80LARC18R0005_Amendment_000002.pdf

PDF 28 MB Posted

Attached to
NASA LaRC Compressor Station Upgrades, Phase 2
Solicitation number
80LARC18R0005
Issued by

About this file

Amendment # 2 Package

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

000002

Daphne G. Darden

The purpose of this Amendment is to incorporate TAB 22 Attachment 14 - RFP Answers to Industry Questions, to include the Government's responses to questions received from Industry in response to the Request for Proposal (RFP); incorporate TAB 23 Attachment 15 - Manufacturer Data Sheets; and incorporate updated versions of Exhibit C Specifications and Design, Exhibit D Contract Pricing Schedule, and Attachment 5 Pricing Forms.

NASA/Langley Research Center 5 Langley Blvd., Bldg. 2101 M/S 12 Hampton, VA 23681-2199

80LARC18R0005

06/19/2018

7/19/2018

UNITED STATES

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

LANGLEY RESEARCH CENTER

HAMPTON, VIRGINIA

SPECIFICATIONS

FOR

COMPRESSOR STATION UPGRADES, PHASE 2

LOCATED IN

WEST AREA

LANGLEY RESEARCH CENTER, HAMPTON, VIRGINIA

SPECIFICATION NO. CTN001205 DATE: 5-10-18

CTN001205 COMPRESSOR STATION UPGRADES, PHASE 2 (5-10-18)

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.00 41 SUMMARY OF WORK

01 30 00.00 41 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 41 NASA LANGLEY SAFETY REQUIREMENTS

01 35 40.00 41 NASA LANGLEY ENVIRONMENTAL REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 86 13.08 41 EQUIPMENT QUALITY ASSURANCE AND TESTING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00.00 41 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23.00 41 WELDING, STRUCTURAL

05 12 00.00 41 STRUCTURAL STEEL

DIVISION 22 - PLUMBING

22 15 13.16 40 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS,

AND VALVES, STAINLESS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 15.00 41 COMMON PIPING FOR HVAC

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 41 COMMON WORK RESULTS FOR ELECTRICAL

26 05 13.00 41 MEDIUM-VOLTAGE CABLES

26 05 70.00 41 MEDIUM VOLTAGE OVERCURRENT PROTECTIVE DEVICES

26 08 00 APPARATUS INSPECTION AND TESTING

26 24 19.00 40 MOTOR CONTROL CENTERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 01.00 10 ELECTRIC MOTORS, 3-PHASE HORIZONTAL INDUCTION TYPE

DIVISION 40 - PROCESS INTERCONNECTIONS

40 95 00.00 41 PROCESS CONTROL

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE

EQUIPMENT

43 02 00.00 41 WELDING PRESSURE/MECHANICAL PIPING/VESSELS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

SECTION 01 11 00.00 41

SUMMARY OF WORK

09/15

PART 1 GENERAL

1.1 TERMINOLOGY CLARIFICATIONS

1.2 SUBMITTALS

1.3 SUMMARY

1.4 SPECIAL PROJECT CONSIDERATIONS

1.5 CONTRACT DOCUMENTS

1.5.1 Langley Procedural Requirements (LPRs)

1.5.2 Contract Drawings

1.5.3 Reference Drawings

1.6 PERFORMANCE PERIOD AND SCHEDULE

1.7 SALVAGE MATERIAL AND EQUIPMENT

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

SECTION 01 11 00.00 41 Page 1

SECTION 01 11 00.00 41

SUMMARY OF WORK

09/15

The Contractor shall furnish all services and material for the effort specified herein. Throughout all sections, paragraphs and statements of this specification document, the Contractor shall be considered the subject of all declarative statements and shall be responsible for the stated action unless it is explicitly stated otherwise.

1.1 TERMINOLOGY CLARIFICATIONS

All references to the Contracting Officer contained in this specification, or any severable part thereof, shall be determined to mean the Contracting Officer or the Contracting Officer's Representative (COR). If any question arises concerning the "authorization" status of a Contracting Officer Representative, the Contractor shall immediately refer the question, in writing, to the Contracting Officer. Any references to "as directed", "approved by", "witnessed by", or "submitted to", shall be determined to mean the Contracting Officer.

Where "day" or "days" are written, it shall mean calendar day or days, unless otherwise stated in the specification.

Where "hour" or "hours" are written, it shall mean clock hours, unless otherwise stated in the specification.

Where "must" is written, it has the same meaning as "shall".

Where "as indicated" and "as specified" are written it shall refer to "as indicated on the drawings," and "as specified in the specifications". The specifications shall always take precedence over the drawings. Large-scale drawings shall govern small-scale drawings. The Contractor shall follow figures marked on drawings in preference to scale measurements. Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

"LPR" refers to Langley Procedural Requirement.

"NPR" refers to NASA Procedural Requirement.

"LF" refers to Langley Form.

"RFI" refers to Request for Information.

The Contractor shall submit the following to the Contracting Officer in accordance with the requirements of Section 01 33 00 SUBMITTAL PROCEDURES:

SECTION 01 11 00.00 41 Page 2

SD-01 Preconstruction Submittals

Dust and Debris Mitigation Plan

1.3 SUMMARY

The Contractor shall furnish all services and materials to replace Compressor 4 and its associated ancillary systems as specified herein. The Contractor shall furnish all plant, equipment, tools, materials, labor, and services necessary for the complete and finished effort.

The work is located at Building 1247E, East Reid Street, West Area of the Langley Research Center, Hampton, Virginia.

The Contractor shall replace one 8.0 lbs/sec at 6,000 psi compressor and associated ancillary systems with a new AG Equipment HPA-4C-D-4R-C compressor system, including associated ancillary system. The Contractor shall also integrate the new compressor system into the plant-wide control system.

The Contractor shall be responsible for all aspects of implementing the existing design for demolition, new compressor system installation, and the integration into the plant-wide control system based on the Government's parameters as specified herein. The Contractor shall be responsible for furnishing and installing all aspects of the design, including site work, concrete, steel, metals, interior wall and floor finishes, painting, plumbing, mechanical, electrical, control systems, process piping, high pressure work, high voltage work, vibration analysis, power system analysis, and all other items defined in the contract documents.

1.4 SPECIAL PROJECT CONSIDERATIONS

The Contractor shall be aware of the following special considerations required by this project:

The Contractor shall minimize interruptions to Compressors 5, 6, and 7 and their ancillary systems during the construction period.

Hazardous Materials - The following items are noted in the Building 1247E Hazardous Materials Study.

A. Light fixtures on the first floor and basement contain PCB ballasts, and all fluorescent light bulbs are presumed to contain mercury.

B. Asbestos Containing Materials and pipe insulation and fittings are located in the basement and on the dryer 3 vessels on the first floor.

C. Various quantities of oil associated with the compressors are presumed hazardous.

D. Electrical components that previously contained oil shall be considered to contain PCB contaminated oil residual after the oil removal process.

E. Mechanical systems, generators, and motors are presumed to contain PCB oils and components.

F. Various levels of cadmium, chromium, and lead are present on various equipment, safety rails, and the building structure.

SECTION 01 11 00.00 41 Page 3

G. Fire proofing tape on the medium voltage feeders for Compressors contain asbestos.

These items shall be handled in accordance with the requirements of Section 01 35 26.00 41 NASA LANGLEY SAFETY REQUIREMENTS, paragraph 1.19 and Section 01 35 40.00 41 NASA LANGLEY ENVIRONMENTAL REQUIREMENTS, paragraph 3.6.

Assume painted surfaces on equipment, handrails, and columns contain lead.

These items shall be handled in accordance with Section 01 35 40.00 41 NASA LANGLEY ENVIRONMENTAL REQUIREMENTS, paragraph 3.5.2. Assume ballasts in all lighting fixtures to be removed contain PCB's. These items shall be handled in accordance with Section 01 35 40.00 41 NASA LANGLEY ENVIRONMENTAL REQUIREMENTS, paragraph 3.7.

The Contractor shall schedule work to hold utility (air, water, electricity) outages to a minimum. Outages, in this context, refer to outages that extend beyond the work zone, to the remainder of Building 1247E, or to parts or all of the LaRC campus.

Allowances for Personnel Access

During construction, there will be active equipment systems in the basement that are within the construction zone that require regular operator access and maintenance. The Contractor shall be responsible to ensure that Government and Compressor Station personnel have access to the active equipment systems that shall be maintained at all times during performance of this contract. These items will include but not be limited to the following:

The Contractor shall provide a Dust and Debris Mitigation Plan clarifying the mitigation and testing to monitor and prevent dust and debris generated during the construction activity that may impact the activities within Building 1247E. Compressors 5, 6, and 7 will be operational as well as other equipment within the Facility. The Contractor shall install barriers (such as tarps, shields, and curtains) to separate the construction area from the area with the active Compressor equipment. Additionally, the Contractor shall provide a method of monitoring the amount of dust and debris that may escape the containment area. This shall include methods such as daily walkthroughs, swabbing of equipment, inspection of equipment internals if/when available, and placement of methods of debris collection/measuring. If during inspections the level of dust is determined to be detrimental or unacceptable by the Government, construction activities shall be halted and an improved method of containment constructed and approved. The Contractor shall coordinate the construction of barriers and other site limiting methods during construction with the Facility. Visual means of verification (line of site vision) is required during some operational time periods for specific equipment. The Contractor shall be responsible for cleanup and repair of any damage (equipment or otherwise) caused by dust or debris created by their construction activities.

During construction, the Contractor shall coordinate with NASA GIS to complete laser scans at the following points during construction:

1. Upon the completion of the Demolition Phase (this included the demolition of all existing foundation work).

2. Upon the completion of setting new reinforcing steel (prior to concrete placement).

SECTION 01 11 00.00 41 Page 4

3. Upon the installation of the new foundations (prior to any installation of new equipment).

4. Upon the completion of construction.

1.5 CONTRACT DOCUMENTS

NASA Langley uses Portable Document Format (PDF) forms of the Technical Submittal Form 317, Request For Information form LF 253, and Facility Systems Engineering - Request for Change form LF 337. The Contracting Officer will supply the Contractor with the latest version of each of these forms, as well as the following documents:

1. Two hard copies of full size drawings and drawings in electronic (PDF) format on a Compact Disc (CD)

2. One Revit (.rvt) file containing a copy of the Building Information Model (BIM) for creation of content and drawing production. The file will be supplied through the Large File Transfer Protocol (LFT). This material is being provided as "For Information Only".

3. One AutoCAD (.dwg) file for each drawing not included in the BIM.

These files will be supplied through LFT. This material is being provided as "For Information Only".

4. Two hardbound copies of Specifications and Specifications in electronic PDF format on a CD.

5. Electronic copy of NASA Langley's Technical Submittal Form 317 in PDF format on a CD.

6. Electronic copy of NASA Langley's Request for Information (R.F.I.)

form 253 in PDF format on a CD.

7. Electronic copy of NASA Langley's Facility Systems Engineering Request for Change form 337 in PDF format on a CD.

8. Electronic copy of the Requirements Traceability Matrix on a CD. The Contractor shall maintain and update the Requirements Traceability Matrix for the full duration of the Contract.

9. Electronic copy of the Computerized Maintenance Management System (CMMS) Software/Maintenance/Equipment Change Request Form LF 491.

10. Electronic copies of NASA Langley Procedural Requirements (LPRs) and other documents in PDF format on a CD.

LPR 1710.6 Langley Research Center Electrical Safety LPR 1710.10 Langley Research Center Energy Control Program (Lockout/Tagout) LPR 1710.17 Respiratory Protection Program LaRC-FES-FAS Center Operation Directorate Facility Engineering Standards, Facility Automation Systems LPR 1710.40 Langley Research Center Pressure Systems Handbook LPR 1710.41 Langley Research Center Standard for the Evaluation of Socket and Branch Connection

SECTION 01 11 00.00 41 Page 5

Welds LPR 1740.2 Facility Safety Requirements LARC-FES-PVS Facilities Engineering Standards Piping Systems and Pressure Vessels

LPR 1710.11 Fire Protection Program LAPD 1700.7 Traffic Management LPR 1740.6 Personnel Safety Certification LPR 8500.1 Environmental and Energy Program Manual LPR 7150.2B Software Engineering Requirement LAPD 7000.2 Review Program for Langley Research Center (LaRC) Facility Projects LMS-CP-4754 Software Assurance (SA) for Development and Acquisition LMS-CP-5698 Welding/Brazing

11. One hard copy and one electronic copy in PDF format on a CD of the Building 1247E Hazardous Materials Study.

12. One hard copy and one electronic copy in PDF format of the Preliminary Site Acceptance Test Plan.

13. One hard copy and one electronic copy in PDF format of (AE03154 - Compressor Station Upgrades WP#1 Automation Upgrades) C5-D4 System SAT Plan for reference only.

14. One hard copy and one electronic copy in PDF format of the listed reference drawings for this project.

Contractor shall immediately check furnished drawings and specifications, and notify the Contracting Officer of any discrepancies within 14 calendar days of receipt of the documentation.

1.5.1 Langley Procedural Requirements (LPRs)

The Contractor shall adhere to LPRs and other Langley specific documents that specify requirements particular to work at NASA Langley. These LPRs parallel or exceed standard codes. It is the responsibility of the Contractor to become familiar with and follow the associated LPRs. Refer to paragraph 1.4 for a listing of these documents.

1.5.2 Contract Drawings

The work shall conform to these specifications and the drawings listed below:

DRAWING NO. SHEET NO. TITLE

GENERAL

1300567 G-100 TITLE SHEET

1300568 G-101 INDEX OF DRAWINGS

STRUCTURAL

1300569 S-001 STRUCTURAL NOTES

1300570 SD-101 FIRST FLOOR REMOVAL PLAN

1300571 SD-102 FIRST FLOOR FRAMING REMOVAL PLAN

1300572 SD-301 REMOVAL SECTIONS

1300573 S-101 BASEMENT ALTERATION PLAN

1300574 S-102 FIRST FLOOR FRAMING PLAN

1300575 S-103 FIRST FLOOR ALTERATION PLAN

SECTION 01 11 00.00 41 Page 6

1300576 S-301 RECIPROCATING COMPRESSOR FOUNDATION

SECTIONS AND DETAILS

1300577 S-302 RECIPROCATING COMPRESSOR FOUNDATION

SECTIONS

1300578 S-303 COMPRESSOR FOUNDATIONS - ISOMETRIC

VIEWS

1300579 S-304 CENTRIFUGAL COMPRESSOR FOUNDATION

SECTIONS AND DETAILS

1300580 S-305 CENTRIFUGAL COMPRESSOR FOUNDATION

SECTIONS

1300581 S-401 RECIPROCATING VENT SILENCER AND INTAKE

FILTER FOUNDATIONS

1300582 S-402 ENLARGED PLATFORM PLANS SECTIONS AND

DETAILS

1300583 S-403 PURGE DRYER SKID FRAME PLAN AND

SECTIONS

PROCESS

1300587 D-001 MECHANICAL GENERAL NOTES, LEGEND, AND

ABBREVIATIONS

1300588 D-101 MECHANICAL REMOVAL PLAN - BASEMENT

1300589 D-102 MECHANICAL REMOVAL PLAN - FIRST FLOOR

1300590 D-103 MECHANICAL NEW WORK PLAN - BASEMENT

1300591 D-104 MECHANICAL NEW WORK PLAN - FIRST

FLOOR

1300592 D-401 MECHANICAL REMOVAL SECTIONS AND

PHOTOS

1300593 D-402 MECHANICAL REMOVAL SECTIONS

1300594 D-403 MECHANICAL REMOVAL SECTIONS

1300595 D-404 MECHANICAL 3D VIEW - COMPRESSOR 4

REMOVAL

1300596 D-405 MECHANICAL 3D VIEW - COMPRESSOR 4

REMOVAL

1300597 D-406 MECHANICAL NEW WORK ENLARGED PLAN AND

SECTIONS

1300598 D-407 MECHANICAL NEW WORK ENLARGED PLAN AND

SECTION

1300599 D-408 MECHANICAL 3D VIEWS - CENTRIFUGAL

COMPRESSOR #8A & DRYER #8

1300600 D-409 MECHANICAL 3D VIEWS - RECIPROCATING

COMPRESSOR #8B

1300601 D-410 MECHANICAL 3D VIEWS - AIR

INTAKE/SILENCERS & SUMP PIT #8

1300602 D-411 MECHANICAL 3D VIEWS - BASEMENT PIPING

1300603 D-501 PIPE SUPPORTS DETAILS

1300604 D-601 MECHANICAL SCHEDULES

1300605 D-700 PIPING AND INSTRUMENTATION DIAGRAM

LEGEND AND ABBREVIATIONS

1300606 D-701 CENTRIFUGAL COMPRESSOR #8A (1 OF 2)

AIR AND COOLING WATER P&ID

1300607 D-702 CENTRIFUGAL COMPRESSOR #8A (2 OF 2)

DRAIN SYSTEM P&ID

1300608 D-703 DRYER #8 P&ID

1300609 D-704 RECIPROCATING COMPRESSOR #8B (1 OF

6) 1ST AND 2ND STAGE P&ID

1300610 D-705 RECIPROCATING COMPRESSOR #8B (2 OF

6) 3RD AND 4TH STAGE P&ID

1300611 D-706 RECIPROCATING COMPRESSOR #8B (3 OF 6)

SECTION 01 11 00.00 41 Page 7

COOLING WATER P&ID

1300612 D-707 RECIPROCATING COMPRESSOR #8B (4 OF

6) LUBRICATING SYSTEM P&ID

1300613 D-708 RECIPROCATING COMPRESSOR #8B (5 OF 6)

PACKING COOLING WATER P&ID

1300614 D-709 RECIPROCATING COMPRESSOR #8B (6 OF

6) FINAL FILTER P&ID

1300615 D-710 COMPRESSOR 8 SYSTEM DRAIN P&ID

ELECTRICAL

1300620 E-001 ELECTRICAL LEGENDS AND ABBREVIATIONS

1300621 E-002 ELECTRICAL GENERAL AND REMOVAL NOTES

1300622 E-101 POWER REMOVAL PLAN - FIRST FLOOR

1300623 E-102 POWER REMOVAL PLAN - BASEMENT

1300624 E-103 INSTRUMENT FIELD DEVICES LOCATION

REMOVAL PLAN

1300625 E-104 LIGHTING AND GROUNDING REMOVAL PLAN -

BASEMENT

1300626 E-105 ELECTRICAL REMOVAL - FEEDER ROUTING

PLAN

1300627 E-106 NEW POWER PLAN - FIRST FLOOR

1300628 E-107 NEW POWER PLAN - BASEMENT

1300629 E-108 NEW LIGHTING PLAN BASEMENT

1300630 E-109 NEW EQUIPMENT GROUNDING PLAN -

BASEMENT

1300631 E-110 NEW COMMUNICATION SYSTEM PLAN

1300632 E-111 ELECTRICAL NEW WORK - FIRE ALARM

SYSTEM

1300633 E-112 NEW FEEDERS 3DE2-1 AND 3DE2-2 ROUTING

PLAN

1300634 E-201 EXISTING 3DE SWITCHGEAR ELEVATION FEEDER

3DE2 REMOVAL

1300635 E-202 NEW 3DE2-1 AND 3DE2-2 INSTALLATION AT

SWITCHGEAR 3DE

1300636 E-210 SWITCHGEAR ELEVATION DIAGRAM

1300639 E-501 EXISTING MANHOLE 1606 AND 1607 REMOVAL

FEEDER 3D2E

1300640 E-502 EXISTING MANHOLE 1612 & 1629 REMOVAL

FEEDER 3DE2

1300641 E-503 PHOTOS/SECTION VIEW - DETAILS

1300642 E-504 NEW POWER CABLE ROUTE INSIDE MANHOLES

1606 & 1607

1300643 E-505 NEW POWER CABLE ROUTES INSIDE MANHOLE

1612 & 1629

1300644 E-508 SUMP LEVEL CONTROL CABINET LAYOUT

1300647 E-601 REMOVAL - MV MOTOR STARTER AND MCC #4

ONE LINE DIAGRAMS

1300648 E-602 ELECTRICAL REMOVAL - MCC#4 SCHEMATIC

DIAGRAMS

1300649 E-605 COMPRESSOR 8 INSTRUMENTATION AND

CONTROLS BLOCK DIAGRAM

1300650 E-610 NEW MV COMPRESSOR #8 STARTER ONE LINE

DIAGRAM

1300651 E-611 MV SW 3345 THREE LINE DIAGRAM

1300652 E-612 MV CENTRIFUGAL COMPRESSOR 8A THREE LINE

DIAGRAM

1300653 E-613 MV RECIPROCATING COMPRESSOR 8B THREE

LINE DIAGRAM

SECTION 01 11 00.00 41 Page 8

1300654 E-614 MV MCC SW #3345 CONTROL ELEMENTARY

DIAGRAM

1300655 E-615 MV MCC SW #3345 HVL-CB MECHANISM

DIAGRAM

1300656 E-616 MV MCC SEL-710 LOGIC DIAGRAM

1300657 E-617 MV MCC COMPRESSOR 8A, CONTROL

ELEMENTARY, 1 OF 2

1300658 E-618 MV MCC COMPRESSOR 8A, CONTROL

ELEMENTARY, 2 OF 2

1300659 E-619 MV MCC COMPRESSOR 8B, CONTROL

ELEMENTARY, 1 OF 2

1300660 E-620 MV MCC COMPRESSOR 8B, CONTROL

ELEMENTARY, 2 OF 2

1300661 E-621 MV MCC NAMEPLATE DETAILS

1300662 E-622 MV MCC SEL-710 LOGIC DIAGRAM

1300663 E-623 MCC-8 NEW ONE-LINE DIAGRAM &

ELEVATION

1300664 E-624 MCC-8, SECTION 1A C8A AUXILIARY OIL PUMP

MTR-1426Q

1300665 E-625 MCC-8, SECTION 1B C8A OIL HEATER

HTR-1411Q

1300666 E-626 MCC-8, SECTION 1C INCOMING FEEDER

1300667 E-627 MCC-8, SECTION 2A C8A DEMISTER MOTOR

BLW-1417Q

1300668 E-628 MCC-8, SECTION 2B C8B PACKING COOLING

PUMP MTR-5043

1300669 E-629 MCC-8, SECTION 2C C8B PRE-LUBE PUMP

MTR-1442Q

1300670 E-630 MCC-8, SECTION 3A SAHARA DRYER 480V

FEEDER

1300671 E-631 MCC-8 SECTION 3B SPARE

1300672 E-634 COMPRESSOR 8 SYSTEM INTERCONNECTION

DIAGRAM SHEET 1

1300673 E-635 COMPRESSOR 8 SYSTEM INTERCONNECTION

DIAGRAM SHEET 2

1300674 E-636 COMPRESSOR 8 SYSTEM NETWORK

INTERCONNECTION DIAGRAM

1300675 E-637 COMPRESSOR 8B SCHEMATIC SYSTEM LAYOUT

OVERVIEW

1300676 E-638 COMPRESSOR 8 SYSTEM CONDUIT

SCHEDULE 1

1300677 E-639 COMPRESSOR 8 SYSTEM CONDUIT

SCHEDULE 2

1300678 E-641 COMPRESSOR 8 INTERLOCK SYSTEM READY

1300679 E-642 COMPRESSOR 8 INTERLOCK C8A READY,

REMOTE

1300680 E-643 COMPRESSOR 8 INTERLOCK D8 READY

1300681 E-644 COMPRESSOR 8 INTERLOCK C8B READY

1300682 E-645 COMPRESSOR 8 INTERLOCK SYSTEM RUN

PERMISSIVES

1300683 E-646 COMPRESSOR 8 INTERLOCK C8A RUN

PERMISSIVES

1300684 E-647 COMPRESSOR 8 INTERLOCK C8B RUN

PERMISSIVES

1300685 E-648 COMPRESSOR 8 INTERLOCK D8 RUN

PERMISSIVES

1300686 E-649 SEL-2600A ELEMENTARY DIAGRAM FOR C8A

1300687 E-650 SEL-2600A ELEMENTARY DIAGRAM FOR C8B

SECTION 01 11 00.00 41 Page 9

1300688 E-651 COMPRESSOR 8 SYSTEM CABLE SCHEDULE

SHEET 1

1300689 E-652 COMPRESSOR 8 SYSTEM CABLE SCHEDULE

SHEET 2

1300690 E-653 STATION CONTROL REMOTE SHUTDOWN

OVERVIEWS

1300695 E-710 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 1 OF 7

1300696 E-711 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 2 OF 7

1300697 E-712 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 3 OF 7

1300698 E-713 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 4 OF 7

1300699 E-714 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 5 OF 7

1300700 E-715 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 6 OF 7

1300701 E-716 COMPRESSOR 8A MAESTRO PLC-R2 CONTROLLER,

SCHEMATIC SHEET 7 OF 7

1300702 E-718 COMPRESSOR 8B SCHEMATIC SHEET 1 OF 13

WIRING DIAGRAM

1300703 E-719 COMPRESSOR 8B SCHEMATIC SHEET 2 OF 13

I/O MODULE

1300704 E-720 COMPRESSOR 8B SCHEMATIC SHEET 3 OF 13

I/O MODULE

1300705 E-721 COMPRESSOR 8B SCHEMATIC SHEET 4 OF 13

I/O MODULE

1300706 E-722 COMPRESSOR 8B SCHEMATIC SHEET 5 OF 13

I/O MODULE

1300707 E-723 COMPRESSOR 8B SCHEMATIC SHEET 6 OF 13

I/O MODULE

1300708 E-724 COMPRESSOR 8B SCHEMATIC SHEET 7 OF 13

I/O MODULE

1300709 E-725 COMPRESSOR 8B SCHEMATIC SHEET 8 OF 13

I/O MODULE

1300710 E-726 COMPRESSOR 8B SCHEMATIC SHEET 9 OF 13

I/O MODULE

1300711 E-727 COMPRESSOR 8B SCHEMATIC SHEET 10 OF 13

I/O MODULE

1300712 E-728 COMPRESSOR 8B SCHEMATIC SHEET 11 OF 13

I/O MODULE

1300713 E-729 COMPRESSOR 8B SCHEMATIC SHEET 12 OF 13

I/O MODULE

1300714 E-730 COMPRESSOR 8B SCHEMATIC SHEET 13 OF 13

PANEL LEGEND & NOTES

1300715 E-731 SAHARA DRYER SCHEMATIC

1300716 E-732 COMPRESSOR 8B PANEL LAYOUT SHEET

1300717 E-733 COMPRESSOR 8B PANEL LAYOUT SHEET

1300718 E-734 COMPRESSOR 8B PANEL LAYOUT SHEET

1300719 E-735 SAHARA DRYER PANEL LAYOUT

1300725 E-810 COMPRESSOR 8A LOOP SHEET STAGE

VIBRATION TRANSMITTERS

1300726 E-811 COMPRESSOR 8A LOOP SHEET INLET AIR

FILTER DIFF. PRESSURE TRANSMITTER

SECTION 01 11 00.00 41 Page 10

1300727 E-812 COMPRESSOR 8A LOOP SHEET PRE & POST

FILTER OIL PRESSURES TRANSMITTERS

1300728 E-813 COMPRESSOR 8A LOOP SHEET SYSTEM AIR

PRESSURE TRANSMITTER

1300729 E-814 COMPRESSOR 8A LOOP SHEET DISCHARGE

PRESSURE TRANSMITTER

1300730 E-815 COMPRESSOR 8A LOOP SHEET GEARBOX VACUUM

TRANSMITTER

1300731 E-816 COMPRESSOR 8A LOOP SHEET

ANTI-SURGE/BLOWOFF VALVE

1300732 E-817 COMPRESSOR 8A LOOP SHEET LUBE OIL

LEVEL & TEMP CONTROL

1300733 E-818 COMPRESSOR 8A LOOP SHEET MOTOR WIRING

TEMP. TRANSMITTER

1300734 E-819 COMPRESSOR 8A LOOP SHEET MOTOR BEARING

TEMP. TRANSMITTERS

1300735 E-820 COMPRESSOR 8A LOOP SHEET DISCHARGE AIR

TEMPERATURE TRANSMITTER

1300736 E-821 COMPRESSOR 8A LOOP SHEET OIL

TEMPERATURE TRANSMITTER

1300737 E-822 COMPRESSOR 8A LOOP SHEET 2ND INLET AIR

TEMP. TRANSMITTER

1300738 E-823 COMPRESSOR 8A LOOP SHEET 3RD INLET AIR

TEMP. TRANSMITTER

1300739 E-824 COMPRESSOR 8A LOOP SHEET 4TH INLET AIR

TEMP. TRANSMITTER

1300740 E-825 DRYER 8 LOOP SHEET EXIT AIR DEWPOINT

TRANSMITTER

1300741 E-826 DRYER 8 LOOP SHEET OUTLET PRESSURE

TRANSMITTER

1300742 E-827 DRYER 8 LOOP SHEET INLET PRESSURE

TRANSMITTERS

1300743 E-828 DRYER 8 LOOP SHEET INLET SWITCH

VALVES

1300744 E-829 DRYER 8 LOOP SHEET DEPRESSURIZATION

VALVES

1300745 E-830 DRYER 8 LOOP SHEET PURGE SWITCHING

VALVES

1300746 E-831 DRYER 8 LOOP SHEET

PRESSURIZATION/EXHAUST VALVE

1300747 E-832 DRYER 8 LOOP SHEET PURGE SWITCHING

VALVES

1300748 E-833 DRYER 8 LOOP SHEET HEATER OUTLET

VALVE

1300749 E-837 COMPRESSOR 8B LOOP SHEET COMPRESSOR

FRAME & MOTOR VIBRATION

1300750 E-838 COMPRESSOR 8B LOOP SHEET THROW

CROSSHEAD VIBRATION

1300751 E-839 COMPRESSOR 8B LOOP SHEET MOTOR BEARING

TEMP. TRANSMITTERS

1300752 E-840 COMPRESSOR 8B LOOP SHEET BLOW DOWN

VALVE

1300753 E-841 COMPRESSOR 8B LOOP SHEET FIRST STAGE

BYPASS VALVE

1300754 E-842 COMPRESSOR 8B LOOP SHEET FOURTH STAGE

BYPASS VALVE

1300755 E-843 COMPRESSOR 8B LOOP SHEET DRYER OUTLET

PRESSURE & FLOW TRANSMITTERS

SECTION 01 11 00.00 41 Page 11

1300756 E-844 COMPRESSOR 8B LOOP SHEET FIRST STAGE

SUCTION TEMP. & PRESSURE

TRANSMITTERS

1300757 E-845 COMPRESSOR 8B LOOP SHEET FIRST STAGE

DISCHARGE TEMP. & PRESSURE

TRANSMITTERS

1300758 E-846 COMPRESSOR 8B LOOP SHEET SECOND STAGE

SUCTION TEMP. & PRESSURE

TRANSMITTERS

1300759 E-847 COMPRESSOR 8B LOOP SHEET SECOND STAGE

DISCHARGE TEMP. & PRESSURE

TRANSMITTERS

1300760 E-848 COMPRESSOR 8B LOOP SHEET THIRD STAGE

SUCTION TEMP. & PRESSURE

TRANSMITTERS

1300761 E-849 COMPRESSOR 8B LOOP SHEET THIRD STAGE

DISCHARGE TEMP. & PRESSURE

TRANSMITTERS

1300762 E-850 COMPRESSOR 8B LOOP SHEET FOURTH STAGE

SUCTION TEMP. & PRESSURE

TRANSMITTERS

1300763 E-851 COMPRESSOR 8B LOOP SHEET FOURTH STAGE

DISCHARGE TEMP. & PRESSURE

TRANSMITTERS

1300764 E-852 COMPRESSOR 8B LOOP SHEET MAIN BEARING

#1 TEMPERATURE TRANSMITTER

1300765 E-853 COMPRESSOR 8B LOOP SHEET MAIN BEARING

#2 TEMPERATURE TRANSMITTER

1300766 E-854 COMPRESSOR 8B LOOP SHEET MAIN BEARING

#3 TEMPERATURE TRANSMITTER

1300767 E-855 COMPRESSOR 8B LOOP SHEET MAIN BEARING

#4 TEMPERATURE TRANSMITTER

1300768 E-856 COMPRESSOR 8B LOOP SHEET MOTOR WINDING

TEMP. TRANSMITTERS

1300769 E-857 COMPRESSOR 8B LOOP SHEET 1ST STAGE

SUCTION SCRUBBER LEVEL SWITCH

1300770 E-858 COMPRESSOR 8B LOOP SHEET 2ND STAGE

SUCTION SCRUBBER LEVEL SWITCH

1300771 E-859 COMPRESSOR 8B LOOP SHEET 3RD STAGE

SUCTION SCRUBBER LEVEL SWITCH

1300772 E-860 COMPRESSOR 8B LOOP SHEET 4TH STAGE

SUCTION SCRUBBER LEVEL SWITCH

1300773 E-861 COMPRESSOR 8B LOOP SHEET 1ST AND 2ND

STAGE LUBRICATOR NO FLOW SWITCH

1300774 E-862 COMPRESSOR 8B LOOP SHEET 3RD STAGE

LUBRICATOR NO FLOW SWITCH

1300775 E-863 COMPRESSOR 8B LOOP SHEET 4TH STAGE

LUBRICATOR NO FLOW SWITCH

1300776 E-864 COMPRESSOR 8B LOOP SHEET COMPRESSOR OIL

TEMPERATURE TRANSMITTER

1300777 E-865 COMPRESSOR 8B LOOP SHEET COMPRESSOR OIL

LOW OIL LEVEL TRANSMITTER

1300778 E-866 COMPRESSOR 8B LOOP SHEET COMPRESSOR OIL

PRESSURE PT-3925

1300779 E-867 COMPRESSOR 8B LOOP SHEET BACKPRESSURE

CONTROL VALVE

1300780 E-868 COMPRESSOR 7B LOOP SHEET RECYCLE VALVE

CONTROL VALVE

SECTION 01 11 00.00 41 Page 12

1300781 E-869 SAHARA DRYER SCHEMATIC ANALOG WIRING

DIAGRAM

1300782 E-870 SAHARA DRYER SCHEMATIC DIGITAL INPUT

WIRING

1300783 E-871 SAHARA DRYER SCHEMATIC RELAY OUTPUT

WIRING DIAGRAM

1300784 E-872 COMPRESSOR 8A E-STOP LOOP SHEET

1300785 E-873 STATION CONTROL PAC E-STOP & INTERLOCKS

LOOP SHEET

1300786 E-874 C8A MEDIUM VOLTAGE STARTERS E-STOP LOOP

SHEET

1300787 E-875 C8B MEDIUM VOLTAGE STARTERS E-STOP

LOOP SHEET

1300788 E-876 SAHARA D8 DRYER E-STOP LOOP SHEET

1300789 E-877 STATION CONTROL PAC DIGITAL INPUT

WIRING - SLOT 04 DEMO

1300790 E-878 STATION CONTROL PAC DIGITAL INPUT

WIRING - SLOT 04 NEW WORK

1300791 E-879 STATION CONTROL PAC DIGITAL OUTPUT

WIRING - SLOT 07 DEMO

1300792 E-880 STATION CONTROL PAC DIGITAL OUTPUT

WIRING - SLOT 07 NEW WORK

1300793 E-881 STATION CONTROL PAC ANALOG INPUT

WIRING - SLOT 02

1300795 E-883 DRAIN TANK FILTER VALVE

1300796 E-884 DRAIN TANK VENT VALVE

1300797 E-885 DRAIN TANK SUMP VALVE

1300798 E-886 SUMP PUMP 11 SOLENOID LOOP

1300799 E-887 SUMP PUMP 12 SOLENOID LOOP

1300800 E-888 COMPRESSOR 8B LOOP SUMP PUMP LEVEL

SWITCH

1.5.3 Reference Drawings

The following drawings are provided for information only, to assist the Contractor in performance of the requirements of these specifications:

DRAWING NO. REV. TITLE

710278 AB TOP LEVEL SIMPLIFIED P & ID OF HIGH PRESSURE

AIR PIPING

740097 L 6000 PSI AIR SYSTEM WELD LOCATIONS FOR COMPRESSOR

NO. 4 IN BLDG 1247E

740104 M 6000 PSI AIR SYSTEM (60-A) TO DRYERS 3, 4 & 5 WELD

LOCATIONS IN BLDG 1247E

741989 F 6000 PSI AIR SYSTEM (60-A) WELD LOCATIONS IN

BLDG 1247E

742058 G 6000 PSI AIR SYSTEM (60-A) AND DRYER #5 WELD

LOCATIONS IN BLDG 1247E

1263786 K HIGH PRESSURE AIR VENT PIPING P & ID

1263790 D COOLING TOWER NO. 2 AND COMPRESSOR NO. 4 WATER

PIPING P & ID

1263793 B SERVICE AIR (COMP 3 & 4 AREA) BASEMENT

1263796 B SERVICE AIR (COMP 3 & 4) 1ST FLOOR

1263801 E COMPRESSOR #4 P & ID

1263806 D DRYER #3 SCHEMATIC

ELECTRICAL

SECTION 01 11 00.00 41 Page 13

LB-41606 U ELECTRIC MANHOLE DEVELOPMENT 1606

LB-41607 P ELECTRIC MANHOLE DEVELOPMENT 1607

LB-41612 M ELECTRIC MANHOLE DEVELOPMENT 1612

LB-41629 L ELECTRIC MANHOLE DEVELOPMENT 1629

660204 F FLOOR PLANS & SWITCHGEAR DIAGRAMS

660152 - SUBSTATIONS "A" AND "C" ONE-LINE DIAGRAM

660541 J INTERCONNECTION - WIRING

665641 E COMPRESSOR NO. 4 AIR DRYER NO.3 WIRING CONNECTION

AND INTERCONNECTION DIAGRAM

1156565 A FIRE DETECTION DEVICES BLDG 1247E

1262906 A COMPRESSOR #4 NEW ELECTRICAL EQUIPMENT

ELEVATIONS

1262906 B COMPRESSOR #4 NEW ELECTRICAL EQUIPMENT

ELEVATIONS

1262908 A COMPRESSOR #4 NEW WORK PLAN

1262909 A COMPRESSOR #4 ANNUNCIATOR DISPLAY LAYOUT

1262910 B COMPRESSOR #4 CONTROL & AUXILIARY PANELS LAYOUT

1262911 A COMPRESSOR #4 AUXILIARY CONTROL PANEL LAYOUT &

LOW

1262913 C COMPRESSOR #4 AND MCC-4 ONE-LINE DIAGRAMS

1262918 A COMPRESSOR #4 MEDIUM VOLTAGE MOTOR SCHEMATIC

1262919 C COMPRESSOR #4 MOTOR CONTROL SCHEMATIC

1262920 A COMPRESSOR #4 ELECTRICAL CONTROL SCHEMATIC

1262921 B COMPRESSOR #4 ALARM ANNUNCIATOR SCHEMATIC

1262924 A COMPRESSOR #4 - ILD - PCV3088A & HX COOLING WATER

FLOW METER

1262930 B COMP #4 INSTRUMENTATION UNIT WIRING DIAGRAM 1

1262931 A COMPRESSOR #4 INSTRUMENTATION UNIT WIRING

DIAGRAM 2

1262932 A COMPRESSOR #4 INSTRUMENTATION UNIT WIRING

DIAGRAM 3

1262933 A COMPRESSOR #4 INSTRUMENTATION UNIT WIRING

DIAGRAM 4

1263806 E DRYER #3 SCHEMATIC

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING DIAGRAM

1264446 - COMPRESSOR 4 RECON SYSTEM SYMBOL LEGEND 2 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING DIAGRAM

1262446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 3a of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 4 of 12

1262446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 5 of 12

1262446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 6 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 7 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 8 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 9 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 10 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

DIAGRAM 11 of 12

1264446 - COMPRESSOR 4 RECON SYSTEM SCHEMATIC WIRING

SECTION 01 11 00.00 41 Page 14

DIAGRAM 12 of 12

1288133 B COMPRESSOR STATION NETWORK DIAGRAM B

1288134 - COMPRESSOR STATION NETWORK DIAGRAM DETAILS

1.6 PERFORMANCE PERIOD AND SCHEDULE

The performance period for this project is 730 calendar days. Notice to proceed will be provided by the Contracting Officer commensurate with award of the contract.

1.7 SALVAGE MATERIAL AND EQUIPMENT

There are no items to be salvaged and turned over to the Contracting Officer or the Government. The Contractor shall be responsible for the removal, demolition, or disposition of all items identified in the contract specifications and drawings.

-- End of Section --

SECTION 01 11 00.00 41 Page 15

SECTION TABLE OF CONTENTS

SECTION 01 30 00.00 41

ADMINISTRATIVE REQUIREMENTS

02/14

1.1 REFERENCE PUBLICATIONS

1.3 PROJECT SIGN

1.4 DISPLAY OF WORKERS DOCUMENTATION BULLETINS

1.5 PROJECT PHOTOGRAPHS

1.6 TIME-LAPSE VIDEO

1.7 ON-SITE PERMITS

1.7.1 Utility Outage Requests and Utility Connection Requests

1.7.2 Borrow, Excavation, Welding, and Burning Permits

1.7.3 Application for Connecting to Government Electrical Utilities

1.8 CONCRETE CUTTING AND DRILLING

1.9 PROJECT MANAGEMENT PLAN

1.10 QUALITY CONTROL

1.10.1 Quality Control Plan

1.10.1.1 Content of the Construction Quality Control (CQC) Plan

1.10.2 Inspections and Tests

1.10.3 Quality Control Documentation

1.10.4 Quality Control (QC) - Quality Assurance (QA) Coordination

Meeting

1.10.5 Changes in CQC Plan

1.10.6 Three Phase Quality Control

1.10.6.1 Preparatory Phase

1.10.6.2 Initial Phase

1.10.6.3 Follow-up Phase

1.11 CONTRACTOR PERSONNEL REQUIREMENTS

1.11.1 Contractor, Subcontractors and Personnel

1.11.2 Project Management

1.11.3 Project Superintendent

1.11.4 Project Quality Control Representative

1.11.5 Plumbing Workers' Qualifications

1.11.6 Mechanical Workers' Qualifications

1.11.7 Electrical Workers' Qualifications

1.11.8 Welding Qualifications

1.11.9 Additional Requirements for Pressure Systems Work

1.11.9.1 Manpower With Emphasis on Welders

1.11.9.2 Pressure System Worker Qualifications(for systems governed by LPR 1710.40) Langley Research Center Pressure System Handbook and LMS-CP-5698 Welding/Brazing and LPR 1710.41 Langley Research Center Evaluation of Socket and Branch Connections

1.11.10 Identification Badges

1.12 WORK HOURS

1.13 CORRESPONDENCE, SUBMITTALS AND INVOICES

1.14 ELECTRONIC MAIL (E-MAIL) ADDRESS

1.15 CLOSEOUT DOCUMENTS

SECTION 01 30 00.00 41 Page 1

1.15.1 As-Built Contract Drawings

1.15.2 Computerized Maintenance Management System (CMMS)

1.15.3 Operation and Maintenance Documents

1.16 HANDLING/PROTECTION OF CONTRACTOR MATERIAL AND EQUIPMENT

1.17 UTILITY OUTAGES

1.17.1 Utility Outages

1.17.2 Application for Connecting to Government Electrical Utilities

1.18 ON-SITE GOVERNMENT/CONTRACTOR/SUBCONTRACTOR COORDINATION

1.19 PROJECT SCHEDULE

1.20 MEETINGS

1.20.1 Project Kick-Off Meeting

1.20.1.1 Kick-Off Meeting Agenda

1.20.2 Preconstruction Conference

1.20.3 Meeting Minutes

1.20.4 Facility Coordination Meetings

1.20.5 Project Status Meetings

1.20.5.1 General

1.20.5.2 Construction Progress Meetings

1.20.6 Integrated Systems Review (ISR)

1.20.7 Operational Readiness Review (ORR)

1.20.8 Progress Report

1.21 FORMAL PARTNERING

1.22 WARRANTY

-- End of Section Table of Contents --

SECTION 01 30 00.00 41 Page 2

SECTION 01 30 00.00 41

ADMINISTRATIVE REQUIREMENTS

02/14

1.1 REFERENCE PUBLICATIONS

The publications listed below form a part of these specifications to the extent referenced. The publications are referred to in the text by the basic designation only.

The listed versions of the following references were used during the development of this design and are the Government approved versions to be used herein. There may be newer versions of certain references that have been released since the commencement and/or approval of the design effort.

However, in order to comply with the Government technical requirements, not all of the latest versions of the listed references were adopted and the versions listed herein shall be utilized.

LAPD 1600.4 (February 2017) Firearms and Dangerous Weapons Policy

LAPD 1600.5 (July 2015) Workplace Violence and Threatening Behavior

LAPD 1700.7 (April 2016) Traffic Management

LAPD 1700.8 (December 2017) Parking Regulations

LPR 1710.40 (April 2017) Langley Research Center Pressure Systems Handbook

NPD 1600.2E (April 2015) NASA Security Policy

NPR 1600.1 (August 2013) NASA Security Program Procedural Requirements with Change 2

NFPA 70E Standard for Electrical Safety in the Workplace

The Contractor shall provide the following Submittals in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Prior to the issuance of the Notice to Proceed (NTP), the Contractor shall submit the following documents to the Contracting Officer:

List of Contact Personnel of the Contractor and Subcontractors

SECTION 01 30 00.00 41 Page 3

Resume for Project Manager

Resume for Superintendent

Resume for QC Representative

Quality Control Plan

Safety Plan

After issuance of Notice to Proceed (NTP) and prior to start of any work, the Contractor shall submit the following:

Plumbing Workers' Qualifications

Mechanical Workers' Qualifications

Electrical Workers' Qualifications

Welding Qualifications

Project Schedule

The Contractor shall file for the following Requests and Permits prior to starting any of the work. The Contractor shall follow all instructions in the Specification Package pertaining to each.

Utility Outage Requests

Utility Connection Requests

Borrow Permits

Excavation Permits

Welding Permits

Burning Permits

Submittal Register

During the project, the Contractor shall provide the following Submittals at the intervals specified:

Downloaded Imagery Digital Photographs Meeting Minutes Progress Report Project Schedule

Upon completion of the Construction phase, the Contractor shall provide the following submittals:

SD-03 Product Data

Computerized Maintenance Management System (CMMS) Software/Maintenance/Equipment Change Request Form, LF 491

Time Lapse Video Camera

SECTION 01 30 00.00 41 Page 4

SD-06 Test Reports

Baseline Data Reports

SD-10 Operation and Maintenance Data

Operation and Maintenance Manuals; G

SD-11 Closeout Submittals

Completed Quality Control Binder

As-Built Contract Drawings

Operation and Maintenance Manuals

1.3 PROJECT SIGN

The Contractor shall furnish and install a project sign, at the location designated by the Contracting Officer, immediately upon beginning site work. The sign shall conform to the details shown in Attachment No. 1, Project Sign, of this section. The sign shall be mounted on a treated wood framework of at least 2-inch by 4-inch material. The sign shall be 4-foot by 8-foot exterior grade plywood and constructed of nominal free alkyd primer and two coats of exterior type white enamel. The border shall be 3/4-inch wide and shall be black. The Contractor shall erect no other display sign at the site.

1.4 DISPLAY OF WORKERS DOCUMENTATION BULLETINS

Immediately upon beginning site work, the Contractor shall display the fair employment poster, wage rates, and safety bulletins and posters. The information shall be located at the job site, in a conspicuous place, easily accessible to all employees. Legible copies of the aforementioned data shall be displayed until on-site work is complete.

1.5 PROJECT PHOTOGRAPHS

The Contractor shall provide color digital photographs of the project weekly in various stages of completion.

The photographs shall be in JPEG format and submitted on a CD.

1.6 TIME-LAPSE VIDEO

The Contractor shall provide time-lapse video of the entire project. One camera on the first floor shall take pictures every 60 seconds. The camera shall be positioned to give the best overview of the removal and construction process. Camera may be relocated during the construction process. The camera shall be turned on at the beginning of each work day and turned off at the end of each work day by the Contractor.

The camera shall have a minimum video resolution of 1080p and be set to capture one image every 60 seconds. The camera shall be housed in a protective enclosure, similar to a GoPro HERO3 model. The camera shall be mounted in such a way as to minimize vibration, and protected from falling or splashing liquids, physical damage, and high temperatures. The power supply for the camera shall be plugged into a convenient non-switched

SECTION 01 30 00.00 41 Page 5 source of 120 VAC.

The Contractor shall submit product data including manufacturer, model speed, resolution, and memory for the Time Lapse Video Camera.

The Contractor shall download the images to a CD or other electronic storage medium. The Contractor shall submit the downloaded imagery from cameras (on a monthly basis) to the Contracting Officer or his representative.

1.7 ON-SITE PERMITS

1.7.1 Utility Outage Requests and Utility Connection Requests

The Contractor shall notify the Contracting Officer at least 24 hours prior to starting excavation work. The Government is responsible for marking and verifying all utilities external to the building.

The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed, but indicated in locations to be transversed by piping, ducts, and other work to be installed. The Contractor shall verify elevations before installing new work.

The Contractor shall arrange utility outages and connections required during the execution of work that affect existing systems at the convenience of the Contracting Officer and outside the regular working hours or on weekends. Contracting Officer may permit utility outages at his discretion.

The Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.

Requests for utility outages and connections to Building 1247 shall be made, by the Contractor, in writing to the Contracting Officer at least 7 calendar days in advance of the time required.

Requests for utility outages and connections impacting any additional Center Facilities shall be made, by the Contractor, in writing to the Contracting Officer at least 21 calendar days in advance of the time required.

Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.7.2 Borrow, Excavation, Welding, and Burning Permits

ACTIVITY SUBMISSION DATE SUBMISSION FORM

Borrow Permits 7 days notice prior to work Excavation Permits 7 days notice prior to work Welding Permits Request on day of work Burning Permits Request on day of work

Permits shall be posted, by the Contractor, at a conspicuous location in the construction area.

Burning of trash or rubbish is not permitted.

SECTION 01 30 00.00 41 Page 6

1.7.3 Application for Connecting to Government Electrical Utilities

Prior to making connection to any part of the Government's electrical power distribution system, the Contractor shall make an application to the Contracting Officer stating the date, time, location, and the service required. The Contractor shall also state when such connection is desired.

The Contractor shall perform the initial energizing of all new electrical equipment in the presence of an authorized representative of the Contracting Officer.

Prior to connecting into any existing Government electrical utility, the Contractor shall conform to the requirements of Section 01 35 26.00 41 NASA

LANGLEY SAFETY REQUIREMENTS.

1.8 CONCRETE CUTTING AND DRILLING

The Contractor shall be required to scan concrete walls and floors before cutting or drilling to ensure no encased pipe or conduit is in the path of the proposed work. If encased pipe or conduit is discovered, the Contractor shall coordinate with the Facility and the Contracting Officer to determine if the enclosed items are active or abandoned.

1.9 PROJECT MANAGEMENT PLAN

The Contractor shall maintain an updated Project Management Plan which describes the Contractor's management approach to fulfilling the requirements of this contract and shall include the following:

a. A complete description of the work in sufficient detail to demonstrate a full understanding of the project requirements.

b. Plans to manage changes that result in significant variations to the total proposed cost including changes to scope, schedule, or critical specifications.

c. Metrics on how the Contractor proposes that the adherence to the project description of work shall be measured. This plan shall also describe how the Contractor shall determine that the tasked project work has been completed and has been accepted by the Contracting Officer.

d. All contract documents.

e. Contractor's documentation control plan.

f. Submittal register as defined in Section 01 33 00 SUBMITTAL PROCEDURE.

g. Risk Assessment Document

h. Contractor's/Subcontractor's Management Plan(s)

1.10 QUALITY CONTROL

1.10.1 Quality Control Plan

The Contractor shall submit a written Quality Control Plan to the Contracting Officer for approval. The Plan shall explain the Contractor's

SECTION 01 30 00.00 41 Page 7 internal quality assurance programs, procedures, and methods. The plan shall include a description of their process for vetting and selecting subcontractors, vendors and suppliers. The plan shall also include methods of controlling procurement sources and those of subcontractors to ensure that each purchase meets the specified quality requirements. The plan shall explain how quality is maintained throughout their process for purchasing, shipping/receiving inspection, inventory control, material storage, and material handling.

1.10.1.1 Content of the Construction Quality Control (CQC) Plan

The CQC Plan shall include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:

a. A description of the quality control organization, including a chart showing lines of authority, responsibilities of personnel, and coordination lines of responsibility for CQC personnel not under direct control the Contractor. The staff shall include a CQC Manager (CQCM) who shall be on-site at all times during construction. The CQCM may perform other duties not related to quality control, but other duties shall not impair their performance in managing the CQC plan.

An alternate CQCM to act in the CQCM's absence shall be provided, and shall have equal responsibility and authority as the CQCM.

b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.

c. Letter of Authority to the CQCM signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQCM, including authority to stop work which is not in compliance with the contract.

d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures shall be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

e. Procedures for control, verification, and acceptance testing for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test.

f. Procedures for implementing and tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

g. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section.

This is the start of the file's text. The full file is on GovTribe.