AMENDMENT_0002_CONTINUATION_SHEETPAGE_2_OF_2.pdf
PDF 49 KB Posted
- Attached to
- CGC CHIPPEWA and Barge dry dock
- Solicitation number
- 70Z085-18-Q-P45B1000
About this file
Page two of amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CHIPPEWA_FY18_DD_Blank_Schedule_B-SOS&S.xlsx | XLSX spreadsheet | |
| Amendment_A0003.pdf | ||
| 75C-WAGL_3801_23_1_-_3.pdf | ||
| 75C-WAGL_3801_23_2_-_-.pdf | ||
| A0002_Amendment.pdf | ||
| Amendment_0001_70Z085-18-Q-P45B1000_CIPPEWA.pdf | ||
| CHIPPEWA_(WLR_75C)_DD_FQ4_MCR_18R0.doc | DOC document | |
| Solicitation_CGC_Dry_Dock_CGC_CHIPPEWA.doc | DOC document | |
| Attachment_5_OMBUDSMAN_PROGRAM_LETTER.DOCX | DOCX document | |
| Attachment_4_Request_for_Clarification.docx | DOCX document | |
| Attachment_3_Past_Performance_Information_Form_ELM.DOC | DOC document | |
| CHIPPEWA_FY18_DD_Blank_Schedule_B-SOS&S.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUATION SHEET
RFQ: 70Z085-18-Q-P45B1000 AMENDMENT 0002
Continuation of SF 30, Block 14, Page 2 of 2
Coast Guard response: Contractor shall use Full Load Displacement (LT FW):
362.75 listed on page 144, para. 3.4 Cutter Conditions, for purposes of performing Pre-Award calculations.
Contractor question: The drawing for Work Item 52 Coast Guard Drawing 75C-WAGL 3801-23, Rev 3, Vent Sys (75404) is not on the CD
Coast Guard response: are listed as attachments.
File details come from the government source that posted it.