ATTACHMENT-1 SCHEDULE
| ATTACHMENT-1 PRICING SCHEDULE FOR: | ||||||
| USCGC SEA OTTER (WPB-87) DRYDOCK AVAILABILITY FY2019 | ||||||
| AFC | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 45 | D-001 | Structural Analysis, 3D Laser Scan, Perform | JOB | 1 | $0.00 | |
| 45 | O-002 | Ultrasonic Thickness Measurements, Perform | JOB | 1 | $0.00 | |
| 45 | D-003 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| 30 | D-004 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | |
| 45 | D-005 | Tank, Dirty Oil, Clean And Inspect | JOB | 1 | $0.00 | |
| 45 | D-006 | Tank, Oily Water, Clean And Inspect | JOB | 1 | $0.00 | |
| 45 | D-007 | Tanks (Mp Fuel Service), Clean And Inspect | JOB | 1 | $0.00 | |
| 30 | D-008 | Decks, Exterior (Main Deck), Preserve | JOB | 1 | $0.00 | |
| 45 | D-009 | Capastic Fairing, Depth Sounder, Renew | JOB | 1 | $0.00 | |
| 30 | D-010 | Mast, Preserve 100% | JOB | 1 | $0.00 | |
| 45 | D-011 | Main Engine/Reduction Gear, Realign | JOB | 1 | $0.00 | |
| 45 | D-012 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $0.00 | |
| 45 | D-013 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $0.00 | |
| 45 | D-014 | Intermediate Bearing Carriers, Renew | JOB | 1 | $0.00 | |
| 45 | D-015 | Aft Bearing Carriers, Renew | JOB | 1 | $0.00 | |
| 45 | D-016 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $0.00 | |
| 45 | D-017 | Propellers, Renew | JOB | 1 | $0.00 | |
| 45 | D-018 | Speed Log, Skin Valve, Renew | JOB | 1 | $0.00 | |
| 45 | D-019 | Sea Water System, Perform Maintenance | JOB | 1 | $0.00 | |
| 45 | D-020 | Rudder Assemblies, Renew | JOB | 1 | $0.00 | |
| 45 | D-021 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | $0.00 | |
| 45 | D-022 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| 45 | D-023 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| 45 | D-024 | Grey Water Piping, Clean And Flush | JOB | 1 | $0.00 | |
| 45 | D-025 | Sewage Piping, Clean And Flush | JOB | 1 | $0.00 | |
| 30 | D-026 | Superstructure, Preserve “100%” | JOB | 1 | $0.00 | |
| 45 | D-027 | Cathodic Protection/Zinc Anodes, Renew | JOB | 1 | $0.00 | |
| 45 | D-028 | Drydock | JOB | 1 | $0.00 | |
| 45 | D-029 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| 45 | D-030 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| 45 | D-031 | Windows, Pilothouse, Renew | JOB | 1 | $0.00 | |
| 30 | D-032 | Pilothouse Deck, Inspect and Preserve | JOB | 1 | $0.00 | |
| 45 | D-033 | Seawater Valves, Renew | JOB | 1 | $0.00 | |
| 45 | D-034 | HVAC Air Intake Box, Renew | JOB | 1 | $0.00 | |
| 45 | D-035 | Platform Framing, Renew | JOB | 1 | $0.00 | |
| 45 | D-036 | Sea Chest Fasteners, Renew | JOB | 1 | $0.00 | |
| 45 | D-037 | Foundation, Anchor Windlass, Renew | JOB | 1 | $0.00 | |
| 45 | D-038 | HVAC Piping “Tree”, Renew | JOB | 1 | $0.00 | |
| 45 | D-039 | Deck Penetration, Electrical, Renew | JOB | 1 | $0.00 | |
| TCTO | D-040 | Main Mast, Modify | JOB | 1 | $0.00 | |
| TCTO | D-041 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | |
| TCTO | D-042 | Oily Water Separator, Remove | JOB | 1 | $0.00 | |
| TCTO | D-043 | Propulsion Shafts, Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 650 | $0.00 | ||
| D-00B | GFP Report | NSP | EA | NSP | ||
| O-00Z | Laydays | Day | 5 | $0.00 | ||
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
&C(10/16/2018) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 1 | 62 | Baltimore, MD | ||||||||||||||||||||||
| O-002 | 1 | 52 | Biloxi, MS | |||||||||||||||||||||
| 1 | 56 | Boston, MA | ||||||||||||||||||||||
| 1 | 50 | Charleston, SC | ||||||||||||||||||||||
| 1 | 60 | Corpus Christi, TX | ||||||||||||||||||||||
| 1 | 51 | Hampton Roads | ||||||||||||||||||||||
| 1 | 64 | Honolulu, HI | ||||||||||||||||||||||
| 1 | 55 | Houston, TX | ||||||||||||||||||||||
| 1 | 56 | Los Angeles, CA | ||||||||||||||||||||||
| 1 | 55 | Median Rate | ||||||||||||||||||||||
| 1 | 49 | Miami | ||||||||||||||||||||||
| 1 | 50 | Narragansett Bay, RI | ||||||||||||||||||||||
| 1 | 55 | New London, CN | ||||||||||||||||||||||
| 1 | 45 | New Orleans | ||||||||||||||||||||||
| 1 | 62 | NYNY | ||||||||||||||||||||||
| D-016 | 1 | 60 | Philadelphia, PA | |||||||||||||||||||||
| D-017 | 1 | 51 | Portland, ME | |||||||||||||||||||||
| D-018 | 1 | 57 | Portland, OR | |||||||||||||||||||||
| D-019 | 1 | 55 | San Diego, CA | |||||||||||||||||||||
| D-020 | 1 | 67 | San Francisco, CA | |||||||||||||||||||||
| D-021 | 1 | 55 | Santa Barbara, CA | |||||||||||||||||||||
| D-022 | 1 | 55 | SE North Carolina | |||||||||||||||||||||
| D-023 | 1 | 65 | Seattle, WA | |||||||||||||||||||||
| D-024 | 1 | 48 | Tampa-St. Petersburg | |||||||||||||||||||||
| D-025 | 1 | 60 | Wilmington, DE | |||||||||||||||||||||
| D-026 | 1 | |||||||||||||||||||||||
| D-027 | 1 | |||||||||||||||||||||||
| D-028 | 1 | |||||||||||||||||||||||
| D-029 | 1 | |||||||||||||||||||||||
| D-030 | 1 | |||||||||||||||||||||||
| D-031 | 1 | |||||||||||||||||||||||
| D-032 | 1 | |||||||||||||||||||||||
| D-033 | 1 | |||||||||||||||||||||||
| D-034 | 1 | |||||||||||||||||||||||
| D-035 | 1 | |||||||||||||||||||||||
| D-036 | 1 | |||||||||||||||||||||||
| D-037 | 1 | |||||||||||||||||||||||
| D-038 | 1 | |||||||||||||||||||||||
| D-039 | 1 | |||||||||||||||||||||||
| D-040 | 1 | |||||||||||||||||||||||
| D-041 | 1 | |||||||||||||||||||||||
| D-042 | 1 | |||||||||||||||||||||||
| D-043 | 1 | 49 | Panama City, FL |