Solicitation 70Z080-19-Q-P4504500

USCGC MANTA (WPB 87320)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2019

Developed By: Paul R Dalton

(Rev-0, 19 Sep 2018)

USCGC MANTA (WPB-87) DOCKSIDE AVAILABILITY FY2019

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items ............................................................................................. ix Principal Characteristics ................................................................................................................................ x General Requirements WORK ITEM 1: Ship Service Diesel Generator Sets, Replace WORK ITEM 2: Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and

Inspect WORK ITEM 3: Insulation, Renew WORK ITEM 4: Interior Deck Covering System, Renew WORK ITEM 5: Joiner Panels, Renew WORK ITEM 6: Ducting, HVAC System, Clean WORK ITEM 7: HVAC System, Repair WORK ITEM 8: HVAC Air Ducting, Renew WORK ITEM 9: Anchor Rope Drum, Repair WORK ITEM 10: Soft Patch Deck Covering, Seals, Renew

WORK ITEM 11: MOTOR CONTROLLER, INSTALL

WORK ITEM 12: HVAC 2-Stage Intake Separator, Modify WORK ITEM 13: Mast Multi-Cable Transit (MCT) Frame, Renew WORK ITEM 14: Mount, HF Antenna, Renew iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Details

Coast Guard Drawing 87 WPB 131-002, Rev -, Forepeak Void New Watertight Flat

Coast Guard Drawing 87 WPB 151-001, Rev L, Superstructure Details

Coast Guard Drawing 87 WPB 182-001, Rev C, Main Engine and Generator Foundation

Coast Guard Drawing 87 WPB 185-001, Rev AN, Auxiliary Foundation Booklet

Coast Guard Drawing 87 WPB 201-001, Rev E, Machinery Arrangement (Ref Block, add 87 WPB 259- 002 Rev B)

Coast Guard Drawing 87 WPB 201-001, Rev F, Machinery Arrangement

Coast Guard Drawing 87 WPB 233-001, Rev A, Remote Emergency Shutdowns

Coast Guard Drawing 87 WPB 252-001, Rev G, Pilot House Console Arrangement

Coast Guard Drawing 87 WPB 252-002, Rev N, Alarm and Monitoring System

Coast Guard Drawing 87 WPB 256-001, Rev Y, Sea Water Cooling Piping

Coast Guard Drawing, 87 WPB 259-001, Rev H, Engine Exhaust Piping

Coast Guard Drawing, 87 WPB 259-002, Rev B, Propulsion Engine/SSDG Exhaust Piping Insulation Modifications

Coast Guard Drawing 87 WPB 261-001, Rev L, Fuel Oil Service Piping

Coast Guard Drawing 87 WPB 261-003, Rev-, Fuel System Mod Incident to John Deere SSDG Install

Coast Guard Drawing 87 WPB 302-001, Rev W, Misc. Controls Wiring Diagram

Coast Guard Drawing 87 WPB 304-001, Rev D, Wireways Arrangement

Coast Guard Drawing 87 WPB 305-001, Rev -, Electrical Label Plates

Coast Guard Drawing 87 WPB 310-001, Rev H, Ship’s Service One-Line Diagram

Coast Guard Drawing 87 WPB 310-010, Powergen Wiring SSDG

Coast Guard Drawing 87 WPB 310-011, Powergen One Line SSDG, One Line

Coast Guard Drawing 87 WPB 310-012, Powergen Schematic SSDG, Electrical Elementaries

Coast Guard Drawing 87 WPB 310-013, Powergen Communications SSDG

Coast Guard Drawing 87 WPB 310-014, Powergen Interconnection, SSDG

Coast Guard Drawing 87 WPB 313-001, Rev M, DC System

Coast Guard Drawing 87 WPB 321-001, Rev K, Power System Deck Plan

Coast Guard Drawing 87 WPB 324-001, Rev B, Switchboard Wiring Diagram & Details (Hulls 1-12) v (Rev-0)

Coast Guard Drawing 87 WPB 324-002, Rev C, Switchboard Wiring Diagram & Details (Hulls 13-On)

Coast Guard Drawing 87 WPB 324-003, Rev B, Switchboard Wiring Diagram & Details (Hulls 52 & )

Coast Guard Drawing 87 WPB 331-001, Rev N, Lighting System Deck Plan

Coast Guard Drawing 87 WPB 405-001, Rev AC, Antenna Arrangement

Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping Systems

Coast Guard Drawing 87 WPB 514-004, Rev -, Mods to HVAC Intake Duct

Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements

Coast Guard Drawing 87 WPB 634-001, Rev C, Deck Covering and Details

Coast Guard Drawing 87 WPB 635-001, Rev C, Linings And Insulation Plan & Details

NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck

Powergen Controls, SSDG System Replacement Project, Preliminary Mock-up Test Plan

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Technical Publication (TP) 4562, Heating, Ventilation, and Air Conditioning (HVAC) System 87’ WPB Class Vessels

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2014, General Requirements for Drawing Preparation

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3040), 2014, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services

OTHER REFERENCES

American Bureau of Shipping (ABS), Steel Vessels Under 90 Meters in Length, Part 4, Vessel System and Machinery, Chapter 6 Electrical Installations, Feb 2015

American Society for Nondestructive Testing, SNT-TC-1A: Personnel Qualification and Certification in Nondestructive Testing, 2016

Coast Guard Technical Publication 4540, Pump, Chilled Water- Model KC2.

Coast Guard TP 4542, Pump, Lube Oil Evacuation-Model 01SS1PTYDJHLW vi (Rev-0)

Coast Guard TP 4570, Pump, Waste Oil

Coast Guard TP 4988, Ventilation Fan, Engine Room Circulating-Model YM-18

Description of System Operations (DOSO)

Institute of Electrical and Electronic Engineers IEEE STD 45, Recommended Practice for Electrical Installations on Shipboard, April 9, 2004

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation

MIL-PRF-24613, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal

Woodward easYgen 3000 Series Technical Manual 37532, Generator Control vii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

1 Y Ship Service Diesel

Generator Set, Port NSN: 2815-01-F13-3325 1 ea. 32,925.00

1 Y Ship Service Diesel Generator Set, STBD

NSN: 2815-01-F18-5409 1 ea. 32,925.00

1 N Main Switchboard NSN: 6110-01-F17-5033 1 ea. 125,500.00 1 N Magnetic Speed

Pickup NSN: 2920-01-663-1295 2 ea. 250.00

1 N SSDG Exhaust Insulation Blankets Advanced Thermal

Products Inc, Marine Wrap, Port

NSN: 2990-01-674-5103 1 ea. 1,485.00

1 N SSDG Exhaust Insulation Blankets Advanced Thermal

Products Inc, Marine Wrap, STBD

NSN: 2990-01-674-9188 1 ea. 1,495.00

1 N Repair Kit, Soft Patch Kit (includes sealant, seal assy and fasteners)

NSN: 8040-01-601-2062 2 ea. 1,028.19

1 N Clamp Synchro 8" NSN: 5340-01-568-6899 12 ea. 47.02 1 N Sealant Compound NSN: 8030-01-593-2919 4 ea. 117.28 1 N Clamp Synchro (12"

V-Band Clamp) NSN: 5340-01-590-8152 6 ea. 55.24

1 N Clamp Synchro NSN: 5340-01-593-2913 4 ea. 277.18 1 N Clamp Synchro 4.5” NSN: 5340-01-593-2907 2 ea. 31.41 1 N Bellow, Exhaust, 4 in PN: 211808P45855 2 N **Fan, Tube Axial NSN: 4010-01-598-0425 1 ea. 1,673.24 2 N **Fan, Tube Axial NSN: 4010-01-598-1549 1 ea. 2,851.52 7 N Compressor NSN: 4130-14-524-0777 1 ea $2,110.37

10 N Soft Patch Kit (includes sealant, soft patch hardware and rubber seal kit)

NSN: 8040-01-601-2062

P/N: 87SPK CPB-1 PATCH

2 kt 3,000.00

10 N Clamp, Synchro NSN: 5340-01-568-6899 P/N: 024-007000

12 ea 75.35

10 N Clamp, Synchro NSN: 5340-01-590-8152 P/N: 024-009000

6 ea 49.59 viii (Rev-0)

10 N Clamp, Synchro NSN: 5340-01-593-2913 P/N: 024-001200

4 ea 274.04

10 N Sealing Compound NSN: 8030-01-593-2919 P/N: 042-023000

6 ea 161.20

13 N MCT Frame Assembly

P/N- RGSO4A1 SPEC 5086 1 ea 450.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter ix (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item

Title

This section is not applicable to this package.

x (Rev-0)

PRINCIPAL CHARACTERISTICS

87' WPB

PHYSICAL

Length overall 87' Length between perpendiculars 81' 7" Depth 10' 11" Maximum beam 19.4' Draft, mean to design waterline 5' 9" Height of highest projection 50.2' Full load displacement 93.5 long tons Minimum operating displacement 83.9 long tons Displacement, light ship 77.9 long tons Framing Longitudinal Bulkheads Four watertight bulkheads located below the Main Deck Anchor 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset

HULL

Hull/main weatherdeck material ABS Grade AH 36 Superstructure 5086 Aluminum

MACHINERY

Main propulsion Two MTU 8V396TE94, sequential turbo-charged diesels Reduction gears Two ZF Type BW 255 Propulsion shaft Two AQUAMET 22, 101.6mm Shaft diameter 4" Shaft seal Two John Crane mechanical seals Shaft bearing, intermediate Thordon Elastomeric Bearing Shaft bearing, aft Thordon Elastomeric Bearing Number of propellers 2 Number of blades 5 Diameter of propeller 1040mm Pitch 1230 mm fixed Shaft RPM 828 Rudders Two 316L Stainless Steel Ship's service generators Two Man Model D08241F01 diesel with Stanford 60KW Generator

TANK CAPACITIES

3-9-1-f (fuel oil) 1402 gal 3-9-2-f (fuel oil) 1402 gal 3-12-2-f (waste oil) 86 gal 3-12-1-f (oily water) 86 gal 3-7-0-q (sewage collection) 352 gal 3-7-1-q (grey water) 52 gal 3-12-1-w (fresh water) 200 gal 3-12-2-w (fresh water) 200 gal

1 (Rev-0)

00000_0618_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Small Quantity Generator.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3 (Rev-0)

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

4 (Rev-0)

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

TIME

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK ITEM

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

11 (Rev-0)

De ECNNN_3110_PAW_0618_87WPB

WORK ITEM 1: Ship Service Diesel Generator Sets, Replace

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to replace the existing Ship Service Generators, Main Switchboard and two (2) 440 VAC Panels. The Contractor shall provide all equipment and materials unless designated as Government-furnished as listed below.

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

Y Ship Service Diesel

Generator Set, Port NSN: 2815-01-F13-3325 1 ea. 40,925.00

Y Ship Service Diesel Generator Set, STBD

NSN: 2815-01-F18-5409 1 ea. 40,925.00

N Main Switchboard, includes 7-inch touch screen HMI for Pilothouse installation

NSN: 6110-01-F17-5033 1 ea. 150,500.00

N Magnetic Speed Pickup NSN: 2920-01-663-1295 2 ea. 250.00 N SSDG Exhaust Insulation

