This document contains a schedule of services and pricing for the USCGC RESOLUTE drydock availability for fiscal year 2022. The schedule lists over 40 line items of work to be performed on the cutter, including hull plating testing and preservation, propulsion system maintenance and repairs, sea valves and strainers overhaul, rudder and appendage inspection and installation, and various system upgrades, replacements, and inspections. Pricing is provided by unit and total extended cost for each item. The related federal contract opportunity posting is solicitation number 70Z080-22-Q-P4503300 for the USCGC RESOLUTE drydocking issued by the Department of Homeland Security United States Coast Guard. Offerors are invited to submit pricing proposals for the scheduled maintenance and repair work in response to the requirements outlined in the opportunity notice and accompanying schedule of services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3.docx | DOCX document | |
| Specification Rev 1.pdf | ||
| Amendment 2 Questions.docx | DOCX document | |
| Amendment 2 Page 1 of 2.docx | DOCX document | |
| Amendment 1.pdf | ||
| Statement of Work _Specification.pdf | ||
| Schedule of Services.xls | XLS spreadsheet | |
| 70Z080-22-Q-P4503300.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC RESOLUTE (WMEC-210B) DRYDOCK AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | ||
| D-002 | Hull Plating Freeboard, Preserve – Partial | JOB | 1 | ||
| D-003 | Appendages (U/W), Preserve (Internal) and Leak Test | JOB | 1 | ||
| D-004 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | JOB | 1 | ||
| D-005 | Voids (Non-Accessible), Preserve (Internal) and Leak Test | JOB | 1 | ||
| D-006 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-007 | Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-008 | Propulsion Shaft Coating, Renew | JOB | 1 | ||
| O-009 | Propulsion Shafting, Straighten | EA | 4 | ||
| O-010 | Propeller Shaft Sleeve(s), Renew | JOB | 1 | ||
| O-011 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | 1 | ||
| D-012 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | ||
| O-013 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | ||
| O-014 | Propulsion Stern Tube Bearings, Renew | JOB | 1 | ||
| O-015 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | ||
| D-016 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | ||
| D-017 | Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and Reinstall | JOB | 1 | ||
| D-018 | Fathometer Transducer, General Maintenance | JOB | 1 | ||
| D-019 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | ||
| D-020 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | ||
| D-021 | Rudder Assembly; Remove, Inspect And Reinstall | JOB | 1 | ||
| D-022 | Superstructure, Preserve “Partial” | JOB | 1 | ||
| D-023 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | ||
| D-024 | Drydock | JOB | 1 | ||
| D-025 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| D-026 | Raw Water Condensate Cooling Pump, Upgrade | JOB | 1 | ||
| D-027 | Hull and Structural Plating, Renew | JOB | 1 | ||
| D-028 | Vertical Ladder, Modify | JOB | 1 | ||
| D-029 | JP-5 Service Tank Plating, Renew | JOB | 1 | ||
| D-030 | Main Engine/Reduction Gear Alignment, Check | JOB | 1 | ||
| D-031 | Fuel Manifold, Overhaul | JOB | 1 | ||
| D-032 | Reefer R/W Piping, Renew | JOB | 1 | ||
| D-033 | Doppler Speed Log, Replace | JOB | 1 | ||
| D-034 | Deep Water Sounder, Remove | JOB | 1 | ||
| D-035 | U/W Body, Preserve (100%) | JOB | 1 | ||
| D-036 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | ||
| D-037 | Sea Trial Performance, Support, Provide | JOB | 1 | ||
| D-038 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | 1 | ||
| D-039 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | ||
| D-040 | Tanks (Potable Water), Preserve "100%" | JOB | 1 | ||
| D-041 | Watertight Doors, External, Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 1 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |