80ARC018R0007_J.1(b)Attachment5_Resource_Workbook_1DEC2017.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Small Spacecraft Prototyping Engineering Development and Integration - Space Solutions (SSPEDI SpS) Federal contract opportunity
- Solicitation number
- 80ARC018R0007
About this file
This document includes a resource workbook and related federal contract opportunity notice. The resource workbook provides templates for offerors to estimate resources required to complete tasks for the Small Spacecraft Prototyping Engineering Development and Integration - Space Solutions (SSPEDI SpS) contract. It includes work breakdown structure summaries and detailed resource workbooks for labor hours, materials, other direct costs, travel, and subcontracting costs over multiple contract line item numbers and years. The federal contract opportunity is for the SSPEDI SpS multiple award contract focused on developing small to medium spacecraft buses, payloads, and space vehicles based on mission requirements for the Orbital Rocket Systems program. The 5-year IDIQ contracts awarded by the National Aeronautics and Space Administration Ames Research Center are contemplated to include both fixed price and cost reimbursement task orders. The solicitation is anticipated to be released in November 2017 with proposals due in December 2017 and contracts awarded in June 2018. Set-aside goals include 25% for small business and targets for small disadvantaged, woman-owned, HUBZone, veteran-owned, and service-disabled veteran-owned small businesses.
Revised Resource Workbook dated 1 DEC 2017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SSPEDI_SpS_Source_Selection_Statement_FINAL_signed.pdf | ||
| SSPEDI_SpS_QandA_Vol4_20DEC2017.pdf | ||
| 80ARC018R0007P00003_-_SF30.pdf | ||
| 80ARC018R0007_SSPEDI_SpS_20DEC2017.pdf | ||
| SSPEDI_SpS_QandA_Vol3_7DEC2017.pdf | ||
| 80ARC018R0007_SF33_4DEC2017.pdf | ||
| 80ARC018R0007P00002_-_SF30.pdf | ||
| SSPEDI_SpS_QandA_Vol2_1DEC2017.pdf | ||
| 80ARC018R0007_J.1(b)Attachment11_Technical_Document_Library_List_1DEC2017.pdf | ||
| 80ARC018R0007_J.1(b)Attachment4_Cost-Price_Template_Workbook_1DEC2017.xlsx | XLSX spreadsheet | |
| 80ARC018R0007P00001_-_SF30.pdf | ||
| 80ARC018R0007_SSPEDI_SpS_1DEC2017.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 1
| SpS Task Order 2 - ORS-8 Space Segment |
| WBS Summary of Resource Volume |
Proposing Entity: _________________________________________
CLIN 0001 Space Vehicle: Development through Launch Operations 0
| WBS | WBS Description | Labor Hrs | Material $ | ODC $ | Travel $ | Subcontractor $ |
| 1.1 | Program Manager/Systems Engineering (PM/SE) | 45 | $ 360.00 | $ 225.00 | $ 12.00 | $ 18.00 |
| 1.1.1 | Level 3 Title | 15 | $ 120.00 | $ 75.00 | $ 6.00 | $ 9.00 |
| 1.1.2 | Level 3 Title | 30 | $ 240.00 | $ 150.00 | $ 6.00 | $ 9.00 |
| 1.1.3 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.1.4 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.2 | Space Vehicle | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.2.1 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.2.2 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.2.3 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.2.4 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.3 | Mission Data Management System | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.3.1 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.3.2 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.3.3 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.3.4 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.4 | Support Equipment | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.4.1 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.4.2 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.4.3 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.4.4 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.5 | Launch Service Integration | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.5.1 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.5.2 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.5.3 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.5.4 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | 45 | $ 360.00 | $ 225.00 | $ 12.00 | $ 18.00 |
CLIN 0002 Launch and Early Orbit, and Mission Operations Support
| WBS | WBS Description | Labor Hrs | Material $ | ODC $ | Travel $ | Subcontractor $ |
| 1.6 | Mission Operations | 5 | $ 40.00 | $ 25.00 | $ 2.00 | $ 3.00 |
| 1.6.1 | Level 3 Title | 5 | $ 40.00 | $ 25.00 | $ 2.00 | $ 3.00 |
| 1.6.2 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.6.3 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.6.4 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | 5 | $ 40.00 | $ 25.00 | $ 2.00 | $ 3.00 |
CLIN 0003 Option 1: Mission Operations Support
| WBS | WBS Description | Labor Hrs | Material $ | ODC $ | Travel $ | Subcontractor $ |
| 1.6 | Mission Operations | 10 | $ 44.00 | $ 30.00 | $ 3.00 | $ 4.00 |
| 1.6.1 | Level 3 Title | 10 | $ 44.00 | $ 30.00 | $ 3.00 | $ 4.00 |
| 1.6.2 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.6.3 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.6.4 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | 10 | $ 44.00 | $ 30.00 | $ 3.00 | $ 4.00 |
CLIN 0004 Option 2: Mission Operations Support
| WBS | WBS Description | Labor Hrs | Material $ | ODC $ | Travel $ | Subcontractor $ |
| 1.6 | Mission Operations | 15 | $ 48.00 | $ 35.00 | $ 4.00 | $ 5.00 |
| 1.6.1 | Level 3 Title | 15 | $ 48.00 | $ 35.00 | $ 4.00 | $ 5.00 |
| 1.6.2 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.6.3 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1.6.4 | Level 3 Title | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | 15 | $ 48.00 | $ 35.00 | $ 4.00 | $ 5.00 |
| Labor Hrs | Material $ | ODC $ | Travel $ | Subcontractor $ | ||
| TOTAL TASK ORDER 2 | 75 | $ 492.00 | $ 315.00 | $ 21.00 | $ 30.00 | |
| Instructions / Notes | ||||||
| Use Exhibit 2 to complete this chart. | ||||||
| Labor hrs, material $, ODC $, travel $, and subcontractor $ are direct costs only (no indirect costs applied). | ||||||
| To align with their proposed WBS Level 3 structure, vendors must add or subtract lines in this Exhibit for each CLIN. | ||||||
| Total labor hrs, material $, ODC $, travel $, and subcontractor $ should match cost/pricing in Attachment J.1(b)2 at the WBS Level II. | ||||||
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
80ARC018R0007 J.1(b) Attachment 5_x000D_Exhibit 1_x000D_
For Official Use Only This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 2
| SpS Task Order 2 - ORS-8 Space Segment | ||||||||||||||
| Detailed Resource Workbook | ||||||||||||||
| Proposing Entity: _________________________________________ | ||||||||||||||
| Task Order | CLIN | WBS Level 2 | WBS Level 3 | WBS Level 3 Description | Cost Element | Units (Hrs or Dollars) | Resource Code | TO Year 1 | TO Year 2 | TO Year 3 | TO Year 4 | TO Year 5 | TO Year 6 | Total |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Labor | Hrs | Labor Category 1 | 1 | 1 | 1 | 0 | 0 | 0 | 3 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Labor | Hrs | Labor Category 2 | 1 | 1 | 1 | 0 | 0 | 0 | 3 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Labor | Hrs | Labor Category 3 | 1 | 1 | 1 | 0 | 0 | 0 | 3 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Labor | Hrs | Labor Category 4 | 1 | 1 | 1 | 0 | 0 | 0 | 3 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Labor | Hrs | etc. | 1 | 1 | 1 | 0 | 0 | 0 | 3 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Material | Dollars | Material Category 1 | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Material | Dollars | Material Category 2 | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Material | Dollars | Material Category 3 | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Material | Dollars | etc. | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | ODC | Dollars | ODC 1 | 5 | 5 | 5 | 0 | 0 | 0 | 15 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | ODC | Dollars | ODC 2 | 5 | 5 | 5 | 0 | 0 | 0 | 15 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | ODC | Dollars | ODC 3 | 5 | 5 | 5 | 0 | 0 | 0 | 15 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | ODC | Dollars | ODC 4 | 5 | 5 | 5 | 0 | 0 | 0 | 15 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | ODC | Dollars | etc. | 5 | 5 | 5 | 0 | 0 | 0 | 15 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Travel | Dollars | Travel Category 1 | 2 | 2 | 2 | 0 | 0 | 0 | 6 |
| 2 | 0001 | 1.1 | 1.1.1 | Level 3 Title | Subcontractor | Dollars | Subcontractor Name | 3 | 3 | 3 | 0 | 0 | 0 | 9 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Labor | Hrs | Labor Category 1 | 2 | 2 | 2 | 0 | 0 | 0 | 6 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Labor | Hrs | Labor Category 2 | 2 | 2 | 2 | 0 | 0 | 0 | 6 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Labor | Hrs | Labor Category 3 | 2 | 2 | 2 | 0 | 0 | 0 | 6 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Labor | Hrs | Labor Category 4 | 2 | 2 | 2 | 0 | 0 | 0 | 6 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Labor | Hrs | etc. | 2 | 2 | 2 | 0 | 0 | 0 | 6 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Material | Dollars | Material Category 1 | 20 | 20 | 20 | 0 | 0 | 0 | 60 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Material | Dollars | Material Category 2 | 20 | 20 | 20 | 0 | 0 | 0 | 60 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Material | Dollars | Material Category 3 | 20 | 20 | 20 | 0 | 0 | 0 | 60 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Material | Dollars | etc. | 20 | 20 | 20 | 0 | 0 | 0 | 60 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | ODC | Dollars | ODC 1 | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | ODC | Dollars | ODC 2 | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | ODC | Dollars | ODC 3 | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | ODC | Dollars | ODC 4 | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | ODC | Dollars | etc. | 10 | 10 | 10 | 0 | 0 | 0 | 30 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Travel | Dollars | Travel Category 1 | 2 | 2 | 2 | 0 | 0 | 0 | 6 |
| 2 | 0001 | 1.1 | 1.1.2 | Level 3 Title | Subcontractor | Dollars | Subcontractor Name | 3 | 3 | 3 | 0 | 0 | 0 | 9 |
| 2 | 0001 | 1.1 | 1.1.3 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.1 | 1.1.4 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.2 | 1.2.1 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.2 | 1.2.2 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.2 | 1.2.3 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.2 | 1.2.4 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.3 | 1.3.1 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.3 | 1.3.2 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.3 | 1.3.3 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.3 | 1.3.4 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.4 | 1.4.1 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.4 | 1.4.2 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.4 | 1.4.3 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.4 | 1.4.4 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.5 | 1.5.1 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.5 | 1.5.2 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.5 | 1.5.3 | Level 3 Title | 0 | |||||||||
| 2 | 0001 | 1.5 | 1.5.4 | Level 3 Title | 0 | |||||||||
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 1 | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 2 | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 3 | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 4 | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | etc. | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 1 | 0 | 0 | 0 | 10 | 0 | 0 | 10 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 2 | 0 | 0 | 0 | 10 | 0 | 0 | 10 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 3 | 0 | 0 | 0 | 10 | 0 | 0 | 10 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | etc. | 0 | 0 | 0 | 10 | 0 | 0 | 10 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 1 | 0 | 0 | 0 | 5 | 0 | 0 | 5 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 2 | 0 | 0 | 0 | 5 | 0 | 0 | 5 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 3 | 0 | 0 | 0 | 5 | 0 | 0 | 5 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 4 | 0 | 0 | 0 | 5 | 0 | 0 | 5 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | etc. | 0 | 0 | 0 | 5 | 0 | 0 | 5 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Travel | Dollars | Travel Category 1 | 0 | 0 | 0 | 2 | 0 | 0 | 2 |
| 2 | 0002 | 1.6 | 1.6.1 | Level 3 Title | Subcontractor | Dollars | Subcontractor Name | 0 | 0 | 0 | 3 | 0 | 0 | 3 |
| 2 | 0002 | 1.6 | 1.6.2 | Level 3 Title | 0 | |||||||||
| 2 | 0002 | 1.6 | 1.6.3 | Level 3 Title | 0 | |||||||||
| 2 | 0002 | 1.6 | 1.6.4 | Level 3 Title | 0 | |||||||||
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 1 | 0 | 0 | 0 | 0 | 2 | 0 | 2 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 2 | 0 | 0 | 0 | 0 | 2 | 0 | 2 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 3 | 0 | 0 | 0 | 0 | 2 | 0 | 2 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 4 | 0 | 0 | 0 | 0 | 2 | 0 | 2 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | etc. | 0 | 0 | 0 | 0 | 2 | 0 | 2 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 1 | 0 | 0 | 0 | 0 | 11 | 0 | 11 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 2 | 0 | 0 | 0 | 0 | 11 | 0 | 11 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 3 | 0 | 0 | 0 | 0 | 11 | 0 | 11 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | etc. | 0 | 0 | 0 | 0 | 11 | 0 | 11 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 1 | 0 | 0 | 0 | 0 | 6 | 0 | 6 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 2 | 0 | 0 | 0 | 0 | 6 | 0 | 6 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 3 | 0 | 0 | 0 | 0 | 6 | 0 | 6 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 4 | 0 | 0 | 0 | 0 | 6 | 0 | 6 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | etc. | 0 | 0 | 0 | 0 | 6 | 0 | 6 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Travel | Dollars | Travel Category 1 | 0 | 0 | 0 | 0 | 3 | 0 | 3 |
| 2 | 0003 | 1.6 | 1.6.1 | Level 3 Title | Subcontractor | Dollars | Subcontractor Name | 0 | 0 | 0 | 0 | 4 | 0 | 4 |
| 2 | 0003 | 1.6 | 1.6.2 | Level 3 Title | 0 | |||||||||
| 2 | 0003 | 1.6 | 1.6.3 | Level 3 Title | 0 | |||||||||
| 2 | 0003 | 1.6 | 1.6.4 | Level 3 Title | 0 | |||||||||
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 1 | 0 | 0 | 0 | 0 | 0 | 3 | 3 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 2 | 0 | 0 | 0 | 0 | 0 | 3 | 3 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 3 | 0 | 0 | 0 | 0 | 0 | 3 | 3 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | Labor Category 4 | 0 | 0 | 0 | 0 | 0 | 3 | 3 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Labor | Hrs | etc. | 0 | 0 | 0 | 0 | 0 | 3 | 3 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 1 | 0 | 0 | 0 | 0 | 0 | 12 | 12 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 2 | 0 | 0 | 0 | 0 | 0 | 12 | 12 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | Material Category 3 | 0 | 0 | 0 | 0 | 0 | 12 | 12 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Material | Dollars | etc. | 0 | 0 | 0 | 0 | 0 | 12 | 12 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 1 | 0 | 0 | 0 | 0 | 0 | 7 | 7 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 2 | 0 | 0 | 0 | 0 | 0 | 7 | 7 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 3 | 0 | 0 | 0 | 0 | 0 | 7 | 7 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | ODC 4 | 0 | 0 | 0 | 0 | 0 | 7 | 7 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | ODC | Dollars | etc. | 0 | 0 | 0 | 0 | 0 | 7 | 7 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Travel | Dollars | Travel Category 1 | 0 | 0 | 0 | 0 | 0 | 4 | 4 |
| 2 | 0004 | 1.6 | 1.6.1 | Level 3 Title | Subcontractor | Dollars | Subcontractor Name | 0 | 0 | 0 | 0 | 0 | 5 | 5 |
| 2 | 0004 | 1.6 | 1.6.2 | Level 3 Title | 0 | |||||||||
| 2 | 0004 | 1.6 | 1.6.3 | Level 3 Title | 0 | |||||||||
| 2 | 0004 | 1.6 | 1.6.4 | Level 3 Title | 0 | |||||||||
| TO Year 1 | TO Year 2 | TO Year 3 | TO Year 4 | TO Year 5 | TO Year 6 | Total | ||||||||
| Labor Hrs Subtotal (based on what is filtered in table) | 15 | 15 | 15 | 5 | 10 | 15 | 75 | |||||||
| Material $ Subtotal (based on what is filtered in table) | 120 | 120 | 120 | 40 | 44 | 48 | 492 | |||||||
| ODC $ Subtotal (based on what is filtered in table) | 75 | 75 | 75 | 25 | 30 | 35 | 315 | |||||||
| Travel $ Subtotal (based on what is filtered in table) | 4 | 4 | 4 | 2 | 3 | 4 | 21 | |||||||
| Subcontractor $ Subtotal (based on what is filtered in table) | 6 | 6 | 6 | 3 | 4 | 5 | 30 | |||||||
| Instructions / Notes | ||||||||||||||
| Offerors must add/subtract rows to this spreadsheet to add/subtract labor categories, material categories, and ODC. Columns B through P must be filled in when inserting new rows, and correct mapping from CLIN to WBS Level 2 to WBS Level 3 and on must be maintained. | ||||||||||||||
| All labor hrs, material $, ODC $, travel $, and subcontractor $ must be given at each contractor defined WBS Level 3. | ||||||||||||||
| Enter direct costs only (no indirect costs applied). | ||||||||||||||
| Labor hrs, material $, ODC $, travel $, and subcontractor $ should match cost/pricing in Attachment J.1(b)2 at the WBS Level 2. | ||||||||||||||
| The rows and numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
80ARC018R0007 J.1(b) Attachment 5_x000D_Exhibit 2