Blanket, Advanced Thermal Products Inc, Marine Wrap, Port

NSN: 2990-01-674-5103 1 ea. 1,485.00

N SSDG Exhaust Insulation Blanket, Advanced

Thermal Products Inc, Marine Wrap, STBD

NSN: 2990-01-674-9188 1 ea. 1,495.00

N Repair Kit, Soft Patch Kit NSN: 8040-01-601-2062 2 ea. 1,028.19 N Clamp Synchro 8” NSN: 5340-01-568-6899 12 ea. 47.02 N Sealant Compound NSN: 8030-01-593-2919 4 ea. 117.28 N Clamp Synchro (12” V-

Band Clamp) NSN: 5340-01-590-8152 6 ea. 55.24

N Clamp Synchro NSN: 5340-01-593-2913 4 ea. 277.18 N Clamp Synchro 4.5” NSN: 5340-01-593-2907 2 ea. 31.41 N Exhaust Bellows: 4-inch

Heavy Duty Flex Lined Bellows-Stainless Steel

PN: 2118808P45855 2 ea. 148.50

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

12 (Rev-0)

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan

Coast Guard Drawing 87 WPB 182-001, Rev C, Main Engine & Generator Foundation

Coast Guard Drawing 87 WPB 201-001, Rev E, Machinery Arrangement

Coast Guard Drawing 87 WPB 233-001, Rev A, Remote Emergency Shutdowns

Coast Guard Drawing 87 WPB 252-001, Rev G, Pilot House Console Arrangement

Coast Guard Drawing 87 WPB 252-002, Rev N, Alarm Monitoring System

Coast Guard Drawing 87 WPB 256-001, Rev Y, Sea Water Cooling Piping

Coast Guard Drawing 87 WPB 259-001, Rev H, Engine Exhaust Piping

Coast Guard Drawing 87 WPB 259-002, Rev B, Propulsion Engine/SSDG Exhaust piping Insulation Modifications

Coast Guard Drawing 87 WPB 261-001, Rev L, Fuel Oil Service Piping

Coast Guard Drawing 87 WPB 261-003, Rev -, Fuel Oil System Mods Incidental to John Deere SSDG Installation

Coast Guard Drawing 87 WPB 310-001, Rev H, Ship Service One-Line Diagram

Coast Guard Drawing 87 WPB 310-010, Rev-, Powergen Wiring SSDG

Coast Guard Drawing 87 WPB 310-011, Rev-, Powergen One Line SSDG, One Line

Coast Guard Drawing 87 WPB 310-012, Rev-, Powergen Schematic SSDG, Electrical Elementaries

Coast Guard Drawing 87 WPB 310-013, Rev-, Powergen Communications SSDG

Coast Guard Drawing 87 WPB 310-014, Rev-, Powergen Interconnection, SSDG

Coast Guard Drawing 87 WPB 313-001, Rev M, DC System

Coast Guard Drawing 87 WPB 324-001, Rev B, Switchboard Wiring Diagram & Details (Hulls 1-12)

Coast Guard Drawing 87 WPB 324-002, Rev C, Switchboard Wiring Diagram & Details (Hulls 13-On)

Coast Guard Drawing 87 WPB 324-003, Rev B, Switchboard Wiring Diagram & Details (Hulls 52 & )

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2014, General Requirements for Drawing Preparation

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3040), 2014, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

13 (Rev-0)

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services

OTHER REFERENCES

American Bureau of Shipping (ABS), Steel Vessels Under 90 Meters in Length, Part 4, Vessel System and Machinery, Chapter 6 Electrical Installations, Feb 2015

Description of System Operations (DOSO)

Institute of Electrical and Electronic Engineers IEEE STD 45, Recommended Practice for Electrical Installations on Shipboard, April 9, 2004

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation

NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

None.

3.1.2 Tech Rep. The Contractor shall provide the services of an OEM authorized/ licensed Tech Rep for the Powergen Switchboard to accomplish the following on site:

Provide manufacturer's proprietary system/ equipment information, software, and tools.

Commission Easygens and program new switchboard.

See Note 4.1

3.1.3 Advance notification. The Contractor shall notify the Contracting Officer's Representative (COR) with 24 hours advance written notice at the following instances:

Prior to placing the existing SSDG sets out of commission.

NOTE

Notes do not contain commands to perform or prohibitions against performing certain actions.

3.1.4 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

14 (Rev-0)

3.1.5 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Main Diesel Engines

Exhaust Lagging

Overhead Deck Plating and Supports

Piping (Various)

Electrical wiring (Various)

Bolted Engine Room Removable Plate (BERP)

Fuel Oil

Lube Oil

Coolant, Raw Water

3.1.6 Temporary services. The Contractor shall provide temporary services in accordance with SFLC Std Spec 8635.

Firemain System.

3.1.7 Temporary ventilation. The Contractor shall provide temporary ventilation to the cutter capable of maintaining the onboard temperature between 65°F and 75°F while the HVAC system is temporarily off line in accordance with SFLC Std Spec 0000, section 3.3.1.1 Temporary ventilation.

3.1.8 Sanitary facilities for vessel-personnel – due to disruption of grey water and sewage systems. The Contractor shall provide temporary services in accordance with SFLC Std Spec 8635.

3.1.9 Fire alarm and bilge alarm. The Contractor shall ensure that the fire alarm and bilge alarms are energized during change out of the main switchboard. This shall include providing 24 VDC Power to the Engine Room Alarm Panel and to the Fire Alarm Control Panel located in the Pilot House.

3.2 Equipment installation/modification. The Contractor shall refer to all references listed in section 2 and accomplish the following:

3.2.1 Removals. The Contractor shall perform the following:

3.2.1.1 Removal procedure. Refer to Coast Guard Drawing 87 WPB 131-001, Detail 11-A and all other referenced applicable drawings as guidance, submit a written procedure to the Coast Guard Inspector for approval, detailing the intended sequence and methods of lifting and removing the existing generator sets, main switchboard and 440 VAC Panels to be performed by the Contractor within 48 hours prior to beginning removal. This shall include the removal and disposal of SSDG fluids (L/O and Coolant).

3.2.1.2 Disconnections. Accomplish all mechanical and electrical work in accordance with ABS, IEEE-Std 45, SFLC Std Spec 3042, test cables in accordance with SFLC Std Spec 3041 and applicable drawings listed in Section 2 of this work item. Utilize the existing wire ways for new cable runs.

15 (Rev-0)

Remote Pull Cables CA-6-350, CA-6-370, CA-300, CA-370 shown on Coast Guard Drawing 233-001. Do not dispose of these pull cable as they will be reused for new installation of John Deere Generators.

Alarm & Monitoring circuits (a.) Main SWBD Control Battery Charger (b.) Main SWBD P/S IRM P/S Steering Pump Failure (c.) SSDG, Port L/O Pressure, J/W Temp, Emergency Stop Activated, J/W Level Low, SSDG, Port/STBD - L/O Pressure, J/W Temp, Emergency Stop Activated, J/W Level Low.

Drain and dispose of all fluids in accordance with applicable Federal, State and Local regulations.

WARNING

Do not drain any fluids including fresh water, into any space, bilge, or exterior location.

3.2.1.3 Generator set removals. Remove the existing generator sets using the approved removal procedure, and Coast Guard Drawing 87 WPB 182-001, 201-001, 233-001, 252-002, 259-001, 261-001, and 310-001, as guidance.

3.2.1.4 Main switchboard and associated 440 VAC distribution panels removals. Remove the existing main switchboard and associated 440 VAC distribution panels using Coast Guard Drawing 87 WPB 310-001. 324-001, 324-002 and 324-003 as guidance. Retain circuits 1SGA- 4P-1S AND 1SGB-4P-1S, cable type LSTNW-75 for later reinstallation. Disconnect and discard all control and indicating circuits as shown on referenced Drawings 324-001 through 324-003 as applicable.

3.2.2 Bilge cleaning and inspection. Clean and visually inspect the bilge areas under the SSDG, and Main Switchboard foundations for signs of corrosion or defect, and submit a Condition Found Report (CFR).

3.2.3 Generator set foundations. Preserve the SSDG foundations in accordance with the applicable coating system listed in SFLC Std Spec 6310.

3.2.4 Installations. The Contractor shall:

3.2.4.1 Main Switchboard and associated 440 VAC Panels. Install Government-furnished Main Switchboard, 440 VAC Panels and all associated controls and monitoring systems as shown on Coast Guard Drawings 87 WPB 310-012, Powergen Schematic SSDG, Electrical Elementaries, 87 WPB 310-014, Powergen Interconnection, SSDG and 87 WPB 310-011 Powergen One Line SSDG, One Line. Switchboard installation entails all interface interconnections including wiring from the Easygen Panels to each generator for control and monitoring.

3.2.4.1.1 The 5.7-inch Operator Interface shall be installed in the Pilot House starboard side, aft section overhead as designated by the Coast Guard inspector. See Figure 1, Pilot House SSDG Display, in the last page of this work item. The Coast Guard Drawings 87 WPB 310-013 and 87 WPB 310-014 should be used for guidance only. Additional guidance shall be provided by the Technical Representative.

3.2.4.2 Generator sets. Install Government-furnished generator sets as shown on Coast Guard Drawing 87 WPB 201-001. Provide all fluids to include approximately 8 gallons of 50/50

16 (Rev-0) mixture of John Deere Cool-Gard II J/W coolant and approximately 7 gallons of John Deere Break-In Plus oil per engine. All system interconnections shall be performed as follows:

3.2.4.2.1 Fuel oil (F/O) piping. The intent of this modification is to create a dedicated fuel line for each ship’s service generator set. Modify the existing F/O piping using Coast Guard Drawing 87 WPB 261-003 as guidance except the Item 1 and Item 4. Item 1 shown on the Materials List shall be 1-1/4” IPS to ¾” OD stainless steel Tee with Lokring, and Item 4 shall be 3/4” OD stainless Steel tubing with 0.065” wall thickness.

3.2.4.2.2 Sea water cooling. Make all sea water cooling connections and modifications as shown on Coast Guard Drawing 87 WPB 256-001.

3.2.4.2.3 Exhaust piping and insulation blankets. Remove and discard the existing port and starboard SSDG exhaust insulation blankets. Modify exhaust piping from muffler to turbo as shown in Coast Guard Drawings 87 WPB 259-001 and 87 WPB 259-002. Install the Government-furnished exhaust bellows and insulation blankets.

3.2.4.2.4 Remote emergency shutdowns. Connect all remote emergency shut downs using existing pull cables as shown in Coast Guard Drawing 87 WPB 233-001.

3.2.4.2.5 Adhesive bond fasteners. To avoid any hot work and gas freeing, the Contractor shall use adhesive-bond fastening system wherever the application can be used. The adhesive-bonded fasteners shall be American Bureau of Shipping (ABS) approved, and meet the appropriate loading requirement for each application. The adhesive-bond fasteners shall be Click Bond or equal. See Note 4.2

3.2.4.3 Hydrostatic test. Conduct hydrostatic test to the new piping/tubing to 150% of its operational pressure using fresh water. Check for any leaks, and submit CFR.

3.2.4.4 Pipe flushing. Flush all new and disturbed piping with clean fresh water until all debris is removed but no longer than five minutes. Ensure flushing fluid is directed to move scale and foreign debris away from installed machinery to prevent possible damage upon operational testing. Submit a CFR documenting date and time of flushing process and level of pipe cleanliness.

3.2.4.4.1 Dispose of flushing fluid in accordance with all applicable Federal, state, and local regulations.

3.2.4.4.2 Ensure all water is removed by blowing dry all flushed piping with dry, low-pressure air.

3.2.4.4.3 Inspect the piping interior using a borescope in the presence of the COR, to verify that all solid deposits visible to the unmagnified eye have been removed. Continue the cleaning process until all visible solid deposits are removed from the pipe wall. Inspect piping interior walls for deterioration and metal failure. Submit a CFR.

3.2.4.5 Pipe hanger installation. The Contractor shall furnish, fit, and install new pipe hangers in accordance with MSS SP-58. In lieu of welding use adhesive bond fasteners. See Note 4.2.

17 (Rev-0)

3.2.4.6 Pipe labeling. The Contractor shall label affected piping in accordance SFLC Std Spec 0000.

3.2.5 Nameplate label installations. The Contractor shall furnish and install a nameplate labels in accordance with SFLC Std Spec 0000.

3.2.6 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph

3.1.13 (Touch-ups and minor coating repairs.

3.3 Requirements for test performance. The Contractor shall prepare and submit to the COR for approval, all test procedures, operational demonstrations, and a schedule of tests for all equipment.

3.3.1 Operational test, post-repair. The Contractor shall perform the operational test using the services of the authorized technical representative as specified above Tech Rep. The Technical Representative shall perform the operational test using the “Description of Operational Procedures” (DOSO) which the tech rep has developed for the new Main Switchboard. Provide a copy of the DOSO to the COR prior to performing test. The technical representative shall thoroughly test and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Operational tests shall include the following modes. Submit a CFR.

Initial Conditions/Manual Control Gen 1/Gen 2/Shore Power – All C/B’s in Off Position

Auto Mode Test Off Gen 1/Gen 2/Off

Auto Mode Test Off/Shore Power/Off

Generators/Shore Power Hot Parallel transfer test

Generators Manual Test

Post Test Actions – All Buses and Generators in Automatic Mode

Initial Conditions/Manual Control Gen 1/Gen 2/Shore Power – All C/B’s in Off Position

Auto Mode Test Off Gen 1/Gen 2/Off

Auto Mode Test Off/Shore Power/Off

Generators/Shore Power Hot Parallel transfer test

Generators Manual Test

Post Test Actions – All Buses and Generators in Automatic Mode

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.4 Redlined drawing deliverables. The Contractor shall “red-line” referenced drawings listed in section 2. above to reflect the work or deviations specified in this work item in accordance SFLC Std Spec 0850.

18 (Rev-0)

3.4.1 Preliminary/draft submission. No later than 24 hours after completion of this work item, submit a draft copy of the "red-lined" drawing(s) to the COR for review and approval.

3.4.2 Final submission. No later than 10 calendar days after receiving Coast Guard comments or completion of the availability, whichever occurs first, incorporate all comments and deliver one set of the final red-lined drawing(s) to the COR.

4. NOTES

4.1 Powergen Controls LLC contact information.

Main Office: 7322 Almeda Genoa Rd Houston TX 77075 Phone +1(832) 730-5220 E-mail: info@powergencontrols.com

4.2 Click Bond contact information

2151 Lockheed Way Carson City, NV 89706-0713 www.clickbond.com

19 (Rev-0)

51300_MWS_0714_87WPB

WORK ITEM 2: Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the engine room supply and exhaust fan assemblies.

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

No **Fan, Tube Axial NSN: 4010-01-598-0425 1 ea. 1,673.24 No **Fan, Tube Axial NSN: 4010-01-598-1549 1 ea. 2,851.52

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 185-001, Rev AN, Auxiliary Foundation Booklet.

Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

20 (Rev-0)

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

Louver screens.

3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.2 Work particulars. Using Coast Guard Drawings 87 WPB 185-001 and 87 WPB 601-001 as guidance, the Contractor shall accomplish the following:

3.2.1 Remove the louver screens from the intake and exhaust vent trunks (aft side of superstructure, FR 16, main deck, port and stbd side) to gain access to supply and exhaust vent fans. Disassemble, clean, and inspect duct and fan housing assemblies. Unbolt aluminum rings (fan assembly fdns) from main deck and inspect. Inspect both electric motors and measure the insulation resistance of the motor windings.

Determine all required repairs (e.g.