| File | Type | Posted |
|---|---|---|
| Additional_Question_and_answer_received_against_73095201097.pdf | ||
| Questions_and_answers_received_against_73095201097.pdf | ||
| Wage_Determination_TX170253_05192017_TX253.pdf | ||
| Sign-in_Sheet.pdf | ||
| One_Line_Diagram_for_Intake_Project.pdf | ||
| SCA_Wage_Determination_No._2015-5309,_Rev._No._1.pdf | ||
| FINAL_-_PWS_Intake_Electrical_Panels_rev4.doc | DOC document | |
| Intake_OA-4-1477_Drawing.pdf | ||
| Applicable_Clauses_and_Provisions.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Intake Project
| COST ESTIMATE | ||||
| Motor Control Centers Upgrade | ||||
| FALCON POWER PLANT | ||||
| January 30, 2017 | ||||
| DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| Electrical Panels | 5 | EA | ||
| 3 Phase Transformers | 2 | EA | ||
| Electrical Wire (3/0 AWG 600 Volts Rated) | 10000 | FT | ||
| Electrical Disconnects | 10 | EA | ||
| Conduits UndergroundG/Above Ground | 4000 | FT | ||
| Communication/ Radio Equipment | 20 | EA | ||
| Software (Equipment Status) | 1 | EA | ||
| Automatic Transfer Switch | 3 | EA | ||
| Software Installation | 1 | EA | ||
| Install Automatic Transfer Switch | 3 | EA | ||
| Install Communication/ Radio Equipment | 20 | EA | ||
| Trenching (Underground Conduit) | 1500 | FT | ||
| Install Conduit | 4000 | FT | ||
| Remove Old Wire | 3100 | FT | ||
| Electrical Supplies | 1 | EA | ||
| Electrical Panels & Disconnects Installation | 15 | EA | ||
| Disposal Old Equipment | 1 | EA | ||
| Test Equipment/ Arc Flash Analysis | 1 | EA | ||
| Final Inspection/ | 1 | EA | ||
| Shipping (FOB Destination) (If Applicable) | ||||
| Engineering | ||||
| Electrical Technicians | ||||
| Lodging / Meals (If Applicable) | ||||
| Overtime for weekend and afterhours (If Applicable) | ||||
| As Build Drawings and Schematics | 1 | LS | ||
| Provide Training to Employees | 1 | LS | ||
| OVERHEAD | ||||
| GENERAL AND ADMINISTRATIVE COST | ||||
| PROFIT | ||||
| TOTAL |