USCGC ELM Post MMA Amendment 0002 - Answering RFC questions 7 & 9 and additional information for Questions 2 & 5.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30_-_Amendment_0001_-_ELM_Post_MMA.pdf | ||
| Attachment_4__Past_Performance_Information_Form.doc | DOC document | |
| Attachment_6_-_FTC-OSPR-17Z.pdf | ||
| Attachment_2_-_ELM_(WLB_225A)_DS_FQ3_JCR_19R2_(002).pdf | ||
| Attachment_3_Request_for_Clarifications.doc | DOC document | |
| Attachment__5__USCG_Ombudsman_Notice.pdf | ||
| Attachment_1_-_ELM_(WLB_225A)_DS_FQ3_JCR_19ER2_BLANK.xls | XLS spreadsheet | |
| CGC_ELM_Post_MMA_-_COMBINED_SYNOPSIS-.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
CONTINUATION SHEET
RFQ: 70Z085-19-Q-P45EB6 AMENDMENT 0002
Continuation of SF 30, Block 14 Page 2 of 2
1. Question 7: Section 3.2 calls for the renewal of piping insulation and gaskets. There is no other mention of gaskets in the item. Are gaskets to be removed and renewed? There are no reference documents provided that are related to gaskets.
CG Answer: for Work Item D-007 “Machinery Exhaust Stack Insulation, Renew” the intent is to renew the gaskets. New gaskets should match the currently installed gaskets in form, fit, function, and appearance.
2. Question 9: Section 3.2 states “states to perform deck preservation as described below”.
Section 3.3 states “(see 3.5 (Surface preservation)). There is no section 3.5 and nothing for deck preservation. Please advise information on deck preservation and what type of coating or flooring should be installed.
CG Answer: Follow the guidance of the cited Standard Spec 6310, Appendix B, while performing surface preservation on any disturbed surfaces. Document any deteriorated surfaces underneath the racks via CFR as per Work Item 16 Para 3.3, if additional deck replacement is required it can be handled via CR.
3. Additional response to RFC #2 - The intention for work item 2 is to have it priced to replace qty (1) padeye. At this time we do not plan on activating this work item but if we need to we will activate it based on the number of padeyes that need to be replaced, as stated in Condition Found Report (CFR) and a Change Request will be issued to acitvate option WI.
4. Additional response to RFC #5 - Part of the work we are asking the contractor perform includes determining the correct type of fitting for each specific hose IAW the cited references. The government cannot provide more specific information at this time. Standard Spec 5000 provides guidance on which components to use, specifically in paragraphs C2.2, C2.2.1.2, C2.2.1.2, and C2.2.1.2.1.
New end fittings shall be as follows:
• Mild steel crimp type fittings or reusable non-crimp style SST fittings, where the hose assembly will be in the weather or where condensation develops.
• Fabricated from Monel, if the hose assembly fittings being renewed are Monel or other nickel alloys.
• Pressure rated equal to or greater than the new mating hose.
• Compatible with the connection points in the hydraulic system.