Attachment 1_Schedule of Services_Blank Price Schedule.xls
XLS spreadsheet 57 KB Posted
- Attached to
- Dock-Side: USCGC VIGOROUS FY24 DS2
- Solicitation number
- 70Z08024QMECP0015
About this file
This document contains a price schedule and cost estimate template for ship cleaning and maintenance services for the USCGC Vigorous from June 12 to August 6, 2024. The schedule lists over 30 line items for cleaning tanks, ducts, chains, engines, and conducting inspections and repairs of various ship systems and structures. Labor categories and composite rates are provided for cost estimating purposes. The price schedule is intended for use in evaluating offers submitted in response to solicitation number 70Z08024QMECP0015 issued by the U.S. Coast Guard for dock-side availability work on the USCGC Vigorous. Prices should be provided per job, unit, hour or percentage as indicated. The schedule also includes provisions for optional and over and above growth work to be awarded via contract modification as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08024QMECP0015_A0001_VIGOROUS.pdf | ||
| 70Z08024QMECP0015.pdf | ||
| Attachment 2_ Statement of Work_Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC VIGOROUS (WMEC-210B) DOCKSIDE AVAILABILITY FY2024 | |||||
| ATTACHMENT1: 70Z08024QMECP0015 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Chain Lockers, Clean and Inspect | JOB | 1 | ||
| D-002 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | 1 | ||
| D-003 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | ||
| D-004 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | ||
| D-005 | Voids, Accessible, Clean and Inspect | JOB | 1 | ||
| D-006 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | ||
| D-007 | Propulsion Shafting, Strain Gauge Alignment, Dockside, Check | JOB | 1 | ||
| D-008 | Vent Ducts, Engine And Motor Room, All, Commercial Cleaning | JOB | 1 | ||
| D-009 | Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning | JOB | 1 | ||
| D-010 | Vent Ducts, Laundry Exhaust, Commercial Cleaning | JOB | 1 | ||
| D-011 | Vent Ducts, All Other, Commercial Cleaning | JOB | 1 | ||
| D-012 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | ||
| D-013 | Anchor Windlass, Overhaul | JOB | 1 | ||
| D-014 | Towing Bitts, Chocks, and Fairleads; Inspect and Test | JOB | 1 | ||
| D-015 | Warping Capstan, Overhaul | JOB | 1 | ||
| O-016 | Chain Lockers, Preserve, Partial | JOB | 1 | ||
| O-017 | Tanks, Dirty Oil and Waste, Preserve, Partial, | JOB | 1 | ||
| O-018 | Tanks, Potable Water, Preserve, Partial, | JOB | 1 | ||
| D-019 | Emergency Diesel Generator (EDG) Fuel Oil Tank, Modify | JOB | 1 | ||
| D-020 | Watertight Doors, External, Renew | JOB | 1 | ||
| D-021 | Pilot House Deck Coaming, Renew | JOB | 1 | ||
| D-022 | 02 Level Plating and Stanchion, Renew | JOB | 1 | ||
| D-023 | Steam Piping, Renew | JOB | 1 | ||
| D-024 | Sewage Piping, Renew | JOB | 1 | ||
| D-025 | Tank Plating, Renew & Preserve | JOB | 1 | ||
| D-026 | Ammunition Elevator, Service and Inspect | JOB | 1 | ||
| D-00C | Travel and Perdiem | JOB | 1 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Over and Above/Growth Work | |||||
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||
| OA/G-001 | **Provide breakdown, as follows: |
Over and Above/Growth Labor Rate
| Unit Price: $________; Quantity:810; Unit of Issue: Hour; Extended Price: $____________ | Hour | 810 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee |
Unit Price: $50,000; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$50,000.00 X percentage quoted]: $______________ | $50,000.00 | % |
| Total Price of Over and Above/Growth |
&C(11/28/2023) Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .