work on this project shall be paid the general minimum Prevailing Wage Rates supplied herein, as determined by the Secretary of the Pennsylvania Department of Labor and Industry, in accordance with the Regulations for Pennsylvania Prevailing Wage Act.
There will be an on-site Pre-Bid Conference at 11:00AM on July 7th, 2026. This conference is not mandatory but is highly encouraged.
Questions may be asked through the PennBID system. The final date to submit questions is 2:00pm on July 21th, 2026.
If you are a person with a disability and wish to attend the bid opening, and require an auxiliary aid, service or accommodation to observe or participate in the bid opening proceedings, please contact Delaware County Department of Public Works to discuss how your needs can best be accommodated.
The Delaware County Council reserves the right to reject any and all bids or parts thereof and to determine whether the quality and type of equipment and/or service to be furnished meet the requirements for which it is intended. They further reserve the right to insist or waive any technicalities required for the best interest of the County and to consider competency and responsibility of the bidder before the award of the Contract and award bids accordingly.
06-18-2026 eDPW-081226 barbara.malewicz Text Box The Pre-Bid Conference will held at 403 East 24th Street, Chester, PA 19013.
Voting Machine Warehouse Elevator 3 Invitation for Bids
Delaware County Council:
Dr. Monica Taylor, Chair Richard R. Womack, Vice Chair
Kevin M. Madden
Christine A. Reuther
Name and Address of Bidder
Phone Number
Terms (if offered, list here):
barbara.malewicz Text Box Richard R. Womack, Chair Christine A. Reuther, Vice Chair Dr. Monica Taylor
Joanne Phillips
Voting Machine Warehouse Elevator 1 Instructions to Bidders
INSTRUCTIONS TO BIDDERS
1. PROJECT SCOPE
The complete description of the work required to complete this project is contained in the General Conditions, Standard Specifications, Special Provisions and Construction Plans.
2. TIME FOR COMPLETING WORK
The work under this contract must be completed (90) ninety consecutive calendar days from the date of the Official Notice-to-Proceed. All Bidders are notified that time is of the essence of this Contract. The successful Bidder will be required to so execute the work to ensure its completion within the above number of calendar days set forth.
3. BID INFORMATION
The Owner may consider non-responsive any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities in or reject any and all bids. A bid which is incomplete, obscure, conditioned, or which contains additions not called for, or irregularities of any kind, including alterations or erasures, may be rejected. Any bid received after the time and date specified shall not be considered.
In the event that there is a tie between two or more lowest responsible bidders, and the place of business of one is located in Delaware County and the other(s) is (are) located outside of the County, the Council may in their discretion opt to award the bid to the Delaware County bidder, all other relevant factors being equal.
Requests for Information are required to be submitted in writing seven (7) calendar days prior to bid opening via Pennbid at https://pennbid.bonfirehub.com.
No bid may be withdrawn within the twenty-four (24) hours prior to the bid opening.
The Contractor shall not transfer or sublet any portion of the work covered by these bid documents without written consent of the County.
4. BID SUBMITTAL FORMS
The Bid Submittal Forms consist of the following:
- Invitation to Bid
Voting Machine Warehouse Elevator 2 Instructions to Bidders
- Proposal Form for Unit Price Contract
- Bid Guarantee
- Consent / Agreement of Surety
- Non-Collusion Affidavit
- AIA Document A305 - 2020, Contractor’s Qualification Statement
- Financial Statement in accordance with A305 – 2020, Section 5.1.1
- Affirmative Action Program (Special Conditions No. 22)
5. PREPARATION OF BIDS
Bidders will be assumed to have carefully examined the Invitation for Bids, the Instructions to Bidders, the Form of Proposal, the Agreement, the General Conditions, Other Conditions of the Contract, the Standard Specifications, Special Provisions and the Construction Drawings for the work, all attached hereto, and to have carefully investigated physical conditions at the site and character of the work to be done and to have inquired fully into the difficulties of construction of the work before preparing their Proposal. The Owner will not be responsible for failure of the Contractor to properly estimate such difficulties and costs, or for overlooking any of the requirements of the Contract Documents.
If, in the Bidder’s opinion, any work is specified in such a manner as would make it impossible for him to guarantee to produce the required result; or should obvious and unintentional errors or omissions appear in Contract Documents, the Bidder shall refer the same in writing to the Engineer for a decision before submitting his bid. If the Bidder fails to make such reference, no extra charge thereafter will be allowed or excuse entertained for failure to carry out the work in an acceptable manner, or to produce the required results, or to remedy defects in the workmanship because of alleged impossibilities in the production of the results specified or because of inadequate or improper Specifications.
No oral interpretations of the meaning of the Contract Documents made to any prospective Bidder by any person will be binding upon the Owner to any extent or for any purpose and may not be relied upon by any prospective Bidder.
Every request for such interpretation should be in writing via the Pennbid website (https://pennbid.bonfirehub.com/login) by the posted deadline. Bidders are not permitted to directly contact the Design Professional or County Staff.
To be given consideration, each request must be received at least seven (7) calendar days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be given in the form of written Addenda to the Bid Documents which will be mailed by Certified Mail to all prospective Bidders (at the respective address furnished for such purposes) not later than three (3) calendar days prior to the date fixed for the opening of bids. Failure of
Voting Machine Warehouse Elevator 3 Instructions to Bidders any Bidder to receive any such Addenda or interpretations shall not relieve said Bidder from obligations with respect to the bid as submitted. All addenda so issued shall become part of the Contract Documents
6. CONDITIONS OF WORK
Each Bidder must inform himself fully of the conditions relating to the construction and labor under which the work will be performed; failure to do so will not relieve the successful Bidder of his obligation to furnish all material and labor necessary to carry out provisions of the Contract Documents and to complete the contemplated work for the consideration set forth in his bid.
Bidders are notified that it is obligatory upon them to obtain by their own means, information which they may require as to the existing physical conditions and, in particular, as to subsurface and groundwater conditions. Bids for all types of excavation are to be based on Unclassified Excavation which shall include all types of materials which are encountered, including, but not limited to weathered, decomposed, and sound bedrock; soil, gravel, and boulders; debris of any kind and organic matter.
7. ESTIMATED QUANTITIES
The quantities given in the Form of Proposal and attached to the Contract Documents are approximate only, being given as a basis for the uniform comparison of bids, and the Owner does not expressly or by implication warrant that the actual amount of work will correspond therewith.
8. CONTAMINATED SOILS
Should the Engineer agree that reasons exist to believe that contaminated soil is encountered in the excavation, the Owner shall, at his cost, engage the services of an environmental services company to assess the extent, if any, of the contamination of soils. If contamination is found to be present, the contaminated soils shall be separately stockpiled on and covered by plastic sheeting at the site for disposal by the Contractor.
Prepared by the County of Delaware Department of Public Works IFB 03-04-2026
Voting Machine Warehouse Elevator 1 Proposal Form
PROPOSAL
Contract No. Date: _______________
Council Members:
The undersigned hereby submits a proposal for Voting Machine Warehouse Elevator Addition, located at 403 East 24th Street, Chester, PA 19013, Delaware County, Pennsylvania, at the following price:
Having become completely familiar with the local conditions affecting the cost of Work at the place where Work is to be executed, and having carefully examined the site conditions as they currently exist, and having carefully examined the Bidding and Contract Documents prepared for this project, together with any Addenda to such Bidding and Contract Documents as listed hereinafter, the Undersigned hereby proposes and agrees to provide all labor, materials, plant, equipment, transportation and other facilities as necessary and/or required to execute all of the Work described by the Contract Documents for the above cited Contract for the lump sum consideration of:
________________________________________________________________Dollars ($__________________________), said amount being hereinafter referred to as the Base Proposal Amount.
Base proposal Amount includes Unit Price Items listed below, if applicable.
BID ALTERNATES
1. Replacement/repair of entire exterior window unit, as indicated on Architectural Drawings
2. Replacement of damaged existing windowpanes only, as indicated on Architectural Drawings
UNIT PRICES:
Item No. Quantity Item Description (Unit Price in words)
Unit Price Total Price eDPW-081226
Prepared by the County of Delaware Department of Public Works IFB 03-04-2026
Voting Machine Warehouse Elevator 2 Proposal Form
Item Description
TOTAL BASE BID
Dollars $
(The unit prices supplied above are required to be indicated in both words and figures. In the event of a discrepancy between the words and figures for a given item, the price shown in words will be accepted.)
• All items must be bid.
• A performance bond and a labor and materials bond in the amount of one hundred percent (100%) of the total amount bid, and a maintenance bond must be submitted by the successful bidder within ten (10) days from the bid award date.
Prepared by the County of Delaware Department of Public Works IFB 03-04-2026
Voting Machine Warehouse Elevator 3 Proposal Form
IF AND WHERE DIRECTED BID
Item Description
IF AND WHERE DIRECTED BID
Dollars $
It is understood that THE INSURANCE REQUIREMENTS ARE A CRITICAL PORTION OF THIS BID. THE REQUIREMENTS AS SET FORTH IN VARIOUS SECTIONS MUST BE SATISFIED. IT IS UNDERSTOOD
THAT NO EXCEPTIONS WILL BE MADE.
It is further understood that upon notice to furnish the County with the necessary Contract and Bonds, we will execute the attached Form of Contract and Bonds with the County of Delaware within twenty (20) calendar days after receipt of such notice.
Prepared by the County of Delaware Department of Public Works IFB 03-04-2026
Voting Machine Warehouse Elevator 4 Proposal Form
It is understood and agreed that the County Council reserves the right to reject any and all bids and that if the Successful Bidder fails to execute the attached Contract and Bond within twenty (20) calendar days after receiving notice from the County to do so, the County Council shall be free to notify the next lowest, responsible bidder. It is understood that if the Successful Bidder shall fail to execute a Contract as set forth in these General Condition, the deposit will be forfeited as liquidated damages. Award will be based on bids for the Base Bid(s) or a combination of Base Bid(s) and if and where directed.
It is understood that this Bid may not be withdrawn for a period of sixty (60) calendar days after the date of opening thereof.
A “Notice to Proceed” will be issued after the execution of the Contract, directing the General Contractor when they can commence work on the project. All completed work shall be in accordance with the schedule given in Section B, Instructions to Bidders, Time for Completing Work. Liquidated Damages (if any) shall be assessed as defined in the Special Conditions, Liquid Damages, for all days past this limit. It is understood that the County may, on its own decision or initiate, extend the completion date by giving notice of all parties to this Contract of its intention to extend.
Delaware County shall not be liable for any expenses, damages, or loss of profits, anticipated or otherwise.
It is understood that if our Bonding Company is not a Pennsylvania Company, the Bid Bond, Performance Bond and Payment Bond, must be countersigned by a Pennsylvania Resident Agent, with Power of Attorney so to do.
The undersigned acknowledges receipt of the foregoing Addenda and that he has prepared this bid accordingly.
Addendum No. Date
Insert the numbers of all addenda received - If none were received, insert the word "None"
It is understood that each bidder is to prepare and present satisfactory evidence of his experience, qualifications, and financial abilities to carry out the terms of the Contract. In addition, the Prime Contractor shall prepare and present satisfactory evidence of his qualification and references related to the work.
Material Safety Data Sheets (MSDS) must be submitted for respective products before award, in compliance with the Federal Hazard Communication Standard Act (29 CFR 1910, 1200) and various State Right-to-Know laws, as applicable.
Prepared by the County of Delaware Department of Public Works IFB 03-04-2026
Voting Machine Warehouse Elevator 5 Proposal Form
Our signature on this proposal page signifies that we have read and agree to comply with all parts of the Invitation, Instructions, Proposal, General Conditions, Special Conditions and Specifications of this Bid and will carry out all the conditions of the above.
The undersigned hereby certifies that this bid is genuine, and not a sham or collusive, or made in the interest or in behalf of any person, firm, or corporation not herein named; that the undersigned has not directly or indirectly induced or solicited any bidder to refrain from bidding, and that the undersigned has not, in any manner, sought by collusion to secure for himself an advantage over any other bidder.
It is understood that the Proposal Page must have two (2) signatures, and if the firm is a corporation, the corporate seal must also be affixed when submitting bid.
Respectfully submitted, FIRM NAME
SIGNATURE
TYPED NAME & TITLE
OFFICIAL ADDRESS
Telephone # FAX #
ATTEST:
Secretary or Assistant Secretary
Bidder will check whether the bid is by:
an individual ( ), partnership ( ), or corporation ( ).
NOTES:
If the Bidder is a partnership, the names of all members of the firm, as well as the trading name, shall be set forth. If the Bidder is a corporation, the Bid must be executed by the President or Vice-President, and attested by the Secretary or Assistant Secretary of the corporation, with the corporate seal applied. No other names will be accepted unless accompanied by the proper certification from the corporation permitting other than the President or Vice-President and Secretary to sign contracts. If the business is operated by a sole owner, only his signature is required, and it should be noted under signature that he is the sole owner.
Voting Machine Warehouse Elevator 1 Insurance Requirements
COUNTY OF DELAWARE
VENDOR/CONTRACTOR’S INSURANCE REQUIREMENTS
COMPREHENSIVE GENERAL LIABILITY
Before the Contract is awarded, the Contractor shall take out and maintain during the life of this Contract such Public Liability and Property Damage insurance as shall protect him and any sub-contractors, if any, performing work covered by this Contract, from all claims for loss arising form Property damage, personal injury and bodily injury including accidental death. Such Insurance Policy shall include Products and Completed Operations coverage and include coverage for damages that may arise from the Operations of the Contractor or by any sub-contractor or by anyone directly or indirectly employed by either of them. The Combined Single Limit of Liability required is $3,000,000 per occurrence with a deductible of no more than $1,000.
VEHICLES
Comprehensive Business Automobile Coverage shall be maintained with a Combined Single Limit of Liability in an amount no less than $1,000,000 per occurrence with no deductible.
CATASTROPHE UMBRELLA LIABILITY
One million dollars in excess of Primary General.
WORKER’S COMPENSATION
Worker’s Compensation Insurance required by Pennsylvania law covering all Owner’s employees and all employees of the general contractors and all sub-contractors. A current certificate of Exempt status from the Pennsylvania Department of Labor and Industry is acceptable if the Owner is an Exempt Self-Insurer in the State of Pennsylvania.
EMPLOYER’S LIABILITY INSURANCE:
Employer’s Liability Insurance with limits no less than $500,000 per accident or employee disease.
The County of Delaware shall be named as an additional insured on all policies insofar as the specified Contract is concerned. In addition, the Contractor shall furnish the County with a certificate of insurance showing the type, amount, class of operations covered, effective dates and dates of expiration. All policies should also contain a sixty
(60) day notice of cancellation clause.
NOTE:
If the owner maintains a self-insurance program or a limited self-insurance program for any or all of the exposures listed above, a complete description of the program with information on excess carriers and funding arrangements should be provided. In the event that the worker’s compensation is self-insured, a copy of the current exemption shall be provided.
Voting Machine Warehouse Elevator 1 Bid Guarantee
BID GUARANTEE
KNOW ALL MEN BY THESE PRESENTS, THAT WE, the undersigned, , as Principal, and held firmly bound unto as OWNER in the penal sum of for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.
Signed, this day of , 20 .
The Condition of the above obligation is such that whereas the Principal has submitted to The Delaware County Council a certain BID, attached hereto and hereby made a part hereof to enter into a contract in writing, for Voting Machine Warehouse Elevator
Addition located at 403 East 24th Street, Chester, PA 19013, Delaware County, Pennsylvania.
NOW, THEREFORE,
(a) If said BID shall be rejected, or
(b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said BID) and shall furnish a BOND for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith and shall in all other respects perform the agreement created by the acceptance of said BID, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation stated.
Voting Machine Warehouse Elevator 2 Bid Guarantee
The Surety, for value received, hereby stipulates and agrees that the obligations of said
Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set there hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set above.
Principal
Surety
By:
Voting Machine Warehouse Elevator 1 Consent Agreement of Surety
CONSENT/AGREEMENT OF SURETY
The undersigned __________________________________________________ Name of Surety Company a corporation organized and existing under the laws of
________________________________________ and authorized to do business in the Commonwealth of Pennsylvania do hereby consent and agree with
The County of Delaware that if the proposal of
____________________________________________________, for the project Name of Bidder
Voting Machine Warehouse Elevator Addition 403 East 24th Street, Chester, PA 19013 be accepted and a contract for said work be awarded to said bidder, it will, upon its being so awarded, become the surety for said Bidder on such surety bonds as are called for in the Bid Documents.
Signed and Sealed (Date)
Name of Surety Company
By: ___________________________ Attorney-in-fact
Voting Machine Warehouse Elevator 1 None-Collusion Affidavit
INSTRUCTIONS FOR NON-COLLUSION AFFIDAVIT
1. This Non-Collusion Affidavit is material to any contract awarded pursuant to this bid.
According to the Pennsylvania Antibid-Rigging Act, 73 P.S. 1611 et seq., governmental agencies may require Non-Collusion Affidavits to be submitted together with bids.
2. This Non-Collusion Affidavit must be executed by the member, officer or employee of the bidder who makes the final decision on prices and the amount quoted in the bid.
3. Bid rigging and other efforts to restrain competition, and the making of false sworn statements in connection with the submission of bids are unlawful and may be subject to criminal prosecution. The person who signs the Affidavit should examine it carefully before signing and assure himself or herself that each statement is true and accurate, making diligent inquiry, as necessary, of all other persons employed by or associated with the bidder with responsibilities for the preparation, approval or submission of this bid.
4. In the case of a bid submitted by a joint venture, each party to the venture must be identified in the bid documents, and an Affidavit must be submitted separately on behalf of each party.
5. The term “complementary bid” as used in the Affidavit has the meaning commonly associated with that term in the bidding process, and includes the knowing submission of bids lower than the bid of another firm, any intentionally low or noncompetitive bid, and any other form of bid submitted for the purpose of giving a false appearance of competition.
6. Failure to file an Affidavit in compliance with these instructions may result in disqualification of the bid.
Voting Machine Warehouse Elevator 2 None-Collusion Affidavit
NON-COLLUSION AFFIDAVIT
Contract/Bid No.
State of :
County of :
I state that I am of Title Name of Firm and that I am authorized to make this affidavit on behalf of my firm and its owners, directors, and officers. I am the person responsible in my firm for the price(s) and the amount of this bid.
I state that:
(1) The price(s) and amount of this bid have been arrived at independently and without consultation, communication or agreement with any other contractor, bidder or potential bidder.
(2) Neither the price(s) nor the amount of this bid, and neither the approximate price(s) nor approximate amount of this bid have been disclosed to any other firm or person who is a bidder or potential bidder, and they will not be disclosed before bid opening.
(3) No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, or to submit a bid lower than this bid, or to submit any intentionally low or noncompetitive bid or other form of complementary bid.
(4) The bid of my firm is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or other noncompetitive bid.
(5) ____________________________, its affiliates, Name of my firm Subsidiaries, officers, directors and employees are not currently under investigation by any governmental agency and have not in the last four years been convicted or found liable for any act prohibited by the State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as follows:
I ____________________state that ________________________________ Name of firm understands and acknowledges that the representations are material and important and will be relied on by Delaware County in awarding the contract(s) for which this bid is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from Delaware County of the true facts relating to the submission of bids for this contract.
Voting Machine Warehouse Elevator 3 None-Collusion Affidavit
Name
Company Position
SWORN TO AND SUBSCRIBED
BEFORE ME THIS DAY
OF , 20
My Commission Expires:
Notary Public
Voting Machine Warehouse Elevator 1 Ordinance of Financials
Prepared by the County of Delaware Department of Public Works IFB 03-04-2026
COUNTY OF DELAWARE PENNSYLVANIA
ORDINANCE No. 2021-2
AN ORDINANCE OF THE COUNTY OF DELAWARE,
COMMONWEALTH OF PENNSYLVANIA AMENDING SECTION 6-12
OF THE ADMINISTRATIVE CODE TO INCLUDE THAT COUNTY
COUNCIL MEMBERS ARE PROHIBITED FROM KNOWINGLY
DERIVING A FINANCIAL INTEREST FROM COUNTY CONTRACTS
AND ADDING CERTAIN OTHER CONFLICT OF INTEREST
PROVISIONS.
WHEREAS, pursuant to Section 6-121 of the Administrative Code (the "Code") of the County of Delaware, Commonwealth of Pennsylvania (the "County"), the Code may be amended by ordinances of the County Council; and
WHEREAS, Section 6-12.B(2) of the Code limits elected and appointed officials, the
County Executive Director and department heads, and all County employees from having a business interest that would interfere with their official duties; and
WHEREAS, Section 6-12.B(2) includes only a limited restriction of Council members from having a financial interest or other conflict that would interfere with their official duties; and
WHEREAS, County Council believes that a more expansive restriction on financial interests and other conflicts of Council members will allow Delaware County citizens to be assured that Council members will not directly or indirectly knowingly realize any financial gain through their public office other than any compensation that is provided by law;
IT IS HEREBY, ENACTED AND ORDAINED BY County Council of Delaware
County, Commonwealth of Pennsylvania as follows:
SECTION 1. The Code shall be amended to add a new Section 6-12.D to read as set forth below:
§ 6-12.D County Council Members Prohibited From Knowingly Deriving a Financial Interest From County Contracts.
(1). Prohibition Against Knowingly Deriving Financial Gain and Conflict of Interest. In addition to the limitations imposed elsewhere in this Administrative Code, including Section 6-12.B(2), no Council member shall knowingly have a financial interest (including any immediate family member having a financial interest) in any entity that is a party to a contract with the County, approved by County Council, including subcontractors.
Notwithstanding the foregoing, there shall be no violation of this Section 6-12.D(1) if a Council member recuses her or himself from voting on a contract in which such Council member (or an immediate family member) has a minor financial interest and submits a written statement listing the reasons for such recusal. Said statement shall be submitted by the Council member to the County Clerk, Council Chairman and Vice Chairman within seven
Voting Machine Warehouse Elevator 2 Ordinance of Financials
(7) days of identification of the conflict by the member but not less than one (1) day prior to the Council meeting at which a vote on the contract is scheduled. Such statement shall be read into the Council minutes at such meeting.
Voting Machine Warehouse Elevator 3 Ordinance of Financials
(2). Other Prohibitions.
(a) Council members are prohibited from receiving compensation (other than the payment of expenses) as an officer or director of (i) any entity that is a party to a contract with the County and/or (ii) any subcontractor to such an entity.
(b) Council members are prohibited from using non-public information received through public office for their own financial benefit or the financial benefit of an immediate family member.
(3). Conflicts of Interest. A Council member must recuse her or himself from voting on a contract if he or she knows that there is a conflict of interest (which is not a financial interest) and shall submit a written statement listing the reasons for such recusal.
Such conflicts of interest shall include serving as an officer or director of a nonprofit organization that is a party to a contract with the County and/or any subcontractor to such a contract.
Said statement shall be submitted by the Council member to the County Clerk, Council Chairman and Vice Chairman within seven (7) days of identification of the conflict by the member but not less than one (1) day prior to the Council meeting at which a vote on the contract is scheduled. Such statement shall be read into the Council minutes at such meeting.
(4). Definitions.
A "financial interest" for purposes of this Section 6-12.D is any financial interest in a legal entity engaged in business for profit which comprises more than 5% of the equity of the business or more than 5% of the assets of the economic interest in indebtedness.
An "immediate family member'' for purposes of this Section 6-12.D is defined as a parent, spouse, brother and sister (or like relative in laws), child(ren) and step-child(ren).
“Knowingly” or “Knows” means that the individual in question actually knew or, based on facts and circumstances, should have known, of the existence of a financial interest or conflict of interest, as applicable.
A “minor financial interest” for purposes of this Section 6-12.D is any financial interest from which a Council member and all immediate family members, in the aggregate, derives (or reasonably anticipates deriving) compensation, earnings, revenues and/or other payments not exceeding a total of $25,000 on an annual basis (including the effect of the contract then under consideration for approval by Council).
(5). Penalties. Any of the following penalties may be imposed for violations of the limitations in Section 6-12.D(1) as determined per Section 6-12.D (5):
a. A reprimand of the Council member in violation.
b. A censure of the Council member in violation.
Voting Machine Warehouse Elevator 4 Ordinance of Financials
c. An assessment of a fine of the Council member in violation, in an amount not to exceed the lesser of (i) ten percent (10%) of the total compensation under the contract in question or (ii) $20,000.
Voting Machine Warehouse Elevator 5 Ordinance of Financials
d. To the extent legally permitted, termination of the contract in question and/or repayment to the County of any profit made by the contractor under such contract.
e. Any entity, contractor or subcontractor which entered into a contract with the
County which resulted in a violation of this section, may be banned as a contractor or subcontractor to the County for a period of two (2) years.
(6). Determination of Penalties. The determination of a penalty for the violation of this ordinance shall be made by a majority vote of County Council (not to include the Council member whose action is the subject of such vote) following such investigation and consideration of such evidence as County Council deems appropriate or such other entity or body as may be designated by resolution of County Council.
(7). County Executive Director. If the County Executive Director knows that he or she has a financial interest in a contract being considered for approval by County Council, he or she shall disclose such financial interest to County Council prior to approval of such contract by County Council, and such financial interest shall be noted in the minutes of the Council meeting at which such approval is considered.
County Council may take appropriate disciplinary action for violation of this requirement by the County Executive Director, subject to the limitations elsewhere in the Administrative Code.
SECTION 2. This Ordinance shall take effect on the tenth day after its adoption.
ENACTED AND ORDAINED by County Council of the County of Delaware, Pennsylvania, this day of 2021.
Brian P. Zidek, Chair
Dr. Monica Taylor, Vice Chair
Kevin M. Madden
Christine A. Reuther
Attested:
Voting Machine Warehouse Elevator 6 Ordinance of Financials
Anne M. Coogan County Clerk
Voting Machine Warehouse Elevator 1 Public Works Diversity Goals
Prepared by the County of Delaware Department of Public Works IFB 03-04-2026
COMMONWEALTH OF PENNSYLVANIA
RESOLUTION NUMBER 2022-3
RESOLUTION REGARDING GOALS FOR DIVERSITY IN
PUBLIC WORKS CONTRACTING
WHEREAS, County Council is committed to addressing the challenges it faces relating to public works projects and, to that end, is considering enactment of the revision of Chapter 29 of the County Code to protect its proprietary and financial interests and create adequate safeguards to ensure the successful delivery of such projects to the fullest extent possible; and
WHEREAS, together with the changes to the County Code in such revision of Chapter 29, County Council also desires to set forth its goals for increasing the diversity of the workforce for such public works projects;
NOW, THEREFORE, BE IT RESOLVED BY THE COUNTY COUNCIL OF DELAWARE
COUNTY, PENNSYLVANIA as follows:
1. County Council hereby directs that the following provisions shall be included in any contract which is subject to the requirements of Chapter 29 of the County Code:
a. The contractor will make a good faith effort to employ local residents for completion of the project, when it has a need for new employees, in an effort to meet a goal of 10% local worker participation on the project. Good faith effort shall include, but not be limited to: hosting a public job fair prior to the commencement of the Project open to residents of Delaware County, posting of available employment opportunities with the Delaware County Workforce Development Board and its PACareerLink offices, providing employment and training services, advertisement of employment opportunities in a newspaper of general circulation throughout Delaware County, and internet advertisements.
b. The contractor will make a good faith effort to employ minority and female craftspeople for completion of the qualified project when such contractor has a need for new employees to complete the project, in an effort to meet the goal of having 10% minority and female participation on the project. Good faith effort shall include, but not be limited to: hosting a public job fair prior to the commencement of the Project open to all applicants in an attempt to identify, hire and utilize minority and female craftspeople, the posting of available employment opportunities with the Delaware County Workforce Development Board and its PACareerLink offices, providing employment and training services, advertisement of employment opportunities in a newspaper of general circulation throughout Delaware County, and internet advertisements.
c. The contractor shall, as a material condition of the contract, make a good faith effort to utilize veteran owned businesses, minority owned businesses, women owned
I-2 businesses and small business enterprises on the qualified project. “Minority owned business” shall mean that at least 51% of the business is owned by an individual who is a United States citizen or permanent resident alien who has and can demonstrate membership in one of the following groups: Black persons having origins in any of the Black African racial groups; Hispanic persons of Mexican, Puerto Rican, Dominican, Cuban, Central or South American Descent of either Indian or Hispanic origin, regardless of race; Native American or Alaskan native persons having origins in any of the original peoples of North America; Asian and Pacific Islander persons having origins in any of the Far East countries, South East Asia, the Indian subcontinent or the Pacific Islands. “Small business enterprise” shall mean a business with an annual gross income which is determined by the United States Small Business Administration to qualify it as a small business enterprise.
2. County Council hereby directs the County Executive Director to take steps to obtain a disparity study related to relevant County public works contracting in order to assess the utilization by the County of a diverse workforce for public works projects and to help direct any further actions by County Council to increase such diversity.
ADOPTED by the County Council of the County of Delaware, Pennsylvania, this 15th day of June, 2022.
BY: DELAWARE COUNTY COUNCIL
Dr. Monica Taylor, Chair
ATTESTED:
ANNE COOGAN, County Clerk
Voting Machine Warehouse Elevator 1 Public Works Diversity Goals 2
Voting Machine Warehouse Elevator 1 Ordinance 2022-7 Executed
COUNTY OF DELAWARE PENNSYLVANIA
ORDINANCE No. 2022-7
AN ORDINANCE OF THE COUNTY OF DELAWARE, COMMON
WEALT1-1 OF PENN SYLVAN IA AMENDING AND RESTATING
CHAPTER 29 OF THE COUNTY CODE RELAT1N G TO
CONTRACTORS
WHEREAS, pursuant to § 1-10 or the Code (the "Code") of' the County of Delaware, Commonwealth of Pennsylvania (the "County"), the Code may be amended by ordinances of the County Council when passed and adopted in such form as to indicate the intention of the County Council to be a part of the Code; and
WHEREAS, Chapter 29 of the Code sets forth provisions regarding the qualification of contractors for certain County public worlds projects; and
WHEREAS, County Council has been presented considerations regarding the current public works contract environment and the need for significant changes to its procurement standards for public works construction to address these considerations, limit project delivery risks, protect its financial and proprietary interests, and better ensure a efficient procurement and successful delivery of these projects; and
WHEREAS, County Council is committed to addressing the challenges it faces relating to public works projects by enacting necessary and appropriate procurement legislation to protect its property and financials interests and create adequate safeguards to ensure the successful delivery of such projects to the fullest extent possible; and
WHEREAS, Chapter 29 of the Code was last revised in 2007, and County Council desires to update and modernize the provisions of Chapter 29 of the Code;
lT IS HEREBY ENACTED AND ORDAIN ED BY County Council of Delaware County, Commonwealth of Pennsylvania as follows:
SECTION 1 . The Code shall be amended to replace Chapter 29 of the Code in its entirety to read as set forth in Exhibit A attached hereto.
SECTION 2. Any and all other ordinances or parts of ordinances in violation or in conflict with the terms, conditions and provisions of this ordinance are hereby repealed to the extent of such irreconcilable conflict.
SECTION 3. The terms, conditions and provisions of this ordinance are hereby declared to be sever able, and should any portion, par t of provision of this ordinance be found by a court of competent jurisdiction to be invalid, unenforceable or unconstitutional County
Voting Machine Warehouse Elevator 2 Ordinance 2022-7 Executed
Council hereby declares its intent that the ordinance shall have been enacted without regard to the invalid, unenforceable or unconstitutional portion, part or provision of this ordinance.
SECTION 4. This Ordinance shall take effect on the tenth day after its adoption.
ENACTED AND ORDAINED by County Council of the County of Delaware, Pennsylvania, this 15th day of June, 2022.
IFB 06-18-2026
Voting Machine Warehouse Elevator 3 Ordinance 2022-7 Executed
Exhibit A
CHAPTER 29
CONTRACTORS
§ 29-1. Purpose
A. Delaware County recognizes that there is a need to ensure that all world on public construction and maintenance contracts is performed by responsible, qualified firms that maintain the capacity, expertise, personnel and other qualifications and resources necessary to successfully perform such contracts in a timely, reliable and cost-effective manner.
B. To effectively mate the purpose of selecting responsible contractors for these public contracts and to protect Delaware County's investments in such contracts, prospective contractors and sub-contractors should be required to meet pre-established, clearly defined, minimum qualification standards regarding pas i project performance in terms of competency, safety and law comp hence, technical abilities, experience, and adequacy of resources, C. Further, due to the critical impact that skilled craft labor has on the execution of public works projects, and the increasingly limited availability of such labor , it is necessary to i require contractor s and subcontractor s to participate in proven apprenticeship training programs as a condition of bidding to promote successful project delivery and help ensure fixture wor1‹force development.
D. Therefore, Delaware County shall require compliance with the provisions of this Chapter by business entities seeking to provide services as specified herein. The requirements of this Chapter are intended to supplement, not replace, existing contractor qualification standards or other criteria currently required by Delaware County. However, in the event that this Chapter conflicts with any law, public policy or contracting documents of Delaware County, the requirements of this Chapter shall prevail.
§ 29-2. Responsible Contractor Requirements
A. This Chapter shall apply to contracts valued at $500,000 or more for public works projects undertaken by Dela\vat e County for construction, demolition, alteration, modernization, modernization, service or…