ATTACHMENT-3

Technical Evaluation Factors

USCGC SEA OTTER 87362 FY19 DD Contract

*Submit all Technical Evaluation Factor information as a separate attachment with your quote.

1. General Technical Approach

Submit a brief overview planning document in accordance with SFLC Std Spec

0000, that outlines the strategy for ensuring that this requirement is completed on or before the contract completion date. The planning document shall include at least:

1) Proposed schedule, resources, completion-dates, float, and major millstones for the various tasks required to complete this contract and

2) Identify a list of items that may pose the most contract schedule risk and approach to mitigate or eliminate each risk.

2. Welding Welding Certifications/Procedures

Submit welding documentation (e.g. WPSs, welder certs, etc.) in accordance with

SFLC Standard Specification 0740, specific to your internal or subcontracted staff for the weld joints that will be installed.

3. Preservation Coatings Certification Requirements

Submit a description of how you intend to meet SFLC Standard Specification

6310 and 0000 coatings QC/QA requirements for this contract. This plan must include the names of any subcontractors and resumes for any proposed QP1 certified painters and/or independent NACE CIP Level 3 inspectors.

4. HVAC Repairs Environmental Protection Compliance Submit documentation of Environmental Protection Agency (EPA) certification for each servicing technician IAW SFLC Standard Specification 0000, Appendix

A & B (e.g. résumé w/photo-copy of cert card, etc.).

5. Sewage and/or Grey Water Cleaning Sewage and Grey Water System Cleaning Procedures Submit a description of the methods that will be employed to clean the sewage and grey water system piping and tanks (e.g. chemical cleaning, pressure washing, etc.) and if applicable, a description of the subcontracting plan.

ATTACHMENT-3

Technical Evaluation Factors

USCGC SEA OTTER 87362 FY19 DD Contract

*Submit all Technical Evaluation Factor information as a separate attachment with your quote.

6. Dry Dock Dry Dock Certifications Submit all documents specified under “3.5.1 Pre-award events” in SFLC Standard

Specification 8634 (e.g. dry dock facility certifications, pre-award calculations, etc.).