80LARC18R0005_DRFP_CompressorStationUpgradesPhase2.pdf

PDF 31 MB Posted

Attached to
NASA LaRC Compressor Station Upgrades, Phase 2
Solicitation number
80LARC18R0005
Issued by

About this file

80LARC18R0005 DRFP Package - Compressor Station Upgrades, Phase 2

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

80LARC18R0005 Exhibit B

Exhibit B CONTRACT DOCUMENTATION REQUIREMENTS

I. Required Reports

A. Monthly Project Status Report - The Contractor shall submit monthly progress reports describing work accomplished during the reporting period, current and potential problem areas and proposed corrective action, and work to be performed during the next reporting period. The Contractor shall submit the monthly project status reports in accordance with Specification 01 30

00.00 41.

B. Contractor Monthly Accident/Incident Reports - The Contractor shall submit monthly man-hours, headcount and accident/incident data for the prime and the subcontractor to the LaRC Safety and Facility Assurance Branch (SFAB) within 10 working days after the end of each month. The Contractor shall submit this data via the web-based system entitled Contractor Monthly Accident Reporting (CMAR) located at https://cmar.larc.nasa.gov/login.cfm. If the Contractor is unable to submit its information electronically via CMAR, then the Contractor shall submit Langley Form 272A to SFAB at Mail Stop 305. The Contractor shall also submit an annual summary of occupational injuries and illnesses to the Occupational Safety and Health Administration (OSHA) as described in 29 CFR Part 1904.32.

C. Mishap Reporting – In the event of an emergency, the contractor shall call 911 on a center telephone or 757-864-2222 from a cellular phone.

The Contractor shall verbally notify SFAB (Call 757-864-7233) of any NASA mishap (reference NPR 8621.1) as soon as practical, but no later than 2 hours following occurrence. For any incident that does not result in contractor personnel injury, the Contractor shall submit a NASA Langley Form 164 through the LaRC Safety Website located at https://safety.larc.nasa.gov/index.cfm?ContentID=3 within 24 hours of occurrence. For any incident involving contractor personnel injury, the Contractor shall call the NASA Langley Research Center (LaRC) Occupational Health Clinic at 757-864-3193 [between 7:00 a.m. to 3:30 p.m. (M-F)] to initiate the injury report within 24 business hours of occurrence if the injured employee does not seek initial treatment at the NASA LaRC Occupational Health Clinic. Any contractor employee who receives medical treatment for a work-related injury from the LaRC Fire Department or an outside medical facility shall report to the NASA LaRC Occupational Health Clinic (Building 1216) when they return to work on Center at LaRC. The Contractor is required to investigate their own NASA mishaps and coordinate with SFAB on the submission requirements of the investigation report.

D. Notice of Violation Response -- The Contractor shall respond to any Notice of Violation (NOV) issued for safety violations to the prime and/or its subcontractors. The response shall include the cause for violation; mitigation of impact, if applicable; and planned prevention of recurrence. The Contractor shall submit the response to the NASA LaRC Safety and Facility Assurance Branch (SFAB) and the Contracting Officer within three working days of issuance.

E. Safety and Health Plan - The Contractor shall submit a Safety and Health Plan within 30 calendar days of contract award date (date the Contracting Officer Signs the Contract). Per NFS 1852.223-73, the Contractor shall not commence work until a functional review of the submitted Safety and Health Plan is completed by the NASA LaRC Safety and Mission Assurance Office (SMAO) Safety and Facility Assurance Branch (SFAB), and the Safety and Health Plan is approved by the Contracting Officer.

The Safety and Health Plan shall be written in accordance with the Safety and Health Plan Instructions for construction contracts see Specifications section 01 35 26.00 41, and in conjunction with the requirements outlined at 1852.223-70, Safety and Health Measures and Mishap Reporting. The Contractor is required to continually update the Safety and Health Plan when necessary (e.g., requirement change, safety regulation change, safety incident impact). The Contractor shall submit a revised Plan for Contracting Officer approval no later than 30 calendar days after the effect of a change or incident.

F. Information Technology (IT) Security Management Plan

1. In accordance with NFS 1852.204-76, Security Requirements for Unclassified Information

Technology Resources, the Contractor shall submit an IT Security Management Plan within 30 calendar days after contract effective date for review and approval by the Center Information Security Officer (CISO).

2. The Contractor shall maintain the IT Security Management Plan throughout the term of the contract. The Contractor’s plan shall:

a. Identify how the requirements for IT security (including developing and maintaining IT system security plans, contingency plans, and performing information system security assessment).

b. Identify how the requirements for which NASA directives specifically mandate compliance with respect to security of NASA IT resources will be met.

c. Describe how the Contractor intends to hold its employees and subcontractors accountable for meeting all the requirements relative to the NPR 2810.1, Security Information Technology, IT Security Handbooks, and CIO directives. The documents can be found at:

http://www.nasa.gov/offices/ocio/itsecurity/index.html.

d. Describe how the Contractor will meet future or changing IT security requirements as directed by Federal Law or NASA requirements.

e. Describe how the Contractor plans to protect their corporate IT resources to ensure that they pose no adverse impact on NASA resources.

f. Describe how the Contractor will protect NASA or contract-specific information and data under their control.

g. Describe how the Contractor plans to provide documentation for any required IT security-related deliverable.

h. Describe how the Contractor will ensure compliance with all NASA IT security training and awareness requirements.

i. Describe how the Contractor will ensure compliance with NASA-established physical security requirements as they relate to IT security requirements.

j. Describe how the Contractor will ensure compliance with personnel screening requirements including assurance that employees with privileged access have the appropriate background screening.

k. Describe the Contractor’s procedures for termination of employees including assurance that all access privileges (e.g., network, remote access, virtual private network (VPN), campus computing, and other application access) are terminated.

3. The IT Security Management Plan will be updated as required by changes in the Federal Law or other NASA regulations.

4. Specific guidance for contracts can be found in the following documents. These documents can be located at http://www.nasa.gov/offices/ocio/itsecurity/index.html or http://csrc.nist.gov/publications/PubsSPs.html

a. Federal Information Security Management Act (FISMA)

b. NPD 1600.2, NASA Security Policy

c. NPD 2810.1, NASA Information Security Policy

d. NPR 1600.1, NASA Security Program Procedural Requirements

e. NPR 1620.2, Physical Security Vulnerability Risk Assessments

f. NPR 2810.1a, Security of Information Technology

g. NIST Special Publication (SP) 800-18, Guide for Developing Security Plans for Federal

Information Systems

h. NIST Special Publication (SP) 800-35, Guide to IT Security Services

i. NIST SP 800-36, Guide to Selecting Information Security Products

j. NIST SP 800-64, Security Considerations in the Information System Development Life

Cycle

H. Employment Reports on Veterans - The Contractor shall submit a Veterans’ Employment Report (VETS-4212 Report) as required by Clause 52.222-37, Employment Reports on Veterans.

Within 30 calendar days following the VETS-4212 Report submission, the Contractor shall submit a letter to the Contracting Officer confirming that it has submitted the most recent annual VETS-4212 Report required by FAR 52.222.37.

I. Evidence of Insurance - The Contractor shall submit evidence of the insurance coverage required by NFS 1852.228-75, Minimum Insurance Coverage (i.e., a Certificate of Insurance or other confirmation) to the Contracting Officer prior to performing under this contract. The Contractor shall also present such evidence to the Contracting Officer prior to commencement of performance under any options exercised, if applicable.

J. On and Near-Site Staffing Report

1. The Contractor shall submit a report which includes the number of on-site and near-site Work

Year Equivalents (WYE's) performing work on the contract, broken down by skill category.

An initial report shall be submitted within 30 calendar days from the effective date of the contract. Subsequent updated reports are due quarterly, within the first 5 work day after the end of the quarter (e.g. on or before the 5th workday in January, April, July and October of each year).

2. These reports shall be e-mailed to the following:

larc-dl-contractorwye@mail.nasa.gov The subject line for the e-mail should be "Contractor WYE".

3. "On-site" WYE's include the time worked by prime Contractor and subcontractor employees on this contract whose primary duty station is on-site at Langley Research Center, whether such employees charge direct or indirect in the Contractor's or subcontractor's accounting systems (e.g., management and administrative staff may charge their time to an "indirect" account, but the time worked by such individuals shall still be counted in the on-site WYE).

4. "Near-site" WYE's include the time worked by prime Contractor and subcontractor employees on this contract whose primary duty station is within 50 miles of LaRC, whether such employees charge direct or indirect in the Contractor's or subcontractor's accounting systems. Work performed on local college campuses shall not be considered "near site" WYE's.

5. The Contractor shall use the number of hours in its productive work year to compute the number of WYE's to be reported. For example, if the Contractor’s standard work-year is 1,860 productive hours (excludes leave, holidays, etc.) , the quarterly WYE reported would be calculated as the total labor hours for the quarter divided by the available productive hours in the quarter (in this example 1,860 annual productive hours divided by 4 quarters yields 465 hours). Thus, if 10,000 hours were incurred on the contract during the quarter the WYE would be (10,000/465 = 21.5 WYE). The Contractor shall break out the On-site and Near-site WYE by skill category using the following categories: Scientist, engineer, technician, administrative professional, and clerical.

K. EPA-Designated Categories Annual Purchasing Report

In accordance with FAR 52.223-17, Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts, the Contractor shall submit to the environmental point of contact, ingrid.a.carlberg@nasa.gov, with a copy to the Contracting Officer, an annual Recycled Content Purchasing Report detailing the product types and total amounts of EPA-designated categories and products procured and used in performance of this contract during the preceding fiscal year period. The annual Purchasing Report is due by November 1st for purchases during the preceding fiscal year period (October 1 through September 30). If the contract ends prior to November 1st, the annual Purchasing Report is due at the end of the contract period of performance. After contract award, the Contractor will be granted access to this reporting template at https://emis.ndc.nasa.gov/ap.cfm.

L. Bio-based Products Report

In accordance with FAR 52.223-2, the Contractor shall report not later than October 31 of each year during contract performance to https://www.sam.gov, with a copy to the Contracting

Officer, on the product types and dollar value of any USDA-designated bio-based products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30. The Contractor shall input the annual data into https://www.sam.gov by October 31st for purchases during the preceding fiscal year (October 1st through September 30th). If the contract ends prior to October 31st, data must be entered at the end of the contract period of performance.

II. DOCUMENT DISTRIBUTION REQUIREMENTS

A. Unless otherwise specified elsewhere in this contract, the Contractor shall submit reports and other documentation f.o.b. destination as specified below, addressed as follows:

National Aeronautics and Space Administration Langley Research Center, Attn: Morgan Whitfield Mail Stop 12), Contract (Award Number) Hampton, VA 23681-2199

B. The following letter codes designate the recipients of reports and other documentation which are required to be delivered prepaid to Langley Research Center by the Contractor:

A - Contract Specialist, morgan.l.whitifled@nasa.gov

B - Contracting Officer’s Representative, Benjamin.r.galke@nasa.gov

C –CMMI Representative, charles.e.niles@nasa.gov with “SDP Review” in the Subject line

D - Financial Management, LaRC-DL-NF533@mail.nasa.gov

E - Safety and Facility Assurance Branch, Mail Stop 305 or fax 757-864-8918 or CMAR http://cmar.larc.nasa.gov/login.cfm

F - Contractor Labor Relations Officer, Robert.betts@nasa.gov

G - Financial Management, sonya.a.sweeney@nasa.gov

H - Patent Counsel, https://invention.nasa.gov

I - Industrial Property Officer, susan.c.tillman@nasa.gov

J - RESERVED

K - Center Information Technology Security Manager (CITSM), kendall.e.freeman@nasa.gov; kim.elliott@nasa.gov

L - According to instructions on form

M - As required by Task Order

N - Task Monitor

O - Langley Management System Project Office, kathryn.c.suddreth@nasa.gov

P – Langley STI Manager, p.k.costulis@nasa.gov, and Langley STI Manager Alternate, greta.m.lowe@nasa.gov

Q - On and Near-Site Staffing Report, larc-dl-contractorwye@mail.nasa.gov with “Contractor WYE” in subject line

R - Environmental Management Team, ingird.a.carlberg@nasa.gov

S – New Technology Administrator, LaRC-New-Technology@mail.nasa.gov

C. The following are the distribution requirements for reports and other documentation required to be delivered f.o.b. destination. The numeral following the letter code specifying the number of copies to be provided:

LETTER CODE AND DOCUMENT DISTRIBUTION

Monthly Progress Report: A-1, B-1, M-1

Contractor Monthly Accident Report: https://cmar.larc.nasa.gov/login.cfm, or E-1.

Mishap Reporting: A-1, E-1

Notice of Violation Responses: A-1, E-1

Safety and Health Plan: A-1, B-1, E-1

IT Security Management Plan: A-1, B-1, K-1

Veterans Employment Report (VETS-4212): A-1, L

Evidence of Insurance: A-1

On and Near-Site Staffing Report: Q-1

EPA – Designated Categories Annual Purchasing Report: A-1, R-1 mailto:greta.m.lowe@nasa.gov https://cmar.larc.nasa.gov/login.cfm

D. When the Contract Specialist (A) is not designated above to receive a copy of a report or document, the Contractor shall furnish a copy of the report/document transmittal letter to the Contract Specialist. If delegated, the Contractor shall also furnish a copy of the transmittal letter and a copy of each Financial Management Report to the delegated Administrative Contracting Officer of the cognizant DoD (or other agency) contract administrative services component.

Exhibit B CONTRACT DOCUMENTATION REQUIREMENTS

UNITED STATES

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

LANGLEY RESEARCH CENTER

HAMPTON, VIRGINIA

SPECIFICATIONS

FOR

COMPRESSOR STATION UPGRADES, PHASE 2

LOCATED IN

WEST AREA

LANGLEY RESEARCH CENTER, HAMPTON, VIRGINIA

SPECIFICATION NO. CTN001205 DATE: 4-24-18

CTN001205 COMPRESSOR STATION UPGRADES, PHASE 2 (4-24-18)

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.00 41 SUMMARY OF WORK

01 30 00.00 41 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 41 NASA LANGLEY SAFETY REQUIREMENTS

01 35 40.00 41 NASA LANGLEY ENVIRONMENTAL REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 86 13.08 41 EQUIPMENT QUALITY ASSURANCE AND TESTING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00.00 41 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23.00 41 WELDING, STRUCTURAL

05 12 00.00 41 STRUCTURAL STEEL

DIVISION 22 - PLUMBING

22 15 13.16 40 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS,

AND VALVES, STAINLESS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 15.00 41 COMMON PIPING FOR HVAC

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 41 COMMON WORK RESULTS FOR ELECTRICAL

26 05 13.00 41 MEDIUM-VOLTAGE CABLES

26 05 70.00 41 MEDIUM VOLTAGE OVERCURRENT PROTECTIVE DEVICES

26 08 00 APPARATUS INSPECTION AND TESTING

26 24 19.00 40 MOTOR CONTROL CENTERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 01.00 10 ELECTRIC MOTORS, 3-PHASE HORIZONTAL INDUCTION TYPE

DIVISION 40 - PROCESS INTERCONNECTIONS

40 95 00.00 41 PROCESS CONTROL

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE

EQUIPMENT

43 02 00.00 41 WELDING PRESSURE/MECHANICAL PIPING/VESSELS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

SECTION 01 11 00.00 41

SUMMARY OF WORK

09/15

PART 1 GENERAL

1.1 TERMINOLOGY CLARIFICATIONS

1.2 SUBMITTALS

1.3 SUMMARY

1.4 SPECIAL PROJECT CONSIDERATIONS

1.5 CONTRACT DOCUMENTS

1.5.1 Langley Procedural Requirements (LPRs)

1.5.2 Contract Drawings

1.5.3 Reference Drawings

1.6 PERFORMANCE PERIOD AND SCHEDULE

1.7 SALVAGE MATERIAL AND EQUIPMENT

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

SECTION 01 11 00.00 41 Page 1

SECTION 01 11 00.00 41

SUMMARY OF WORK

09/15

The Contractor shall furnish all services and material for the effort specified herein. Throughout all sections, paragraphs and statements of this specification document, the Contractor shall be considered the subject of all declarative statements and shall be responsible for the stated action unless it is explicitly stated otherwise.

1.1 TERMINOLOGY CLARIFICATIONS

All references to the Contracting Officer contained in this specification, or any severable part thereof, shall be determined to mean the Contracting Officer or the Contracting Officer's Representative (COR). If any question arises concerning the "authorization" status of a Contracting Officer Representative, the Contractor shall immediately refer the question, in writing, to the Contracting Officer. Any references to "as directed", "approved by", "witnessed by", or "submitted to", shall be determined to mean the Contracting Officer.

Where "day" or "days" are written, it shall mean calendar day or days, unless otherwise stated in the specification.

Where "hour" or "hours" are written, it shall mean clock hours, unless otherwise stated in the specification.

Where "must" is written, it has the same meaning as "shall".

Where "as indicated" and "as specified" are written it shall refer to "as indicated on the drawings," and "as specified in the specifications". The specifications shall always take precedence over the drawings. Large-scale drawings shall govern small-scale drawings. The Contractor shall follow figures marked on drawings in preference to scale measurements. Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

"LPR" refers to Langley Procedural Requirement.

"NPR" refers to NASA Procedural Requirement.

"LF" refers to Langley Form.

"RFI" refers to Request for Information.

The Contractor shall submit the following to the Contracting Officer in accordance with the requirements of Section 01 33 00 SUBMITTAL PROCEDURES:

SECTION 01 11 00.00 41 Page 2

SD-01 Preconstruction Submittals

Dust and Debris Mitigation Plan

1.3 SUMMARY

The Contractor shall furnish all services and materials to replace Compressor 4 and its associated ancillary systems as specified herein. The Contractor shall furnish all plant, equipment, tools, materials, labor, and services necessary for the complete and finished effort.

The work is located at Building 1247E, East Reid Street, West Area of the Langley Research Center, Hampton, Virginia.

The Contractor shall replace one 8.0 lbs/sec at 6,000 psi compressor and associated ancillary systems with a new AG Equipment HPA-4C-D-4R-C compressor system, including associated ancillary system. The Contractor shall also integrate the new compressor system into the plant-wide control system.

The Contractor shall be responsible for all aspects of implementing the existing design for demolition, new compressor system installation, and the integration into the plant-wide control system based on the Government's parameters as specified herein. The Contractor shall be responsible for furnishing and installing all aspects of the design, including site work, concrete, steel, metals, interior wall and floor finishes, painting, plumbing, mechanical, electrical, control systems, process piping, high pressure work, high voltage work, vibration analysis, power system analysis, and all other items defined in the contract documents.

1.4 SPECIAL PROJECT CONSIDERATIONS

The Contractor shall be aware of the following special considerations required by this project:

The Contractor shall minimize interruptions to Compressors 5, 6, and 7 and their ancillary systems during the construction period.

Hazardous Materials - The following items are noted in the Building 1247E Hazardous Materials Study.

A. Light fixtures on the first floor and basement contain PCB ballasts, and all fluorescent light bulbs are presumed to contain mercury.

B. Asbestos Containing Materials and pipe insulation and fittings are located in the basement and on the dryer 3 vessels on the first floor.

C. Various quantities of oil associated with the compressors are presumed hazardous.

D. Electrical components that previously contained oil shall be considered to contain PCB contaminated oil residual after the oil removal process.

E. Mechanical systems, generators, and motors are presumed to contain PCB oils and components.

F. Various levels of cadmium, chromium, and lead are present on various equipment, safety rails, and the building structure.

SECTION 01 11 00.00 41 Page 3

G. Fire proofing tape on the medium voltage feeders for Compressors contain asbestos.

These items shall be handled in accordance with the requirements of Section 01 35 26.00 41 NASA LANGLEY SAFETY REQUIREMENTS, paragraph 1.19 and Section 01 35 40.00 41 NASA LANGLEY ENVIRONMENTAL REQUIREMENTS, paragraph 3.6.

Assume painted surfaces on equipment, handrails, and columns contain lead.

These items shall be handled in accordance with Section 01 35 40.00 41 NASA LANGLEY ENVIRONMENTAL REQUIREMENTS, paragraph 3.5.2. Assume ballasts in all lighting fixtures to be removed contain PCB's. These items shall be handled in accordance with Section 01 35 40.00 41 NASA LANGLEY ENVIRONMENTAL REQUIREMENTS, paragraph 3.7.

The Contractor shall schedule work to hold utility (air, water, electricity) outages to a minimum. Outages, in this context, refer to outages that extend beyond the work zone, to the remainder of Building 1247E, or to parts or all of the LaRC campus.

Allowances for Personnel Access

During construction, there will be active equipment systems in the basement that are within the construction zone that require regular operator access and maintenance. The Contractor shall be responsible to ensure that Government and Compressor Station personnel have access to the active equipment systems that shall be maintained at all times during performance of this contract. These items will include but not be limited to the following:

The Contractor shall provide a Dust and Debris Mitigation Plan clarifying the mitigation and testing to monitor and prevent dust and debris generated during the construction activity that may impact the activities within Building 1247E. Compressors 5, 6, and 7 will be operational as well as other equipment within the Facility. The Contractor shall install barriers (such as tarps, shields, and curtains) to separate the construction area from the area with the active Compressor equipment. Additionally, the Contractor shall provide a method of monitoring the amount of dust and debris that may escape the containment area. This shall include methods such as daily walkthroughs, swabbing of equipment, inspection of equipment internals if/when available, and placement of methods of debris collection/measuring. If during inspections the level of dust is determined to be detrimental or unacceptable by the Government, construction activities shall be halted and an improved method of containment constructed and approved. The Contractor shall coordinate the construction of barriers and other site limiting methods during construction with the Facility. Visual means of verification (line of site vision) is required during some operational time periods for specific equipment. The Contractor shall be responsible for cleanup and repair of any damage (equipment or otherwise) caused by dust or debris created by their construction activities.

During construction, the Contractor shall coordinate with NASA GIS to complete laser scans at the following points during construction:

1. Upon the completion of the Demolition Phase (this included the demolition of all existing foundation work).

2. Upon the completion of setting new reinforcing steel (prior to concrete placement).

SECTION 01 11 00.00 41 Page 4

3. Upon the installation of the new foundations (prior to any installation of new equipment).

4. Upon the completion of construction.

1.5 CONTRACT DOCUMENTS

NASA Langley uses Portable Document Format (PDF) forms of the Technical Submittal Form 317, Request For Information form LF 253, and Facility Systems Engineering - Request for Change form LF 337. The Contracting Officer will supply the Contractor with the latest version of each of these forms, as well as the following documents:

1. Two hard copies of full size drawings and drawings in electronic (PDF) format on a Compact Disc (CD)

2. One Revit (.rvt) file containing a copy of the Building Information Model (BIM) for creation of content and drawing production. The file will be supplied through the Large File Transfer Protocol (LFT). This material is being provided as "For Information Only".

3. One AutoCAD (.dwg) file for each drawing not included in the BIM.

These files will be supplied through LFT. This material is being provided as "For Information Only".

4. Two hardbound copies of Specifications and Specifications in electronic PDF format on a CD.

5. Electronic copy of NASA Langley's Technical Submittal Form 317 in PDF format on a CD.

6. Electronic copy of NASA Langley's Request for Information (R.F.I.)

form 253 in PDF format on a CD.

7. Electronic copy of NASA Langley's Facility Systems Engineering Request for Change form 337 in PDF format on a CD.

8. Electronic copy of the Requirements Traceability Matrix on a CD. The Contractor shall maintain and update the Requirements Traceability Matrix for the full duration of the Contract.

9. Electronic copy of the Computerized Maintenance Management System (CMMS) Software/Maintenance/Equipment Change Request Form LF 491.

10. Electronic copies of NASA Langley Procedural Requirements (LPRs) and other documents in PDF format on a CD.

LPR 1710.6 Langley Research Center Electrical Safety LPR 1710.10 Langley Research Center Energy Control Program (Lockout/Tagout) LPR 1710.17 Respiratory Protection Program LaRC-FES-FAS Center Operation Directorate Facility Engineering Standards, Facility Automation Systems LPR 1710.40 Langley Research Center Pressure Systems Handbook LPR 1710.41 Langley Research Center Standard for the Evaluation of Socket and Branch Connection

SECTION 01 11 00.00 41 Page 5

Welds LPR 1740.2 Facility Safety Requirements LARC-FES-PVS Facilities Engineering Standards Piping Systems and Pressure Vessels

LPR 1710.11 Fire Protection Program LAPD 1700.7 Traffic Management LPR 1740.6 Personnel Safety Certification LPR 8500.1 Environmental and Energy Program Manual LPR 7150.2B Software Engineering Requirement LAPD 7000.2 Review Program for Langley Research Center (LaRC) Facility Projects LMS-CP-4754 Software Assurance (SA) for Development and Acquisition LMS-CP-5698 Welding/Brazing

11. One hard copy and one electronic copy in PDF format on a CD of the Building 1247E Hazardous Materials Study.

12. One hard copy and one electronic copy in PDF format of the Preliminary Site Acceptance Test Plan.

13. One hard copy and one electronic copy in PDF format of (AE03154 - Compressor Station Upgrades WP#1 Automation Upgrades) C5-D4 System SAT Plan for reference only.

14. One hard copy and one electronic copy in PDF format of the listed reference drawings for this project.

Contractor shall immediately check furnished drawings and specifications, and notify the Contracting Officer of any discrepancies within 14 calendar days of receipt of the documentation.

1.5.1 Langley Procedural Requirements (LPRs)

The Contractor shall adhere to LPRs and other Langley specific documents that specify requirements particular to work at NASA Langley. These LPRs parallel or exceed standard codes. It is the responsibility of the Contractor to become familiar with and follow the associated LPRs. Refer to paragraph 1.4 for a listing of these documents.

1.5.2 Contract Drawings

The work shall conform to these specifications and the drawings listed below:

DRAWING NO. SHEET NO. TITLE

GENERAL

1300567 G-100 TITLE SHEET

1300568 G-101 INDEX OF DRAWINGS

STRUCTURAL

1300569 S-001 STRUCTURAL NOTES

1300570 SD-101 FIRST FLOOR REMOVAL PLAN

1300571 SD-102 FIRST FLOOR FRAMING REMOVAL PLAN

1300572 SD-301 REMOVAL SECTIONS

1300573 S-101 BASEMENT ALTERATION PLAN

1300574 S-102 FIRST FLOOR FRAMING PLAN

1300575 S-103 FIRST FLOOR ALTERATION PLAN

SECTION 01 11 00.00 41 Page 6

1300576 S-301 RECIPROCATING COMPRESSOR FOUNDATION

SECTIONS AND DETAILS

1300577 S-302 RECIPROCATING COMPRESSOR FOUNDATION

SECTIONS

1300578 S-303 COMPRESSOR FOUNDATIONS - ISOMETRIC

VIEWS

1300579 S-304 CENTRIFUGAL COMPRESSOR FOUNDATION

SECTIONS AND DETAILS

1300580 S-305 CENTRIFUGAL COMPRESSOR FOUNDATION

SECTIONS

1300581 S-401 RECIPROCATING VENT SILENCER AND INTAKE

FILTER FOUNDATIONS

1300582 S-402 ENLARGED PLATFORM PLANS SECTIONS AND

DETAILS

1300583 S-403 PURGE DRYER SKID FRAME PLAN AND

SECTIONS

PROCESS

1300587 D-001 MECHANICAL GENERAL NOTES, LEGEND, AND

ABBREVIATIONS

1300588 D-101 MECHANICAL REMOVAL PLAN - BASEMENT

1300589 D-102 MECHANICAL REMOVAL PLAN - FIRST FLOOR

1300590 D-103 MECHANICAL NEW WORK PLAN - BASEMENT

1300591 D-104 MECHANICAL NEW WORK PLAN - FIRST FLOOR

1300592 D-401 MECHANICAL REMOVAL SECTIONS AND PHOTOS

1300593 D-402 MECHANICAL REMOVAL SECTIONS

1300594 D-403 MECHANICAL REMOVAL SECTIONS

1300595 D-404 MECHANICAL 3D VIEW - COMPRESSOR 4

REMOVAL

1300596 D-405 MECHANICAL 3D VIEW - COMPRESSOR 4

REMOVAL

1300597 D-406 MECHANICAL NEW WORK ENLARGED PLAN AND

SECTIONS

1300598 D-407 MECHANICAL NEW WORK ENLARGED PLAN AND

SECTION

1300599 D-408 MECHANICAL 3D VIEWS - CENTRIFUGAL

COMPRESSOR #8A & DRYER #8

1300600 D-409 MECHANICAL 3D VIEWS - RECIPROCATING

COMPRESSOR #8B

1300601 D-410 MECHANICAL 3D VIEWS - AIR

INTAKE/SILENCERS & SUMP PIT #8

1300602 D-411 MECHANICAL 3D VIEWS - BASEMENT PIPING

1300603 D-501 PIPE SUPPORTS DETAILS

1300604 D-601 MECHANICAL SCHEDULES

1300605 D-700 PIPING AND INSTRUMENTATION DIAGRAM

LEGEND AND ABBREVIATIONS

1300606 D-701 CENTRIFUGAL COMPRESSOR #8A (1 OF 2)

AIR AND COOLING WATER P&ID

1300607 D-702 CENTRIFUGAL COMPRESSOR #8A (2 OF 2)

DRAIN SYSTEM P&ID

1300608 D-703 DRYER #8 P&ID

1300609 D-704 RECIPROCATING COMPRESSOR #8B (1 OF

6) 1ST AND 2ND STAGE P&ID

1300610 D-705 RECIPROCATING COMPRESSOR #8B (2 OF

6) 3RD AND 4TH STAGE P&ID

1300611 D-706 RECIPROCATING COMPRESSOR #8B (3 OF 6)

COOLING WATER P&ID

1300612 D-707 RECIPROCATING COMPRESSOR #8B (4 OF

SECTION 01 11 00.00 41 Page 7

6) LUBRICATING SYSTEM P&ID

1300613 D-708 RECIPROCATING COMPRESSOR #8B (5 OF 6)

PACKING COOLING WATER P&ID

1300614 D-709 RECIPROCATING COMPRESSOR #8B (6 OF

6) FINAL FILTER P&ID

1300615 D-710 COMPRESSOR 8 SYSTEM DRAIN P&ID

ELECTRICAL

1300620 E-001 ELECTRICAL LEGENDS AND ABBREVIATIONS

1300621 E-002 ELECTRICAL GENERAL AND REMOVAL NOTES

1300622 E-101 POWER REMOVAL PLAN - FIRST FLOOR

1300623 E-102 POWER REMOVAL PLAN - BASEMENT

1300624 E-103 INSTRUMENT FIELD DEVICES LOCATION

REMOVAL PLAN

1300625 E-104 LIGHTING AND GROUNDING REMOVAL PLAN -

BASEMENT

1300626 E-105 ELECTRICAL REMOVAL - FEEDER ROUTING

PLAN

1300627 E-106 NEW POWER PLAN - FIRST FLOOR

1300628 E-107 NEW POWER PLAN - BASEMENT

1300629 E-108 NEW LIGHTING PLAN BASEMENT

1300630 E-109 NEW EQUIPMENT GROUNDING PLAN -

BASEMENT

1300631 E-110 NEW COMMUNICATION SYSTEM PLAN

1300632 E-111 ELECTRICAL NEW WORK - FIRE ALARM

SYSTEM

1300633 E-112 NEW FEEDERS 3DE2-1 AND 3DE2-2 ROUTING

PLAN

1300634 E-201 EXISTING 3DE SWITCHGEAR ELEVATION FEEDER

3DE2 REMOVAL

1300635 E-202 NEW 3DE2-1 AND 3DE2-2 INSTALLATION AT

SWITCHGEAR 3DE

1300636 E-210 SWITCHGEAR ELEVATION DIAGRAM

1300639 E-501 EXISTING MANHOLE 1606 AND 1607 REMOVAL

FEEDER 3D2E

1300640 E-502 EXISTING MANHOLE 1612 & 1629 REMOVAL

FEEDER 3DE2

1300641 E-503 PHOTOS/SECTION VIEW - DETAILS

1300642 E-504 NEW POWER CABLE ROUTE INSIDE MANHOLES

1606 & 1607

1300643 E-505 NEW POWER CABLE ROUTES INSIDE MANHOLE

1612 & 1629

1300644 E-508 SUMP LEVEL CONTROL CABINET LAYOUT

1300647 E-601 REMOVAL - MV MOTOR STARTER AND MCC #4

ONE LINE DIAGRAMS

1300648 E-602 ELECTRICAL REMOVAL - MCC#4 SCHEMATIC

DIAGRAMS

1300649 E-605 COMPRESSOR 8 INSTRUMENTATION AND

CONTROLS BLOCK DIAGRAM

1300650 E-610 NEW MV COMPRESSOR #8 STARTER ONE LINE

DIAGRAM

1300651 E-611 MV SW 3345 THREE LINE DIAGRAM

1300652 E-612 MV CENTRIFUGAL COMPRESSOR 8A THREE LINE

DIAGRAM

1300653 E-613 MV RECIPROCATING COMPRESSOR 8B THREE

LINE DIAGRAM

1300654 E-614 MV MCC SW #3345 CONTROL ELEMENTARY

DIAGRAM

SECTION 01 11 00.00 41 Page 8

1300655 E-615 MV MCC SW #3345 HVL-CB MECHANISM

DIAGRAM

1300656 E-616 MV MCC SEL-710 LOGIC DIAGRAM

1300657 E-617 MV MCC COMPRESSOR 8A, CONTROL

ELEMENTARY, 1 OF 2

1300658 E-618 MV MCC COMPRESSOR 8A, CONTROL

ELEMENTARY, 2 OF 2

1300659 E-619 MV MCC COMPRESSOR 8B, CONTROL

ELEMENTARY, 1 OF 2

1300660 E-620 MV MCC COMPRESSOR 8B, CONTROL

ELEMENTARY, 2 OF 2

1300661 E-621 MV MCC NAMEPLATE DETAILS

1300662 E-622 MV MCC SEL-710 LOGIC DIAGRAM

1300663 E-623 MCC-8 NEW ONE-LINE DIAGRAM & ELEVATION

1300664 E-624 MCC-8, SECTION 1A C8A AUXILIARY OIL PUMP

MTR-1426Q

1300665 E-625 MCC-8, SECTION 1B C8A OIL HEATER

HTR-1411Q

1300666 E-626 MCC-8, SECTION 1C INCOMING FEEDER

1300667 E-627 MCC-8, SECTION 2A C8A DEMISTER MOTOR

BLW-1417Q

1300668 E-628 MCC-8, SECTION 2B C8B PACKING COOLING

PUMP MTR-5043

1300669 E-629 MCC-8, SECTION 2C C8B PRE-LUBE PUMP

MTR-1442Q

1300670 E-630 MCC-8, SECTION 3A SAHARA DRYER 480V

FEEDER

1300671 E-631 MCC-8 SECTION 3B SPARE

1300672 E-634 COMPRESSOR 8 SYSTEM INTERCONNECTION

DIAGRAM SHEET 1

1300673 E-635 COMPRESSOR 8 SYSTEM INTERCONNECTION

DIAGRAM SHEET 2

1300674 E-636 COMPRESSOR 8 SYSTEM NETWORK

INTERCONNECTION DIAGRAM

1300675 E-637 COMPRESSOR 8B SCHEMATIC SYSTEM LAYOUT

OVERVIEW

1300676 E-638 COMPRESSOR 8 SYSTEM CONDUIT SCHEDULE 1

1300677 E-639 COMPRESSOR 8 SYSTEM CONDUIT SCHEDULE 2

1300678 E-641 COMPRESSOR 8 INTERLOCK SYSTEM READY

1300679 E-642 COMPRESSOR 8 INTERLOCK C8A READY,

REMOTE

1300680 E-643 COMPRESSOR 8 INTERLOCK D8 READY

1300681 E-644 COMPRESSOR 8 INTERLOCK C8B READY

1300682 E-645 COMPRESSOR 8 INTERLOCK SYSTEM RUN

PERMISSIVES

1300683 E-646 COMPRESSOR 8 INTERLOCK C8A RUN

PERMISSIVES

1300684 E-647 COMPRESSOR 8 INTERLOCK C8B RUN

PERMISSIVES

1300685 E-648 COMPRESSOR 8 INTERLOCK D8 RUN

PERMISSIVES

1300686 E-649 SEL-2600A ELEMENTARY DIAGRAM FOR C8A

1300687 E-650 SEL-2600A ELEMENTARY DIAGRAM FOR C8B

1300688 E-651 COMPRESSOR 8 SYSTEM CABLE SCHEDULE

SHEET 1

1300689 E-652 COMPRESSOR 8 SYSTEM CABLE SCHEDULE

SHEET 2

1300690 E-653 STATION CONTROL REMOTE SHUTDOWN

SECTION 01 11 00.00 41 Page 9

OVERVIEWS

1300695 E-710 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 1 OF 7

1300696 E-711 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 2 OF 7

1300697 E-712 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 3 OF 7

1300698 E-713 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 4 OF 7

1300699 E-714 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 5 OF 7

1300700 E-715 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 6 OF 7

1300701 E-716 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 7 OF 7

1300702 E-718 COMPRESSOR 8B SCHEMATIC SHEET 1 OF 13

WIRING DIAGRAM

1300703 E-719 COMPRESSOR 8B SCHEMATIC SHEET 2 OF 13

I/O MODULE

1300704 E-720 COMPRESSOR 8B SCHEMATIC SHEET 3 OF 13

I/O MODULE

1300705 E-721 COMPRESSOR 8B SCHEMATIC SHEET 4 OF 13

I/O MODULE

1300706 E-722 COMPRESSOR 8B SCHEMATIC SHEET 5 OF 13

I/O MODULE

1300707 E-723 COMPRESSOR 8B SCHEMATIC SHEET 6 OF 13

I/O MODULE

1300708 E-724 COMPRESSOR 8B SCHEMATIC SHEET 7 OF 13

I/O MODULE

1300709 E-725 COMPRESSOR 8B SCHEMATIC SHEET 8 OF 13

I/O MODULE

1300710 E-726 COMPRESSOR 8B SCHEMATIC SHEET 9 OF 13

I/O MODULE

1300711 E-727 COMPRESSOR 8B SCHEMATIC SHEET 10 OF 13

I/O MODULE

1300712 E-728 COMPRESSOR 8B SCHEMATIC SHEET 11 OF 13

I/O MODULE

1300713 E-729 COMPRESSOR 8B SCHEMATIC SHEET 12 OF 13

I/O MODULE

1300714 E-730 COMPRESSOR 8B SCHEMATIC SHEET 13 OF 13

PANEL LEGEND & NOTES

1300715 E-731 SAHARA DRYER SCHEMATIC

1300716 E-732 COMPRESSOR 8B PANEL LAYOUT SHEET

1300717 E-733 COMPRESSOR 8B PANEL LAYOUT SHEET

1300718 E-734 COMPRESSOR 8B PANEL LAYOUT SHEET

1300719 E-735 SAHARA DRYER PANEL LAYOUT

1300725 E-810 COMPRESSOR 8A LOOP SHEET STAGE

VIBRATION TRANSMITTERS

1300726 E-811 COMPRESSOR 8A LOOP SHEET INLET AIR

FILTER DIFF. PRESSURE TRANSMITTER

1300727 E-812 COMPRESSOR 8A LOOP SHEET PRE & POST

FILTER OIL PRESSURES TRANSMITTERS

1300728 E-813 COMPRESSOR 8A LOOP SHEET SYSTEM AIR

PRESSURE TRANSMITTER

1300729 E-814 COMPRESSOR 8A LOOP SHEET DISCHARGE

SECTION 01 11 00.00 41 Page 10

PRESSURE TRANSMITTER

1300730 E-815 COMPRESSOR 8A LOOP SHEET GEARBOX VACUUM

TRANSMITTER

1300731 E-816 COMPRESSOR 8A LOOP SHEET

ANTI-SURGE/BLOWOFF VALVE

1300732 E-817 COMPRESSOR 8A LOOP SHEET LUBE OIL

LEVEL & TEMP CONTROL

1300733 E-818 COMPRESSOR 8A LOOP SHEET MOTOR WIRING

TEMP. TRANSMITTER

1300734 E-819 COMPRESSOR 8A LOOP SHEET MOTOR BEARING

TEMP. TRANSMITTERS

1300735 E-820 COMPRESSOR 8A LOOP SHEET DISCHARGE AIR

TEMPERATURE TRANSMITTER

1300736 E-821 COMPRESSOR 8A LOOP SHEET OIL

TEMPERATURE TRANSMITTER

1300737 E-822 COMPRESSOR 8A LOOP SHEET 2ND INLET AIR

TEMP. TRANSMITTER

1300738 E-823 COMPRESSOR 8A LOOP SHEET 3RD INLET AIR

TEMP. TRANSMITTER

1300739 E-824 COMPRESSOR 8A LOOP SHEET 4TH INLET AIR

TEMP. TRANSMITTER

1300740 E-825 DRYER 8 LOOP SHEET EXIT AIR DEWPOINT

TRANSMITTER

1300741 E-826 DRYER 8 LOOP SHEET OUTLET PRESSURE

TRANSMITTER

1300742 E-827 DRYER 8 LOOP SHEET INLET PRESSURE

TRANSMITTERS

1300743 E-828 DRYER 8 LOOP SHEET INLET SWITCH

VALVES

1300744 E-829 DRYER 8 LOOP SHEET DEPRESSURIZATION

VALVES

1300745 E-830 DRYER 8 LOOP SHEET PURGE SWITCHING

VALVES

1300746 E-831 DRYER 8 LOOP SHEET

PRESSURIZATION/EXHAUST VALVE

1300747 E-832 DRYER 8 LOOP SHEET PURGE SWITCHING

VALVES

1300748 E-833 DRYER 8 LOOP SHEET HEATER OUTLET

VALVE

1300749 E-837 COMPRESSOR 8B LOOP SHEET COMPRESSOR

FRAME & MOTOR VIBRATION

1300750 E-838 COMPRESSOR 8B LOOP SHEET THROW

CROSSHEAD VIBRATION

1300751 E-839 COMPRESSOR 8B LOOP SHEET MOTOR BEARING

TEMP. TRANSMITTERS

1300752 E-840 COMPRESSOR 8B LOOP SHEET BLOW DOWN

VALVE

1300753 E-841 COMPRESSOR 8B LOOP SHEET FIRST STAGE

BYPASS VALVE

1300754 E-842 COMPRESSOR 8B LOOP SHEET FOURTH STAGE

BYPASS VALVE

1300755 E-843 COMPRESSOR 8B LOOP SHEET DRYER OUTLET

PRESSURE & FLOW TRANSMITTERS

1300756 E-844 COMPRESSOR 8B LOOP SHEET FIRST STAGE

SUCTION TEMP. & PRESSURE

TRANSMITTERS

1300757 E-845 COMPRESSOR 8B LOOP SHEET FIRST STAGE

DISCHARGE TEMP. & PRESSURE

SECTION 01 11 00.00 41 Page 11

TRANSMITTERS

1300758 E-846 COMPRESSOR 8B LOOP SHEET SECOND STAGE

SUCTION TEMP. & PRESSURE

TRANSMITTERS

1300759 E-847 COMPRESSOR 8B LOOP SHEET SECOND STAGE

DISCHARGE TEMP. & PRESSURE

TRANSMITTERS

1300760 E-848 COMPRESSOR 8B LOOP SHEET THIRD STAGE

SUCTION TEMP. & PRESSURE

TRANSMITTERS

1300761 E-849 COMPRESSOR 8B LOOP SHEET THIRD STAGE

DISCHARGE TEMP. & PRESSURE

TRANSMITTERS

1300762 E-850 COMPRESSOR 8B LOOP SHEET FOURTH STAGE

SUCTION TEMP. & PRESSURE

TRANSMITTERS

1300763 E-851 COMPRESSOR 8B LOOP SHEET FOURTH STAGE

DISCHARGE TEMP. & PRESSURE

TRANSMITTERS

1300764 E-852 COMPRESSOR 8B LOOP SHEET MAIN BEARING

#1 TEMPERATURE TRANSMITTER

1300765 E-853 COMPRESSOR 8B LOOP SHEET MAIN BEARING

#2 TEMPERATURE TRANSMITTER

1300766 E-854 COMPRESSOR 8B LOOP SHEET MAIN BEARING

#3 TEMPERATURE TRANSMITTER

1300767 E-855 COMPRESSOR 8B LOOP SHEET MAIN BEARING

#4 TEMPERATURE TRANSMITTER

1300768 E-856 COMPRESSOR 8B LOOP SHEET MOTOR WINDING

TEMP. TRANSMITTERS

1300769 E-857 COMPRESSOR 8B LOOP SHEET 1ST STAGE

SUCTION SCRUBBER LEVEL SWITCH

1300770 E-858 COMPRESSOR 8B LOOP SHEET 2ND STAGE

SUCTION SCRUBBER LEVEL SWITCH

1300771 E-859 COMPRESSOR 8B LOOP SHEET 3RD STAGE

SUCTION SCRUBBER LEVEL SWITCH

1300772 E-860 COMPRESSOR 8B LOOP SHEET 4TH STAGE

SUCTION SCRUBBER LEVEL SWITCH

1300773 E-861 COMPRESSOR 8B LOOP SHEET 1ST AND 2ND

STAGE LUBRICATOR NO FLOW SWITCH

1300774 E-862 COMPRESSOR 8B LOOP SHEET 3RD STAGE

LUBRICATOR NO FLOW SWITCH

1300775 E-863 COMPRESSOR 8B LOOP SHEET 4TH STAGE

LUBRICATOR NO FLOW SWITCH

1300776 E-864 COMPRESSOR 8B LOOP SHEET COMPRESSOR OIL

TEMPERATURE TRANSMITTER

1300777 E-865 COMPRESSOR 8B LOOP SHEET COMPRESSOR OIL

LOW OIL LEVEL TRANSMITTER

1300778 E-866 COMPRESSOR 8B LOOP SHEET COMPRESSOR OIL

PRESSURE PT-3925

1300779 E-867 COMPRESSOR 8B LOOP SHEET BACKPRESSURE

CONTROL VALVE

1300780 E-868 COMPRESSOR 7B LOOP SHEET RECYCLE VALVE

CONTROL VALVE

1300781 E-869 SAHARA DRYER SCHEMATIC ANALOG WIRING

DIAGRAM

1300782 E-870 SAHARA DRYER SCHEMATIC DIGITAL INPUT

WIRING

1300783 E-871 SAHARA DRYER SCHEMATIC RELAY OUTPUT

SECTION 01 11 00.00 41 Page 12

WIRING DIAGRAM

1300784 E-872 COMPRESSOR 8A E-STOP LOOP SHEET

1300785 E-873 STATION CONTROL PAC E-STOP & INTERLOCKS

LOOP SHEET

1300786 E-874 C8A MEDIUM VOLTAGE STARTERS E-STOP LOOP

SHEET

1300787 E-875 C8B MEDIUM VOLTAGE STARTERS E-STOP

LOOP SHEET

1300788 E-876 SAHARA D8 DRYER E-STOP LOOP SHEET

1300789 E-877 STATION CONTROL PAC DIGITAL INPUT

WIRING - SLOT 04 DEMO

1300790 E-878 STATION CONTROL PAC DIGITAL INPUT

WIRING - SLOT 04 NEW WORK

1300791 E-879 STATION CONTROL PAC DIGITAL OUTPUT

WIRING - SLOT 07 DEMO

1300792 E-880 STATION CONTROL PAC DIGITAL OUTPUT

WIRING - SLOT 07 NEW WORK

1300793 E-881 STATION CONTROL PAC ANALOG INPUT

WIRING - SLOT 02

1300794 E-882 STATION CONTROL PAC DIGITAL OUTPUT

WIRING - SLOT 10

1300795 E-883 DRAIN TANK FILTER VALVE

1300796 E-884 DRAIN TANK VENT VALVE

1300797 E-885 DRAIN TANK SUMP VALVE

1300798 E-886 SUMP PUMP 11 SOLENOID LOOP

1300799 E-887 SUMP PUMP 12 SOLENOID LOOP

1300800 E-888 COMPRESSOR 8B LOOP SUMP PUMP LEVEL

SWITCH

1.5.3 Reference Drawings

The following drawings are provided for information only, to assist the Contractor in performance of the requirements of these specifications:

DRAWING NO. REV. TITLE

710278 AB TOP LEVEL SIMPLIFIED P & ID OF HIGH PRESSURE

AIR PIPING

740097 L 6000 PSI AIR SYSTEM WELD LOCATIONS FOR COMPRESSOR

NO. 4 IN BLDG 1247E

740104 M 6000 PSI AIR SYSTEM (60-A) TO DRYERS 3, 4 & 5 WELD

LOCATIONS IN BLDG 1247E

741989 F 6000 PSI AIR SYSTEM (60-A) WELD LOCATIONS IN

BLDG 1247E

742058 G 6000 PSI AIR SYSTEM (60-A) AND DRYER #5 WELD

LOCATIONS IN BLDG 1247E

1263786 K HIGH PRESSURE AIR VENT PIPING P & ID

1263790 D COOLING TOWER NO. 2 AND COMPRESSOR NO. 4 WATER

PIPING P & ID

1263793 B SERVICE AIR (COMP 3 & 4 AREA) BASEMENT

1263796 B SERVICE AIR (COMP 3 & 4) 1ST FLOOR

1263801 E COMPRESSOR #4 P & ID

1263806 D DRYER #3 SCHEMATIC

ELECTRICAL

LB-41606 U ELECTRIC MANHOLE DEVELOPMENT 1606

LB-41607 P ELECTRIC MANHOLE DEVELOPMENT 1607

LB-41612 M ELECTRIC MANHOLE DEVELOPMENT 1612

SECTION 01 11 00.00 41 Page 13

DRAWING NO. REV. TITLE

LB-41629 L ELECTRIC MANHOLE DEVELOPMENT 1629

660204 F FLOOR PLANS & SWITCHGEAR DIAGRAMS

660152 - SUBSTATIONS "A" AND "C" ONE-LINE DIAGRAM

660541 J INTERCONNECTION - WIRING

665641 E COMPRESSOR NO. 4 AIR DRYER NO.3 WIRING CONNECTION

AND INTERCONNECTION DIAGRAM

1156565 A FIRE DETECTION DEVICES BLDG 1247E

1262906 A COMPRESSOR #4 NEW ELECTRICAL EQUIPMENT

ELEVATIONS

1262906 B COMPRESSOR #4 NEW ELECTRICAL EQUIPMENT

ELEVATIONS

1262908 A COMPRESSOR #4 NEW WORK PLAN

1262909 A COMPRESSOR #4 ANNUNCIATOR DISPLAY LAYOUT

1262910 B COMPRESSOR #4 CONTROL & AUXILIARY PANELS LAYOUT

1262911 A COMPRESSOR #4 AUXILIARY CONTROL PANEL LAYOUT &

LOW

1262913 C COMPRESSOR #4 AND MCC-4 ONE-LINE DIAGRAMS

1262918 A COMPRESSOR #4 MEDIUM VOLTAGE MOTOR SCHEMATIC

1262919 C COMPRESSOR #4 MOTOR CONTROL SCHEMATIC

1262920 A COMPRESSOR #4 ELECTRICAL CONTROL SCHEMATIC

1262921 B COMPRESSOR #4 ALARM ANNUNCIATOR SCHEMATIC

1262924 A COMPRESSOR #4 - ILD - PCV3088A & HX COOLING WATER

FLOW METER

1262930 B COMP #4 INSTRUMENTATION UNIT WIRING DIAGRAM 1

1262931 A COMPRESSOR #4 INSTRUMENTATION UNIT WIRING

DIAGRAM 2

1262932 A COMPRESSOR #4 INSTRUMENTATION UNIT WIRING

DIAGRAM 3

1262933 A COMPRESSOR #4 INSTRUMENTATION UNIT WIRING

DIAGRAM 4

1263806 E DRYER #3 SCHEMATIC

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING DIAGRAM

1264446 - COMPRESSOR 4 RECON SYSTEM SYMBOL LEGEND 2 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING DIAGRAM

1262446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 3a of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 4 of 12

1262446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 5 of 12

1262446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 6 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 7 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 8 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 9 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 10 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 11 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 12 of 12

1288133 B COMPRESSOR STATION NETWORK DIAGRAM B

1288134 - COMPRESSOR STATION NETWORK DIAGRAM DETAILS

SECTION 01 11 00.00 41 Page 14

1.6 PERFORMANCE PERIOD AND SCHEDULE

The performance period for this project is 730 calendar days. Notice to proceed will be provided by the Contracting Officer commensurate with award of the contract.

1.7 SALVAGE MATERIAL AND EQUIPMENT

There are no items to be salvaged and turned over to the Contracting Officer or the Government. The Contractor shall be responsible for the removal, demolition, or disposition of all items identified in the contract specifications and drawings.

-- End of Section --

SECTION 01 11 00.00 41 Page 15

SECTION TABLE OF CONTENTS

SECTION 01 30 00.00 41

ADMINISTRATIVE REQUIREMENTS

02/14

1.1 REFERENCE PUBLICATIONS

1.3 PROJECT SIGN

1.4 DISPLAY OF WORKERS DOCUMENTATION BULLETINS

1.5 PROJECT PHOTOGRAPHS

1.6 TIME-LAPSE VIDEO

1.7 ON-SITE PERMITS

1.7.1 Utility Outage Requests and Utility Connection Requests

1.7.2 Borrow, Excavation, Welding, and Burning Permits

1.7.3 Application for Connecting to Government Electrical Utilities

1.8 CONCRETE CUTTING AND DRILLING

1.9 PROJECT MANAGEMENT PLAN

1.10 QUALITY CONTROL

1.10.1 Quality Control Plan

1.10.1.1 Content of the Construction Quality Control (CQC) Plan

1.10.2 Inspections and Tests

1.10.3 Quality Control Documentation

1.10.4 Quality Control (QC) - Quality Assurance (QA) Coordination

Meeting

1.10.5 Changes in CQC Plan

1.10.6 Three Phase Quality Control

1.10.6.1 Preparatory Phase

1.10.6.2 Initial Phase

1.10.6.3 Follow-up Phase

1.11 CONTRACTOR PERSONNEL REQUIREMENTS

1.11.1 Contractor, Subcontractors and Personnel

1.11.2 Project Management

1.11.3 Project Superintendent

1.11.4 Project Quality Control Representative

1.11.5 Plumbing Workers' Qualifications

1.11.6 Mechanical Workers' Qualifications

1.11.7 Electrical Workers' Qualifications

1.11.8 Welding Qualifications

1.11.9 Additional Requirements for Pressure Systems Work

1.11.9.1 Manpower With Emphasis on Welders

1.11.9.2 Pressure System Worker Qualifications(for systems governed by LPR 1710.40) Langley Research Center Pressure System Handbook and LMS-CP-5698 Welding/Brazing and LPR 1710.41 Langley Research Center Evaluation of Socket and Branch Connections

1.11.10 Identification Badges

1.12 WORK HOURS

1.13 CORRESPONDENCE, SUBMITTALS AND INVOICES

1.14 ELECTRONIC MAIL (E-MAIL) ADDRESS

1.15 CLOSEOUT DOCUMENTS

SECTION 01 30 00.00 41 Page 1

1.15.1 As-Built Contract Drawings

1.15.2 Computerized Maintenance Management System (CMMS)

1.15.3 Operation and Maintenance Documents

1.16 HANDLING/PROTECTION OF CONTRACTOR MATERIAL AND EQUIPMENT

1.17 UTILITY OUTAGES

1.17.1 Utility Outages

1.17.2 Application for Connecting to Government Electrical Utilities

1.18 ON-SITE GOVERNMENT/CONTRACTOR/SUBCONTRACTOR COORDINATION

1.19 PROJECT SCHEDULE

1.20 MEETINGS

1.20.1 Project Kick-Off Meeting

1.20.1.1 Kick-Off Meeting Agenda

1.20.2 Preconstruction Conference

1.20.3 Meeting Minutes

1.20.4 Facility Coordination Meetings

1.20.5 Project Status Meetings

1.20.5.1 General

1.20.5.2 Construction Progress Meetings

1.20.6 Integrated Systems Review (ISR)

1.20.7 Operational Readiness Review (ORR)

1.20.8 Progress Report

1.21 FORMAL PARTNERING

1.22 WARRANTY

-- End of Section Table of Contents --

SECTION 01 30 00.00 41 Page 2

SECTION 01 30 00.00 41

ADMINISTRATIVE REQUIREMENTS

02/14

1.1 REFERENCE PUBLICATIONS

The publications listed below form a part of these specifications to the extent referenced. The publications are referred to in the text by the basic designation only.

The listed versions of the following references were used during the development of this design and are the Government approved versions to be used herein. There may be newer versions of certain references that have been released since the commencement and/or approval of the design effort.

However, in order to comply with the Government technical requirements, not all of the latest versions of the listed references were adopted and the versions listed herein shall be utilized.

LAPD 1600.4 (February 2017) Firearms and Dangerous Weapons Policy

LAPD 1600.5 (July 2015) Workplace Violence and Threatening Behavior

LAPD 1700.7 (April 2016) Traffic Management

LAPD 1700.8 (December 2017) Parking Regulations

LPR 1710.40 (April 2017) Langley Research Center Pressure Systems Handbook

NPD…

This is the start of the file's text. The full file is on GovTribe.