CHIPPEWA_FY18_DD_Blank_Schedule_B-SOS&S.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
CGC CHIPPEWA and Barge dry dock
Solicitation number
70Z085-18-Q-P45B1000
Issued by

About this file

Attachment 1 Section B / SOS

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

BLANK SCHEDULE B/SOS&SAPM
USCGC CHIPPEWA (WLR-75C) DRYDOCK AVAILABILITY FY2018Date Spec Due
Date Est Due
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (U/W Body), Inspect - TenderJOB1
D-002Hull Plating (U/W Body), Ultra Sonic Testing - TenderJOB1
D-003U/W Body, Preserve (100%), TenderJOB1
D-004Voids (Non Accessible) Leak TestJOB1
O-005Voids (Non-Accessible), Internal Surfaces, Preserve (Optional)JOB1
D-006Tanks (MP Fuel Service), Clean and Inspect - TenderJOB1
D-007Propulsion Shafting; Remove, Inspect, and ReinstallJOB1
D-008Propulsion Shaft Seals, Mechanical & Inflatable, Overhaul and RenewJOB1
O-009Propulsion Shafting, Straighten (Optional)JOB1
D-010Propulsion Shaft Bearings (External), Check ClearancesJOB1
D-011Propulsion Shaft Bearings (External), RenewJOB1
D-012Stern Tube Interior Surfaces, Preserve 100%JOB1
D-013Propeller, Perform Minor Repairs and ReconditioningJOB1
D-014Propellers, Remove, Inspect, and ReinstallJOB1
D-015Keel Coolers, Clean, Inspect and Hydro - TenderJOB1
D-016Fathometer Transducer, Renew - TenderJOB1
D-017Rudder Assembly; Remove, Inspect and ReinstallJOB1
D-018Rudder(s), Preserve (“100%”)JOB1
D-019Hull Fittings (Mooring and Towing), Inspect and Test - TenderJOB1
D-020Spuds, Overhaul - TenderJOB1
D-021Spud Wells, Preserve - TenderJOB1
D-022Hull Plating Freeboard, Preserve “100%” - TenderJOB1
D-023Cathodic Protection / Magnesium Anodes, Renew - TenderJOB1
D-024Drydock, TenderJOB1
D-025Temporary Services, Provide - TenderJOB1
D-026Sea Trial Performance, Support, ProvideJOB1
D-027Hull Plating (U/W Body), Inspect - BargeJOB1
D-028Hull Plating (U/W Body), Ultra Sonic Testing - BargeJOB1
D-029U/W Body, Preserve (100%), BargeJOB1
D-030Voids (Non-Accessible), Leak Test - BargeJOB1
O-031Voids (Non-Accessible), Internal Surfaces, Preserve (Optional)JOB1
D-032Keel Coolers, Clean, Inspect and Hydro - BargeJOB1
D-033Fathometer Transducer, Renew - BargeJOB1
D-034Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - BargeJOB1
D-035Hull Fittings (Mooring and Towing), Inspect and Test - BargeJOB1
D-036Spuds, Overhaul - BargeJOB1
D-037Spud Wells, Preserve - BargeJOB1
D-038Decks - Exterior (Buoy or Construction Deck), Preserve 100%JOB1
D-039Hull Plating Freeboard (Buoy Port Areas), PreserveJOB1
D-043Rudder(s), Preserve (“100%”)JOB1
D-040Cathodic Protection / Magnesium Anodes, Renew - BargeJOB1
D-041Drydock, BargeJOB1
D-042Temporary Services, Provide - BargeJOB1
D-043Boat Davit Winch, Shrink WrapJOB1
D-044Buoy Cargo handling Crane, Shrink WrapJOB1
D-045Transducer Well Inspection and PreserveJOB1
D-046Sewage Holding Tank(s), Clean and Inspect - TenderJOB1
D-047Tanks (MP Fuel Stowage and Overflow), Clean and Inspect - BargeJOB1
D-048Piping Insulation (Chill Water), RenewJOB1
D-049Lazzarette (2-45-0-E), PreserveJOB1
D-050AC System Seawater Duplex Strainer, RenewJOB1
D-051Grey Water Piping, ReplaceJOB1
D-052Galley Ventilation Systems, RenewJOB1
D-053Ventilation Fan, OverhaulJOB1
O-00AComposite Labor RateHour750
D-00BGFP ReportNSPEA1NSP
O-00ZLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

(9/8/2017)_x000D_ Draft-1 - Page &P of &N

File details come from the government source that posted it.