This document contains questions and answers regarding drawings required to complete work items for the drydocking of the USCGC RESOLUTE. The solicitation seeks a contractor to perform various maintenance and repair work items for the USCGC RESOLUTE during its drydocking, including replacing the Doppler speed log, inspecting and servicing the controllable pitch propeller system, renewing external watertight doors, preserving and leak testing voids, and overhauling or renewing sea valves and waste pieces. For each work item, the contractor questions whether the drawings provided by the Coast Guard match the drawings specified in the work item requirements. The Coast Guard is asked to provide the drawings specified in the work items to allow the contractor to accomplish the scopes of work. Clarification is also requested regarding the list of government furnished property to be installed for one work item.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC RESOLUTE DRYDOCK FY22, newest first.
File Type Posted
Schedule of Services UPDATED.xls XLS spreadsheet
Amendment 3.docx DOCX document
Specification Rev 1.pdf PDF
Amendment 2 Page 1 of 2.docx DOCX document
Amendment 1.pdf PDF
Statement of Work _Specification.pdf PDF
Schedule of Services.xls XLS spreadsheet
70Z080-22-Q-P4503300.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70Z080-22-Q-P4503300

Q1. WI 33, Doppler Speed Log, Replace Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

(627) 320-001 Rev BD

(627) 401-001 Rev AF

(627) 401-002 Rev BE

(618) 410-001 Rev M

(627) 424-001 Rev U

(618) 426-001 Rev R

(627) 426-001 Rev L

(618) 426-003 Rev D

(618) 426-005 Rev -

(618) 451-009 Rev - 6701-221 Rev R Drawings provided are as follows:

(627) 320-001 Rev BF

(627) 401-001 Rev AL

(627) 401-002 Rev BK

(618) 410-001 Rev P

(627) 424-001 Rev V

(618) 426-001 Rev V

(627) 426-001 Rev P

(618) 426-003 Rev F

(618) 426-005 Rev B

(618) 451-009 Rev B 6701-221 Rev W Please provide the following drawings as specified by the work item:

(627) 320-001 Rev BD

(627) 401-001 Rev AF

(627) 401-002 Rev BE

(618) 410-001 Rev M

(627) 424-001 Rev U

(618) 426-001 Rev R

(627) 426-001 Rev L

(618) 426-003 Rev D

(618) 426-005 Rev -

(618) 451-009 Rev - 6701-221 Rev R Q2. WI 34, Deep Water Sounder, Remove Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

(618) 320-003 Rev AV

(627) 320-002 Rev AV

(618) 410-001 Rev M

(618) 424-001 Rev AA

(618) 424-002 Rev W

(627) 424-001 Rev U

(627) 424-002 Rev V Drawings provided are as follows:

(618) 320-003 Rev AW

(627) 320-002 Rev AY

(618) 410-001 Rev P

(627) 424-001 Rev V

(627) 424-002 Rev W

(618) 424-001 Rev AA was not provided.

(618) 424-002 Rev W was not provided.

Please provide the following drawings as specified by the work item:

(618) 320-003 Rev AV

(627) 320-002 Rev AV

(618) 410-001 Rev M

(618) 424-001 Rev AA

(618) 424-002 Rev W

(627) 424-001 Rev U

(627) 424-002 Rev V Q3. WI 38 Controllable Pitch Propeller (CPP) System, Inspect and Service Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

(627) 245-001 Rev -

(627) 245-002 Rev - Drawings provided are as follows:

(627) 245-001 Rev E

(627) 245-002 Rev E Please provide the following drawings as specified by the work item:

(627) 245-001 Rev -

(627) 245-002 Rev – Q4. WI 41 Watertight Doors, External, Renew Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

(627) 152-001 Rev F Drawings provided are as follows:

(627) 152-001 Rev G Please provide the following drawings as specified by the work item:

(627) 152-001 Rev F Q5. WI 5 Voids (Non-Accessible), Preserve (Internal) and Leak Test Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

(627) 163-001 Rev C Drawings provided are as follows:

(627) 163-001 Rev B Please provide the following drawings as specified by the work item:

(627) 163-001 Rev C Q6. WI 18 Fathometer Transducer, General Maintenance Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

6713-203 Rev A Drawings provided are as follows:

6713-203 Rev B Please provide the following drawings as specified by the work item:

6713-203 Rev A Q7. WI 17 Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and Reinstall

Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

(627) 245-001 Rev -

(627) 245-002 Rev -

(627) 245-009 Rev A

(627) 245-021 Rev A Drawings provided are as follows:

(627) 245-001 Rev E

(627) 245-002 Rev E

(627) 245-009 Not Provided

(627) 245-021 Not Provided Please provide the following drawings as specified by the work item:

(627) 245-001 Rev -

(627) 245-002 Rev -

(627) 245-009 Rev A

(627) 245-021 Rev A Q8. WI 19 Sea Valves and Waster Pieces, Overhaul Or Renew Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

(627) 184-004 Rev E

(627) 184-004 Rev E was not provided Please provide the following drawings as specified by the work item:

(627) 184-004 Rev E Q9. WI 24 Drydock Paragraph 2 References, sub-paragraph Coast Guard Drawings specifies to use the following drawings to accomplish the scope of work:

(618) 801-008 Rev -

(618) 801-008 Rev - was not provided.

Please provide the following drawings as specified by the work item:

(618) 801-008 Rev – Q10. WI 33 Doppler Speed Log, Replace Paragraph 3.4 directs the Contractor to "install all GFE listed in paragraph 1.2…"

Paragraph 1.2 does not specify any Government-Furnished Property.

Will the government clarify the list of Government-Furnished Property directed for Contractor installation?