Attachment 1_Schedule of Services_Blank Price Schedule.xls

XLS spreadsheet 57 KB Posted

Attached to
Dock-Side: USCGC VIGOROUS FY24 DS2
Solicitation number
70Z08024QMECP0015
Issued by

About this file

This document contains a price schedule and cost estimate template for ship cleaning and maintenance services for the USCGC Vigorous from June 12 to August 6, 2024. The schedule lists over 30 line items for cleaning tanks, ducts, chains, engines, and conducting inspections and repairs of various ship systems and structures. Labor categories and composite rates are provided for cost estimating purposes. The price schedule is intended for use in evaluating offers submitted in response to solicitation number 70Z08024QMECP0015 issued by the U.S. Coast Guard for dock-side availability work on the USCGC Vigorous. Prices should be provided per job, unit, hour or percentage as indicated. The schedule also includes provisions for optional and over and above growth work to be awarded via contract modification as needed.

View the file

Other files

File Type Posted
70Z08024QMECP0015_A0001_VIGOROUS.pdf PDF
70Z08024QMECP0015.pdf PDF
Attachment 2_ Statement of Work_Specification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC VIGOROUS (WMEC-210B) DOCKSIDE AVAILABILITY FY2024
ATTACHMENT1: 70Z08024QMECP0015
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Chain Lockers, Clean and InspectJOB1
D-002Tanks, MP Fuel Stowage and Overflow, Clean and InspectJOB1
D-003Tanks, MP Fuel Service, Clean and InspectJOB1
D-004Tanks, Potable Water, Clean and InspectJOB1
D-005Voids, Accessible, Clean and InspectJOB1
D-006Tanks, Dirty Oil and Waste, Clean and InspectJOB1
D-007Propulsion Shafting, Strain Gauge Alignment, Dockside, CheckJOB1
D-008Vent Ducts, Engine And Motor Room, All, Commercial CleaningJOB1
D-009Vent Ducts, Galley and Pantry Room, All, Commercial CleaningJOB1
D-010Vent Ducts, Laundry Exhaust, Commercial CleaningJOB1
D-011Vent Ducts, All Other, Commercial CleaningJOB1
D-012Anchor Chains and Ground Tackle, Inspect and RepairJOB1
D-013Anchor Windlass, OverhaulJOB1
D-014Towing Bitts, Chocks, and Fairleads; Inspect and TestJOB1
D-015Warping Capstan, OverhaulJOB1
O-016Chain Lockers, Preserve, PartialJOB1
O-017Tanks, Dirty Oil and Waste, Preserve, Partial,JOB1
O-018Tanks, Potable Water, Preserve, Partial,JOB1
D-019Emergency Diesel Generator (EDG) Fuel Oil Tank, ModifyJOB1
D-020Watertight Doors, External, RenewJOB1
D-021Pilot House Deck Coaming, RenewJOB1
D-02202 Level Plating and Stanchion, RenewJOB1
D-023Steam Piping, RenewJOB1
D-024Sewage Piping, RenewJOB1
D-025Tank Plating, Renew & PreserveJOB1
D-026Ammunition Elevator, Service and InspectJOB1
D-00CTravel and PerdiemJOB1
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Over and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
OA/G-001**Provide breakdown, as follows:

Over and Above/Growth Labor Rate

Unit Price: $________; Quantity:810; Unit of Issue: Hour; Extended Price: $____________Hour810
OA/G-002Over and Above/Growth Material Markup/Handling Fee

Unit Price: $50,000; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$50,000.00 X percentage quoted]: $______________$50,000.00%
Total Price of Over and Above/Growth

&C(11/28/2023) Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N