USCGC DILIGENCE (WMEC 616)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2019
Developed By: Carlos A Palenzuela (Rev-1, 7 January 2019)
TABLE OF CONTENTS
ivRevisions Record vConsolidated List of References xiConsolidated List of Government-furnished Property xiiiConsolidated List of Critical Inspection Items xivPrincipal Characteristics
1General Requirements
11WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing
14WORK ITEM 2: U/W Body, Preserve (100%)
18WORK ITEM 3: Hull Plating Freeboard, Preserve – Partial
22WORK ITEM 4: Appendages (U/W), Leak Test
25WORK ITEM 5: Propulsion Shaft Fairwaters and Rope Guards, Inspect
28WORK ITEM 6: Appendages (U/W) - Internal, Preserve
30WORK ITEM 7: Voids (Non-Accessible), Leak Test
33WORK ITEM 8: Voids (Non-Accessible), Internal Surfaces, Preserve
35WORK ITEM 9: Propulsion Shafting, Strain Gage Alignment, Inspect
40WORK ITEM 10: Propulsion Shafting; Remove, Inspect, and Reinstall
45WORK ITEM 11: Propulsion Intermediate/Line Shafts, Inspect
47WORK ITEM 12: Propulsion Shaft Coating, Renew
50WORK ITEM 13: Propulsion Shafting, Straighten
52WORK ITEM 14: Propulsion Shafting, Optical Or Laser Alignment Check
55WORK ITEM 15: Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew
60WORK ITEM 16: Propulsion Shaft Bearings (External), Renew
63WORK ITEM 17: Controllable Pitch Propeller (CPP) System, Inspect and Service
69WORK ITEM 18: DELETE
70WORK ITEM 19: Propeller Blades, Inspect
75WORK ITEM 20: Doppler Speed Log Transducer, Clean And Inspect
79WORK ITEM 21: Sea Valves and Waster Pieces, Overhaul or Renew
85WORK ITEM 22: Sea Strainers - Duplex (All Sizes), Overhaul
89WORK ITEM 23: Rudder Assembly; Remove, Inspect and Reinstall
95WORK ITEM 24: Rudder(s), Preserve (“100%”)
97WORK ITEM 25: Rudder Stock Bearings Clearances, Check
101WORK ITEM 26: Rudder Stock, Rebuild
104WORK ITEM 27: Superstructure, Preserve “Partial”
109WORK ITEM 28: Cathodic Protection / Zinc Anodes, Renew
112WORK ITEM 29: Drydock
116WORK ITEM 30: Temporary Services, Provide - Cutter
119WORK ITEM 31: Bilges, Preserve
122WORK ITEM 32: Forward Starboard Side Stringers, Renew
124WORK ITEM 33: JP-5 Pump Room Stringers, Renew
127WORK ITEM 34: Engine Room Stringers and Plating, Renew
130WORK ITEM 35: Keel and Hull Plating, Renew
133WORK ITEM 36: Oily Water Holding Tank Striker Plate, Renew
135WORK ITEM 37: Fixed Ballast (Lead Ingots), Reinstall
144WORK ITEM 38: Compartment(s) Interior, Lead Dust, Clean
149WORK ITEM 39: Sea Trial Performance, Support, Provide
153WORK ITEM 40: Fathometer Transducer, Renew
157WORK ITEM 41: Propulsion Shaft Strut Bearing Housings, Inspect, (“A-Class”)
159WORK ITEM 42: Doppler Log Underwater Hull Fairing, Renew
161WORK ITEM 43: Stern Tube Interior Surfaces, Preserve 100%
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
| 07 JAN 19 |
| 1 |
| 17 |
| ADD GFE; |
ADD 3.1.1 CIR;
ADD 3.1.4 Interferences;
DELETE Sections 3.2.2 thru 3.2.4;
ADD Section 3.2.5.1 thru 3.2.5.6
| 07 JAN 19 |
| 1 |
| 18 |
| DELETE Work Item: Work covered in Work Item 17 |
| 07 JAN 19 |
| 1 |
| 19 |
| DELETE Sections 3.1.3.2 & 3.1.3.3; |
ADD Section 3.2.6 & 3.2.7
| 07 JAN 19 |
| 1 |
| 30 |
| Update Table 1 |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
“A” Class
“A-Class”
“B” Class
“B-Class”
Coast Guard Bill of Materials 618 WMEC 007, Rev J, Structural Modifications
Coast Guard Bill of Materials 618 WMEC 049, Rev J, Arrgt. Of Sounding Tubes & Air Escapes
Coast Guard Bill of Materials 618 WMEC 311, Rev C, Doppler Speed Log
Coast Guard Drawing 618 WMEC 085-162, Rev F, Docking Plan
Coast Guard Drawing 618 WMEC 085-162, Rev F, Docking Plan, (DILIGENCE)
Coast Guard Drawing 618 WMEC 085-192, Rev H, Docking Plan
Coast Guard Drawing 618 WMEC 101-001, Rev -, Structural Details Detail 1-21
Coast Guard Drawing 618 WMEC 111-001, Rev G, Shell Expansion Framing & C.V.K.
Coast Guard Drawing 618 WMEC 111-001, Rev G, Shell Expansion Framing & CVK
Coast Guard Drawing 618 WMEC 117-001, Rev H, Transverse Web Frames Fwd and Aft of Midship
Coast Guard Drawing 618 WMEC 117-003, Rev -, Midship and Type Sections
Coast Guard Drawing 618 WMEC 122-001, Rev J, Transv. WT Bulkheads Fwd & Aft of Midship
Coast Guard Drawing 618 WMEC 123-003, Rev G, Lube Oil, Dirty Oil, & Diesel Oil Overflow Tanks Structural Details
Coast Guard Drawing 618 WMEC 152-001, Rev N, Superstructure Aircastle, 01 & 02 Deckhouse
Coast Guard Drawing 618 WMEC 152-1, Rev N, Superstructure – Aircastle, 01 and 02 Deckhouse and Stack
Coast Guard Drawing 618 WMEC 161-001, Rev B, Arrg’t & Details Stern Tube & Strut (NOTE: For purpose of bid, Contractor shall assume rope guards are welded in.)
Coast Guard Drawing 618 WMEC 161-1, Rev B, Arrangement and Details Stern Tube and Strut
Coast Guard Drawing 618 WMEC 184-004, Rev D, Doppler Log Sea Valve Foundation
Coast Guard Drawing 618 WMEC 184-004, Rev D, Doppler Sea Log Valve Foundation
Coast Guard Drawing 618 WMEC 184-4, Rev D, Doppler Log Sea Valve Foundation
Coast Guard Drawing 618 WMEC 191-001, Rev E, Solid Ballast Arrangement
Coast Guard Drawing 618 WMEC 201-003, Rev C, Arrangement of Aux Machinery Room
Coast Guard Drawing 618 WMEC 201-003, Rev C, Arrangement of Auxiliary Machinery Room
Coast Guard Drawing 618 WMEC 243-002, Rev G, Arrangement and Details of CPP Piping and Hydraulics
Coast Guard Drawing 618 WMEC 243-002, Rev H, Arrangement & Details of Piping & Hydraulics
Coast Guard Drawing 618 WMEC 243-050, Rev-, Hub Oil Tank 10 Gal. Cap.
Coast Guard Drawing 618 WMEC 243-050, Rev-, Hub Oil Tank
Coast Guard Drawing 618 WMEC 243-1, Rev E, A&D John Crane Stern Tube System
Coast Guard Drawing 618 WMEC 243-1, Rev E, A&D: John Crane Stern Tube System
Coast Guard Drawing 618 WMEC 243-2, Rev H, Arrangement & Details of Piping & Hydraulics
Coast Guard Drawing 618 WMEC 243-5, Rev C, Piping Mod – Water Lubricated Stern Tube Seal
Coast Guard Drawing 618 WMEC 243-51, Rev-, John Crane Seal
Coast Guard Drawing 618 WMEC 243-51, Rev-, John Crane Seal
Coast Guard Drawing 618 WMEC 243-52, Rev-, Reduction Gear Coupling
Coast Guard Drawing 618 WMEC 244-001, Rev B, Shafting Alignment
Coast Guard Drawing 618 WMEC 244-003, Rev F, Shafting Arrangement & Details (Water Lubricated Bearing)
Coast Guard Drawing 618 WMEC 244-003, Rev G, Shafting Arrangement & Details (Water Lubricated Bearing)
Coast Guard Drawing 618 WMEC 244-004, Rev A, Shafting Alignment (RELIANCE)
Coast Guard Drawing 618 WMEC 244-1, Rev B, Shafting Alignment
Coast Guard Drawing 618 WMEC 244-3, Rev G, Shafting Arrangement & Details (Water Lubricated Bearing)
Coast Guard Drawing 618 WMEC 244-3, Rev G, Shafting Arrangement and Details (Water Lubricated Bearings)
Coast Guard Drawing 618 WMEC 245-052, Rev -, Propeller Hub Double Crank
Coast Guard Drawing 618 WMEC 424-050, Rev -, Doppler Log System Schematic, Wiring & Installation Details Model TSM 5721 (Thomson – CSF)
Coast Guard Drawing 618 WMEC 424-50, Rev-, Doppler Log System Schem, Wrg & Inst. DET
Coast Guard Drawing 618 WMEC 506-002, Rev K, Arrgt. Of Sounding Tubes & Air Escapes
Coast Guard Drawing 618 WMEC 521-003, Rev H, Arrangement of Firemain, Sprinkling and Washdown System 2nd Dk. & Below
Coast Guard Drawing 618 WMEC 521-003, Rev J, Arr of Firemain, Sprinkling & Washdown 2nd Dk. & Below
Coast Guard Drawing 618 WMEC 535-002, Rev J, Arrgt - Steam Feed & Condensate System Piping
Coast Guard Drawing 618 WMEC 535-002, Rev K, Arrangement of Stm., Feed & Condensate System Piping
Coast Guard Drawing 618 WMEC 562-001, Rev G, Arrg’t & Details Rudder Stocks, Bearings, & Stuffing Box
Coast Guard Drawing 618 WMEC 562-001, Rev G, Arrgt & Details Rudder Stock, Bearings & Stuffing Box
Coast Guard Drawing 618 WMEC 562-001, Rev G, Arrgt & Details Rudder Stocks, Bearings, & Stuffing Box
Coast Guard Drawing 618 WMEC 601-001, Rev H, Outboard Profile
Coast Guard Drawing 618 WMEC 601-003, Rev K, General Arrangement – Second and Third Decks
Coast Guard Drawing 618 WMEC 601-1, Rev E; Outboard Profile
Coast Guard Drawing 618 WMEC 801-008, Rev -, Curves of Form
Coast Guard Drawing 618 WMEC 85-181, Rev D; Booklet Of General Plans
Coast Guard Drawing 618-WMEC 633-001, Rev A; Major Maintenance Availability Hull Protectors
Coast Guard Drawing 618-WMEC-111-001, Rev G; Shell Expansion Framing & CVK
Coast Guard Drawing 618-WMEC-191-001, Rev E; Solid Ballast Arrangement
Coast Guard Drawing 627 WMEC 103-006, Rev -, Inboard Profile
Coast Guard Drawing 627 WMEC 111-001, Rev A, Shell Expansion Framing & CVK
Coast Guard Drawing 627 WMEC 191-001, Rev G, MMA Solid Ballast Arrangement
Coast Guard Drawing 627 WMEC 191-002, Rev -, Fixed Ballast Arrangement
Coast Guard Drawing 627 WMEC 562-003, Rev A, “A” & “B” Class Rudder Construction
Coast Guard Drawing 627 WMEC 562-003, Rev A, Rudder Construction NSN 2040-01-336-6545
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 3231, Feb 2012, SWBS 245, Revised by CG Yard in MMA Project, Instruction Book for LIAAEN Controllable Pitch Propeller Double Crank
Coast Guard Technical Publication (TP) 3231A, Feb 2012, Manufacturer’s Instruction Book-SWBS Group(s) 242-245, Chapter 243, Section B, Stern Tube Seal, MX9, US-71736 (S/A 210R-A-021)
Coast Guard Technical Publication (TP) 3231A, Sep2014, Manufacturer’s Instruction Book, SWBS Group(s) 242-245, 210’ WMEC Class Cutters, SWBS 245, Section A, Instruction Book, LIAAEN Controllable Pitch Propeller Double Crank for 210’ U.S. Coast Guard Medium Endurance Vessel, Revised by USCG Yard for 210’ MMA Project (“A” Class)
Coast Guard Technical Publication (TP) 3231A, Sept 2014, Manufacturers Instruction Book - SWBS Group(s) 242-245
Coast Guard Technical Publication (TP) 3231A, Sept 2014, SWBS 245, Section A, Controllable Pitch Propeller Double Crank, Liaaen
Coast Guard Technical Publication (TP) 3446, May 2013, Doppler Speed Log, Model SRD-500 Dual Axis
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses
Surface Forces Logistics Center Standard Specification 8636, (SFLC Std Spec 8636), 2014, Temporary Hull Accesses.
OTHER REFERENCES
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
ASTM International (ASTM) A36, 2008, Standard Specification for Carbon Structural Steel
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D4174, R2015, Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems
ASTM International (ASTM) D4174, Re-approved 2005, Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart Z, 1910.1025, 2011, Toxic and Hazardous Substances-Lead
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-Petrolatum
Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert
Federal Specification (Fed Spec) QQ-L-171, Mar 1988, Lead Pig
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for Coding Level of Contamination by Solid Particles
International Standard Organization (ISO) 4406, 2017, Hydraulic Fluid Power – Fluids – Method for Coding the Level of Contamination by Solid Particles – Third Edition
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness.
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
MIL-PRF-24647, Apr 2013, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-2191, Nov 1992, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
MIL-STD-2199A(SH), July 2010, Covering for Waterborne Main Propulsion Shafting on U.S. Naval Surface Ships and Submarines
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Jan 2006, Chapter 16, Cofferdams
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Jan 2011, Chapter 16, Cofferdams
ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual
Raytheon V850 Color Echosounder, 2nd Edition, Mar 1993, Operation Manual
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification SSPC-SP 11, 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE), 2007, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 10 |
| Y |
| **Propeller shaft |
| NSN: 2010-01-459-5795 |
| 2 ea. |
| 42,000.00 |
| 10 |
| N |
| Hub Installation Kit |
| NSN: 2010-01-630-1155 |
PN: 13527-CK (PSI)
| 2 ea. |
| 1,200.00 |
| 11 |
| Y |
| **Line Shaft |
| NSN: 2010-01-459-5795 |
| 2 ea. |
| 10,000.00 |
| 15 |
| N |
| Overhaul kit |
| PN: 210A-JCL001228001B |
| 2 ea. |
| 3,000.00 |
| 15 |
| Y |
| **Seal Assy |
| NSN: MX9 US-71736 |
| 2 ea. |
| 24,000.00 |
| 15 |
| N |
| **Seal, Seat Assy |
| NSN: 2010-01-361-7722 PN: H48626A03 |
| 2 ea. |
| 1,200.00 |
| 16 |
| N |
| Aft strut bearing (PN: PIECE #1) |
| NSN: 3120-01-233-3262 PN: 615WPC-4302-1 |
| 2 ea. |
| 5127.00 |
| 16 |
| N |
| Intermediate strut bearing (PN: PIECE #2) |
| NSN: 3120-01-115-3451 PN: 615WPC-4302-1 |
| 2 ea. |
| 5821.00 |
| 17 |
| Y |
| **Port Propeller Blades (R/H) |
| NSN: 2010-00-906-6009 |
| 1 set |
| 33,090.26 |
| 17 |
| Y |
| **Starboard Propeller Blades (L/H) |
| NSN: 2010-00-906-6010 |
| 1 set |
| 33,090.26 |
| 17 |
| N |
| **Propeller Blade Bolts |
| NSN: 5306-01-201-0438 |
| 48 ea. |
| 1,900.02 |
| 17 |
| N |
| Propeller Blade Bolt Washers |
| NSN: 5306-01-517-0914 |
| 48 ea. |
| 278.02 |
| 17 |
| N |
| Seal for Prop Blade |
| P/N: 13369-A |
| 8 ea. |
| 1,155.00 |
| 17 |
| N |
| Servo Box seal kit (NOTE: Parts may require machining for proper fit.) |
| NSN: 5330-01-476-2026 |
| 1 ea. |
| 850.00 |
| 18 |
| N |
| Servo Box seal kit (NOTE: Parts may require machining for proper fit.) |
| NSN: 5330-01-476-2026 |
| 1 ea. |
| 850.00 |
| 18 |
| N |
| Servo Box seal |
| P/N: 9891-LUP |
| 1 ea. |
| 25.00 |
| 19 |
| Y |
| **Hub Assembly (R/H) |
| NSN: 2010-01-141-3494 |
| 1 ea. |
| 90,219.50 |
| 19 |
| Y |
| **Hub Assembly (L/H) |
| NSN: 2010-01-143-5217 |
| 1 ea. |
| 87,439.00 |
| 19 |
| N |
| **Hub Seal Kit |
| NSN: 2010-01-466-4894 P/N: 13338-SK D63/4 |
| 2 ea. |
| 6,524.50 |
| 19 |
| N |
| **Prop shaft flange D-63/4 screws |
| PN: 13382-A |
| 16 ea. |
| 1,200.50 |
| 20 |
| Y |
| ***Sperry SRD 500 Doppler speed log |
| NSN:5999-01-472-7499 |
| 1 ea. |
| 16,504.00 |
| 21 |
| N |
| Valve, Gate |
| 4820-00-463-2191 |
| 2 |
| $2,577.28 |
| 23 |
| N |
| Upper Roller Bearing Assembly |
| NSN: 3110-01-080-0814 |
| 2 ea. |
| 2,300.00 |
| 23 |
| N |
| Lower Micarta Split Bearing Assembly (9-3/8"ID x 10-1/8"OD x 14" Lg) |
| NSN: 3120-01-148-3763 |
| 2 ea. |
| 2,429.00 |
| 23 |
| N |
| **Rudder stock sleeve |
| NSN: 2040-01-653-9587 |
| 2 ea. |
| 4,429.00 |
| 29 |
| Y |
| *Transducer Cover Plate |
| N/A |
| 3 ea. |
| 50.00 |
| 40 |
| N |
| *** Fathometer Transducer, Shallow Water, 50-200 kHz (Airmar Technology SS505) (without adapter plate) |
| NSN: 5845-01-470-2500 |
| 1 ea. |
| 346.83 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 1 |
| Hull Plating (U/W Body), Ultrasonic Testing |
| 2 |
| U/W Body, Preserve (100%) |
| 4 |
| Appendages (U/W), Leak Test |
| 7 |
| Voids (Non-Accessible), Leak Test |
| 10 |
| Propulsion Shafting; Remove, Inspect, and Reinstall |
| 11 |
| Propulsion Intermediate/Line Shafts, Inspect |
| 14 |
| Propulsion Shafting, Optical Or Laser Alignment Check |
| 15 |
| Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew |
| 16 |
| Propulsion Shaft Bearings (External), Renew |
| 17 |
| Controllable Pitch Propeller (CPP) System, Inspect and Service |
| 22 |
| Sea Strainers - Duplex (All Sizes), Overhaul |
| 23 |
| Rudder Assembly; Remove, Inspect and Reinstall |
| 25 |
| Rudder Stock Bearings Clearances, Check |
| 36 |
| Oily Water Holding Tank Striker Plate, Renew |
Principal Characteristics
210' WMEC (A-Class)
Physical
| Length overall |
| 210' 6" |
| Length between perpendiculars |
| 200' 0" |
| Beam molded |
| 34' 0" |
| Depth molded, main deck amidships |
| 19' 6" |
| Full load displacement |
| 1,170 long tons |
Draft, full load to baseline amidships
*Baseline is 9” below keel amidships 12' 0"
| Design drag between perpendiculars |
| 1' 6" |
Highest projection above baseline
*VHF-FM ADF antenna 90' 0"
| Shore tie voltage requirements |
| 400A / 440V |
| Frame spacing |
| 1' 0" |
Machinery
| Main propulsion |
| 2 ALCO Model 16-251-CE Diesel Engines, |
5,000 BHP total
| Ship's service generators |
| 2 Caterpillar Model 3406B Diesel-driven SR4, |
250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle
| Emergency generator |
| Caterpillar Model 3306B Diesel-driven SR4, |
180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle
| Number of propellers |
| 2 |
| Propeller diameter |
| 7' 6" |
| Number of blades, Each |
| 4 |
| Pitch |
| Controllable |
| Shaft RPM |
| 300 |
| Shaft diameter |
| 8.25" at exit of hull |
| Anchor & chain |
| Two 2,800 lb Navy Stockless Anchors, |
7 shots of chain each
Tank Capacities
| Diesel fuel total (95%) |
| 47,140 gal. |
| Fresh water total (100%) |
| 11,135 gal. |
| JP-5 fuel total (95%) |
| 4,717 gal. |
| Lube oil total (95%) |
| 2,331 gal. |
00000_0917_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
· Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3: SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.1.5 SFLC Std Spec 6310, page Appendix C-8, Under "Epoxy/Primer/Mid-Coat", add line Column 2: International Intergard 264. Column 3: Various. Under "Polysiloxane", add line Column 2: International Interfine 979. Column 3: Various.
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
| Date |
| Test Locations |
| Conductivity (Microsiemens/CM) |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
11010_UT_0617_FLT
REC_11010_UT_FLT_210’ WMEC ‘A’ Class (CONFIDENCE) (1215) WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to conduct ultrasonic testing (UT) of U/W hull plating.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 618 WMEC 111-001, Rev G, Shell Expansion Framing & C.V.K.
Coast Guard Drawing 618 WMEC 085-192, Rev H, Docking Plan
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
· 3.2 (UT measurements).
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 UT measurements. The Contractor shall perform a total of 1000 UT measurements of U/W hull surfaces, in locations designated by the Coast Guard Inspector, using Coast Guard Drawings 618 WMEC 085-192 and 618 WMEC 111-001. for guidance, in accordance with SFLC Std Spec 0740, Appendix C. Mark up a copy of Coast Guard Drawing 618 WMEC 111-001 to show all locations selected for measurement and record all measurements in Table I (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit A CIR, to also include the marked up drawing and completed Table I.
4. NOTES
4.1 UT Table. Table 1 provided below is for the recording of all UT measurements.
Table 1 - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL
| SHOT # |
| STRAKE # |
| FWD/MID/AFT |
| ORIG PL |
| MEASURED PL |
| PERCENT |
| PLATE # |
| TOP/MID/BOT |
| THICKNESS |
| THICKNESS |
| WASTAGE |
63130_0617_FLT
REC_63130_100Percent_FLT_210' WMEC (“A” Class) (0416)
WORK ITEM 2: U/W Body, Preserve (100%)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve U/W body surfaces.
NOTES
1. The purpose of the preservation tasks covered by this item is to completely remove all existing coatings and recoat the U/W body surfaces with a new coating system.
2. U/W body surfaces are as defined in 4.1 (Definitions) and exclude areas covered by docking blocks, unless the vessel is fleeted for the express purpose of preserving blocked areas.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 618 WMEC 601-001, Rev H, Outboard Profile
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
· 3.2.3 Post-surface preparation cleaning and inspection
3.1.2 Tech Rep. The Contractor shall refer to SFLC Std Spec 0000, paragraphs 3.2.4.2.1 (Painting contractor certification program requirement) and 3.2.4.2.2 (Coating Tech Rep), for applicable requirements.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. Specific areas/equipment/components to be protected include, but are not limited to:
· All scuppers and overboard discharges.
· Waterline area where U/W body coating system interfaces with freeboard coating system (unless freeboard surfaces are also being preserved).
· Fathometer transducer surfaces.
· Sea valve openings.
· Propeller shaft bearings and seals.
· Rudder bearings.
· Propellers.
· Zinc anodes (unless anodes are being renewed).
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
· Sea chest grating.
· Fathometer Transducers
· Doppler Speed Log
NOTE
The hull fairings are not to be removed simply as an interference for 100% near white blasting unless found to be failing.
3.1.5 Initial inspection. Prior to removing the existing coating system, the Contractor shall inspect and verify whether all draft marks have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.
3.1.5.1 Fairing inspection. Prior to preservation preparation, inspect hull fairing condition. Submit a CFR.
3.1.6 Water used in preparation and washing procedures. The Contractor shall ensure that water used in all surface preparation tasks, including pre-surface preparation wash and water jetting, is of sufficient purity and quality that it does not prevent the surface being cleaned from achieving the required degree of surface cleanliness or non-visible contamination criteria.
3.1.6.1 Ensure that surface preparation water does not contain sediments or other impurities that are destructive to the proper functioning of the cleaning equipment.
3.1.6.2 Ensure that all water used in any surface preparation or cleaning procedures is captured, contained, and all spent water disposed of in accordance with all Federal, state and local regulations.
3.1.7 Surface preparation optional methods. The Contractor has the option of using either high/ultrahigh pressure water jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.2 (Preservation requirements). The Contractor may add abrasives to the water jet stream, for one or both of the following reasons:
· Achieving greater productivity.
· Achieving the required surface profile.
NOTES
1. Existing coating system on the U/W body surfaces may have a nominal thickness in excess of that which was originally installed, because of “patch-coats” applied during past drydock availabilities.
2. Water jetting without abrasive addition does not provide any additional…