80KSC021R0029 Amendment 0001 with Attachments.pdf
PDF 828 KB Posted
- Attached to
- Mobile Launcher 1 (ML-1) Emergency Egress System (EES) Conveyance Federal contract opportunity
- Solicitation number
- 80KSC021R0029
About this file
This document provides details for a federal contract solicitation to install an Emergency Egress System conveyance at Kennedy Space Center in Florida. The solicitation seeks a contractor to furnish all labor, equipment, materials and related activities necessary for structural modifications and additions to implement a new conveyance system for the EES. This includes basket assemblies, wire rope, braking systems and other aerial hardware and equipment. The scope also includes fabrication and installation of platforms, modifications to existing ML-1 structures and tower platforms, PLC based safety control systems, testing, verification and validation of new and modified installations. All specifications and drawings for the project are considered controlled documents under export regulations and will only be provided to vendors certified through the Defense Logistics Agency Joint Certification Program.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Untitled
NASA/KSC SOLICITATION 80KSC021R0029
SECTION J – LIST OF ATTACHMENTS
J. 1 LIST OF ATTACHMENTS
Attachment Title Date # of
Pages J-A Project Deliverables No Date 21
J-B KSC Project Specific Requirements No Date 25
J-C Department of Labor Wage Determination Number FL20210001, Modification 06 07
June 18July 09, 2021
J-D Certification Of Progress Payments Under Fixed-Price Construction Contracts Based On A Percentage Or Stage Of Completion
November
J-E KSC Badging Issuance and Identity Verification Process, Rev: A-1
No Date 6
J-F Technical Specifications K0000434325-SPC EES for SLS Drawings K0000151040, K0000151041, K0000151046, K0000151047, K0000151048, K0000154712, K0000154713
Mar 29, 2021 192
J-G Section C.2 Summary of Drawings with Reference Drawings No date N/A
J-G01 Drawing K0000151046, EES Basket Assembly Mar 29, 2021 535
J-G02 Drawing K0000151040, Launch Pad 39B EES Mar 29, 2021 5
J-G03 Drawing K0000151041, LC-39B Pad EES for SLS Vehicles EES Setup and Arrangement Drawing
Mar 29, 2021 22
J-G04 Drawing K0000154712, Terminus Sheave Installation, Emergency Egress, Launch Pad 39B
Mar 29, 2021 15
J-G05 Drawing K0000154713, Pilot Line Hoist Installation, Emergency Egress, ML-1
Mar 29, 2021 3
J-G06 Drawing K0000151047, Cable Puller And Weights Assembly
Mar 29, 2021 24
J-G07 Drawing K0000151048, Clamp Brake Assembly Mar 29, 2021 18
J-G08 Drawing 79K40865, Modifications to LC39B for EES Jan 28, 2021 132
J-G09 Drawing K0000151049, LC-39B EES for SLS Vehicles EES Installation for ML-1
Feb 11, 2021 40
J-G10 Drawing K0000151043, EES Basket Support Assembly Feb 11, 2021 49
J-G11 Drawing K0000151050, EES Loading Guardrail Gates Assembly
Feb 11, 2021 6
J-G12 Drawing K0000144040, ML-1 Mods for Artemis II Feb 24, 2021 177
J-H Commissioning Plan KSC-NE-15114, EES for SLS Vehicles Mar 29, 2021 75
J-I Project Execution Plan TBD TBD
J-J Site Specific Safety and Occupational Health Plan TBD TBD
J-K Small Business Subcontracting Plan TBD TBD
"General Decision Number: FL20210001 07/09/2021
Superseded General Decision Number: FL20200001
State: Florida
Construction Types: Building, Heavy and Highway
County: Brevard County in Florida.
**CAPE CANAVERAL AIR STATION, PATRICK AIR FORCE BASE KENNEDY
SPACE CENTER AND MALABAR RADAR SITE IN BREVARD COUNTY BUILDING
CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and partments up to and including 4 stories) HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 01/22/2021 2 02/12/2021 3 04/09/2021 4 04/23/2021 5 05/07/2021 6 06/18/2021 7 07/09/2021
ASBE0067-001 01/01/2021
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 30.12 13.11
ASBE0067-002 07/01/2017
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming,bagging, and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not).........$ 16.50 10.90
BOIL0433-001 03/01/2018
BOILERMAKER......................$ 30.07 22.71
BRFL0008-001 05/01/2020
BRICKLAYER (BRICKLAYERS,
BLOCKLAYERS, PLASTERERS,
TERRAZZO WORKERS, TILE
SETTERS AND CEMENT MASONS)
COMMERCIAL..................$ 24.60 10.09
INDUSTRIAL..................$ 25.20 10.09
INDUSTRIAL work includes: Bulk plants, power houses, chemical plants, missile sites including all work at Cape Canaveral Air Force Station and Kennedy Space Flight Center.
CARP1000-001 07/01/2020
MILLWRIGHT.......................$ 32.00 17.33
* CARP1905-002 06/01/2021
Carpenters:
*INDUSTRIAL:
CARPENTERS.................$ 29.70 12.33
PILEDRIVERMEN..............$ 25.45 12.20
COMMERCIAL:
CARPENTERS.................$ 25.15 12.33
PILEDRIVERMEN..............$ 25.45 12.20
ELEC0222-001 09/01/2016
Line Construction:
CABLE SPLICER...............$ 35.72 5.00+24.5%
GROUNDMAN...................$ 19.39 5.00+24.5%
LINEMAN; HEAVY EQUIPMENT
OPERATOR....................$ 34.02 5.00+24.5%
ELEC0756-001 08/31/2020
ELECTRICIAN
Cable Splicer...............$ 29.33 3%+12.74 Wireman.....................$ 30.57 3%+13.24
ELEV0139-001 01/01/2021
ELEVATOR MECHANIC................$ 45.60 35.825
FOOTNOTE:
A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.
Paid Holidays: New Year's Day; Memorial Day; Independence
Day; Labor Day; Thanksgiving Day; The Friday after Thanksgiving Day; and Christmas Day.
* ENGI0673-001 05/01/2021
Power equipment operators:
GROUP 1.....................$ 32.36 14.00
GROUP 2.....................$ 26.59 14.00
GROUP 3.....................$ 24.65 14.00
GROUP 4.....................$ 22.81 14.00
POWER EQUIPMENT OPERATORS
CLASSIFICATIONS GROUP 1: Mechanic/Welder,Tower Crane, Locomotive Crane, Crawler Crane, Truck Crane, Hydro Crane, Piledriver (including auger and boring machine)
GROUP 2: Gantry Crane, Bridge Crane, Clam Shell, Dragline, Backhoe, Gradall, Grader, Sideboom, Multi-Drum Hoist, Extendable Forklift or Straight-Mast Forklift twenty (20) tons or above, Locomotive Engineer, Tugboat Captain (150 hp or more), Concrete Pump with boom
GROUP 3: Bulldozers, Straight-Mast Forklift under twenty
(20) tons, Straddle Buggy, Single Drum Hoist, Winch Truck, Trenching Machine, Concrete Paver, Scraper, Loader, Asphalt Paving Machine, Lubricating Engineer, Fireman, Concrete Breaking Machine, Concrete Mixer
GROUP 4: Tractors, Wellpoint System Operator and Installer, Air Compressor, Pulver Mixer, Motor Boat, Power Boat, Power Sweeper, Welding Machine, Oiler, Pump, Conveyor, Roller, WaterTruck, Asphalt Distributor, Concrete Pump (trailer type), Utility Operator
IRON0808-001 02/03/2020
IRONWORKER.......................$ 28.28 14.70
LABO0517-001 05/01/2020
Laborers:
Asbestos Abatement, Hazardous and Toxic Waste Removal Laborers; (On all mechaincal systems: Lead Base Paint Removal;pipes, boilers, ducts, flues, breechings, ect.; that are going to be scrapped, the removal of all insulating materials whether they contain asbestos or not shall be the exclusive work of the laborers;.......$ 20.51 9.39 Carpenter Tender, Cement Mason Tender, Block/ Bricklayer Tender Plasterer Tender............$ 20.51 9.39 Demolition Laborers.........$ 20.51 9.39 General Laborer.............$ 20.51 9.39 Pipelayer Laborer, Laborer engaged in the pouring of concrete, mortar mixers, masonry forklift operator, and operation of power tools.......................$ 20.51 9.39
PAIN0078-001 06/01/2021
GLAZIER..........................$ 24.71 14.60
PAIN0078-002 08/01/2020
PAINTER..........................$ 24.71 14.05
PLUM0295-001 01/01/2021
Plumber/Pipefitter/Steamfitter INDUSTRIAL: Bulk Plants, Power-houses, Chemical Plants, Missile Sites, (Including all Work at Cape Canaveral Air Force Station and Kennedy Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site), Oil Refineries, etc., and such other work which is related to and considered a part of the above type projects....................$ 35.70 21.26 Schools, Hospitals, Shopping Centers, and work not listed as Industrial....$ 35.70 21.26
ROOF0136-001 08/01/2019
ROOFER...........................$ 22.79 8.57
* SFFL0821-002 07/01/2021
SPRINKLER FITTER
Commercial..................$ 30.63 20.55 Industrial..................$ 32.98 20.55
Industrial: Jobs covering sugar mills, power plants, trash burning plants, military installations and Cape Kennedy. All other work shall be commercial rate.
SHEE0015-001 07/01/2020
SHEET METAL WORKER...............$ 26.89 8.89
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
80KSC021R0029, Emergency Egress System Conveyance Installation
Virtual Site Attendance List – July 08, 2021
Contractors:
1. Matt Decker – matt.decker@precgroup.com
2. Lisa Durette – Lisa.Durette@precgroup.com
3. Ralph Kennedy – ralphk@mavcon.net
4. Mike Taylor – mtaylor@jpdonovan.com
5. Tyler Reith – treith@jpdonovan.com
6. Ashley Bass – abass@advonconstruction.com
7. Jeff Gibson – jgibson@advonstruction.com
NASA:
1. Jesse Berdis (Host)
2. Sherwin Hamada
3. Ariel Pavlick
4. Derrick Wade
5. Randy Gumke
6. Kyle Rubin
7. Michael Van Houten
8. Robert Wilcox
9. Samantha Testa
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0001 |
| Code[0]: KSC |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: C. M. Julius Williams, Contracting Officer |
| Description[0]: The purpose of Amendment 0001 is to |
1. Provide the "EES Virtual Site Visit Roster," listing participants present for the virtual site visit, 1 page attached.
2. Provide updated Attachment J-C Wage Determination Mod 07, dated July 09, 2021; 6 pages attached.
3. Update solicitation Section J table; see attached "Slip Page;" 1 page attached.
Note: For Reference the updated Wage Determination, Attachment J-C Mod 07 is separately uploaded to SAM.gov.
| FacilityCode[0]: |
| Code[2]: KSC |
| IssuedBy[0]: NASA/John F. Kennedy Space Center |
Office of Procurement Mail Code OP-CS
KENNEDY SPACE CENTER FL, 32899
| NameandAddress[0]: |
| AdministeredBy[0]: NASA/John F. Kennedy Space Center |
Office of Procurement Mail Code OP-CS
KENNEDY SPACE CENTER FL, 32899
| ContractIDCode[0]: | |
| ReqNumber[0]: 4200769759 | |
| AmendmentNo[1]: 80KSC021R0029 | |
| ModificationNo[0]: | |
| ProjectNo[0]: | |
| Page[0]: 1 | |
| Pages[0]: 1 | |
| EffectiveDate[0]: July 15, 2021 | |
| Dated9B[0]: June 30, 2021 | |
| Dated10B[0]: | |
| CheckBox9[0]: 1 | |
| CheckBox10[0]: Off | |
| CheckBox11[0]: 1 | |
| CheckBox13A[0]: Off | |
| CheckBox13B[0]: Off | |
| CheckBox13C[0]: Off | |
| CheckBox13D[0]: Off | |
| IsNot[0]: Off | |
| Is[0]: Off | |
| Extended[0]: Off | |
| NotExtended[0]: 1 | |
| 2021-07-15T19:08:11-0400 | |
| CHRISTOPHER WILLIAMS |
| DateSigned[0]: |
| DateSigned[1]: July 15, 2021 |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .