This document contains an amendment to a solicitation for construction services and responses to questions from prospective offerors. The amendment provides responses to questions submitted regarding solicitation number 75H70123R00024, which seeks proposals for a backup generator installation project at Whiteriver Hospital located in Whiteriver, Arizona. The scope of work involves renovating the essential electrical system to accommodate an additional backup generator. The period of performance is 180 calendar days from notice to proceed. The anticipated contract value is between $500,000 and $1,000,000. A pre-bid site visit will be held on May 15, 2023 at 2:00pm local time. The contract type is firm fixed price. Proposals are due by June 7, 2023 at 2:00pm local time. The Indian Health Service will evaluate proposals using lowest price technically acceptable criteria.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B05 Amend A00001.pdf | ||
| B01 Att J04 - Construction Narrative.pdf | ||
| B01 Att J01 - WD AZ20230027 Mod 1 2023.02.03.pdf | ||
| B01 RFP 75H70123R00024 Whiteriver Backup Generator Installation.pdf | ||
| B01 Att J02 - Construction Drawings.pdf | ||
| B01 Att J06 - Self Performed Calculation Sheet (Construction).docx | DOCX document | |
| B01 Att J10 - Generator Price Schedule.xlsx | XLSX spreadsheet | |
| B01 Att J09 - Key Personnel Resume Form.docx | DOCX document | |
| B01 Att J05a - FORMS_TPT_5000HC_11228.pdf | ||
| B01 Att J03 - Construction Specifications.pdf | ||
| B01 Att J08 - PPQ.docx | DOCX document | |
| B01 Att J07 - Company Specialized Experience Form Construction.docx | DOCX document | |
| B01 Att J05 - 2023 Exemption Letter for a Qualifying Hospital.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Questions and Answers #1
75H70123R00026
Whiteriver Backup Generator
Item # Section and Page # Question Response
1 Sheet AE-100 Elevation B notes chain link fencing with Privacy Slats, Match Existing; Can the Government provide specifications for the Privacy Slats as there is no fencing around the new generator pad with privacy slats? We have a recommendation to use Noodle Link Plus – 2” Mesh – Factory Installed Slats.
The Recommended privacy slats are acceptable.
2 Can the Government verify the width, length, and height of the backup generator at Hopi Healthcare Center (HHCC)? The HHCC appears to be 12’ wide and 35’ long.
The generator enclosure is 11’ W x 26’ L.
3 Can the government verify the fuel type, make, and model of the HHCC Generator?
Kohler 1000REOZM Diesel.
4 Are the landing and stairs attached to the HHCC generator to be relocated with the generator? If yes, is the contractor to incorporate them into the new 6’-0” apron?
No, the stairs will not be relocated with the generator.
GC shall provide prefabricated steps to access the generator.
5 If the landing and stairs are to be incorporated into the new apron, will the contractor be required to add additional footings for the landing and stairs?
Yes
6 If footings for the relocated landing and stairs are required, is the contractor responsible for the structural engineering for these footings?
Yes
7 Sheet E-201 indicates a double-door location with a light and plug to be installed by the contractor. The door configuration shown for the enclosure is not consistent with the HHCC generator enclosure. Is the contractor to install and light and plug at each door?
The generator as drawn in plan is a generic layout and differs from the actual generator. The contractor will be required to install lights such that all doors are covered with egress lighting whether they are egress doors or not.
Provide minimum of (1) receptacle installed on north and
(1) receptacle installed on south side of generator.
8 Are both the existing generator and the new generator required to operate at the same time?
There is no equipment shown on the plans to synchronize the two generators.
No, they will not run at the same time. No synchronization equipment is required.
9 Are there special certifications or engineering requirements for fireproofing of rated wall penetrations?
Existing wall ratings must be maintained. Where penetrations are through rated walls provide UL listed fire proofing.
10 Will the AHJ have to inspect the fireproofing system for rated penetrations at each stage? For example; spacing between the opening and through penetrations, mineral wool packing, and fire caulking.
Yes, all penetrations shall be inspected. If the penetration is easily accessible, multiple penetrations can be inspected at once.
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: A00002 |
| Code[0]: 199 |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: The purpose of this amendment is to: |
1) Include responses from questions submitted by prospective offerors (3 pages) *** Proposal due date remains unchanged. Proposals are due 7 June 2023 at 2:00 PM PDT.
NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and all amendments by number and date on their cover letter in their offeror or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: Indian Health Service (IHS) |
Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1650 Seattle, WA 98104
| NameandAddress[0]: |
| AdministeredBy[0]: See item 6 |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: 75H70123R00024 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 4 |
| EffectiveDate[0]: 06/02/2023 |
| Dated9B[0]: 05/02/2023 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |