Attachment 2 - Statement of Work - 70Z03825QJ0000403.pdf

PDF 304 KB Posted

Attached to
Inter Communication System (ICS) Cord
Solicitation number
70Z03825QJ0000403
Issued by

About this file

This Statement of Work (SOW) details a requirement for first articles of water-resistant Inter Communication System (ICS) cords for MH-60T and MH-65E helicopters for the United States Coast Guard (USCG) Aviation Logistics Center. The contract calls for manufacturing 15 first article units within 12 weeks of order receipt, with potential follow-on production of up to 630 parts after successful testing. Specific technical requirements include a U94/D8 PTT capable of connecting with a U-92A/U downlead, an IP67 or greater rating, a cord with 10" straight wire sections and a 60"-180" curly retractable section, and a MS3116E10-6P connector with an over-molded back shell.

Key contract terms include F.O.B. Destination delivery, comprehensive quality control requirements, mandatory Certificate of Conformance for each component, and specific packaging and marking instructions. The contractor must retain manufacturing tooling for three years, provide complete engineering drawings after first article testing, and adhere to the contractor's standard commercial warranty. The solicitation is an unrestricted requirement with a small business size standard of 1,250 employees. Quotations are due by 8/11/2025 at 2:00 PM Eastern Time, with an anticipated award date of 8/13/2025, and will be evaluated competitively for a firm-fixed price purchase order.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 – STATEMENT OF WORK (SOW) – 70Z03825QJ0000403

Inter Communication System (ICS) cords

1.0 Scope This requirement is for first articles of a water-resistant replacement for existing Inter Communication System (ICS) cords utilized in the MH-60T and MH-65E helicopters. The description of the part is listed in the table below.

Description National Stock Number Part Number

Inter Communication System (ICS) cords

N/A N/A

1.1 The objective for the Contractor is to provide first articles of the component, listed in the above table, that meet United States Coast Guard (USCG), Aviation Logistics Center (ALC)’s testing requirements in support of our efforts to sustain MH-60T aircraft. ALC may purchase additional quantities if the Contractor’s first articles meet ALC’s testing requirements. After a favorable completion of the form, fit, and function, a follow-on production run of up to six hundred thirty (630) parts may be requested.

2.0 Major Tasks Work under this Purchase Order shall be performed at the Contractor’s facility or USCG approved facility. The Contractor shall provide all necessary parts, materials, labor, tooling, and facilities to manufacture the components listed in this Purchase Order at the firm fixed prices listed in the schedule. The Contractor shall manufacture the components in accordance with the specified characteristics and standard commercially acceptable methods. All services shall be accomplished as directed by the Government. Request for clarification shall be directed to the Contracting Officer.

Notes:

1. A U94/D8 PTT capable of connecting with a U-92A/U downlead.

2. The PTT shall have an IP67 or greater rating while a downlead is connected.

3. A cord consisting of 10” straight wire, a curly cord retractable section 60” when retracted and approximately 180” when stretched, and another 10” section.

4. A MS3116E10-6P connector for connection to the aircraft (Pin-out will be provided upon awarding of contract).

Connector shall have an over molded back shell for environmental shielding and strain relief purposes.

2.1 Tool Retention

The Government will not provide any tooling as Government Furnished Property for the manufacture of any part. The Contractor shall manufacture all special, nonstandard tooling and retain it on site as government property. The Contractor shall store all special, nonstandard tooling in a weatherproof location or container for a period of three (3) years and be responsible for any damage which may occur during the storage period. Storage shall be no additional cost to the Government.

2.2 Tool Disposal Requirement

The Contractor shall notify the Government in writing after three (3) years if no additional manufacturing contracts are awarded to said Contractor. The Government will provide written instructions for final disposition for all special, nonstandard Government tooling. The Contractor shall comply with all written instructions and provide any reply requirements to insure proper disposal. However, if a new contract was awarded to the Contractor, the three (3) year storage period shall be reset to zero time and restart at the last delivery of the latest contract awarded.

2.3 Non Recurring Engineering (NRE) - The Contractor shall use commercially reasonable efforts to perform the Manufacturing Services in conformity with the SOW. Service charges, and other costs incurred in the performance of the manufacturing services, shall be included in the one-time NRE allowance when deemed “fair and reasonable” and agreed upon by all parties involved. The cost of NRE shall be incorporated and allowed in the Schedule. Payment of NRE charges do not confer any rights in, or title to, such tooling, fixtures, or other appurtenances unless otherwise indicated in the Schedule. The Contractor shall be authorized a one-time payment for NRE charges at the firm-fixed prices shown in Contract Line-Item Number (CLIN) 01.

2.4 First Article – The Contractor shall provide a quantity of fifteen (15) each of the component listed in the Schedule within twelve (12) weeks of receipt of the resulting purchase order. The First Article will be tested on Government aircraft at ALC within thirty (30) days of receipt. Upon successful completion of form, fit, and function testing on the aircraft by the Government, USCG Engineering will approve the unit for the production phase. The Contracting Officer will notify the Contractor in writing of conditional approval, approval, or disapproval of the first article system within thirty (30) calendar days after receipt of the first article systems.

This approval process is only required for first article units. Any production unit sent to the USCG without approval will be returned at the offeror’s expense.

2.5 Manufacture – All components are to be manufactured in accordance with (IAW) drawings which have been produced by Contractor and approved by USCG. Documentation certifying that these parts are in compliance with the Contractor provided/ALC approved drawings must be provided with each part. Payments will not be made until these certifications are received. The prices in the Schedule for the manufacture of the parts shall include all requirements outlined in the relevant ALC approved Contractor drawings. These requirements may include, but are not limited to: deburring, marking, testing, and applying finishes.

3.0 USCG Documents Not Applicable.

4.0 Industry Documents Complete engineering drawings, which have been produced by the Contractor, shall be provided to the USCG via electronic media, upon successful completion of first article testing.

5.0 Quality

5.1 Quality Control - The Contractor is responsible for performing or assuring all inspections, test and calibration necessary to substantiate that the goods or services furnished conform to Government’s requirements. The Contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements. Records of conformance shall be maintained on file at the Contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at Contractor’s facility to verify the existence, adequacy and effectiveness of the quality system. Upon request of the Government, the Contractor shall forward a copy of their current certification and Quality Assurance Manual for review.

5.2 The Contractor shall, immediately upon discovery, notify and disclose conditions to the Contracting Officer of any event, supply change, material change, supply malfunction, counterfeit/suspect parts or materiel, defect or non-airworthy condition of any product or component (to include components used in repairs) found to potentially cause a non-conformity to the original specifications of this contract. The Government reserves the right to inspect any non-conforming product or component. Therefore, the Contractor shall obtain approval from the Contracting Officer prior to the disposition of any non-conforming product or component.

5.3 The Contractor’s quality control manual shall address in detail the Contractor’s risk management, test, inspection, non-conforming product and counterfeit/suspect parts processes.

5.4 The Contractor shall immediately notify the Contracting Officer of any changes that potentially have an impact on the product. Changes may include but are not limited to products, processes, materiel, supplier sources, manufacturing facility location and personnel qualifications.

5.5 Upon notification of the change, the USCG will approve or deny the change. Facility location changes may require the Government to perform a facility inspection. The Contractor shall allow the Government access to all applicable areas of the Contractor’s facilities to ensure compliance with contractual requirements. In the event that the change is not approved by the USCG, the purchase order, contract, delivery order or task order may be cancelled or terminated IAW Federal Acquisition Regulation (FAR).

5.6 The Contractor shall retain all records in accordance with FAR 4.7 Contractor Records Retention. The Contractor shall be required to permit Government access to applicable records retained at any level of the supply chain.

5.7 Unless otherwise specified, the Contractor shall flow down all requirements in this contract to their supply chain, to include all subcontractors and suppliers.

5.8 Warranty - The Contractor’s standard commercial warranty, including extended warranties, for manufactured components will be incorporated into the purchase order at no additional cost to the Government.

6.0 Records and Reports

6.1 Certificates - All manufactured components under the provisions of this Purchase Order must be suitable for installation on USCG aircraft. The Contractor shall furnish a Certificate of Conformance (COC) IAW FAR 52.246-15 for all components. These forms shall be packaged with each component.

7.0 Delivery Requirements

7.1 F.O.B. Point – F.O.B. Destination is requested as the Incoterm for all deliverables. All offers will be considered F.O.B. Destination unless F.O.B. origin is specified AND estimated shipping costs are included.

8.0 Purchase order Information

8.1 Packaging and Preservation - Packaging and preservation shall include the following information:

Material will be stored and transshipped, to various users; therefore, material must be packed and labeled suitable for shipment via land, air, or sea.

The items must be individually packaged and shipped in a box, carton, or crate.

The internal packing material shall be sufficient to prevent damage during shipment, handling and storage. Preservation and protection must be sufficient to prevent corrosion, deterioration, or decay during warehouse storage for a period of one (1) year.

Packaging material shall NOT consist of the following: popcorn, shredded paper, Styrofoam of any type, or peanut style packaging.

8.2 Marking Instructions - All shipping containers/packages shall be marked for delivery IAW the Purchase Order. All components, which require special care during packing, handling or shipping shall be identified and marked appropriately. The exterior of the package or shipping container shall be legibly marked with the following information in such a manner that the marking shall not be rendered illegible when opened.

Part Number Nomenclature Serial Number Purchase Order/Line Item Number Contractor’s Name and Address

8.3 Markings of Warranted Items – Pursuant to the requirements of FAR 46.706 (b) (5), the Contractor shall stamp or mark the supplies delivered, or otherwise furnish notice with the supplies, of the existence of the warranty. For commercial items, the Contractor’s trade practice in warranty marking is acceptable if sufficient information is presented for supply personnel and users to identify warranted supplies. Markings may be brief, but should include information below:

A brief statement that a warranty exists The substance of the warranty The duration of the warranty

CLIN Item Description Quantity Due No Later Than:

1 NRE TOOLING 1

Twelve (12) weeks after receipt of order.

2 First Articles 15 Twelve (12) weeks after receipt of order.

Who to notify if the supplies are found to be defective

8.4 Inspection and Acceptance - Inspection and acceptance shall be performed at destination by USCG personnel for count, condition and proper completed documentation. Inspection and acceptance deficiencies may delay or cause rejection of invoice payments. Equipment found to have operational deficiencies will be reported on standard form "SF 368", Product Quality Deficiency Report, and sent to the Contractor for investigation. The Contractor shall report findings of the investigation to the Contracting Officer, within thirty (30) calendar days after receipt of quality deficient exhibit.

File details come from the government source that posted it. Updated .