USCGC MOHAWK (FY19 DS1) (WMEC 913)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2019

Developed By: Mark C Rawls

(Rev-0, 19 February 2019)

USCGC MOHAWK (WMEC-270B) DOCKSIDE AVAILABILITY FY2019

ii (Rev-1)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items ............................................................................................. ix Principal Characteristics ................................................................................................................................ x General Requirements WORK ITEM 01: SW Heat Exchangers, Clean, Inspect, and Hydrostatically Test (“B-Class”) WORK ITEM 02: Chill Water and Heat System, Clean and Flush WORK ITEM 03: Hot Water Accumulator Tanks, Clean, Inspect, and Hydrostatically Test WORK ITEM 04: Tank (Potable Water Pneumatic); Clean, Inspect, and Test WORK ITEM 05: Padeyes, Inspect and Test (“B-Class”)

WORK ITEM 06: REMOVED

WORK ITEM 07: Piping (Sewage), Clean and Flush WORK ITEM 08: Tanks (Grey Water Holding), Clean and Inspect WORK ITEM 09: Tanks (Sewage Vacuum Collection and Holding), Clean and Inspect WORKITEM 010: One-Step Deck Covering, Renew (NCWR 20180061, 20180051, and 2080055) WORK ITEM 011: Electrical Grade Sheet (Dielectric) Deck Covering, Renew (NCWR 20180052) WORK ITEM 012: Sewage Discharge and Transfer Pumps, Renew WORK ITEM 013: Tanks (Sewage Holding 3-82-0-E), Preserve “100%” (NCWR 20180048) WORK ITEM 014: Auxiliary Sea Water System Valves and Piping, Renew (NCWR 20180074) WORK ITEM 015: Auxiliary Sea Water System Valves, Renew (NCWR 20180047) WORK ITEM 016: Compressed Air System Valves and Piping, Renew (NCWR 20180058) WORK ITEM 017: Flight Deck Drain, Renew (NCWR 20170057) WORK ITEM 018: Bilges, Preserve (NCWR 20170054) WORK ITEM 019: Sea Strainers (All Sizes), Overhaul/Renew (NCWR 20180056) WORK ITEM 020: Appleton FB 20-21 Single Point Davit (SPD), Renew WORK ITEM 021: Fantail Deck, Preserve (NCWR 20180054) WORK ITEM 022: OTHB Fueling Station Pump Relief Valve, Replace (TCTO TM4070) WORK ITEM 023: Fire Hose Stations, Modify (TCTO TM2040) WORK ITEM 024: Hydraulic Oil Purifier, Remove (TCTO TM2020) WORK ITEM 025: Oily Water Separator, Replace (TCTO TM2020) WORK ITEM 026: Refrigerant Leak Detection System (Dry Stores), Upgrade (TCTO TE7030) iii (Rev-1)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

19 FEB 2019 1 06 Removed from the spec

19 FEB 2019 1 02 Added a lot of additional CMPTS to cool

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-1)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

“A-Class”

“B-Class”

«APPDOCS»

Coast Guard Drawing 618 WMEC 533-001, Rev L, Diag Hot & Cold Potable Water

Coast Guard Drawing 627 WMEC 533-001, Rev E, Diag Hot & Cold Potable Water Systems

Coast Guard Drawing 901 WMEC 162-001, Rev I, Stacks

Coast Guard Drawing 901 WMEC 259-001, Rev G, Diesel Exhaust System Diagram

Coast Guard Drawing 901 WMEC 259-002, Rev K, Diesel Exhaust System Arrangements & Details

(A&D)

Coast Guard Drawing 901 WMEC 505-007, Rev F, Piping System Cleaning and Flushing Procedures

Coast Guard Drawing 901 WMEC 514-001, Rev K, HVAC System Diagram

Coast Guard Drawing 901 WMEC 514-020, Rev J, CHW & HW System Diagram

Coast Guard Drawing 901 WMEC 514-021, Rev K, CHW & HW Sys Mchry Sps – A&D

Coast Guard Drawing 901 WMEC 514-022, Rev K, CHW & HW Pipe Sys Mn Dk & Blw A&D

Coast Guard Drawing 901 WMEC 514-024, Rev K, CHW & HW Pipe Sys 01 Lvl & Abv – A&D

Coast Guard Drawing 901 WMEC 533-003, Rev N, Potable Water Brominator System Diagram

Coast Guard Drawing 901 WMEC 588-10, Rev G, Hangar Arr and Det

Coast Guard Drawing 901 WMEC 588-11, Rev F, Hangar Electric Wiring Assembly

Coast Guard Drawing 901 WMEC 593-004, Rev H, Sewage Transfer System, Arrangement and Details

Coast Guard Drawing 901 WMEC 593-005, Rev H, Sewage Vacuum System Diagram

Coast Guard Drawing 901 WMEC 593-006, Rev J, Sewage Vacuum System Below Main Deck

Arrangement and Details

Coast Guard Drawing 901 WMEC 593-006, Rev J, Sewage Vacuum System Below Main Deck

Coast Guard Drawing 901 WMEC 593-007, Rev F, Sewage Vacuum System Above Main Deck

Arrangement and Details

Coast Guard Drawing 901 WMEC 593-007, Rev F, Sewage Vacuum System, Main Deck and Above –

A&D

Coast Guard Drawing 901 WMEC 801-003, Rev H, General Arrangement-02/Pilothouse & Above

Coast Guard Drawing 901 WMEC 801-004, Rev H, General Arrangement-01 Level

Coast Guard Drawing 901 WMEC 801-005, Rev J, General Arrangement-Main Deck v (Rev-1)

Coast Guard Drawing 905 WMEC 111-003, Rev F, Shell Exp Fr 101-182

Coast Guard Drawing 905 WMEC 113-001, Rev C, Tank Top Pl & Fr Fwd Fr 101

Coast Guard Drawing 905 WMEC 113-003, Rev F, Tank Top Pltg & Framing Fr 101-182

Coast Guard Drawing 905 WMEC 136-002, Rev D, 01 Level Pl & Fr Aft 182

Coast Guard Drawing 905 WMEC 162-001, Rev B, Stacks

Coast Guard Drawing 905 WMEC 162-001, Rev B, Stacks

Coast Guard Drawing 905 WMEC 182-101, Rev C, Mn Eng & Rdcn Gear Fdn

Coast Guard Drawing 905 WMEC 201-001, Rev H, Engine Room Arrangement

Coast Guard Drawing 905 WMEC 256-001, Rev W, Main & Auxiliary Salt Water Cooling System

Diagram

Coast Guard Drawing 905 WMEC 256-004, Rev E, AMS SW Cooling Sys A&D

Coast Guard Drawing 905 WMEC 256-005, Rev C, Misc Equipment SW Cooling A&D

Coast Guard Drawing 905 WMEC 259-001, Rev D, Diesel Exhaust, Sheet 1

Coast Guard Drawing 905 WMEC 259-002, Rev C, Diesel Exhaust System A&D

Coast Guard Drawing 905 WMEC 259-002, Rev C, Diesel Exhaust, Arrangement

Coast Guard Drawing 905 WMEC 505-007, Rev J, Piping System Cleaning and Flushing Procedures

Coast Guard Drawing 905 WMEC 514-001, Rev F, HVAC System Diagram

Coast Guard Drawing 905 WMEC 514-020, Rev E, CHW & HW System Diagram

Coast Guard Drawing 905 WMEC 514-021, Rev C, CHW & HW Sys Mchry Sps – A&D

Coast Guard Drawing 905 WMEC 514-022, Rev B, CHW & HW Pipe Sys Mn Dk & Blw A&D

Coast Guard Drawing 905 WMEC 514-024, Rev B, CHW & HW Pipe Sys 01 Lvl & Abv – A&D

Coast Guard Drawing 905 WMEC 526-002, Rev B, Weather Deck Drains 01 Lvl & Abv, Arr & Det

Coast Guard Drawing 905 WMEC 533-003, Rev G, Potable Water Brominator System Diagram

Coast Guard Drawing 905 WMEC 551-001, Rev R, Compressed Air System Diagram

Coast Guard Drawing 905 WMEC 551-002, Rev E, Compressed Air Mchry Sp – A&D

Coast Guard Drawing 905 WMEC 588-10, Rev C, Hangar A & D

Coast Guard Drawing 905 WMEC 588-11, Rev C, Hangar Electr Wiring Assy

Coast Guard Drawing 905 WMEC 593-001, Rev C, Vacuum Flush Collection System Electrical

Schematic Diagram

Coast Guard Drawing 905 WMEC 593-001, Rev C, Vacuum Flush Collection System Electrical

Schematic Diagram

Coast Guard Drawing 905 WMEC 593-002, Rev A, Vacuum Sewage System Comp Installation A&D

Coast Guard Drawing 905 WMEC 593-003, Rev D, Sewage Transfer System Diagram

Coast Guard Drawing 905 WMEC 593-004, Rev D, Sewage Transfer System A&D

Coast Guard Drawing 905 WMEC 593-004, Rev D, Sewage Transfer System, Arrangement and Details

Coast Guard Drawing 905 WMEC 593-005, Rev B, Sewage Vacuum System Diagram

Coast Guard Drawing 905 WMEC 593-006, Rev F, Sewage Vacuum System Below Main Deck

Arrangement and Details

Coast Guard Drawing 905 WMEC 593-006, Rev F, Sewage Vacuum System Below Main Deck

Coast Guard Drawing 905 WMEC 593-007, Rev D, Sewage Vacuum System Above Main Deck

Arrangement and Details

Coast Guard Drawing 905 WMEC 593-007, Rev D, Sewage Vacuum System, Main Deck and Above –

A&D vi (Rev-1)

Coast Guard Drawing 905 WMEC 611-002, Rev G, Machinery Spaces Padeyes – A&D

Coast Guard Drawing 905 WMEC 611-003, Rev D, Padeyes Outside Machinery Spaces – A&D

Coast Guard Drawing 905 WMEC 635-001, Rev F, Hull Thermal & Acoustic Insulation A/D

Coast Guard Drawing 905 WMEC 801-003, Rev H, General Arrangement-02/Pilothouse & Above

Coast Guard Drawing 905 WMEC 801-004, Rev E, General Arrangement-01 Level

Coast Guard Drawing 905 WMEC 801-005, Rev J, General Arrangement-Main Deck

Coast Guard Drawing 905 WMEC 801-006, Rev D, General Arrangement 1st Platform

Coast Guard Drawing 905 WMEC 801-007, Rev E, General Arrangement Hold

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual

Coast Guard Technical Publication (TP) 2722, Jul 1997, Manufacturer’s Instruction Book, SWBS

Group(s) 588-593, SWBS 588, Telescopic Aluminum Helicopter Hangar Model No. 1230-4

Coast Guard Technical Publication (TP) 2815, July 2010, Reduction Gear

Coast Guard Technical Publication (TP) 2817, Apr 2008, Controllable Pitch Propeller System

Coast Guard Technical Publication (TP) 2820, Dec 2010, Ship Service Diesel Generator

Coast Guard Technical Publication (TP) 2837, Dec 2010, Manufacturer’s Instruction Book - SWBS

Group(s) 565-582

Coast Guard Technical Publication (TP) 2839, Jun 2007, Manufacturer’s Instruction Book, SWBS

Group(s) 588-593, SWBS 588, Section A, Telescope Aluminum Helicopter Hangar Model No.

1230-5

Coast Guard Technical Publication (TP) 2839, SWBS 593, Feb 2013, Sewage Holding System

Coast Guard Technical Publication (TP) 4647, Aug 2008, FM/ALCO 251 Engine – Operations and

Maintenance Manual

MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC

Electric Motors

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior

Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary

Hull Accesses

OTHER REFERENCES

«REF»

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities vii (Rev-1)

American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services

American Society for Testing and Materials (ASTM) International F992, 2017, Standard Specification for

Valve Label Plates

American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and

Welding End

American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and

Welding End

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health

Standards for Shipyard Employment

Commercial Item Description (CID) A-A-59588, Jul 2013, Rubber Silicone

DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems

Manufacturer’s Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing of Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72A, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves

MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP-1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 3 (SSPC-SP-3), 2004, Power Tool Cleaning viii (Rev-1)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

1 N MDE JW Seal Kit NSN: 2930-01-602-8570

P/N: KAM Thermal

Equipment LTD, 12-

1AEW SEAL

2 ea 1,250.00

1 N MDE JW Lantern

Ring

NSN: 4320-01-602-8545

P/N: Marmetal Industries, C46407511OD10ID

2 ea 500.00

1 N MDE LO Seal Kit NSN: 2930-01-602-8561

P/N: KAM Thermal

Equipment LTD, 12-

1AEW SEAL

2 ea 1,250.00

1 N MDE LO Lantern

Ring

NSN: 4320-01-602-8508

P/N: Marmetal Industries, C46407513OD12ID

2 ea 500.00

14 Y Sewage Discharge

Pump

NSN: 4320-01-131-0841 2 $4,719.00

14 Y Sewage Transfer

Pump

NSN: 4320-01-112-0008 2 $4,719.00

21 Y Davit, Single Point, Appleton FB 20-21

NSN: 3950-01-619-5772 1 ea. $86,888.24

21 N Hook Release NSN: 4030-01-467-1005 1 ea. 4,000.00

23 N Relief Valve NSN: 4820-01-653-3917 1 ea. 2,627.00

23 N Gaskets NSN: 5330-01-324-1054 1 set 10.00

26 N GEA Westfalia

BilgeMaster-E 500

Clean Design

PN: WSE 5-01-037 1 ea. 76,640.00

26 N ELWA Preheating

Unit

PN: KVE-45 1 ea. 15,000.00

26 N Duplex Strainer, Flanged

PN: ST053010BF11TS 1 ea. 3,209.97

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter ix (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5

(Inspection report particulars)):

Work

Item Title

3 Hot Water Accumulator Tanks, Clean, Inspect, and Hydrostatically Test x (Rev-1)

PRINCIPAL CHARACTERISTICS

270' WMEC (B-CLASS)

PHYSICAL

Length overall 270' 0"

Length between perpendiculars 255' 0"

Beam molded 38' 0"

Depth molded, main deck amidships, 01 level amidships

23' 7"

31' 4"

Full load displacement 1,886 long tons

Draft, full load to baseline amidships 14' 2"

Highest projection above baseline

*height approximated

≈ 110' 0"

Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase

Frame spacing 1' 0"

MACHINERY

Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,650 BHP each

Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475

KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle

Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle

Number of propellers 2

Propeller diameter 9' 0"

Number of blades, each 4

Pitch Controllable

Shaft RPM 260

Shaft diameter 10.55" at exit of hull

Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each

TANK CAPACITIES

Diesel fuel total (95%) 79,950 gal.

JP-5 total (95%) 19,626 gal.

Potable water total (100%) 8,553 gal.

Hydraulic & lube oil total (95%) 2,561 gal.

1 (Rev-1)

00000_0315_FLT

REC_00000_FLT_ MATOC Dockside (0515)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure NOTE: NAVSEA TP 1688 applies only to WMEC 270 “B-Class” cutters, HY-130 flight deck welding.

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

3.1.1 Interferences. The contractor shall be aware that the scope of work pertaining to each work item herein references known interferences to the extent practicable unless otherwise stated. Any additional work required for

2 (Rev-1) interference removal and reinstallation shall be addressed on the Schedule of Supplies and Services (Schedule B) for individual Task Orders as applicable.

3.1.2 Cutter class applicability. The contractor shall be aware that work items herein may pertain to a specific vessel class (“A-Class” or “B-Class”) or to a unique hull number. Where work items do not specify a specific cutter class or unique hull number, the work item is applicable to all WMEC 270 vessels. A listing of WMEC

270 vessels by name, hull #, and class is shown in Table 1 for general reference as follows:

TABLE 1 – WMEC 270 VESSELS

CUTTER NAME HULL # CLASS HOMEPORT

CGC BEAR 901 A Portsmouth, VA

CGC TAMPA 902 A Portsmouth, VA

CGC HARRIET LANE 903 A Portsmouth, VA

CGC NORTHLAND 904 A Portsmouth, VA

CGC SPENCER 905 B Boston, MA

CGC SENECA 906 B Boston, MA

CGC ESCANABA 907 B Boston, MA

CGC TAHOMA 908 B Kittery, ME

CGC CAMPBELL 909 B Kittery, ME

CGC THETIS 910 B Key West, FL

CGC FORWARD 911 B Portsmouth, VA

CGC LEGARE 912 B Portsmouth, VA

CGC MOHAWK 913 B Key West, FL

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec

0000, in accomplishing the following task:

• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two

Coast Guard fire watch personnel.

• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized

3 (Rev-1) coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes

(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740. For any and all welding of HY-130 the contractor shall be required to meet the requirements set forth in paragraphs 3.4.1 through 3.4.3 as follows:

3.4.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-

Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-

130.

3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-

Class” cutters, perform all welding and allied processes, and non-destructive testing/inspection (NDT/NDI) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.

3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-

Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in

NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding

Weldox 900 shall be considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at

Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC

Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable

4 (Rev-1)

Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

NOTE TO USCG A-TEAM PERSONNEL

Ensure the CG Base or Sector Environmental POC for this is actively engaged in the early planning for availability as necessary to ensure the Facility can accommodate the planned work.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility (USCG Activity

Generator Status) will be provided as-needed for the specific facility where work is to be accomplished. CG Base or Sector Environmental POC must provide these details.

3.5.1.2 Plans and permits. The CG Facility may have unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste

Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the

Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40

CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the

5 (Rev-1)

Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For

Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the

Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast

Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

6 (Rev-1)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name Hull # Work Item # Work Item Title

Location of Work (incl. frame #’s) Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down

(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.

threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector Signature Cert. # Date / Time

7 (Rev-1)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE &

TIME

ACTIVITY

(Surface preparation, primer coat, barrier coat, top coat, etc…)

LOCATION

(Frame & Deck, relation to equipment, etc.)

TEMPERATURE

% REL.

HUMID-

ITY DEW

PT.

SURFACE AMBIENT

ΔT

| DP -

Surface |

8 (Rev-1)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Location of Work (Frame References) Area (sqft)

SURFACE PREPARATION METHOD

PROFILE ACHIEVED (mils)

Min Max Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________

9 (Rev-1)

10 (Rev-1)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD

PROFILE ACHIEVED (mils)

Min Max Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):

_____ mils _____ mils _____ mils _____ mils _____ mils

11 (Rev-1)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15

DATE TEST LOCATIONS

CONDUCTIVITY

(microsiemens/cm)

12 (Rev-1)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Coating Mfg Product Name Batch # Induction

Time

Coating System Sequence

(Primer/Touchup/3rd Coat, etc.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL

READING (BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation

3 Before

Adjustments

After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation

3 Before

Adjustments

After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation

3 Before

Adjustments

After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled) Average DFT

13 (Rev-1)

WORK ITEM 01: SW Heat Exchangers, Clean, Inspect, and Hydrostatically Test (“B-Class”)

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect one or more of the following heat exchanger(s) as designated on individual Task Order(s):

SYSTEM LOCATION OEM / MODEL QTY

SSDG Lube Oil Engine Room Caterpillar, p/n 5R4255 2

SSDG Jacket Water Engine Room Caterpillar, p/n 4W4642 2

MDE Jacket Water Engine Room KAM Thermal, p/n BEW 12-112 2

MDE Lube Oil Engine Room KAM Thermal, p/n 12-116-1BEW 2

Reduction Gear Lube Oil Engine Room IRL Thermal, p/n 44248-5071 2

CPP Hydraulic Oil Engine Room ITT Standard, p/n 5-126-04-036-002 2

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST

($/UNIT)

N MDE JW Seal Kit NSN: 2930-01-602-8570

P/N: KAM Thermal Equipment

LTD, 12-1AEW SEAL

2 ea 1,250.00

N MDE JW Lantern Ring NSN: 4320-01-602-8545

P/N: Marmetal Industries, C46407511OD10ID

2 ea 500.00

N MDE LO Seal Kit NSN: 2930-01-602-8561

P/N: KAM Thermal Equipment

LTD, 12-1AEW SEAL

2 ea 1,250.00

N MDE LO Lantern Ring NSN: 4320-01-602-8508

P/N: Marmetal Industries, C46407513OD12ID

2 ea 500.00

NOTE TO PORT ENGINEER

Verify the dimensions of the seal immediately upon receipt. The standard size

O ring for the KAM Model 12116-1 BEW cooler is 3/8" x 12 3/4", p/n 12-1

PG, which is included in Kit 12-1AEW (2930-01-602-8561). Notify the PL if the seal is incorrect.

14 (Rev-1)

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 905 WMEC 201-001, Rev H, Engine Room Arrangement

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 2815, July 2010, Reduction Gear

Coast Guard Technical Publication (TP) 2817, Apr 2008, Controllable Pitch Propeller System

Coast Guard Technical Publication (TP) 2820, Dec 2010, Ship Service Diesel Generator

Coast Guard Technical Publication (TP) 2837, Dec 2010, Manufacturer’s Instruction Book -

SWBS Group(s) 565-582

Coast Guard Technical Publication (TP) 4647, Aug 2008, FM/ALCO 251 Engine – Operations and Maintenance Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses

OTHER REFERENCES

Commercial Item Description (CID) A-A-59588, Jul 2013, Rubber Silicone

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Technical representative.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the

Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 Install blanks on the open ends of piping to prevent any contamination or foreign debris from entering the affected systems. Ensure that all cleaning equipment or media used in the cleaning process do not cause any damage to cooler components.

15 (Rev-1)

3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph

3.3.5 (Interferences):

Piping and hoses.

Filters.

Deck plating and associated framing.

Electrical cables.

Thermal insulation.

3.1.5 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.

3.2 Environmental compliance. The Contractor shall dispose of all waste fluids in accordance with all

Federal, state and local regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.

3.3 Disassembly. The Contractor shall drain and disassemble the designated heat exchangers (see paragraph 1.1 (Intent)) to the extent necessary to perform all work specified herein. The Contractor shall unship and accomplish all cleaning and inspection at the Contractor’s facility. The Contractor shall machine the GFE lantern ring(s) to fit upon reinstallation. Refer to Coast Guard Drawing 905 WMEC

201-001 and TPs 2837A 2820A (Sections E and H), 4647 (Section A), 2815 (Section A) and 2817

(Section A) for guidance

3.3.1 The Contractor shall perform all disassembly and reassembly in accordance with manufacturer-recommended procedures using manufacturer-recommended tooling to ensure parts are reinstalled in proper sequence and configuration.

3.4 Inspection. Before cleaning is begun, the Contractor shall visually inspect all heat exchanger surfaces for excessive deterioration and any other defects. Submit a CFR.

3.5 Cleaning requirements. The Contractor shall clean all interior and exterior heat transfer surfaces to a state free of all debris, scale and surface contaminants in accordance with the heat exchanger manufacturer’s recommendations, and in compliance with all Federal, state, and local environmental regulations.

3.5.1 The Contractor shall ensure that chemical cleaners do not damage the environment, heat exchanger or the vessel.

NOTE

The Contractor shall be aware that historically chemical cleaning has been necessary to thoroughly clean most heat exchanger tubes.

3.6 Reassembly. After authorized repairs, if any, the Contractor shall reassemble each heat exchanger.

Renew all software (seals, gaskets, O-rings, lantern rings). Renew isolation fittings/mounts and fasteners if disturbed. Renew all hoses, thermostats and anodes as applicable. Apply silicone rubber sealant

16 (Rev-1) conforming to CID A-A-59588 around all fasteners, nozzles or gaskets that penetrate the hull. Refill all heat exchanger fluid levels in accordance with manufacturer and vessel specifications. Prior to recirculating through the engines, the Contractor shall test the jacket water for chloride and nitrite concentrations in accordance with manufacturer recommendations in the presence of the Coast Guard

Inspector. Submit a CFR.

3.7 Reinstallation. After completion of testing and all authorized repairs, if any, the Contractor shall reinstall each cooler (if previously removed). Where applicable, renew all zinc electrode plates, gaskets, and recessed hex-head bolts in accordance with the manufacturer's specifications. Apply a copper-based anti-seize compound on all bolts, and torque in accordance with manufacturer’s specifications.

3.8 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std

Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

3.9 Cleanliness requirement. The Contractor shall ensure that all cleaned surfaces are one hundred percent free of debris and surface contaminants.

CAUTION

Extreme precaution must be taken to not exceed manufacturer’s recommended test pressure during hydrostatic testing.

3.10 Pressure test. After all authorized work is complete and prior to reconnecting the heat exchanger(s), the Contractor shall pressure test each heat exchanger in the presence of the COR, in accordance with paragraph C2.7 (Heat exchangers and fluid coolers) of SFLC Std Spec 5000. Be aware that no leakage or permanent deformation of pressure-containing parts is permissible. Repair all leaks and discrepancies found. Submit a CFR.

3.11 Label plates. The Contractor shall attach an anodized aluminum test data plate to each heat exchanger using epoxy resin cement. Ensure that each plate is engraved with ¼-inch high letters, stating the following:

Test pressure.

Test date.

Testing facility.

NOTE AND CAUTION

1. If the heat exchanger design makes mounting a test data plate impractical, the Government reserves the right to request written documentation of the above-listed testing data in lieu of a test data plate, at no additional cost to the

Government.

3.12 Leak test. After reconnecting the heat exchanger(s) on the vessel (and post undocking, if applicable), the Contractor shall perform an operational test of the heat exchanger and associated system piping for one hour using the system fluid at normal operating pressure. Be aware that no visible leakage or deformation is acceptable. Repair all leaks and discrepancies found. Submit a CFR.

17 (Rev-1)

4. NOTES

4.1 Contractor furnished equipment. The following parts list is provided to assist the Contractor in identifying some of the parts that may be required to accomplish the work detailed above for each fin stabilizer heat exchanger. This list may not reflect the most recent part number changes by the manufacturer; and this list is not fully comprehensive of the parts required to accomplish this work item.

The Contractor shall verify all part numbers and quantities with the manufacturer, prior to ordering. The

Contractor is cautioned to verify the cost of all materials required to complete this work item prior to submitting a bid price.

MDE HEAT EXCHANGERS

ITEM DESCRIPTION NSN/PN QTY

P01 NBR “A” GLUE ON

Channel Plate Gasket Alpha Laval P/N: 3226309146 10

P01 NBR “B” GLUE ON

Channel Plate Gasket Alpha Laval P/N: 3226308146 10

End Plate II Gasket Alpha Laval P/N: 3226309646 1

Ring Gasket

Connection Gasket - small

Alpha Laval P/N:

3226309846

18 (Rev-1)

WORK ITEM 02:…