76312.pdf
PDF 54 MB Posted
- Solicitation number
- 76312
- Issued by
- Cook County, Illinois
About this file
Auburn Gresham Corridor Improvements Section 1 (SBI-I) - Project Summary
This is a Scope of Work document for the City of Chicago Department of Transportation detailing the Auburn Gresham Corridor Improvements Section 1 project. The project encompasses roadway rehabilitation and infrastructure improvements along a designated corridor in the Auburn Gresham neighborhood. The scope includes pavement reconstruction, utility coordination, traffic control, and related site work necessary to restore the corridor to functional condition. The project is divided into sections, with this document addressing Section 1 specifically, and involves coordination with multiple city departments and utility providers to ensure comprehensive corridor improvements.
The project is funded through the Strategic Breakeven Initiative (SBI) program and represents a capital improvement investment by the City of Chicago. Specific pricing, bid amounts, contract duration, and award criteria are detailed within the procurement documents associated with this opportunity. The project requires contractor qualifications in municipal infrastructure work and compliance with city procurement regulations. Site-specific conditions, utility locations, and existing infrastructure assessments are documented to inform contractor planning and cost estimation. All work must conform to City of Chicago standards and specifications for public roadway construction and meet applicable prevailing wage requirements for public works projects in Illinois.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 76312_1.pdf | ||
| 76312_3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .