Specification_Updated.pdf
PDF 1 MB Posted
- Attached to
- USCGC BLUE SHARK DS FY21
- Solicitation number
- 70Z080-21-Q-P4594300
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 00004 (04-27-21).pdf | ||
| Amendment 00004 Attachment_ NAVSTAEVERETTINST 11450 2A (SEP 2010).pdf | ||
| Amendment 00003 (04-13-21).pdf | ||
| Amendment 00002 (04-12-21).pdf | ||
| Schedule B_Updated.xls | XLS spreadsheet | |
| Amendment 00001(04-12-21).pdf | ||
| Specification_BLUE SHARK DS FY21.pdf | ||
| 70Z080-21-Q-P4594300_ BLUE SHARK DS FY21_Solicitation.pdf | ||
| Schedule B_Blank.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC BLUE SHARK (WPB 87360)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2021
Developed By: James E Beechey
(Rev-1, 12 April 2021)
USCGC BLUE SHARK (WPB-87) DOCKSIDE AVAILABILITY FY2021
ii (Rev-1)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: U/W Body, Diver Inspect WORK ITEM 2: Watertight Closures, Assess WORK ITEM 3: Main Diesel Engines (MDE), Renew (W-6) WORK ITEM 4: Electrical Power Distribution System, Thermographic Inspection (450 VAC And
Below) WORK ITEM 5: Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and
Inspect WORK ITEM 6: Ducting, HVAC System, Clean WORK ITEM 7: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 8: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 9: Grey Water Piping, Clean And Flush WORK ITEM 10: Sewage Piping, Clean And Flush WORK ITEM 11: Insulation, Renew WORK ITEM 12: Sewage Piping, Renew WORK ITEM 13: Fire Alarm Control Panel, Replace WORK ITEM 14: Foundation, Boat Winch, Modify
WORK ITEM 15: SEWAGE SYSTEM (TOILET), MODIFY
WORK ITEM 16: Stern Door Cross Connect Valves Modify iii (Rev-1)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
4/12/2021 1 01 Removed all reference to cleaning of hull from WI 1. Update WI title. Updated paragraph 1.1. Removed cleaning from paragraph 3.4.
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-1)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 085-013, Rev B, Docking Plan Coast Guard Drawing 87 WPB 111-001, Rev H, Shell Expansion Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan Coast Guard Drawing 87 WPB 161-001, Rev C, Skeg Construction Coast Guard Drawing 87 WPB 167-002, Rev C, CG Schedule of Doors, Manholes, Windows & Hatches Coast Guard Drawing 87 WPB 167-003, Rev -, Weather Tight Door for Fuel Station Access Coast Guard Drawing 87 WPB 167-004, Rev H, W.T. Doors and Hatches Coast Guard Drawing 87 WPB 182-001, Rev C, Main Engine & Generator Foundations Coast Guard Drawing 87 WPB 185-001, Rev AP, Auxiliary Foundation Booklet Coast Guard Drawing 87 WPB 186-001, Rev -, Foundations for Install of Jets Vacuum System Coast Guard Drawing 87 WPB 243-003, Rev -, Propulsion Shaft Details Coast Guard Drawing 87 WPB 252-002, Rev P, Alarm and Monitoring System Coast Guard Drawing 87 WPB 302-001, Rev AC, Misc. Controls Wiring Diagram Coast Guard Drawing 87 WPB 302-003, Rev -, Jets Vacuum Toilet Electrical Details Coast Guard Drawing 87 WPB 310-001, Rev J, Ship’s Service One-Line Diagram Coast Guard Drawing 87 WPB 321-001, Rev L, Power System Deck Plan Coast Guard Drawing 87 WPB 321-002, Rev AU, Power & Lighting Circuit Details & V.D. Calculations Coast Guard Drawing 87 WPB 331-001, Rev P, Lighting System Deck Plan Coast Guard Drawing 87 WPB 436-001, Rev F, Fire Detection System Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping Systems Coast Guard Drawing 87 WPB 526-001, Rev J, Scuppers & Deck Drains Piping Coast Guard Drawing 87 WPB 556-005, Rev -, Hyd Steering Sys mods for Emer Door Operation Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details Coast Guard Drawing 87 WPB 583-001, Rev Y, RIB Deployment Structure Coast Guard Drawing 87 WPB 593-001, Rev L, Sewage Piping Coast Guard Drawing 87 WPB 593-004, Rev B, Sewage System Modifications Jets Vacuum System Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 621-001, Rev K, Joiner Work Details Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details v (Rev-1)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Technical Publication (TP) 4499, Jun 2018, SWBS 243, Stern Tube Seal- Model 442C Coast Guard Technical Publication (TP) 4500, SWBS 233, Sept 2017, Engine Change-Out Guide –
Waterborne Main Diesel Coast Guard Technical Publication (TP) 4531, SWBS 233, March 2003, Main Diesel Engine -
Description & Operation Manual - Model 8V396TE94 Coast Guard Technical Publication (TP) 4532, SWBS 233, Main Diesel Engine - Parts Catalog - Model
8V396TE94
Coast Guard Technical Publication (TP) 4533, SWBS 233, 2016, Main Diesel Engine - Maintenance
Manual - Model 8V396TE94 Coast Guard Technical Publication (TP) 4559, SWBS 513, Oct 2019, Ventilation System, Engine Room Coast Guard Technical Publication (TP) 7025A, SWBS 233, Oct 2017, Main Diesel Engine - Fluids and
Lubricants Specifications (A001061/37E) Coast Guard Technical Publication (TP) 7796, SWBS 233, Sept 2012, Main Diesel Engine (MDE) –
Preservation & Represervation Specs (A001070/00E) Coast Guard Technical Publication (TP) 9051, SWBS 436, Mar 2016, Fire Alarm Control Panel NFS-
320/E/C & LCD2-80, Multiple Class Cutters Coast Guard Technical Publication (TP) 9115, SWBS 593, March 2016, Jets Vacuum Sewage System Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard
Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2020, Clean
Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
American Society for Nondestructive Testing, SNT-TC-1A: Personnel Qualification and Certification in
Nondestructive Testing, 2016 ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2011, Commercial Diving Operations vi (Rev-1)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
3 Y Main Diesel Engine NSN: 2815-12-348-2440 PN:
5560028101TE94
1 ea. 500,000.00
3 N Soft Patch Kit NSN: 8040-01-601-2062 PN:
87SPK CPB-1 PATCH
1 ea. 1173.03
3 Y *Alignment Kit N/A 1 set 3000.00 3 N Clamp, synchro (8" V-clamp), DeAngelo Marine
NSN: 5340-01-568-6899 PN:
024-007000
2 ea. 47.19
3 N Clamp, Turbo Adaptor NSN: 5340-01-593-2913 PN:
024-001200
2 ea. 274.04
3 N Clamp, synchro (12" V-band clamp)
NSN: 5340-01-590-8152 PN:
024-009000
2 ea. 56.85
3 N Nut, plain, hexagon NSN: 5310-01-F17-5302 16 ea. 1.35 3 N Washer, flat NSN: 5310-01-F17-4971 32 ea. 0.42 3 N Screw, cap, hexagon head NSN: 5305-01-F17-4972 16 ea. 3.73
3 N Sealant, Silkolene NSN: 8030-01-593-2919 2 ea. 117.28 3 N Kit, Rebuild, Chesterton Seal Assembly
NSN: 5330-01-F18-5383 1 ea. 2,956.00
5 N **Fan, Tube Axial NSN: 4140-01-598-0425 1 ea. 2,223.72 5 N **Fan, Tube Axial NSN: 4140-01-598-1549 1 ea. 3,091.15 13 N Fire Alarm Control
Panel NSN: 6320-01-F18-5529 1 ea. 2,185.00
13 N Battery, 12 Volt, 12
AH
NSN: 6140-01-529-4234 2 ea. 151.95
15 N Sewage installation kit:
Jets 610SS Toilets, Vacuum Pump, controller and Vacuum
Accumulator
NSN: 4510-01-F16-4844 PN:
CUSTVU15-TO610
1 ea. $13,957
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center vii (Rev-1)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
15 SEWAGE SYSTEM (TOILET), MODIFY
viii (Rev-1)
PRINCIPAL CHARACTERISTICS
87' WPB
PHYSICAL
Length overall 87' Length between perpendiculars 81' 7" Depth 10' 11" Maximum beam 19.4' Draft, mean to design waterline 5' 9" Height of highest projection 50.2' Full load displacement 93.5 long tons Minimum operating displacement 83.9 long tons Displacement, light ship 77.9 long tons Framing Longitudinal Bulkheads Four watertight bulkheads located below the Main Deck Anchor 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset
HULL
Hull/main weatherdeck material ABS Grade AH 36 Superstructure 5086 Aluminum
MACHINERY
Main propulsion Two MTU 8V396TE94, sequential turbo-charged diesels Reduction gears Two ZF Type BW 255 Propulsion shaft Two AQUAMET 22, 101.6mm Shaft diameter 4" Shaft seal Two John Crane mechanical seals Shaft bearing, intermediate Thordon Elastomeric Bearing Shaft bearing, aft Thordon Elastomeric Bearing Number of propellers 2 Number of blades 5 Diameter of propeller 1040mm Pitch 1230 mm fixed Shaft RPM 828 Rudders Two 316L Stainless Steel Ship's service generators Two Man Model D08241F01 diesel with Stanford 60KW Generator
TANK CAPACITIES
3-9-1-f (fuel oil) 1402 gal 3-9-2-f (fuel oil) 1402 gal 3-12-2-f (waste oil) 86 gal 3-12-1-f (oily water) 86 gal 3-7-0-q (sewage collection) 352 gal 3-7-1-q (grey water) 52 gal 3-12-1-w (fresh water) 200 gal 3-12-2-w (fresh water) 200 gal
1 (Rev-1)
00000_0220_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
1.1.2 The Contractor shall coordinate with the below-listed USCG-hired contractors to provide access in order to perform the work outlined during the time period in the table below. The Contractor shall ensure that this work is accounted for in their project plan and provide the resources as detailed in the table below.
Contractor Name
Work to be Performed
Spaces Effected
Period of Performance
Resources Requested of Prime
POCs
CG Yard SINSII Install Pilot House, Mast
27 SEP – 01
OCT 2021
Power to energize Pilot House systems (Day 09/27, 09/30, 10/01).
CWO Keith Jarvis
2 (Rev-1)
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3 (Rev-1)
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________. (to be provided upon award of contract)
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR
4 (Rev-1) requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-1)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-1)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-1)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-1)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-1)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-1)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
COATING MFG PRODUCT NAME BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-1)
11001_FJL_0220_87WPB
WORK ITEM 1: U/W Body, Diver Inspect
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to inspect the vessel’s underwater (U/W) body prior to sea trials, while the vessel is moored pier side. Affected surfaces or components include, but are not limited to the following:
• Hull plating.
• Shafts.
• Transducers
• Propellers.
• Rudders.
• Sea chests and gratings.
• Miscellaneous appendages (examples: bilge keels, rope guards, and fairwaters).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 085-013, Rev B, Docking Plan Coast Guard Drawing 87 WPB 111-001, Rev H, Shell Expansion Coast Guard Drawing 87 WPB 161-001, Rev C, Skeg Construction Coast Guard Drawing 87 WPB 243-003, Rev -, Propulsion Shaft Details Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2011, Commercial Diving
Operations
12 (Rev-1)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Dive notification. The Contractor shall provide the Coast Guard Inspector 24 hours advance notice of when the diver inspection will occur. Before diving procedures are commenced, meet with the COR and the Coast Guard Inspector, to discuss diving safety requirements and the securing of cutter machinery, as applicable.
NOTE
Coast Guard preference is to schedule diving operations as near as possible to the end of the availability in order to minimize development of new growth prior to sea trials.
3.2 Pre-diving requirements.
3.2.1 The Contractor shall, in accordance with 29 CFR 1910.401-440, provide a certified diver and a tender team, as well as necessary support personnel and equipment, to accomplish the tasks specified herein.
WARNING
Mixed gas diving and live boating are not permitted.
3.2.2 The Contractor shall ensure that the diving team shall obtain clearance from the Officer-of-the-Deck (OOD) before beginning diving operations. Ensure the Coast Guard Inspector has capability for maintaining continuous two-way communication with diving personnel at all times, during the performance of the this work item.
3.3 Inspection requirements. Using the drawings listed in Section 2 as guidance, the Contractor shall perform the following inspections and fill out forms provided in Section 4. Submit CFR with results of inspections.
13 (Rev-1)
3.3.1 Conduct a biofouling inspection. Fill out Form 4-1, including fouler rating for each component (see Table 1 for fouler rating descriptions).
NOTE:
When completing the fouler rating, ensure that all (100%) of the area of the component/surface being inspected has a fouler rating. For example, if only 50% of the rudder has growth at a FR-20 rating, then there should be another rating on the rudder that is FR-0 rating over 50% of the area. All ratings should equal 100% of the area/component being inspected.
TABLE 1 - FOULING RATINGS (FR) IN ORDER OF INCREASING SEVERITY
TYPE FOULING
RATING
(FR)
DESCRIPTION
Soft 0 A clean, foul-free surface; red and/or black AF paint or a bare metal surface.
Soft 10 Light shades of red and green (incipient slime). Bare metal and painted surfaces are visible beneath the fouling.
Soft 20 Slime as dark green patches with yellow or brown colored areas (advanced slime).
Bare metal and painted surfaces may be obscured by the fouling.
Soft 30 Grass as filaments up to 3 inches (76 mm) in length; projections up to ¼ inch (6.4
mm) in height; a flat network of filaments, green, yellow, or brown in color; or soft, non-calcareous fouling such as sea cucumbers, sea grapes, or sea squirts projecting up to ¼ inch (6.4 mm) in height. The fouling cannot be easily wiped off by hand.
Hard 40 Calcareous fouling in the form of tubeworms less than ¼ inch in diameter or height.
Hard 50 Calcareous fouling in the form of barnacles less than ¼ inch in diameter or height.
Hard 60 Combination of tubeworms and barnacles, less than ¼ inch (6.4 mm) in diameter or height.
Hard 70 Combination of tubeworms and barnacles, greater than ¼ inch in diameter or height.
Hard 80 Tubeworms closely packed together and growing upright away from surface.
Barnacles growing one on top of another, ¼ inch or less in height. Calcareous shells appear clean or white in color.
Hard 90 Dense growth of tubeworms with barnacles, ¼ inch or greater in height; calcareous shells brown in color (oysters and mussels); or with slime or grass overlay.
Composite 100 All forms of fouling present, soft and hard, particularly soft sedentary animals without calcareous covering (tunicates) growing over various forms of hard growth.
14 (Rev-1)
TABLE 2 - PAINT DETERIORATION RATINGS (PDR)
FORANTIFOULING/ANTICORROSION (AF/AC) PAINT SYSTEM
PAINT
DETERIORATION
RATING (PDR)
DESCRIPTION
10 AF paint intact, red in color or with mottled pattern of light green and red.
20 AF paint missing from edges, corners, seams welds, river or boll head to expose AC paint.
30 AF paint missing from slightly curved or flat areas to expose AC paint.
40 AF paint missing from intact blisters to expose AC paint.
50 AF blisters ruptured to expose intact AC paint.
60 AF/AC paint missing or peeling to expose steel substrate, no corrosion present.
70 AF/AC paint removed from edges, corners, seams, welds, river or bolt heads to expose steel substrate with corrosion present.
80 Ruptured AF/AC blisters on slightly curved or flat surfaces with corrosion stains present.
90 Area corrosion of steel substrate with no AF/AC paint cover due to peeling or abrasion damage.
100 Area corrosion showing visible surface evidence of pitting, scaling, and roughening or steel substrate.
3.3.2 Conduct diver hull inspection. Fill out Form 4-2. Complete any additional inspection forms as required to document underwater component damage (Forms 4-2, 4-3, and 4-4). See Table 2 for description of Paint Deterioration Ratings (PDR’s).
3.4 Additional documentation requirements. The Contractor shall submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.). Place linear measuring devices, as applicable, in the field of view when videotaping hull damages, to provide scale for these damages.
4. NOTES
4.1 Unit responsibilities. The ship's force will tag-out and secure the following:
• All propulsion machinery and shafting and all steering machinery whenever the diver is in the water.
• All underwater body transducers, including the sonar equipment, for the duration of the underwater hull cleaning operation.
• All active cathodic protection equipment for the duration of the hull cleaning operation.
• Each sea suction while the diver is inspecting the sea suction's sea chest strainer.
15 (Rev-1)
4.2 Inspection forms. (See following pages)
16 (Rev-1)
FORM 4-1. PRE-CLEAN BIOFOULING INSPECTION DATA
VESSEL NAME: HULL TYPE / NUMBER LOCATION (CITY) DATE (mm/dd/yy)
PRODUCT LINE: INSPECTING ACTIVITY VISIBILITY (ft)
LOCATION OF LAST DRYDOCKING UNDOCKING DATE
LOCATION OF LAST PAINTING DATE
PAINT
TYPE: ANTIFOULING: ANTICORROSION:
DATE OF THE LAST WATERBORNE FULL HULL CLEANING DATE OF THE LAST WATERBORNE INTERIM CLEANING
UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO VIDEO TAKEN □ YES □ NO
COMPONENTS ( CHECK IF: )
N/A NOT INSPECTED
( PERCENTAGES MUST ADD UP TO 100 )
FOULING RATING FOULING RATING FOULING RATING
PROPELLER Centerline FR- % FR- % FR- %
Port Outboard FR- % FR- % FR- %
Port Inboard FR- % FR- % FR- %
Starboard Inboard FR- % FR- % FR- %
Starboard Outboard FR- % FR- % FR- %
SHAFT Centerline FR- % FR- % FR- %
Port Outboard FR- % FR- % FR- %
Port Inboard FR- % FR- % FR- %
Starboard Inboard FR- % FR- % FR- %
Starboard Outboard FR- % FR- % FR- %
RUDDER Centerline FR- % FR- % FR- %
Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
SONAR DOME Port Side FR- % FR- % FR- %
Starboard Side FR- % FR- % FR- %
SEA CHEST Typical FR- % FR- % FR- %
BOW Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
SIDES Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
BOTTOM Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
STERN Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
TRANSOM Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
Signature (Ship’s Engineer):_______________________________________________________ Signature (Diving Supervisor):______________________________________________________
17 (Rev-1)
FORM 4-2. DIVER HULL INSPECTION DATA
VESSEL NAME: HULL TYPE / NUMBER LOCATION (CITY) DATE (mm/dd/yy)
PRODUCT LINE: INSPECTING ACTIVITY VISIBILITY (ft)
LOCATION OF LAST DRYDOCKING UNDOCKING DATE
LOCATION OF LAST PAINTING DATE
PAINT
TYPE: ANTIFOULING: ANTICORROSION:
DATE OF THE LAST WATERBORNE FULL HULL CLEANING DATE OF THE LAST WATERBORNE INTERIM CLEANING
UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO UNDERWATER COLOR VIDEO TAKEN □ YES □ NO
UNDERWATER WORK ACCOMPLISHED THIS DATE
□ FULL CLEAN □POLISH □MULTI-BRUSH □INSPECT □PAINT
□INTERIM □HYDRO □HAND-HELD □REPAIR □OTHER__________________________________
1. HULL COATING SYSTEM (PDR___________)
a. ANTIFOULING PAINT
PERCENTAGE REMAINING________________ PERCENT REJUVENATION________________
IS THE A/F □ HARD □ SOFT
PERCENTAGE __________ PEELING __________ LOCALIZED or __________ GENERAL __________ BLISTERING __________ LOCALIZED or __________ GENERAL __________ ABRASION __________ LOCALIZED or __________ GENERAL
CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]
b) ANTICORROSION PAINT
PERCENTAGE REMAINING _______________
PERCENTAGE __________ PEELING __________ LOCALIZED or __________ GENERAL __________ BLISTERING __________ LOCALIZED or __________ GENERAL __________ ABRASION __________ LOCALIZED or __________ GENERAL
CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]
c) DOCKING BLOCK AREAS (PDR _________)
AVERAGE PERCENTAGE OF BLOCK AREAS PAINTED ____________________ %
BARE METAL PITTING ____________________ % __________________ IN. DIAMETER ____________________ IN. DEEP
CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]
18 (Rev-1)
FORM 4-2. DIVER HULL INSPECTION DATA (CONTINUED)
2. CATHODIC PROTECTION SYSTEM
a. SACRIFICIAL ANODES (ZINCS)
AVERAGE PERCENTAGES OF ANODES REMANING ____________________ %
ANODES ARE: □ UNIFORMLY WASTED □ WASTAGE GREATEST IN FOLLOWING AREAS:
ANODES ARE : □ WELDED □ BOLTED □ BOTH
NUMBER AND LOCATION OF ANY ANODES MISSING OR INACTIVE:
MISSING___________________________________________________
INACTIVE__________________________________________________
b. IMPRESSED CURRENT □ NOT APPLICABLE
□ DAMAGE NOTED ON ATTACHED DRAWING (Port/Stbd) (FRAME ____________________ )
□ WIRES LOOSE, BROKEN, OR MISSING (Port/Stbd) (FRAME ____________________ )
□ CAPASTIC SHIELD DAMAGE (Port/Stbd) (FRAME ____________________ )
□ INSULATORS LOOSE OR DAMAGED (Port/Stbd) (FRAME ____________________ )
□ OTHER (Port/Stbd) (FRAME ____________________ )
3. GENERAL HULL DAMAGE (HULL PLATING, BILGE KEELS, etc.):
4. HULL PENETRATIONS (PDR _________)
_______________ % CLOGGED WITH MARINE GROWTH (POST CLEAN)
_______________ % BARE METAL (AREA SURROUNDING PENETRATION)
_______________ % BARE METAL PITTING
AVERAGE PIT SIZE: _______________ in. DIAMETER, _______________ in. DEPTH
CONDITION SUMMARY: ___________________________________________________
19 (Rev-1)
FORM 4-2. DIVER HULL INSPECTION DATA (CONTINUED)
5. SONAR DOME □ NOT APPLICABLE
□ NO VISIBLE DAMAGE □ DAMAGE NOTED ON ATTACHED DRAWING □ CUTS □ LAYER SEPARATION □ WIRE PILES EXPOSED
6. PROPULSION SHAFTING
VISIBLE BARE METAL □ YES □ NO RUST BLEEDING □ YES □ NO PITTING □ YES □ NO
CONDITION SUMMARY (TYPE OF DAMAGE, LOCATION AND SIZE):
7. STRUTS AND BEARING HOUSING
PERCENT BARE METAL: STARBOARD PORT
MAIN _________________________ % ___________________ %
INTERMEDIATE _________________________ % ___________________ %
PDR _________________________ ___________________
CONDITION OF STRUT LEADING AND TRAILING EDGES: ______________________________________
CONDITION OF ROPE GUARDS: __________________________________________________
CONDITION OF FAIRWATERS: ___________________________________________________
8. RUDDERS
□ NO DAMAGE □ DAMAGE SHOWN ON ATTACHED DRAWINGS
STARBOARD PORT
PERCENT BARE METAL % %
PDR
ACCESS PLATES INTACT? □ YES □ NO □ YES □ NO
WAS RUDDER SOUNDED? □ YES □ NO □ YES □ NO
ANY SIGNS OF
FLOODING? □ YES □ NO □ YES □ NO
ANY SIGNS OF
DROPPING? □ YES □ NO □ YES □ NO
CONDITION SUMMARY:
9. PROPELLERS
□ NO DAMAGE □ DAMAGE SHOWN ON ATTACHED DRAWINGS
PROP #1: NICKS __________ CURLS __________ CRACKS – LARGEST CRACK LENGTH __________ in.
PROP #2: NICKS __________ CURLS __________ CRACKS – LARGEST CRACK LENGTH __________ in.
PROPELLERS NUMBERED STARBOARD TO PORT.
20 (Rev-1)
Diving Supervisor: ___________________________________________ Ship’s Engineer: _________________________________
21 (Rev-1)
FORM 4-3. PROPELLER VISUAL INSPECTION FORM
Pressure Face Suction Face
Contractor inspector (written/signature): /
USCG (written/signature): /
22 (Rev-1)
FORM 4-4. PORT AND STARBOARD RUDDER INSPECTION DATA
23 (Rev-1)
16700_FJL_0220_87WPB
WORK ITEM 2: Watertight Closures, Assess
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform a condition assessment of all installed watertight closures.
TABLE 1 - 87’ WPB WATERTIGHT CLOSURES
LOCATION DESIGNATION DESCRIPTION
Pilot House Access 01-15-0 54” x 24” Clear Opening w/ 4-Dog Weather tight Door w/2 Windows
(Hulls 87301-87309) Pilot House Access 01-15-0 54” x 24” Clear Opening, Quick-Acting Heavy Duty Style w/ Window, Weather tight (Hulls 87310 on) Forepeak Access 1-1-2 18” Clear Opening Round Al. Cast Hatch, SST Deck Ring w/ Integral
Topside Handle Fwd Crew Quarters Access
1-2-0 24”x24” Clear Opening 4-Dog Quick Action WTRTT Raised Hatch
Deck Locker Access 1-6-0 52” x 26” Clear Opening 6-Dog, Quick Acting WTRTT Door Fuel Station Access 1-6-2 26” x 28” Clear Opening, 8-Dog, Weather tight, Individually-Dogged Main Deck Access 1-15-0 54” x 26” Clear Opening, 6-Dog, Quick Acting WTRTT Door Engine Room Access 1-21-1 24” x 24” Clear Opening 4-Dog Quick Acting WTRTT Raised Hatch Lazaret Access (Stbd) 1-22-1 24” x 24” Clear Opening 4-Dog Quick Acting WTRTT Raised Hatch Lazaret Access (Port) 1-22-2 24” x 24” Clear Opening 4-Dog Quick Acting WTRTT Flush Hatch Fwd Passageway Access
2-9-0 54” x 26” Clear Opening 6-Dog, Quick Acting WTRTT Door
Engine Room Access 2-14-0 54” x 26” Clear Opening 6-Dog, Quick Acting WTRTT Door
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 167-002, Rev C, CG Schedule of Doors, Manholes, Windows &
Hatches Coast Guard Drawing 87 WPB 167-003, Rev -, Weather Tight Door for Fuel Station Access Coast Guard Drawing 87 WPB 167-004, Rev H, W.T. Doors and Hatches
24 (Rev-1)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and non-destructive examination (NDE) in accordance with SFLC Std Spec 0740.
3.2. Watertight closure assessment. Using Coast Guard Drawings 87 WPB 167-002, 87 WPB 167-003, and 87 WPB 167-004 as reference, the Contractor shall perform an assessment of all watertight closures listed in Table 1 as follows. Submit CFR with results of inspections including recommendations for repair or renewal:
3.2.1 Inspect all watertight closures for loose, missing or damaged parts; wear of hinge pins and striker plates; and clogged drain lines where applicable.
3.2.2 Operate closures through complete dogging cycle, checking for binding and/or difficult operation.
3.2.3 Inspect closure gasket for the following:
3.2.3.1 Paint/foreign matter, cracks, or deterioration.
25 (Rev-1)
3.2.3.2 Uneven or excessive depression (greater than 1/8”).
3.2.3.3 Gaps greater than 1/16” where ends meet, or any ends that meet in a radius (except for round closures).
3.2.4 Apply grease to all intact grease fittings. Note any missing or broken fittings.
3.2.5 Inspect closure knife edge for nicks and gouges. Repair minor gouges by filing smooth.
NOTE
If the nick or gouge has a gap greater than 1/16”, the knife edge may require weld buildup prior to filing smooth in order to keep the knife edge fair.
3.2.6 Chalk test. Perform a chalk test of all inspected closures in accordance with SFLC Std Spec 0740, Appendix C.
3.2.7 Water hose test. Perform a water hose test of all watertight closure boundaries in accordance with SFLC Std Spec 0740, Appendix C.
3.2.8 String test. Perform a string test of all inspected closures to identify any twisting and/or warpage of knife edge. Measure and report gap at the intersection of the two strings both when pulled taught across corners and when pulled taut across the midpoints of the sides. See Figure 1 for guidance.
FIGURE 1. KNIFE EDGE STRING TEST
3.3 Repair change request authorization. If a Change Request has been authorized and released by the Contracting Officer (KO), the Contractor shall execute minor repairs as identified by CFR to return closure(s) to operable condition and/or restore watertight integrity.
NOTE
Examples of minor repairs include, but are not limited to, parts renewals and weld repairs such as hinge bracket renewal/relocation and knife edge repairs.
3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been repaired are in satisfactory operating condition.
26 (Rev-1)
3.5 Personnel training. While conducting assessments, the Contractor shall provide training on maintenance and repair of watertight closures to Ship’s Force personnel designated by cutter Engineering Petty Officer (EPO). The Contractor shall allow designated personnel to shadow the Contractor while conducting assessments in order to learn assessment and repair techniques used by Contractor.
3.6 Final report. Within seven (7) days after the completion of the assessment and follow-on repairs, the Contractor shall submit a final report to the cutter EO with copy to the COR. The final reports must include:
• Complete list of watertight closures assessed
• List of closures not assessed and the reasons for non-assessment
• Condition found on all assessed closures
• List of repairs accomplished
• List of additional recommended repairs
3.7 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
4. NOTES
4.1 This section does not apply to this WI.
27 (Rev-1)
23000_PAW_0520_87WPB
WORK ITEM 3: Main Diesel Engines (MDE), Renew (W-6)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the port main diesel engine (MDE).
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
Y Main Diesel Engine NSN: 2815-12-348-2440 PN: 5560028101TE94 1 ea. 500,000.00
N Soft Patch Kit NSN: 8040-01-601-2062 PN: 87SPK CPB-1 PATCH 1 ea. 1173.03
Y *Alignment Kit N/A 1 set 3000.00
N Clamp, synchro (8" V-clamp), DeAngelo Marine
NSN: 5340-01-568-6899
PN: 024-007000 2 ea. 47.19
N Clamp, Turbo Adaptor NSN: 5340-01-593-2913 PN: 024-001200 2 ea. 274.04
N Clamp, synchro (12" V-band clamp)
NSN: 5340-01-590-8152
PN: 024-009000 2 ea. 56.85
N Nut, plain, hexagon NSN: 5310-01-F17-5302 16 ea. 1.35 N Washer, flat NSN: 5310-01-F17-4971 32 ea. 0.42 N Screw, cap, hexagon head NSN: 5305-01-F17-4972 16 ea. 3.73 N Sealant, Silkolene NSN: 8030-01-593-2919 2 ea. 117.28
N Kit, Rebuild, Chesterton Seal Assembly NSN: 5330-01-F18-5383 1 ea. 2,956.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB…
This is the start of the file's text. The full file is on GovTribe.