AMENDMENT_0002_CONTINUATION_SHEETPAGE_2_OF_2.pdf

PDF 49 KB Posted

Attached to
CGC CHIPPEWA and Barge dry dock
Solicitation number
70Z085-18-Q-P45B1000
Issued by

About this file

Page two of amendment

View the file

Other files

File Type Posted
CHIPPEWA_FY18_DD_Blank_Schedule_B-SOS&S.xlsx XLSX spreadsheet
Amendment_A0003.pdf PDF
75C-WAGL_3801_23_1_-_3.pdf PDF
75C-WAGL_3801_23_2_-_-.pdf PDF
A0002_Amendment.pdf PDF
Amendment_0001_70Z085-18-Q-P45B1000_CIPPEWA.pdf PDF
CHIPPEWA_(WLR_75C)_DD_FQ4_MCR_18R0.doc DOC document
Solicitation_CGC_Dry_Dock_CGC_CHIPPEWA.doc DOC document
Attachment_5_OMBUDSMAN_PROGRAM_LETTER.DOCX DOCX document
Attachment_4_Request_for_Clarification.docx DOCX document
Attachment_3_Past_Performance_Information_Form_ELM.DOC DOC document
CHIPPEWA_FY18_DD_Blank_Schedule_B-SOS&S.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUATION SHEET

RFQ: 70Z085-18-Q-P45B1000 AMENDMENT 0002

Continuation of SF 30, Block 14, Page 2 of 2

Coast Guard response: Contractor shall use Full Load Displacement (LT FW):

362.75 listed on page 144, para. 3.4 Cutter Conditions, for purposes of performing Pre-Award calculations.

Contractor question: The drawing for Work Item 52 Coast Guard Drawing 75C-WAGL 3801-23, Rev 3, Vent Sys (75404) is not on the CD

Coast Guard response: are listed as attachments.

File details come from the government source that posted it.