This is a Statement of Work (SOW) for the development and manufacturing of an injection-molded Outer Sun Visor for the Exploration Extravehicular Mobility Unit (xEMU) spacesuit. The contract type is Firm Fixed Price, with a 6-month period of performance from Authorize to Proceed (ATP). The procurement is managed by NASA's Crew and Thermal Systems Division, Space Suit and Crew Survival Systems Branch, and hardware must be delivered to Johnson Space Center in Houston, Texas.
The vendor must develop an injection mold and deliver 10 production-quality prototypes meeting strict technical specifications. The Outer Sun Visor shall be a 60-degree wedge measuring 12.6 inches wide (+00/-.01 inches) with optical quality requirements including haze not exceeding 2 percent per ASTM D1003, minimum 82 percent visible light transmission (380-800 nm), and refractive error limited to ±0.125 D in the critical vision area. Imperfections in the critical area are constrained by specific parameters (pits/scratches 0.015" to 0.035" diameter, length 0.1" to 0.15", maximum three occurrences, minimum 0.5" spacing). The visor must withstand 125-pound contact loads and 2-inch steel ball impacts at 1.4 ft/s in microgravity without catastrophic failure. Deliverables include monthly status presentations, a mold design presentation detailing feasibility and manufacturing parameters, a process definition and control plan with standard operating procedures, and hardware accompanied by material certifications, inspection records, and a Certificate of Compliance. Evaluation criteria are Technical Capability, Past Performance, and Price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0042102 Tab 07 Capability Statement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alternative Manufacturing for Spacesuit Outer Sun Visor Statement of Work
Contract Mechanism:
RFQ Title:
Contract Type: Firm Fixed Price Expected Cost:
RFQ Requirements:
Evaluation Criteria:
a) Technical Capability
b) Past Performance
c) Price
1. Background:
The Crew and Thermal Systems Division’s Space Suit and Crew Survival Systems Branch is requesting the development of an injection mold, build of a mold, and delivery of a prototype for an injection molded Outer Sun Visor for future spacesuit designs. The development will be based on the design of the Exploration Extravehicular Mobility Unit (xEMU) spacesuit which is the government reference design. The intent of this procurement is to execute initial research and development of manufacturing the xEMU Outer Sun Visor using an injection molded system.
2. Objectives:
The objective of this contract is to execute development and manufacturing of the xEMU Outer Sun Visor using an injection molded system.
Requirements:
2.1 Outer Dimensions Outer Sun Visor
The xPGS Outer Sun Visor shall be a 60 deg wedge that is 12.6 (+00/-.01) inches wide.
2.2 Optical quality
Figure 1: Critical area of vision
2.2.1 The Outer Sun Visor imperfections (defined as any pit, scratch, bubble coating imperfection, foreign particles or inclusions) in the critical area of vision should be limited by the Imperfection Parameters Table 1.
2.3 Haze
2.3.1 Haze in the critical and noncritical areas of the Outer Sun Visor prior to coating should not exceed 2 percent as determined in accordance with ASTM D1003. Verification is not required by the vendor.
2.4 Visible light transmission
2.4.1 The Outer Sun Visor transmittance percentage in the visible light spectrum (380-800 nm) in both photopic and scotopic conditions shall be a minimum of 82%. Verification is not required by the vendor.
2.5 Refractive Power
2.5.1 Refractive error of the Outer Sun Visor in the critical area of vision should not exceed ±
0.125 D (TBD) in the critical area for spherical or cylindrical power in any meridian.
Verification is not required by the vendor.
2.6 IVA Contact Load
2.6.1 The Outer Sun Visor should be acceptable for nominal EVA operations after an impact during IVA operations of 125 lbs over an area 4"x4". The load can be applied anywhere on the external surface of the suit assembly. Verification is not required by the vendor.
