72kW RFI-Capability Survery_Final.docx
DOCX document 33 KB Posted
- Attached to
- 72kW Ground Power Units (GPU) Federal contract opportunity
- Solicitation number
- FA8533-20-R-72GPU
About this file
This document contains a request for information and contractor capability survey related to a potential procurement of 72kW ground power units by the United States Air Force. The Air Force seeks to replace over 5,000 aging 72kW and 60kW ground power units through potential acquisition strategies including multiple long-term contracts or design contracts with downselect for production. The request seeks information on contractor capabilities to design, test, and produce 72kW ground power units utilizing commercial and existing DoD technologies. Contractors are asked to provide business and capability information in response by May 7, 2020. Key capabilities include engineering, technical data generation, technical manual authoring, quality assurance, and manufacturing for quantities up to 5,000 units over seven years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 72kW PD High Level changes to B809E PD.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) 72kW Ground Power Unit (GPU)
(NSN: TBD)
CAUTION:
This market survey is being conducted to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements to design, test, and produce the 72kW Ground Power Unit (GPU) for use by United States Air Force (USAF) personnel. The level of security clearance and amount of foreign participation in this requirement has not been determined. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The Government will not reimburse participants for any expenses associated with their participation in this survey. See FAR 52.215-3.
INSTRUCTIONS:
1. Below is a document containing a description of the 72kW Ground Power Unit (GPU) requirement and a Contractor Capability Survey, which allows you to provide your company’s capability. Attached draft Purchase Description contains detailed requirements.
2. If, after reviewing these documents, you desire to participate in the market research, you should provide documentation that supports your company’s capability in meeting these requirements. Failure to provide documentation may result in the Government being unable to adequately assess your capabilities. If you lack sufficient experience in a particular area, please provide details explaining how you would overcome the lack of experience/capabilities in order to perform that portion of the requirement (i.e., teaming, subcontracting, etc.)
a. Identify any areas of work that your organization believes should be broken out exclusively for Small Business.
3. Both large and small businesses are encouraged to participate in this Market Research. Joint ventures or teaming arrangements are encouraged.
4. Questions relative to this market survey should be addressed to the PCO Mr. Robert Rollins
72 kW Ground Power Unit (GPU)
PURPOSE/DESCRIPTION
The Government is conducting market research to determine an acquisition strategy to replace the 72kW and 60 kW GPU fleets of over 5,000 units combined. This includes identifying potential sources that possess the expertise, capabilities and experience to design, test, and produce a 72kW GPU for the DoD. The potential acquisition strategies being considered range from awarding multiple long term contracts, to multiple contracts for design, with a down select prior to production. The Government seeks to maximize the use of non-developmental items.
With the exception of some specialized aircraft, 72kW GPUs are used in some form or fashion with almost every aircraft in USAF inventory for pre-launch, recovery, as well as maintenance tasks. These GPU’s are the primary source of ground power for aircraft that includes but is not limited to the C-130, C-17, C-5, B-1B, B-2, F-22, A-10, KC-135, B-52 and secondary power for F-15 and F-16. This effort is geared towards replacing the USAF’s existing and aging 72kW and 60kW GPU fleets.
Attached is a draft requirement that we are seeking industry input on. The USAF is seeking to maximize commercial and existing DoD technologies as much as possible. The USAF is also seeking information concerning the production capacity that currently exists.
CONTRACTOR CAPABILITY SURVEY
72 kW Ground Power Unit (GPU)
Part I. Business Information
Please provide the following business information for your company/institution and for any teaming or joint venture partners:
· Company/Institute Name:
· Address:
· Point of Contact:
· CAGE Code:
· Phone Number:
· E-mail Address:
· Web Page URL:
· Government Proposed North American Industry Classification System (NAICS) Code: 335312 Based on the Government proposed NAICS Code, state whether your company is:
| · Small Business | (Yes / No) | ||||
| · Woman Owned Small Business | (Yes / No) | ||||
| · Small Disadvantaged Business | (Yes / No) | ||||
| · 8(a) Certified | (Yes / No) | ||||
| · HUBZone Certified | (Yes / No) | ||||
| · Veteran Owned Small Business | (Yes / No) | ||||
| · Service Disabled Veteran Small Business | (Yes / No) | ||||
| · System for Award Management (SAM) | (Yes / No) |
· Economically Disadvantaged Women-Owned Small Business (EDWOSB) (Yes / No)
· A statement as to whether your company is domestically or foreign owned (if foreign, please indicate the country of ownership).
Responses to the Capability Survey Part I and Part II must be received no later than close of business 7 May 2020. Please ensure data is in a readable electronic format that can be received through a firewall. Attachments shall not to exceed 10 MB per email. Multiple emails are acceptable. Responses must be sent via email to the PCO Mr. Robert Rollins robert.rollins.2@us.af.mil.
· Questions relative to this market research should be addressed to the PCO or the PM.
· Name and email address for the PM: Mr. Rick Grant relious.grant.2@us.af.mil.
· Person responsible for reviewing responses: Mr. Jeff Hill jeff.hill.23@us.af.mil.
Part II. Capability Survey Questions
A. General Capability Questions:
1. Describe briefly the capabilities of your company and nature of the goods and/or services you provide. Include a description of your staff composition and management structure.
2. Describe your company's capabilities and experience in generating technical data, such as, engineering analyses, test procedures, test reports, engineering drawing/configuration management data, and spare parts provisioning data. Identify what software programs are utilized to generate these data products and what formats are available for delivered items.
3. Describe your company's capabilities and experience in generating technical manuals. If you have delivered technical manuals to the USAF within the last 5 years, please provide the technical manual numbers for up to 5 of the most relevant manuals. Do you typically subcontract out USAF Tech Order development or produce them in house? Please provide the last contract in which you produced USAF TOs.
4. What quality assurance processes and test qualification practices does your company employ? Provide a description of your quality program (ISO 9001, AS9100, etc.).
5. Include a detailed listing of facilities and equipment, including quantities, required to satisfy the requirements of this effort.
6. The Government is considering the issuance of a longer than 5 year contract for production. Do you have any issues with quoting firm-fixed prices for longer than five years? Would you require any price risk protection such as Economic Price Adjustment in out years?
7. Do you have the ability to package IAW military standards?
B. Commerciality Questions:
1. Are there established catalog or market prices for products similar to our requirement?
2. If you offer GPUs to both Government and commercial sources, is the same workforce used for both the U.S. Government and general public?
3. Is our requirement offered to both Government and commercial sources under similar terms and conditions? Briefly describe any differences for the areas of
· Maintenance support
· Financing and discounts
· Marking and packaging
· Inspection and acceptance processes
· Insured/bonded/licensed requirements
· Payment plans
4. Describe your standard warranty and return process for goods and services furnished to the Government for items similar in nature to this requirement, and identify any differences between what is offered to the Government versus commercial customers.
5. What product(s) does your company produce that fully meets, partially meets, or may be able to meet with a modification, the requirements within the draft Purchase Description (PD). For any product that may be able to meet the PD requirements after modification, define the extent of the required modifications, and an estimated amount of time needed to make the required modifications.
6. What aspects of the PD would drive the most significant developmental efforts? What aspects of the PD are the most technically complex?
7. Provide datasheets for any existing equipment that is similar to the Ground Power Unit (GPU) described in the PD.
C. Manufacturing Questions
1. Describe experience for any similar GPU contracts, which in the last 5 years, your company has provided in the commercial and/or military environment. Please provided the following information:
a) Contract Number
b) Procuring Agency/Company
c) Contract Value
d) GPUs Delivered
2. Acquiring over 5,000 units may require a production run of over 7 years, therefore, please describe how your company will identify and resolve parts obsolescence and diminishing manufacturing sources problems?
3. Do you have experience incorporating the Cummins QSB 6.7L engine into your GPU? If the Government was to specify the Cummins QSB 6.7L engine would you have any issue in proposing for this requirement?
4. The Government has had reliability issues with generator sub-assemblies. What generator sub-assembly do you typically use? Do you have experience with other generator sub-assemblies?
5. What is the maximum number of GPUs your company can produce each month? And, what is the number of shifts required to produce this number? Provide information on any facility reserves you may possess to increase capacity in the event of an immediate need do to critical operational mission requirements.
6. List the DoD aircraft that are receiving power from GPUs that your company is currently producing, as well as produced in the last 5 years. Please identify any GPU that has been approved to provide 270 VDC to both the F-22 and the F-35.
7. Describe your fabrication experience with aluminum enclosures? Describe your experience with powder coating steel and aluminum?
8. State any technology insertion ideas for the item that would be suitable for this effort.
File details come from the government source that posted it. Updated .