80ARC018R0007P00001_-_SF30.pdf
PDF 73 KB Posted
- Attached to
- Small Spacecraft Prototyping Engineering Development and Integration - Space Solutions (SSPEDI SpS) Federal contract opportunity
- Solicitation number
- 80ARC018R0007
About this file
This document provides an amendment to a solicitation for the Small Spacecraft Prototyping Engineering Development and Integration - Space Solutions contract opportunity.
The amendment replaces various attachments to update pricing templates, statements of work, and technical definitions. It extends the solicitation response date to January 8, 2017 and changes the delivery location. The amendment also replaces task order statements of work and property lists. The solicitation is for the development of small to medium spacecraft buses, payloads and vehicles for the Orbital/Sub-orbital Program through multiple award contracts over five years. The National Aeronautics and Space Administration Ames Research Center is seeking proposals with pricing terms including cost-plus-fixed-fee, cost-plus-incentive fee and firm-fixed price task orders. Small business, small disadvantaged business, woman-owned small business, historically underutilized business zone, veteran-owned small business and service-disabled veteran-owned small business subcontracting goals are established between 1.5-5%.
Amendment P00001 to solicitation 80ARC018R0007.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SSPEDI_SpS_Source_Selection_Statement_FINAL_signed.pdf | ||
| 80ARC018R0007P00003_-_SF30.pdf | ||
| 80ARC018R0007_SSPEDI_SpS_20DEC2017.pdf | ||
| SSPEDI_SpS_QandA_Vol4_20DEC2017.pdf | ||
| SSPEDI_SpS_QandA_Vol3_7DEC2017.pdf | ||
| 80ARC018R0007_SF33_4DEC2017.pdf | ||
| 80ARC018R0007P00002_-_SF30.pdf | ||
| 80ARC018R0007_SSPEDI_SpS_1DEC2017.pdf | ||
| SSPEDI_SpS_QandA_Vol2_1DEC2017.pdf | ||
| 80ARC018R0007_J.1(b)Attachment11_Technical_Document_Library_List_1DEC2017.pdf | ||
| 80ARC018R0007_J.1(b)Attachment4_Cost-Price_Template_Workbook_1DEC2017.xlsx | XLSX spreadsheet | |
| 80ARC018R0007_J.1(b)Attachment5_Resource_Workbook_1DEC2017.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
PAGE OF PAGES
3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.
7. ADMINISTERED BY (If other than Item 6) CODE
FACILITY CODECODE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code)
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
1. CONTRACT ID CODE
16B. UNITED STATES OF AMERICA 16C. DATE
SIGNED
15B. CONTRACTOR/OFFEROR 15C. DATE
SIGNED
BY
(Signature of Contracting Officer)(Signature of person authorized to sign)
15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
is not
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation
E. IMPORTANT: Contractor is not, is required to sign this document and return
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is extended, copies to issuing office.
4. REQUISITION/PURCHASE REQ. NO.
1 3
P00001
NASA
Ames Research Center M/S 241-1 Moffett Field CA 94035-0001
X
80ARC018R0007
11/30/2017
X
See Continuation Sheet If Applicable date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
CHECK ONE
(X)
See Continuation Sheet
12/01/2017
Attn: Rosalinda R. De Leon
X
80ARC018R0007P00001 Page 2 of 3
Continuation of SF30, Block 14:
1. Solicitation 80ARC018R0007 is hereby amended and replaced with the version dated 1 December 2017. The changes are identified in red in the attached revised document.
2. The solicitation due date is hereby extended to 01/08/2017 and the delivery location is changed to Building N241 Room 222 as indicated on the revised SF33.
3. Section J, Paragraph J.1(b), Attachment 4, Cost/Price Template Workbook is removed in its entirety and replaced with the version dated 1 December 2017. The workbook is revised to remove reference to (GFY) on Exhibits 3a-f, 4a, 5a, & 6a.
4. Section J, Paragraph J.1(b), Attachment 5, Resource Workbook is replaced with the version dated 1 December 2017. The Resource Workbook is revised to remove Level 3 WBS titles.
5. ORS-8 MRL-TRL Definitions, as listed in the Technical Documents Library, is replaced with the version dated November 2017. The document is revised to correct formatting issues.
6. Section J, Paragraph J.1(b), Attachment 11, Technical Documents Library List is replaced with the version dated 1 December 2017. The Technical Documents Library List is revised to incorporate the following documents:
a. ORS-8 MRL-TRL Definitions dated December 2017
b. Tactical Persistence Statement of Need dated December 2017
c. Space Development and Test Wing Aerospace Mission Assurance Process for
Small Satellite Programs dated December 2009
d. Payload Mission Assurance Guidelines for A-D Mission Risk Classes dated June
e. Compatible Satellite C2 Enterprise Framework: GMSEC Interface Specification
Document Addendum dated May 2011
7. Task Order 1, Section T.4, Attachment 1, Tactical Persistence Study Statement of Work is hereby replaced with the version dated 1 December 2017. The changes are indicated in red in the revised document.
8. Section J, Paragrapgh J.1(b), Attachment 1, Task Order 1 – Tactical Persistence Study
Model Task Order is replaced with the version dated 1 December 2017. The changes are indicated in red in the revised document.
9. Task Order 2, Section T.5, Attachment 1, ORS-8 Space Segment Statement of Work is replaced with the version dated 1 December 2017. The changes are indicated in red in the revised document.
80ARC018R0007P00001 Page 3 of 3
10. Task Order 2, Section T.5, Attachment 3, ORS-8 Government Furnished Property List is replaced with the version dated 1 December 2017. The document is revised to add a “Delivery to Contractor” column.
11. Section J, Paragraph J.1(b), Attachment 2, Task Order 2 – ORS-8 Space Segment Model Task Order is replaced with the version dated 1 December 2017. The changes are indicated in red in the revised document.
(End of amendment)
File details come from the government source that posted it. Updated .