2.7 Micro-Gravity Impact
2.7.1 The Outer Sun Visor should not fail catastrophically following impact with a 2 inch diameter steel ball when manned, pressurized to exploration pressure, in microgravity, translating at 1.4 ft/s, and in the heaviest EVA configuration, approximately 300 lbs.
Verification is not required by the vendor.
3. Scope of Work:
3.1 Assessment of Injection Molding for Outer Sun Visor designs
Table 1: Imperfection Parameters
3.1.1 Feasibility
• Evaluate the ability to manufacture the size/shape required of the Outer Sun Visor to the requirements detailed in section 2.0 as executed by simulations
• If needed, recommend design changes to the Outer Sun Visor to improve manufacturability.
3.1.2 Mold Design and Surface Properties
• Evaluate effective mold design and required surface properties to meet the requirements detailed in section 2.0.
• Post machining to be maintained to a minimum, expect for necessary deburring or if necessary, please advise NASA team.
• All chamfers, fillets, and rounds to be molded and not post machined
3.2 Manufacturing
3.2.1 Molds: Build mold
• Outer Sun Visor
3.2.2 Visors
• Build Outer Sun Visor (Deliver 10 highest quality prototypes to NASA)
4. Deliverables:
4.1 Monthly status meetings
Status meetings will occur each month to update the government on the project. The deliverable of the monthly status meeting will be a PowerPoint presentation.
4.2 Mold design Presentation:
The vendor will provide a mold design presentation that will communicate the feasibility, mold design for injection mold production, design of the proposed finished products, and any additional information for how the Outer Sun Visor meets requirements identified in Section 2.
Design information to be included: wall thickness, draft, knit/weld lines, sink, warpage, ribs/bosses, tolerance feasibility, gate type/location, and venting strategy. The delivery presentation will be a PowerPoint presentation.
4.3 Process Definition and Control Plan
a) Process Flow Diagram covering raw material receipt through finished goods shipment.
b) Standard Operating Procedures (SOPs)/Work Instructions (WIs) for:
• Nominal process parameters and control limits. Examples: Barrel/zone temperatures, mold temperature, injection speed/pressure, pack/hold profile, cooling time, cushion, screw speed/backpressure, clamp force, cycle time, and alarm limits.
• Resin information to be included is crying time and temperature, moisture content target before molding, shrink rate of material, material technical data sheet.
4.4 Hardware:
The vendor will deliver 10 Outer Sun Visors to Johnson Space Center on the shipping requirements as defined in section 5. Hardware shall be delivered with an Acceptance Data Package that includes at minimum:
• Material certifications
• Inspection records
5. Shipping Requirements
5.1 Ship all hardware to the following address, unless otherwise directed:
NASA LYNDON B. JOHNSON SPACE CENTER
BLDG.420,CENTRAL RECEIVING
2101 NASA PARKWAY
HOUSTON, TEXAS 77058
Deliver to: Bldg.7A/RM-320 (Controlled Storage)
Hardware shall be delivered as Class III to NASA with all hardware listed on a DD Form 250, with the following information listed, at minimum:
• Contract and Task Order Number
• Part Number
• Lot #
• Serial # (if applicable)
• Nomenclature
• Shelf Life
• Quantity
• Class: III
• Unit cost
• Total Cost
6. Period of Performance / Schedule:
All products identified in section 4 shall be delivered by 6 months from ATP.
7. Travel:
None.
8. Duty Information:
9. Quality Requirements -- Certificate of Compliance (C of C)
Supplier shall provide a certification with each shipment to attest that the parts, assemblies, subassemblies, or detail parts conform to the Order requirements. When applicable, the true manufacturers, lot, heat, batch, date code, and/or serial number must appear on the certification.
Certification shall contain the following:
• Customer’s Order number
• Product name
• Part and Serial number
• Name and address of manufacturing or processing location
• Manufacturer’s lot, heat, batch, date code, and/or serial number (if applicable)
• Quantity and unit of measurement (each, box, case, gallons, etc.)
• Be signed and dated by an official of the company
10. Other Considerations: