80ARC018R0007_J.1(b)Attachment4_Cost-Price_Template_Workbook_1DEC2017.xlsx
XLSX spreadsheet 437 KB Posted
- Attached to
- Small Spacecraft Prototyping Engineering Development and Integration - Space Solutions (SSPEDI SpS) Federal contract opportunity
- Solicitation number
- 80ARC018R0007
About this file
This document describes a Request for Proposal for the Small Spacecraft Prototyping Engineering Development and Integration contract. The National Aeronautics and Space Administration Ames Research Center plans to award multiple indefinite delivery/indefinite quantity contracts for basic research, applied research, and advanced development of payloads, spacecraft buses, ground systems, and launch systems. The total estimated value is $500 million over five years. Offerors must submit proposals by December 2017, and contract awards are expected in June 2018. The primary place of performance will be contractors' facilities. The North American Industry Classification System code is 541715 with a small business size standard of 1,000 employees. Subcontracting goals include 25% for small businesses, with 5% for small disadvantaged businesses, 4.5% for women-owned small businesses, 1.5% for historically underutilized business zone businesses, 2.5% for veteran-owned small businesses, and 1.5% for service-disabled veteran-owned small businesses.
Revised Cost - Price Template Workbook dated 1 DEC 2017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SSPEDI_SpS_Source_Selection_Statement_FINAL_signed.pdf | ||
| 80ARC018R0007_SSPEDI_SpS_20DEC2017.pdf | ||
| SSPEDI_SpS_QandA_Vol4_20DEC2017.pdf | ||
| 80ARC018R0007P00003_-_SF30.pdf | ||
| SSPEDI_SpS_QandA_Vol3_7DEC2017.pdf | ||
| 80ARC018R0007_SF33_4DEC2017.pdf | ||
| 80ARC018R0007P00002_-_SF30.pdf | ||
| SSPEDI_SpS_QandA_Vol2_1DEC2017.pdf | ||
| 80ARC018R0007_J.1(b)Attachment11_Technical_Document_Library_List_1DEC2017.pdf | ||
| 80ARC018R0007_J.1(b)Attachment5_Resource_Workbook_1DEC2017.xlsx | XLSX spreadsheet | |
| 80ARC018R0007P00001_-_SF30.pdf | ||
| 80ARC018R0007_SSPEDI_SpS_1DEC2017.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract form
&"Times New Roman,Bold"&11IDIQ CONTRACT RATES FORM
Exhibit 1 Proposing Entity: ______________________________________
SUMMARY OF PROPOSED PRICE
| SpS Task Order 1 - Tactical Persistence Study | ||||
| CLIN | Qty | Unit | *Firm Fixed Price | |
| 0001 | Tactical Persistence Study | 1 | JOB | $ 25.24 |
| Total Task Order 1 Value | $ 25.24 | |||
| *Total FFP not to exceed $200,000 | ||||
| SpS Task Order 2 - ORS-8 Space Segment | ||||
| CLIN | Qty | Unit | Price (Cost + Fixed Fee) | |
| 0001 | Space Vehicle: Development through Launch Operations | 1 | LOT | $ 13,746.75 |
| 0002 | Launch and Early Orbit, and Mission Operations Support | 1 | JOB | $ 943.28 |
| 0003 | Option 1: Mission Operations Support | 1 | JOB | $ 957.43 |
| 0004 | Option 2: Mission Operations Support | 1 | JOB | $ 971.67 |
| Total Task Order 2 Value | $ 16,619.13 |
| Instructions / Notes |
| Link to Exhibit 2, Exhibit 3, Exhibit 4, Exhibit 5, and Exhibit 6 totals to complete this chart. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 1_x000D_
For Official Use Only This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 2
| SpS Task Order 1 - Tactical Persistence Study |
| CLIN 0001: Tactical Persistence Study |
| Summary of Elements of Cost |
Proposing Entity: ______________________
| Base Period | |
| TO Year 1 | Total |
Total Cost less FCCOM $ 24.00 $ 24.00
Facilities Capital Cost of Money (FCCOM) $ 1.00 $ 1.00
| Fixed Price Profit Rate | 1% | 1% |
| Fixed Price Profit | $ 0.24 | $ 0.24 |
Total Price $ 25.24 $ 25.24
| Instructions / Notes |
| Use Exhibit 2a total to link to the Total Cost less FCCOM amount. |
| Enter FCCOM and fee rate (highlighted in blue) to calculate total price. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 2_x000D_
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 2a
| SpS Task Order 1 - Tactical Persistence Study |
| CLIN 0001: Tactical Persistence Study |
| Estimated Cost |
Proposing Entity: ___________________________
| Task Order Year 1 (4 months) | |||||
| CLIN 0001 - Tactical Persistence Study | Labor | Travel | ODC | Material | *Totals |
| Total CLIN 0001 Cost | $ 6.00 | $ 6.00 | $ 6.00 | $ 6.00 | $24 |
| *Total FFP not to exceed $200,000 |
| Instructions / Notes |
| All costs must be entered as costs less FCCOM |
| Enter total labor dollars in Column B (highlighted in blue). |
| Enter total travel dollars in Column C (highlighted in blue). |
| Enter total ODC dollars in Column D (highlighted in blue). |
| Enter total material dollars in Column E (highlighted in blue). |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 2a_x000D_
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 2b
| SpS Task Order 1 - Tactical Persistence Study |
| CLIN 0001: Tactical Persistence Study |
| Workforce Profile - WYE Equivalent |
Proposing Entity: ____________________
Productive Hours Estimated per WYE: ____________________
| TO Year 1 (4 Months) | |
| CLIN 0001 - Tactical Persistence Study | LOE |
| Total CLIN 0001 | 3 |
| Instructions / Notes |
| Enter WYE equivalent in Column B (highlighted in blue). |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 2b_x000D_
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 3
| SpS Task Order 2 - ORS-8 Space Segment | |
| CLIN 0001: Space Vehicle - Development through Launch Operations | |
| Summary of Elements of Cost |
Proposing Entity: ___________
| Base Period | Base Period | Base Period | |
| TO Year 1 | TO Year 2 | TO Year 3 | Total |
| Labor Hours | ||||
| Prime | 25 | 25 | 25 | 75 |
| Subcontractor #1 (if provided) | - 0 | - 0 | - 0 | - 0 |
| Subcontractor #2 (if provided) | - 0 | - 0 | - 0 | - 0 |
| Total Labor Hours | 25 | 25 | 25 | 75 |
| Direct Labor Costs | ||||
| Total Direct Labor Costs (Prime only) | $ 1,900.00 | $ 1,915.00 | $ 1,935.00 | $ 5,750.00 |
| Indirect Costs | ||||
| Total Fringe Benefits on Prime Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Overhead on Prime Labor | $ 2,111.10 | $ 2,142.10 | $ 2,183.85 | $ 6,437.05 |
| Total Indirect Cost | $ 2,111.10 | $ 2,142.10 | $ 2,183.85 | $ 6,437.05 |
| Subcontractor Total Cost and Fee | ||||
| Subcontractor #1 | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Subcontractor #2 | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Subcontractor #3 | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Subcontractor #4 | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Total Subcontractor Costs | $ 20.00 | $ 20.00 | $ 20.00 | $ 60.00 |
| Other Direct Costs: | ||||
| Hardware/Software/Maintenance | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Launch Services | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Travel/Training | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Consultant 1 | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| ODC - List separately | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Total Other Direct Costs | $ 25.00 | $ 25.00 | $ 25.00 | $ 75.00 |
| Material: | ||||
| Material | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| Material Handling | $ 0.50 | $ 0.50 | $ 0.50 | $ 1.50 |
| Total Material | $ 5.50 | $ 5.50 | $ 5.50 | $ 16.50 |
Subtotal $ 4,061.60 $ 4,107.60 $ 4,169.35 $ 12,338.55
G&A Expense $ 406.15 $ 411.05 $ 417.65 $ 1,234.85
Total Cost $ 4,467.75 $ 4,518.65 $ 4,587.00 $ 13,573.40
| Fixed Fee | $ 44.70 | $ 45.20 | $ 45.85 | $ 135.75 |
| Facilities Capital Cost of Money | $ 11.90 | $ 12.45 | $ 13.25 | $ 37.60 |
Total Cost Plus Fixed Fee $ 4,524.35 $ 4,576.30 $ 4,646.10 $ 13,746.75
| Instructions / Notes |
| Use Exhibit 3a to complete this chart. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 3_x000D_
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 3a
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0001: Space Vehicle - Development through Launch Operations |
| TOTAL CLIN 0001 DETAILED COST/PRICE |
Proposing Entity: _________________________________________
| TOTAL CLIN 0001 | TO Year 1 | TO Year 2 | TO Year 3 | Total | |||||||
| PROPOSED | PROPOSED | PROPOSED | PROPOSED | ||||||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||||||||
| LABOR CATEGORY 1 | 5 | $ 80.00 | $ 400.00 | 5 | $ 80.75 | $ 403.75 | 5 | $ 81.75 | $ 408.75 | 15 | $ 1,212.50 |
| LABOR CATEGORY 2 | 5 | $ 90.00 | $ 450.00 | 5 | $ 90.75 | $ 453.75 | 5 | $ 91.75 | $ 458.75 | 15 | $ 1,362.50 |
| LABOR CATEGORY 3 | 5 | $ 100.00 | $ 500.00 | 5 | $ 100.75 | $ 503.75 | 5 | $ 101.75 | $ 508.75 | 15 | $ 1,512.50 |
| LABOR CATEGORY 4 | 5 | $ 110.00 | $ 550.00 | 5 | $ 110.75 | $ 553.75 | 5 | $ 111.75 | $ 558.75 | 15 | $ 1,662.50 |
| ETC. | 5 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 15 | $ - 0 |
| TOTAL DIRECT LABOR | 25 | $ 1,900.00 | 25 | $ 1,915.00 | 25 | $ 1,935.00 | 75 | $ 5,750.00 |
FRINGE BENEFITS $ 1,900.00 0.00% $ - 0 $ 1,915.00 0.00% $ - 0 $ 1,935.00 0.00% $ - 0 5750 $ - 0
| LABOR OVERHEAD | |||||||||||
| OH CATEGORY 1 | $ 1,900.00 | 111.11% | $ 2,111.10 | $ 1,915.00 | 111.86% | $ 2,142.10 | $ 1,935.00 | 112.86% | $ 2,183.85 | 5750 | $ 6,437.05 |
| OH CATEGORY 2 | $ 1,900.00 | 0.00% | $ - 0 | $ 1,915.00 | 0.00% | $ - 0 | $ 1,935.00 | 0.00% | $ - 0 | 5750 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 2,111.10 $ 2,142.10 $ 2,183.85 $ 6,437.05
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 20.00 | $ 20.00 | $ 20.00 | $ 60.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 5.00 $ 5.00 $ 5.00 $ 15.00
MATERIAL OVERHEAD $ 5.00 10.00% $ 0.50 $ 5.00 10.01% $ 0.50 $ 5.00 10.02% $ 0.50 15 $ 1.50
| OTHER DIRECT COSTS | ||||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| LAUNCH SERVICES | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| TRAVEL/TRAINING | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| CONSULTANT | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| ODC - List separately | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
| TOTAL ODCS | $ 25.00 | $ 25.00 | $ 25.00 | $ 75.00 |
SUBTOTAL $ 4,061.60 $ 4,107.60 $ 4,169.35 $ 12,338.55
G&A $ 4,061.60 10.00% $ 406.15 $ 4,107.60 10.01% $ 411.05 $ 4,169.35 10.02% $ 417.65 12338.55 $ 1,234.85
TOTAL COST $ 4,467.75 $ 4,518.65 $ 4,587.00 $ 13,573.40
| FACILITIES CAPITAL COST OF MONEY | |||||||||||
| DIRECT LABOR | $ 1,900.00 | 0.00200 | $ 3.80 | $ 1,915.00 | 0.00208 | $ 3.95 | $ 1,935.00 | 0.00218 | $ 4.20 | 5750 | $ 11.95 |
| G&A | $ 4,061.60 | 0.00200 | $ 8.10 | $ 4,107.60 | 0.00208 | $ 8.50 | $ 4,169.35 | 0.00218 | $ 9.05 | 12338.55 | $ 25.65 |
| ETC. | 0.00200 | $ - 0 | 0.00208 | $ - 0 | 0.00218 | $ - 0 | $ - 0 | ||||
| TOTAL FCCM | $ 11.90 | $ 12.45 | $ 13.25 | $ 37.60 |
Fixed Fee $ 4,467.75 1.00% $ 44.70 $ 4,518.65 1.00% $ 45.20 $ 4,587.00 1.00% $ 45.85 13573.4 $ 135.75
TOTAL COST PLUS FIXED FEE $ 4,524.35 $ 4,576.30 $ 4,646.10 $ 13,746.75
| Instructions / Notes |
| Use Exhibit 3b, 3c, 3d, 3e, 3f, and Exhibit 6 to complete this chart. All values should roll up from these charts. |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 3a
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 3b
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0001: Space Vehicle - Development through Launch Operations |
| WBS 1.1 DETAILED COST/PRICE |
Proposing Entity: _________________________________________
| WBS 1.1: Program Management / Systems Engineering | TO Year 1 | TO Year 2 | TO Year 3 | Total | |||||||
