Amendment 002 Quotes are due on 26 January 2018 at 12:00PM EST

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4 REQUISITION/PURCHASE REQ NO. PROJECT NO. (If applicable) A002 1/09/2018 N/A

6. ISSUED BY Code 7. ADMINISTERED BY (If other than item 6.) Code N/A Alissa Gavalian USCG Surface Forces Logistics Center Alissa Gavalian, Contract Specialist 300 East Main Street alissa.gavalian@uscg.mil Norfolk, VA 23510 757-628-4597 757-628-4597

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

70Z080-18-Q-P4517500

9B. DATED (SEE ITEM 11)

12/19/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers __X__ is extended ____ is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

USCGC FORWARD (WMEC 911), DRYDOCK

1. This amendment is issued to reflect the following:

a. Respond to Questions received.

b. Attach an updated Schedule of Supplies and Services that includes WI 042

c. Attach updated Specification, Rev 2, dated 13 December 2017, that includes updated WI 009 and WI 042

d. Update Solicitation on Page 35 of 49 to remove verbiage “Past Performance is more important than Price”

e. Remove bullet 8 under Required Documents section on page 10 of 49 and include the following verbiage:

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (49 CFR) 53.243

AGavalian Typewritten Text Alissa Gavalian

AGavalian Typewritten Text 01/09/2018

“Note that after an offeror has been selected, but prior to contract award, the selected offeror shall provide Pre- Award Dry Dock Calculations for applicable US Coast Guard cutter class within seven (7) calendar days after notification of selection. Failure to provide calculations acceptable by the Coast Guard may result in selection of a different offeror."

a. Submission of Quotes are Extended FROM: 16 January 2018 TO: 26 January 2018 at 12:00 PM, Eastern Time.

QUESTION 01:

Work item 009 as written is for inspection only. The shafts are not removed in the item as written. However the title of item 009 on the Pricing Schedule (P4517500_FORWARD-DDL_FY18_SCHEDULE_B_IGE) reads;

Propulsion Intermediate Shaft; Remove, Inspect, and Reinstall.

1. Will the Government provide an amended item 009 to remove, inspect and reinstall the intermediate line shafts?

RESPONSE 01:

The government-amended item 009 to include removal, inspection, and reinstallation of the intermediate line shafts, see attached revised SOW.

2. Or, Will the Government correct the Pricing Schedule to agree with item 009 as written?

If the preceding answers are “no” and “yes” respectively, then the intermediate line shafts will be interferences to the accomplishment of work item 011 as it appears they are not removed under any other item.

1. Is it the Government’s intent for the intermediate line shafts to be removed as interferences under item 011?

2. If not, under which item are they to be removed?

RESPONSE 02:

The schedule already reflects WI 009.