Revised Schedule B MARCUS HANNA.pdf
PDF 345 KB Posted
- Attached to
- CGC MARCUS HANNA DRYDOCK Federal contract opportunity
- Solicitation number
- 70Z085-22-Q-P4501900
About this file
This document contains a revised pricing schedule for drydock repairs to the USCGC MARCUS HANNA. The schedule lists 77 separate repair items with unit prices, quantities, and extended totals. Repairs include hull plating testing, tank cleaning and inspection, sea valve overhaul, deck preservation, ventilation system renewal, piping replacement, and underwater body preservation. The Coast Guard is soliciting these drydock repairs through solicitation number 70Z085-22-Q-P4501900. The required repairs will be performed over a 5 day drydock period and 4,000 labor hours with an incumbent contractor. Pricing is provided for definite and optional line items to complete all necessary maintenance and inspections to fully service the cutter.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED PRICING SCHEDULE FOR:
USCGC MARCUS HANNA (WLM-175) DRYDOCK
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
D-001 Hull Plating, Side Scan, Ultrasonic Testing JOB 1
O-002 Tanks, MP Fuel Service, Clean and Inspect JOB 1
D-003 Tanks, Potable Water, Clean and Inspect JOB 1
D-004 Tanks, Ballast, Clean and Inspect JOB 1
D-005 Voids, Accessible, Clean and Inspect JOB 1
D-006 Tanks, Dirty Oil and Waste, Clean and Inspect JOB 1
D-007 Z-Drive Input Drive Shaft, Bearings Inspect [DESCOPED] 0
D-008 Z-Drive Propulsion Units, Overhaul JOB 1
D-009 Z-Drive Input Drive Shaft, Thrust Bearing Renewal JOB 1
D-010 Heat Exchangers, Clean, Inspect And Hydro JOB 1
D-011 Vent Ducts, Laundry Exhaust, Commercial Cleaning JOB 1
D-012 Sea Valves and Waster Pieces, Overhaul Or Renew JOB 1
D-013 Sea Strainers - Duplex (All Sizes), Overhaul JOB 1
D-014 Sea Bay, Clean and Inspect JOB 1
D-015 Potable Water Pneumatic Tanks, Clean and Inspect JOB 1
D-016 Anchor Windlass, Inspect And Service JOB 1
D-017 Grey Water Piping, Clean and Flush JOB 1
D-018 Decks – Exterior (Buoy or Construction Deck), Preserve 100% JOB 1
D-019 Sewage Tank Vent Piping, Modify JOB 1
D-020 Auxiliary Sea Water System Valves, Overhaul Or Renew JOB 1
D-021 Bilges, Preserve JOB 1
D-022 Deck Covering, Electrical Matting, Renew JOB 1
D-023 Vent Ducts, Renew JOB 1
D-024 Hull Plating, U/W Body, Inspect [DESCOPED] 0
O-025 U/W Body, Preserve (Partial - Condition A) [DESCOPED] 0
O-026 U/W Body, Preserve (Partial - Condition B)[DESCOPED] 0
O-027 U/W Body, Preserve, (Partial - Condition C)[DESCOPED] 0
D-028 Appendages, U/W, Leak Test JOB 0
D-029 Chain Lockers, Clean and Inspect JOB 1
D-030 Voids, Non-Accessible, Leak Test JOB 1
O-031 Voids, Non-Accessible, Internal Surfaces, Preserve JOB 1
D-032 Propulsion Shaft Bulkhead Seals, Overhaul JOB 1
D-033 Fathometer Transducer, General Maintenance JOB 1
D-034 Underwater Speed Log Transducers, Service and Inspect JOB 1
O-035 Sea Bay, Preserve - Partial JOB 1
O-036 Sea Bay, Preserve 100% JOB 1
D-037 Thruster Unit (General), Overhaul JOB 1
D-038 Grey Water Holding Tanks, Clean and Inspect JOB 1
(5/15/2021)
Draft-2 - Page 1 of 3
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
D-039 Sewage Holding Tanks, Clean and Inspect JOB 1
D-040 Oily Water Separator, Overhaul [DESCOPED] 0
O-041 Tanks (Grey Water Holding), Preserve “Partial” JOB 1
O-042 Chain Lockers, Preserve, Partial JOB 1
D-043 Superstructure, Preserve, 100 Percent JOB 1
D-044 Drydock JOB 1
D-045 Temporary Services, Provide - Cutter JOB 1
D-046 Sea Trial Performance, Support, Provide JOB 1
O-047 Compartment Insulation, General, Renew JOB 1
D-048 Deck Covering (Interior Wet/Dry), Renew JOB 1
D-049 Vent Space (01-50-0-Q), Deck, Preserve JOB 1
D-050 Vent Space (02-52-2-Q), Deck, Preserve JOB 1
D-051 Weathertight Doors (External), Renew [DESCOPED] 0
D-052 Superstructure Repair JOB 1
D-053 Fan Coil Unit Condensate Drain Piping, Repairs JOB 1
D-054 Firemain Piping Test Plug, Removals JOB 1
D-055 Deck Drains, Renew (Various Compartments) JOB 1
D-056 Gray Water Overflow, Renew JOB 1
D-057 Pump Room, Deck, Preserve JOB 1
D-058 Scuttles (External), Repair JOB 1
D-059 Circuit Breakers (60 HZ), Inspect and Test. JOB 1
D-060 Drain Piping, Cargo Hatch, Renew JOB 1
D-061 Deck Drains, Repair JOB 1
D-062 Deck Plate Hinge, Renewal JOB 1
D-063 Sewage Piping, Clean and Flush JOB 1
D-064 Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) JOB 1
D-065 Cargo Hold Deck, Preserve 100% JOB 1
D-066 Galley Sink Drain, Modify JOB 1
D-067 Fuel Piping, Renew JOB 1
D-068 Both Main Diesel Engine Mounts, Renewal JOB 1
D-069 Both Z-Drive Propulsion Trains, Alignment JOB 1
O-070 Tanks (Sewage Holding), Preserve “Partial” JOB 1
D-071 RHIB Davit HPU Cofferdam, Preserve JOB 1
D-072 Pilothouse Window Gaskets, Renew JOB 1
D-073 Potable Water Deck Connection Piping, Renew JOB 1
D-074 Z-Drive ASW Valve And Piping, Renew JOB 1
D-075 Bilge Pump, Overhaul JOB 1
D-076 Sewage Gauge Line, Renew JOB 1
Draft-2 - Page 2 of 3
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
D-077 U/W Body, Preserve (100%) JOB 1
D-078 Oily Water Separator, Replace JOB 1
D-079 Thruster Quick Disconnects (QD), Install JOB 1
O-078 Composite Labor Rate Hour 4000
O-081 Laydays Day 5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Draft-2 - Page 3 of 3