| PROPOSED | PROPOSED | PROPOSED | PROPOSED | ||||||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||||||||
| LABOR CATEGORY 1 | 1 | $ 80.00 | $ 80.00 | 1 | $ 80.75 | $ 80.75 | 1 | $ 81.75 | $ 81.75 | 3 | $ 242.50 |
| LABOR CATEGORY 2 | 1 | $ 90.00 | $ 90.00 | 1 | $ 90.75 | $ 90.75 | 1 | $ 91.75 | $ 91.75 | 3 | $ 272.50 |
| LABOR CATEGORY 3 | 1 | $ 100.00 | $ 100.00 | 1 | $ 100.75 | $ 100.75 | 1 | $ 101.75 | $ 101.75 | 3 | $ 302.50 |
| LABOR CATEGORY 4 | 1 | $ 110.00 | $ 110.00 | 1 | $ 110.75 | $ 110.75 | 1 | $ 111.75 | $ 111.75 | 3 | $ 332.50 |
| ETC. | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 3 | $ - 0 |
| TOTAL DIRECT LABOR | 5 | $ 380.00 | 5 | $ 383.00 | 5 | $ 387.00 | 15 | $ 1,150.00 |
FRINGE BENEFITS $ 380.00 0.00% $ - 0 $ 383.00 0.00% $ - 0 $ 387.00 0.00% $ - 0 1150 $ - 0
| LABOR OVERHEAD | |||||||||||
| OH CATEGORY 1 | $ 380.00 | 111.11% | $ 422.22 | $ 383.00 | 111.86% | $ 428.42 | $ 387.00 | 112.86% | $ 436.77 | 1150 | $ 1,287.41 |
| OH CATEGORY 2 | $ 380.00 | 0.00% | $ - 0 | $ 383.00 | 0.00% | $ - 0 | $ 387.00 | 0.00% | $ - 0 | 1150 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 422.22 $ 428.42 $ 436.77 $ 1,287.41
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 4.00 | $ 4.00 | $ 4.00 | $ 12.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 1.00 $ 1.00 $ 1.00 $ 3.00
MATERIAL OVERHEAD $ 1.00 10.00% $ 0.10 $ 1.00 10.01% $ 0.10 $ 1.00 10.02% $ 0.10 3 $ 0.30
| OTHER DIRECT COSTS | ||||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| LAUNCH SERVICES | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TRAVEL/TRAINING | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| CONSULTANT | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| ODC - List separately | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL ODCS | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
SUBTOTAL $ 812.32 $ 821.52 $ 833.87 $ 2,467.71
G&A $ 812.32 10.00% $ 81.23 $ 821.52 10.01% $ 82.21 $ 833.87 10.02% $ 83.53 2467.71 $ 246.97
TOTAL COST $ 893.55 $ 903.73 $ 917.40 $ 2,714.68
| FACILITIES CAPITAL COST OF MONEY | |||||||||||
| DIRECT LABOR | $ 380.00 | 0.00200 | $ 0.76 | $ 383.00 | 0.00208 | $ 0.79 | $ 387.00 | 0.00218 | $ 0.84 | 1150 | $ 2.39 |
| G&A | $ 812.32 | 0.00200 | $ 1.62 | $ 821.52 | 0.00208 | $ 1.70 | $ 833.87 | 0.00218 | $ 1.81 | 2467.71 | $ 5.13 |
| ETC. | 0.00200 | $ - 0 | 0.00208 | $ - 0 | 0.00218 | $ - 0 | $ - 0 | ||||
| TOTAL FCCM | $ 2.38 | $ 2.49 | $ 2.65 | $ 7.52 |
Fixed Fee $ 893.55 1.00% $ 8.94 $ 903.73 1.00% $ 9.04 $ 917.40 1.00% $ 9.17 2714.68 $ 27.15
TOTAL COST PLUS FIXED FEE $ 904.87 $ 915.26 $ 929.22 $ 2,749.35
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 3b
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 3c
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0001: Space Vehicle - Development through Launch Operations |
| WBS 1.2 DETAILED COST/PRICE |
Proposing Entity: _________________________________________
| WBS 1.2: Space Vehicle | TO Year 1 | TO Year 2 | TO Year 3 | Total | |||||||
| PROPOSED | PROPOSED | PROPOSED | PROPOSED | ||||||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||||||||
| LABOR CATEGORY 1 | 1 | $ 80.00 | $ 80.00 | 1 | $ 80.75 | $ 80.75 | 1 | $ 81.75 | $ 81.75 | 3 | $ 242.50 |
| LABOR CATEGORY 2 | 1 | $ 90.00 | $ 90.00 | 1 | $ 90.75 | $ 90.75 | 1 | $ 91.75 | $ 91.75 | 3 | $ 272.50 |
| LABOR CATEGORY 3 | 1 | $ 100.00 | $ 100.00 | 1 | $ 100.75 | $ 100.75 | 1 | $ 101.75 | $ 101.75 | 3 | $ 302.50 |
| LABOR CATEGORY 4 | 1 | $ 110.00 | $ 110.00 | 1 | $ 110.75 | $ 110.75 | 1 | $ 111.75 | $ 111.75 | 3 | $ 332.50 |
| ETC. | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 3 | $ - 0 |
| TOTAL DIRECT LABOR | 5 | $ 380.00 | 5 | $ 383.00 | 5 | $ 387.00 | 15 | $ 1,150.00 |
FRINGE BENEFITS $ 380.00 0.00% $ - 0 $ 383.00 0.00% $ - 0 $ 387.00 0.00% $ - 0 1150 $ - 0
| LABOR OVERHEAD | |||||||||||
| OH CATEGORY 1 | $ 380.00 | 111.11% | $ 422.22 | $ 383.00 | 111.86% | $ 428.42 | $ 387.00 | 112.86% | $ 436.77 | 1150 | $ 1,287.41 |
| OH CATEGORY 2 | $ 380.00 | 0.00% | $ - 0 | $ 383.00 | 0.00% | $ - 0 | $ 387.00 | 0.00% | $ - 0 | 1150 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 422.22 $ 428.42 $ 436.77 $ 1,287.41
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 4.00 | $ 4.00 | $ 4.00 | $ 12.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 1.00 $ 1.00 $ 1.00 $ 3.00
MATERIAL OVERHEAD $ 1.00 10.00% $ 0.10 $ 1.00 10.01% $ 0.10 $ 1.00 10.02% $ 0.10 3 $ 0.30
| OTHER DIRECT COSTS | ||||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| LAUNCH SERVICES | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TRAVEL/TRAINING | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| CONSULTANT | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| ODC - List separately | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL ODCS | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
SUBTOTAL $ 812.32 $ 821.52 $ 833.87 $ 2,467.71
G&A $ 812.32 10.00% $ 81.23 $ 821.52 10.01% $ 82.21 $ 833.87 10.02% $ 83.53 2467.71 $ 246.97
TOTAL COST $ 893.55 $ 903.73 $ 917.40 $ 2,714.68
| FACILITIES CAPITAL COST OF MONEY | |||||||||||
| DIRECT LABOR | $ 380.00 | 0.00200 | $ 0.76 | $ 383.00 | 0.00208 | $ 0.79 | $ 387.00 | 0.00218 | $ 0.84 | 1150 | $ 2.39 |
| G&A | $ 812.32 | 0.00200 | $ 1.62 | $ 821.52 | 0.00208 | $ 1.70 | $ 833.87 | 0.00218 | $ 1.81 | 2467.71 | $ 5.13 |
| ETC. | 0.00200 | $ - 0 | 0.00208 | $ - 0 | 0.00218 | $ - 0 | $ - 0 | ||||
| TOTAL FCCM | $ 2.38 | $ 2.49 | $ 2.65 | $ 7.52 |
Fixed Fee $ 893.55 1.00% $ 8.94 $ 903.73 1.00% $ 9.04 $ 917.40 1.00% $ 9.17 2714.68 $ 27.15
TOTAL COST PLUS FIXED FEE $ 904.87 $ 915.26 $ 929.22 $ 2,749.35
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 3c
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 3d
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0001: Space Vehicle - Development through Launch Operations |
| WBS 1.3 DETAILED COST/PRICE |
Proposing Entity: _________________________________________
| WBS 1.3: Mission Data Management System | TO Year 1 | TO Year 2 | TO Year 3 | Total | |||||||
| PROPOSED | PROPOSED | PROPOSED | PROPOSED | ||||||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||||||||
| LABOR CATEGORY 1 | 1 | $ 80.00 | $ 80.00 | 1 | $ 80.75 | $ 80.75 | 1 | $ 81.75 | $ 81.75 | 3 | $ 242.50 |
| LABOR CATEGORY 2 | 1 | $ 90.00 | $ 90.00 | 1 | $ 90.75 | $ 90.75 | 1 | $ 91.75 | $ 91.75 | 3 | $ 272.50 |
| LABOR CATEGORY 3 | 1 | $ 100.00 | $ 100.00 | 1 | $ 100.75 | $ 100.75 | 1 | $ 101.75 | $ 101.75 | 3 | $ 302.50 |
| LABOR CATEGORY 4 | 1 | $ 110.00 | $ 110.00 | 1 | $ 110.75 | $ 110.75 | 1 | $ 111.75 | $ 111.75 | 3 | $ 332.50 |
| ETC. | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 3 | $ - 0 |
| TOTAL DIRECT LABOR | 5 | $ 380.00 | 5 | $ 383.00 | 5 | $ 387.00 | 15 | $ 1,150.00 |
FRINGE BENEFITS $ 380.00 0.00% $ - 0 $ 383.00 0.00% $ - 0 $ 387.00 0.00% $ - 0 1150 $ - 0
| LABOR OVERHEAD | |||||||||||
| OH CATEGORY 1 | $ 380.00 | 111.11% | $ 422.22 | $ 383.00 | 111.86% | $ 428.42 | $ 387.00 | 112.86% | $ 436.77 | 1150 | $ 1,287.41 |
| OH CATEGORY 2 | $ 380.00 | 0.00% | $ - 0 | $ 383.00 | 0.00% | $ - 0 | $ 387.00 | 0.00% | $ - 0 | 1150 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 422.22 $ 428.42 $ 436.77 $ 1,287.41
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 4.00 | $ 4.00 | $ 4.00 | $ 12.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 1.00 $ 1.00 $ 1.00 $ 3.00
MATERIAL OVERHEAD $ 1.00 10.00% $ 0.10 $ 1.00 10.01% $ 0.10 $ 1.00 10.02% $ 0.10 3 $ 0.30
| OTHER DIRECT COSTS | ||||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| LAUNCH SERVICES | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TRAVEL/TRAINING | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| CONSULTANT | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| ODC - List separately | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL ODCS | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
SUBTOTAL $ 812.32 $ 821.52 $ 833.87 $ 2,467.71
G&A $ 812.32 10.00% $ 81.23 $ 821.52 10.01% $ 82.21 $ 833.87 10.02% $ 83.53 2467.71 $ 246.97
TOTAL COST $ 893.55 $ 903.73 $ 917.40 $ 2,714.68
| FACILITIES CAPITAL COST OF MONEY | |||||||||||
| DIRECT LABOR | $ 380.00 | 0.00200 | $ 0.76 | $ 383.00 | 0.00208 | $ 0.79 | $ 387.00 | 0.00218 | $ 0.84 | 1150 | $ 2.39 |
| G&A | $ 812.32 | 0.00200 | $ 1.62 | $ 821.52 | 0.00208 | $ 1.70 | $ 833.87 | 0.00218 | $ 1.81 | 2467.71 | $ 5.13 |
| ETC. | 0.00200 | $ - 0 | 0.00208 | $ - 0 | 0.00218 | $ - 0 | $ - 0 | ||||
| TOTAL FCCM | $ 2.38 | $ 2.49 | $ 2.65 | $ 7.52 |
Fixed Fee $ 893.55 1.00% $ 8.94 $ 903.73 1.00% $ 9.04 $ 917.40 1.00% $ 9.17 2714.68 $ 27.15
TOTAL COST PLUS FIXED FEE $ 904.87 $ 915.26 $ 929.22 $ 2,749.35
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 3d
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 3e
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0001: Space Vehicle - Development through Launch Operations |
| WBS 1.4 DETAILED COST/PRICE |
Proposing Entity: _________________________________________
| WBS 1.4: Support Equipment | TO Year 1 | TO Year 2 | TO Year 3 | Total | |||||||
| PROPOSED | PROPOSED | PROPOSED | PROPOSED | ||||||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||||||||
| LABOR CATEGORY 1 | 1 | $ 80.00 | $ 80.00 | 1 | $ 80.75 | $ 80.75 | 1 | $ 81.75 | $ 81.75 | 3 | $ 242.50 |
| LABOR CATEGORY 2 | 1 | $ 90.00 | $ 90.00 | 1 | $ 90.75 | $ 90.75 | 1 | $ 91.75 | $ 91.75 | 3 | $ 272.50 |
| LABOR CATEGORY 3 | 1 | $ 100.00 | $ 100.00 | 1 | $ 100.75 | $ 100.75 | 1 | $ 101.75 | $ 101.75 | 3 | $ 302.50 |
| LABOR CATEGORY 4 | 1 | $ 110.00 | $ 110.00 | 1 | $ 110.75 | $ 110.75 | 1 | $ 111.75 | $ 111.75 | 3 | $ 332.50 |
| ETC. | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 3 | $ - 0 |
| TOTAL DIRECT LABOR | 5 | $ 380.00 | 5 | $ 383.00 | 5 | $ 387.00 | 15 | $ 1,150.00 |
FRINGE BENEFITS $ 380.00 0.00% $ - 0 $ 383.00 0.00% $ - 0 $ 387.00 0.00% $ - 0 1150 $ - 0
| LABOR OVERHEAD | |||||||||||
| OH CATEGORY 1 | $ 380.00 | 111.11% | $ 422.22 | $ 383.00 | 111.86% | $ 428.42 | $ 387.00 | 112.86% | $ 436.77 | 1150 | $ 1,287.41 |
| OH CATEGORY 2 | $ 380.00 | 0.00% | $ - 0 | $ 383.00 | 0.00% | $ - 0 | $ 387.00 | 0.00% | $ - 0 | 1150 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 422.22 $ 428.42 $ 436.77 $ 1,287.41
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 4.00 | $ 4.00 | $ 4.00 | $ 12.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 1.00 $ 1.00 $ 1.00 $ 3.00
MATERIAL OVERHEAD $ 1.00 10.00% $ 0.10 $ 1.00 10.01% $ 0.10 $ 1.00 10.02% $ 0.10 3 $ 0.30
| OTHER DIRECT COSTS | ||||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| LAUNCH SERVICES | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TRAVEL/TRAINING | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| CONSULTANT | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| ODC - List separately | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL ODCS | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
SUBTOTAL $ 812.32 $ 821.52 $ 833.87 $ 2,467.71
G&A $ 812.32 10.00% $ 81.23 $ 821.52 10.01% $ 82.21 $ 833.87 10.02% $ 83.53 2467.71 $ 246.97
TOTAL COST $ 893.55 $ 903.73 $ 917.40 $ 2,714.68
| FACILITIES CAPITAL COST OF MONEY | |||||||||||
| DIRECT LABOR | $ 380.00 | 0.00200 | $ 0.76 | $ 383.00 | 0.00208 | $ 0.79 | $ 387.00 | 0.00218 | $ 0.84 | 1150 | $ 2.39 |
| G&A | $ 812.32 | 0.00200 | $ 1.62 | $ 821.52 | 0.00208 | $ 1.70 | $ 833.87 | 0.00218 | $ 1.81 | 2467.71 | $ 5.13 |
| ETC. | 0.00200 | $ - 0 | 0.00208 | $ - 0 | 0.00218 | $ - 0 | $ - 0 | ||||
| TOTAL FCCM | $ 2.38 | $ 2.49 | $ 2.65 | $ 7.52 |
Fixed Fee $ 893.55 1.00% $ 8.94 $ 903.73 1.00% $ 9.04 $ 917.40 1.00% $ 9.17 2714.68 $ 27.15
TOTAL COST PLUS FIXED FEE $ 904.87 $ 915.26 $ 929.22 $ 2,749.35
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4 _x000D_Exhibit 3e
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 3f
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0001: Space Vehicle - Development through Launch Operations |
| WBS 1.5 DETAILED COST/PRICE |
Proposing Entity: _________________________________________
| WBS 1.5: Launch Service Integration | TO Year 1 | TO Year 2 | TO Year 3 | Total | |||||||
| PROPOSED | PROPOSED | PROPOSED | PROPOSED | ||||||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||||||||
| LABOR CATEGORY 1 | 1 | $ 80.00 | $ 80.00 | 1 | $ 80.75 | $ 80.75 | 1 | $ 81.75 | $ 81.75 | 3 | $ 242.50 |
| LABOR CATEGORY 2 | 1 | $ 90.00 | $ 90.00 | 1 | $ 90.75 | $ 90.75 | 1 | $ 91.75 | $ 91.75 | 3 | $ 272.50 |
| LABOR CATEGORY 3 | 1 | $ 100.00 | $ 100.00 | 1 | $ 100.75 | $ 100.75 | 1 | $ 101.75 | $ 101.75 | 3 | $ 302.50 |
| LABOR CATEGORY 4 | 1 | $ 110.00 | $ 110.00 | 1 | $ 110.75 | $ 110.75 | 1 | $ 111.75 | $ 111.75 | 3 | $ 332.50 |
| ETC. | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 3 | $ - 0 |
| TOTAL DIRECT LABOR | 5 | $ 380.00 | 5 | $ 383.00 | 5 | $ 387.00 | 15 | $ 1,150.00 |
FRINGE BENEFITS $ 380.00 0.00% $ - 0 $ 383.00 0.00% $ - 0 $ 387.00 0.00% $ - 0 1150 $ - 0
| LABOR OVERHEAD | |||||||||||
| OH CATEGORY 1 | $ 380.00 | 111.11% | $ 422.22 | $ 383.00 | 111.86% | $ 428.42 | $ 387.00 | 112.86% | $ 436.77 | 1150 | $ 1,287.41 |
| OH CATEGORY 2 | $ 380.00 | 0.00% | $ - 0 | $ 383.00 | 0.00% | $ - 0 | $ 387.00 | 0.00% | $ - 0 | 1150 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 422.22 $ 428.42 $ 436.77 $ 1,287.41
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 4.00 | $ 4.00 | $ 4.00 | $ 12.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 1.00 $ 1.00 $ 1.00 $ 3.00
MATERIAL OVERHEAD $ 1.00 10.00% $ 0.10 $ 1.00 10.01% $ 0.10 $ 1.00 10.02% $ 0.10 3 $ 0.30
| OTHER DIRECT COSTS | ||||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| LAUNCH SERVICES | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TRAVEL/TRAINING | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| CONSULTANT | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| ODC - List separately | $ 1.00 | $ 1.00 | $ 1.00 | $ 3.00 |
| TOTAL ODCS | $ 5.00 | $ 5.00 | $ 5.00 | $ 15.00 |
SUBTOTAL $ 812.32 $ 821.52 $ 833.87 $ 2,467.71
G&A $ 812.32 10.00% $ 81.23 $ 821.52 10.01% $ 82.21 $ 833.87 10.02% $ 83.53 2467.71 $ 246.97
TOTAL COST $ 893.55 $ 903.73 $ 917.40 $ 2,714.68
| FACILITIES CAPITAL COST OF MONEY | |||||||||||
| DIRECT LABOR | $ 380.00 | 0.00200 | $ 0.76 | $ 383.00 | 0.00208 | $ 0.79 | $ 387.00 | 0.00218 | $ 0.84 | 1150 | $ 2.39 |
| G&A | $ 812.32 | 0.00200 | $ 1.62 | $ 821.52 | 0.00208 | $ 1.70 | $ 833.87 | 0.00218 | $ 1.81 | 2467.71 | $ 5.13 |
| ETC. | 0.00200 | $ - 0 | 0.00208 | $ - 0 | 0.00218 | $ - 0 | $ - 0 | ||||
| TOTAL FCCM | $ 2.38 | $ 2.49 | $ 2.65 | $ 7.52 |
Fixed Fee $ 893.55 1.00% $ 8.94 $ 903.73 1.00% $ 9.04 $ 917.40 1.00% $ 9.17 2714.68 $ 27.15
TOTAL COST PLUS FIXED FEE $ 904.87 $ 915.26 $ 929.22 $ 2,749.35
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 3f
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 4
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0002: Launch and Early Orbit, and Mission Operations Support |
| Summary of Elements of Cost |
Proposing Entity: _________________________________________
| Base Period | |
| TO Year 4 | Total |
| Labor Hours | ||
| Prime | 5 | 5 |
| Subcontractor #1 (if provided) | - 0 | - 0 |
| Subcontractor #2 (if provided) | - 0 | - 0 |
| Total Labor Hours | 5 | 5 |
| Direct Labor Costs | ||
| Total Direct Labor Costs (Prime only) | $ 391.00 | $ 391.00 |
| Indirect Costs | ||
| Total Fringe Benefits on Prime Labor | $ - 0 | $ - 0 |
| Total Overhead on Prime Labor | $ 445.19 | $ 445.19 |
| Total Indirect Cost | $ 445.19 | $ 445.19 |
| Subcontractor Total Cost and Fee | ||
| Subcontractor #1 | $ 1.00 | $ 1.00 |
| Subcontractor #2 | $ 1.00 | $ 1.00 |
| Subcontractor #3 | $ 1.00 | $ 1.00 |
| Subcontractor #4 | $ 1.00 | $ 1.00 |
| Total Subcontractor Costs | $ 4.00 | $ 4.00 |
| Other Direct Costs: | ||
| Hardware/Software/Maintenance | $ 1.00 | $ 1.00 |
| Launch Services | $ 1.00 | $ 1.00 |
| Travel/Training | $ 1.00 | $ 1.00 |
| Consultant 1 | $ 1.00 | $ 1.00 |
| ODC - List separately | $ 1.00 | $ 1.00 |
| Total Other Direct Costs | $ 5.00 | $ 5.00 |
| Material: | ||
| Material | $ 1.00 | $ 1.00 |
| Material Handling | $ 0.10 | $ 0.10 |
| Total Material | $ 1.10 | $ 1.10 |
Subtotal $ 846.29 $ 846.29
G&A Expense $ 84.86 $ 84.86
Total Cost $ 931.15 $ 931.15
| Fixed Fee | $ 9.31 | $ 9.31 |
| Facilities Capital Cost of Money | $ 2.82 | $ 2.82 |
Total Cost Plus Fixed Fee $ 943.28 $ 943.28
| Instructions / Notes |
| Use Exhibit 4a to complete this chart. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 4_x000D_
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 4a
| SpS Task Order 2 - ORS-8 Space Segment | |
| CLIN 0002: Launch and Early Orbit, and Mission Operations Support | CLIN 0002: Launch and Early Orbit, and Mission Operations Support |
| WBS 1.6 DETAILED COST/PRICE |
Proposing Entity: _________________________________________
| WBS 1.6: Mission Operations | TO Year 4 | Total | |||
| PROPOSED | PROPOSED | ||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||
| LABOR CATEGORY 1 | 1 | $ 82.75 | $ 82.75 | 1 | $ 82.75 |
| LABOR CATEGORY 2 | 1 | $ 92.75 | $ 92.75 | 1 | $ 92.75 |
| LABOR CATEGORY 3 | 1 | $ 102.75 | $ 102.75 | 1 | $ 102.75 |
| LABOR CATEGORY 4 | 1 | $ 112.75 | $ 112.75 | 1 | $ 112.75 |
| ETC. | 1 | $ - 0 | $ - 0 | 1 | $ - 0 |
| TOTAL DIRECT LABOR | 5 | $ 391.00 | 5 | $ 391.00 |
FRINGE BENEFITS $ 391.00 0.00% $ - 0 391 $ - 0
| LABOR OVERHEAD | |||||
| OH CATEGORY 1 | $ 391.00 | 113.86% | $ 445.19 | 391 | $ 445.19 |
| OH CATEGORY 2 | $ 391.00 | 0.00% | $ - 0 | 391 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 445.19 $ 445.19
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 4.00 | $ 4.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 1.00 $ 1.00
MATERIAL OVERHEAD $ 1.00 10.03% $ 0.10 1 $ 0.10
| OTHER DIRECT COSTS | ||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 1.00 | $ 1.00 |
| LAUNCH SERVICES | $ 1.00 | $ 1.00 |
| TRAVEL/TRAINING | $ 1.00 | $ 1.00 |
| CONSULTANT | $ 1.00 | $ 1.00 |
| ODC - List separately | $ 1.00 | $ 1.00 |
| TOTAL ODCS | $ 5.00 | $ 5.00 |
SUBTOTAL $ 846.29 $ 846.29
G&A $ 846.29 10.03% $ 84.86 846.29 $ 84.86
TOTAL COST $ 931.15 $ 931.15
| FACILITIES CAPITAL COST OF MONEY | |||||
| DIRECT LABOR | $ 391.00 | 0.00228 | $ 0.89 | 391 | $ 0.89 |
| G&A | $ 846.29 | 0.00228 | $ 1.93 | 846.29 | $ 1.93 |
| ETC. | 0.00228 | $ - 0 | $ - 0 | ||
| TOTAL FCCM | $ 2.82 | $ 2.82 |
Fixed Fee $ 931.15 1.00% $ 9.31 931.15 $ 9.31
TOTAL COST PLUS FIXED FEE $ 943.28 $ 943.28
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 4a
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 5
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0003: Option 1: Mission Operations Support |
| Summary of Elements of Cost |
Proposing Entity: _________________________________________
| Base Period | |
| TO Year 5 | Total |
| Labor Hours | ||
| Prime | 5 | 5 |
| Subcontractor #1 (if provided) | - 0 | - 0 |
| Subcontractor #2 (if provided) | - 0 | - 0 |
| Total Labor Hours | 5 | 5 |
| Direct Labor Costs | ||
| Total Direct Labor Costs (Prime only) | $ 395.00 | $ 395.00 |
| Indirect Costs | ||
| Total Fringe Benefits on Prime Labor | $ - 0 | $ - 0 |
| Total Overhead on Prime Labor | $ 453.70 | $ 453.70 |
| Total Indirect Cost | $ 453.70 | $ 453.70 |
| Subcontractor Total Cost and Fee | ||
| Subcontractor #1 | $ 1.00 | $ 1.00 |
| Subcontractor #2 | $ 1.00 | $ 1.00 |
| Subcontractor #3 | $ 1.00 | $ 1.00 |
| Subcontractor #4 | $ 1.00 | $ 1.00 |
| Total Subcontractor Costs | $ 4.00 | $ 4.00 |
| Other Direct Costs: | ||
| Hardware/Software/Maintenance | $ 1.00 | $ 1.00 |
| Launch Services | $ 1.00 | $ 1.00 |
| Travel/Training | $ 1.00 | $ 1.00 |
| Consultant 1 | $ 1.00 | $ 1.00 |
| ODC - List separately | $ 1.00 | $ 1.00 |
| Total Other Direct Costs | $ 5.00 | $ 5.00 |
| Material: | ||
| Material | $ 1.00 | $ 1.00 |
| Material Handling | $ 0.10 | $ 0.10 |
| Total Material | $ 1.10 | $ 1.10 |
Subtotal $ 858.80 $ 858.80
G&A Expense $ 86.20 $ 86.20
Total Cost $ 945.00 $ 945.00
| Fixed Fee | $ 9.45 | $ 9.45 |
| Facilities Capital Cost of Money | $ 2.98 | $ 2.98 |
Total Cost Plus Fixed Fee $ 957.43 $ 957.43
| Instructions / Notes |
| Use Exhibit 5a to complete this chart. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 5_x000D_
Exhibit 5a
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0003: Option 1: Mission Operations Support |
| WBS 1.6 DETAILED COST/PRICE |
Proposing Entity: _________________________________________
| WBS 1.6: Mission Operations | TO Year 5 | Total | |||
| PROPOSED | PROPOSED | ||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||
| LABOR CATEGORY 1 | 1 | $ 83.75 | $ 83.75 | 1 | $ 83.75 |
| LABOR CATEGORY 2 | 1 | $ 93.75 | $ 93.75 | 1 | $ 93.75 |
| LABOR CATEGORY 3 | 1 | $ 103.75 | $ 103.75 | 1 | $ 103.75 |
| LABOR CATEGORY 4 | 1 | $ 113.75 | $ 113.75 | 1 | $ 113.75 |
| ETC. | 1 | $ - 0 | $ - 0 | 1 | $ - 0 |
| TOTAL DIRECT LABOR | 5 | $ 395.00 | 5 | $ 395.00 |
FRINGE BENEFITS $ 395.00 0.00% $ - 0 395 $ - 0
| LABOR OVERHEAD | |||||
| OH CATEGORY 1 | $ 395.00 | 114.86% | $ 453.70 | 395 | $ 453.70 |
| OH CATEGORY 2 | $ 395.00 | 0.00% | $ - 0 | 395 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 453.70 $ 453.70
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 4.00 | $ 4.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 1.00 $ 1.00
MATERIAL OVERHEAD $ 1.00 10.04% $ 0.10 1 $ 0.10
| OTHER DIRECT COSTS | ||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 1.00 | $ 1.00 |
| LAUNCH SERVICES | $ 1.00 | $ 1.00 |
| TRAVEL/TRAINING | $ 1.00 | $ 1.00 |
| CONSULTANT | $ 1.00 | $ 1.00 |
| ODC - List separately | $ 1.00 | $ 1.00 |
| TOTAL ODCS | $ 5.00 | $ 5.00 |
SUBTOTAL $ 858.80 $ 858.80
G&A $ 858.80 10.04% $ 86.20 858.8 $ 86.20
TOTAL COST $ 945.00 $ 945.00
| FACILITIES CAPITAL COST OF MONEY | |||||
| DIRECT LABOR | $ 395.00 | 0.00238 | $ 0.94 | 395 | $ 0.94 |
| G&A | $ 858.80 | 0.00238 | $ 2.04 | 858.8 | $ 2.04 |
| ETC. | 0.00238 | $ - 0 | $ - 0 | ||
| TOTAL FCCM | $ 2.98 | $ 2.98 |
Fixed Fee $ 945.00 1.00% $ 9.45 945 $ 9.45
TOTAL COST PLUS FIXED FEE $ 957.43 $ 957.43
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 5a
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 6
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0004: Option 2: Mission Operations Support |
| Summary of Elements of Cost |
Proposing Entity: ________________
| Base Period | |
| TO Year 6 | Total |
| Labor Hours | ||
| Prime | 5 | 5 |
| Subcontractor #1 (if provided) | - 0 | - 0 |
| Subcontractor #2 (if provided) | - 0 | - 0 |
| Total Labor Hours | 5 | 5 |
| Direct Labor Costs | ||
| Total Direct Labor Costs (Prime only) | $ 399.00 | $ 399.00 |
| Indirect Costs | ||
| Total Fringe Benefits on Prime Labor | $ - 0 | $ - 0 |
| Total Overhead on Prime Labor | $ 462.28 | $ 462.28 |
| Total Indirect Cost | $ 462.28 | $ 462.28 |
| Subcontractor Total Cost and Fee | ||
| Subcontractor #1 | $ 1.00 | $ 1.00 |
| Subcontractor #2 | $ 1.00 | $ 1.00 |
| Subcontractor #3 | $ 1.00 | $ 1.00 |
| Subcontractor #4 | $ 1.00 | $ 1.00 |
| Total Subcontractor Costs | $ 4.00 | $ 4.00 |
| Other Direct Costs: | ||
| Hardware/Software/Maintenance | $ 1.00 | $ 1.00 |
| Launch Services | $ 1.00 | $ 1.00 |
| Travel/Training | $ 1.00 | $ 1.00 |
| Consultant 1 | $ 1.00 | $ 1.00 |
| ODC - List separately | $ 1.00 | $ 1.00 |
| Total Other Direct Costs | $ 5.00 | $ 5.00 |
| Material: | ||
| Material | $ 1.00 | $ 1.00 |
| Material Handling | $ 0.10 | $ 0.10 |
| Total Material | $ 1.10 | $ 1.10 |
Subtotal $ 871.38 $ 871.38
G&A Expense $ 87.55 $ 87.55
Total Cost $ 958.93 $ 958.93
| Fixed Fee | $ 9.59 | $ 9.59 |
| Facilities Capital Cost of Money | $ 3.15 | $ 3.15 |
Total Cost Plus Fixed Fee $ 971.67 $ 971.67
| Instructions / Notes |
| Use Exhibit 6a to complete this chart. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 6_x000D_
Exhibit 6a
| SpS Task Order 2 - ORS-8 Space Segment |
| CLIN 0004: Option 2: Mission Operations Support |
| WBS 1.6 DETAILED COST/PRICE |
Proposing Entity: __________
| WBS 1.6: Mission Operations | TO Year 6 | Total | |||
| PROPOSED | PROPOSED | ||||
| COST/PRICE ELEMENT | HOURS/BASE | RATE | AMOUNT | HOURS/BASE | AMOUNT |
| DIRECT LABOR | |||||
| LABOR CATEGORY 1 | 1 | $ 84.75 | $ 84.75 | 1 | $ 84.75 |
| LABOR CATEGORY 2 | 1 | $ 94.75 | $ 94.75 | 1 | $ 94.75 |
| LABOR CATEGORY 3 | 1 | $ 104.75 | $ 104.75 | 1 | $ 104.75 |
| LABOR CATEGORY 4 | 1 | $ 114.75 | $ 114.75 | 1 | $ 114.75 |
| ETC. | 1 | $ - 0 | $ - 0 | 1 | $ - 0 |
| TOTAL DIRECT LABOR | 5 | $ 399.00 | 5 | $ 399.00 |
FRINGE BENEFITS $ 399.00 0.00% $ - 0 399 $ - 0
| LABOR OVERHEAD | |||||
| OH CATEGORY 1 | $ 399.00 | 115.86% | $ 462.28 | 399 | $ 462.28 |
| OH CATEGORY 2 | $ 399.00 | 0.00% | $ - 0 | 399 | $ - 0 |
| ETC. |
TOTAL INDIRECT LABOR EXPENSE $ 462.28 $ 462.28
| SUB-TIER VENDOR (SUBCONTRACTOR/INTERCOMPANY/TEAMMATE) | ||
| SUB-TIER VENDOR 1 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 2 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 3 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| SUB-TIER VENDOR 4 (See Attached Sub TO Year Cost Summaries) | $ 1.00 | $ 1.00 |
| TOTAL SUB-TIER VENDOR COSTS/PRICES | $ 4.00 | $ 4.00 |
DIRECT MATERIALS (See Attached Bill of Materials) $ 1.00 $ 1.00
MATERIAL OVERHEAD $ 1.00 10.05% $ 0.10 1 $ 0.10
| OTHER DIRECT COSTS | ||
| HARDWARE/SOFTWARE/MAINTENANCE | $ 1.00 | $ 1.00 |
| LAUNCH SERVICES | $ 1.00 | $ 1.00 |
| TRAVEL/TRAINING | $ 1.00 | $ 1.00 |
| CONSULTANT | $ 1.00 | $ 1.00 |
| ODC - List separately | $ 1.00 | $ 1.00 |
| TOTAL ODCS | $ 5.00 | $ 5.00 |
SUBTOTAL $ 871.38 $ 871.38
G&A $ 871.38 10.05% $ 87.55 871.38 $ 87.55
TOTAL COST $ 958.93 $ 958.93
| FACILITIES CAPITAL COST OF MONEY | |||||
| DIRECT LABOR | $ 399.00 | 0.00248 | $ 0.99 | 399 | $ 0.99 |
| G&A | $ 871.38 | 0.00248 | $ 2.16 | 871.38 | $ 2.16 |
| ETC. | 0.00248 | $ - 0 | $ - 0 | ||
| TOTAL FCCM | $ 3.15 | $ 3.15 |
Fixed Fee $ 958.93 1.00% $ 9.59 958.93 $ 9.59
TOTAL COST PLUS FIXED FEE $ 971.67 $ 971.67
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add labor categories, OH categories, etc. to be consistent with the offeror's accounting system. Please do not add columns. |
| Excel Formulas are currently set up to show mappings, calculate costs, and calculate totals. If edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas/calculations/total costs are correct. |
| The numbers contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Map the rates to Exhibit 7. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 6a
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 7
| SpS Direct Labor and Indirect Rates by TO Year | |
| Proposing Entity: | _________________________________________ |
| OFFEROR'S FISCAL YEAR BEGINS | _____________________ |
| OFFEROR'S FISCAL YEAR ENDS | _____________________ |
| RATE OR FACTOR TITLE | Description | APPLICATION / BASE | TO Year 1 | TO Year 2 | TO Year 3 | TO Year 4 | TO Year 5 | TO Year 6 |
| DIRECT LABOR | ||||||||
| LABOR CATEGORY 1 | Program Manager | $ 80.00 | $ 80.75 | $ 81.75 | $ 82.75 | $ 83.75 | $ 84.75 | |
| LABOR CATEGORY 2 | Systems Engineer | $ 90.00 | $ 90.75 | $ 91.75 | $ 92.75 | $ 93.75 | $ 94.75 | |
| LABOR CATEGORY 3 | Electrical Engineer I | $ 100.00 | $ 100.75 | $ 101.75 | $ 102.75 | $ 103.75 | $ 104.75 | |
| LABOR CATEGORY 4 | Electrical Engineer II | $ 110.00 | $ 110.75 | $ 111.75 | $ 112.75 | $ 113.75 | $ 114.75 | |
| ETC. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| INDIRECT COST | |||||||
| FRINGE BENEFITS | Direct Labor Dollars | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| LABOR OVERHEAD | ||||||||
| OH CATEGORY 1 | OH for Site 1 | Direct Labor Dollars LABOR CATEGORY 1 | 111.11% | 111.86% | 112.86% | 113.86% | 114.86% | 115.86% |
| OH CATEGORY 2 | OH for Site 2 | Direct Labor Dollars LABOR CATEGORY 2 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| MATERIAL OVERHEAD | Material Dollars | 10.00% | 10.01% | 10.02% | 10.03% | 10.04% | 10.05% |
| G&A | Total Cost | 10.00% | 10.01% | 10.02% | 10.03% | 10.04% | 10.05% |
| FACILITIES CAPITAL COST OF MONEY | |||||||
| DIRECT LABOR | Direct Labor Dollars + Fringe | 0.00200 | 0.00208 | 0.00218 | 0.00228 | 0.00238 | 0.00248 |
| G&A | Total Cost before G&A | 0.00200 | 0.00208 | 0.00218 | 0.00228 | 0.00238 | 0.00248 |
| ETC. | 0.00200 | 0.00208 | 0.00218 | 0.00228 | 0.00238 | 0.00248 |
| Instructions / Notes |
| Offerors may add rows to this spreadsheet to add direct labor categories, OH categories, Fringe categories, etc. if necessary to be consistent with the offeror's accounting system. |
| Rates are mapped from Exhibit 7a. Excel Formulas are currently set up to show mappings to Exhibit 7a. When edits to this sheet are made, it is the offeror's resposibility to make sure that the formulas are mapping correctly. |
| Provide the labor category resource code and description in columns A and B respectively |
| Provide the application base for the rate (e.g. OH Category 1 rate is applied to direct labor dollars for LABOR CATEGORY 1) |
| Provide all rates used in pricing sheets |
| The rate categories, descriptions, application, and rate values contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 7
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 7a SpS Direct Labor and Indirect Rate Conversion Data
Proposing Entity: _________________________________________
| OFFEROR'S FISCAL YEAR BEGINS | __________ |
| OFFEROR'S FISCAL YEAR ENDS | __________ |
RATE OR FACTOR TITLE CFY Year 1 CFY Year 2 TO Year 1 CFY Year 2 CFY Year 3 TO Year 2 CFY Year 3 CFY Year 4 TO Year 3 CFY Year 4 CFY Year 5 TO Year 4 CFY Year 5 CFY Year 6 TO Year 5 CFY Year 6 CFY Year 7 TO Year 6
Weighting Percentage for each year 0% 100% Used for pricing 25% 75% Used for pricing 25% 75% Used for pricing 25% 75% Used for pricing 25% 75% Used for pricing 25% 75% Used for pricing
| DIRECT LABOR | ||||||||||||||||||
| LABOR CATEGORY 1 | $ 79.00 | $ 80.00 | $ 80.00 | $ 80.00 | $ 81.00 | $ 80.75 | $ 81.00 | $ 82.00 | $ 81.75 | $ 82.00 | $ 83.00 | $ 82.75 | $ 83.00 | $ 84.00 | $ 83.75 | $ 84.00 | $ 85.00 | $ 84.75 |
| LABOR CATEGORY 2 | $ 89.00 | $ 90.00 | $ 90.00 | $ 90.00 | $ 91.00 | $ 90.75 | $ 91.00 | $ 92.00 | $ 91.75 | $ 92.00 | $ 93.00 | $ 92.75 | $ 93.00 | $ 94.00 | $ 93.75 | $ 94.00 | $ 95.00 | $ 94.75 |
| LABOR CATEGORY 3 | $ 99.00 | $ 100.00 | $ 100.00 | $ 100.00 | $ 101.00 | $ 100.75 | $ 101.00 | $ 102.00 | $ 101.75 | $ 102.00 | $ 103.00 | $ 102.75 | $ 103.00 | $ 104.00 | $ 103.75 | $ 104.00 | $ 105.00 | $ 104.75 |
| LABOR CATEGORY 4 | $ 109.00 | $ 110.00 | $ 110.00 | $ 110.00 | $ 111.00 | $ 110.75 | $ 111.00 | $ 112.00 | $ 111.75 | $ 112.00 | $ 113.00 | $ 112.75 | $ 113.00 | $ 114.00 | $ 113.75 | $ 114.00 | $ 115.00 | $ 114.75 |
| ETC. |
| INDIRECT COST | ||||||||||||||||||
| FRINGE BENEFITS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| LABOR OVERHEAD | ||||||||||||||||||
| OH CATEGORY 1 | 110.11% | 111.11% | 111.11% | 111.11% | 112.11% | 111.86% | 112.11% | 113.11% | 112.86% | 113.11% | 114.11% | 113.86% | 114.11% | 115.11% | 114.86% | 115.11% | 116.11% | 115.86% |
| OH CATEGORY 2 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| MATERIAL OVERHEAD | 9.99% | 10.00% | 10.00% | 10.00% | 10.01% | 10.01% | 10.01% | 10.02% | 10.02% | 10.02% | 10.03% | 10.03% | 10.03% | 10.04% | 10.04% | 10.04% | 10.05% | 10.05% |
| G&A | 9.99% | 10.00% | 10.00% | 10.00% | 10.01% | 10.01% | 10.01% | 10.02% | 10.02% | 10.02% | 10.03% | 10.03% | 10.03% | 10.04% | 10.04% | 10.04% | 10.05% | 10.05% |
| FACILITIES CAPITAL COST OF MONEY | ||||||||||||||||||
| DIRECT LABOR | 0.00199 | 0.00200 | 0.00200 | 0.00200 | 0.00210 | 0.00208 | 0.00210 | 0.00220 | 0.00218 | 0.00220 | 0.00230 | 0.00228 | 0.00230 | 0.00240 | 0.00238 | 0.00240 | 0.00250 | 0.00248 |
| G&A | 0.00199 | 0.00200 | 0.00200 | 0.00200 | 0.00210 | 0.00208 | 0.00210 | 0.00220 | 0.00218 | 0.00220 | 0.00230 | 0.00228 | 0.00230 | 0.00240 | 0.00238 | 0.00240 | 0.00250 | 0.00248 |
| ETC. | 0.00199 | 0.00200 | 0.00200 | 0.00200 | 0.00210 | 0.00208 | 0.00210 | 0.00220 | 0.00218 | 0.00220 | 0.00230 | 0.00228 | 0.00230 | 0.00240 | 0.00238 | 0.00240 | 0.00250 | 0.00248 |
| Instructions / Notes |
| This sheet shows calculations for converting Contractor Fiscal Year rates to Task Order Year Rates if a Task Order Year crosses two CFYs. |
| CFY = Contractor Fiscal Year |
| Offerors may add rows to this spreadsheet to add direct labor categories, OH categories, Fringe categories, etc. if necessary to be consistent with the offeror's accounting system. |
| Provide all rates used in pricing sheets. Rate categories must match Exhibit 7. |
| The rate categories and rate values contained in this RFP Exhibit are examples only -- remove or replace in proposal. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 7a
This exhibit contains Source Selection Information. See FAR 3.104.
Exhibit 8 Schedule of Subcontracts
[ ] Prime Contractor: ______________________________________
Description of Work:
| Number of quotes solicted/received | ||||
| Subcontractor selected: | Subcontract (1) Name and Address | Subcontract (2) Name and Address | Subcontract (3) Name and Address | Subcontract (4) Name and Address |
Basis of Selection:*
Type of Subcontract:**
| Cost | ||||
| Fee/Profit | ||||
| Total Amount Proposed | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Affiliation with Prime:*** |
Cost/Price Analysis Performed by Prime:****
| * Lowest price, teaming partner, technical qualifications, etc. |
| ** FFP, CPAF, CPFF, T&M, etc. |
| *** Subcontractor, subsidiary, interdivisional, etc. |
| **** FAR 15.404-3(b) requires that contractors conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices |
| and include the results of these analyses in the price proposal. If response above is "No", explain why cost or price analyis was not performed and how |
| the Offeror determined that the proposed subcontract price was reasonable. |
| Instructions / Notes |
| If more than four subcontracts are needed, additional columns may be added as needed. |
| Please see Section L of the RFP for more explicit instructions. |
&K01+00080ARC018R0007 J.1(b) Attachment 4_x000D_Exhibit 8
This exhibit contains Source Selection Information. See FAR 3.104.
File details come from the government source that posted it. Updated .