STATEMENT OF WORK.docx
DOCX document 721 KB Posted
- Solicitation number
- 70Z02426PBOSTSNNETRASH
About this file
This is a Statement of Work (SOW) for solid waste removal services at United States Coast Guard (USCG) Sector Northern New England installations in Portland and South Portland, Maine. The contractor shall provide all necessary management, labor, materials, equipment, and vehicles to perform scheduled and as-needed Municipal Solid Waste (MSW) and construction debris removal services in compliance with all local, state, and federal environmental laws. The contract period runs from July 1, 2026 through June 30, 2027, with services provided Monday through Friday between 8:15 AM and 4:00 PM during normal Coast Guard business hours, excluding Federal Holidays.
The service requirements include maintaining four 8-yard containers at 259 High Street (collected twice weekly) and one 8-yard container at Wrights Wharf (collected twice weekly), with all containers equipped with functional lids and kept in clean, sanitary, structurally sound condition. Additionally, the contractor must provide as-needed hauling services for one 30-yard construction roll-off container at 259 High Street, responding to service requests within 48 hours. The Government estimates 10 annual haul-offs and 30 tons of disposal per year. The contractor is responsible for all equipment and vehicles and must secure loads at the waterfront location to prevent waste from entering the waterway. Invoicing occurs monthly in arrears through the U.S. Department of the Treasury Invoice Processing Platform, with fixed monthly rates covering 8-yard container rentals and regular dumping, and the 30-yard container billed at a fixed monthly rental rate plus flat haul fee and actual disposal tonnage per occurrence supported by landfill weight tickets. Personnel must possess valid government-issued photo identification and vehicles must be clearly marked with the contractor's corporate logo. The Quality Assurance Inspector will monitor contractor performance against standards including timely pickup completion, prevention of spilled trash, and container maintenance, with remedies for non-compliance including 24-hour resolution requirements for missed pickups and cleanliness issues and 5-business-day repair or replacement timelines for defective containers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR Provisions and Clauses FY25 Trash.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Project Title: USCG Sector Northern New England Solid Waste Removal Services Purchase Request (PR) Number: [To be Determined]
1.0 Background
The United States Coast Guard (USCG) Sector Northern New England requires professional solid waste removal services for its shore installations in Portland and South Portland, ME. The contractor shall provide all necessary management, labor, materials, equipment, and vehicles to perform these services safely and in accordance with all local, state, and federal environmental laws.
2.0 Scope of Work & Deliverables
The contractor shall provide scheduled and "as-needed" solid waste (Municipal Solid Waste - MSW) and construction debris removal services at the specified locations.
2.1 Equipment and Service Frequency
· Lids Required: All MSW 8-yard containers must be equipped with durable, functional lids to prevent access by local wildlife and wind-blown litter.
· Maintenance: The contractor is responsible for maintaining all provided containers in a clean, sanitary, and structurally sound condition (free of leaks and excessive rust).
| Container Description |
| Quantity |
| Location |
| Frequency of Service |
| 30-Yard Roll-off (Construction Waste) |
| 1 |
| 259 High St |
| As Needed (On-Call) |
| 8-Yard Container (Solid Waste) |
| 4 |
| 259 High St |
| Twice per week |
| 8-Yard Container (Solid Waste) |
| 1 |
| Wrights Wharf |
| Twice per week |
2.2 "As Needed" Haul Requirements For the 30-yard construction roll-off container, the contractor shall provide hauling and disposal services on an "as-needed" basis. Upon receiving notification from the Contracting Officer (KO) or Quality Assurance Inspector (QAI), the contractor must service (empty and return, or swap) the container within 48 hours. The Government estimates 10 haul-offs and an estimated 30 tons of disposal per year for quoting and evaluation purposes.
2.3 Prohibited Waste & Environmental Controls
The Government will not place hazardous waste, toxic materials, liquid paint, waste oil, vehicle batteries, or tires in the provided solid waste or construction containers. The contractor is only responsible for the removal of standard Municipal Solid Waste (MSW) and general construction/demolition debris. Given Location 2 is situated on a pier (Wrights Wharf), the contractor must ensure all loads are secured and extreme care is taken during collection to prevent any solid waste from entering the waterway.
3.0 Period of Performance & Hours of Operation
· Period of Performance: 01 July 2026 through 30 June 2027.
· Hours of Operation: Routine collections must occur during normal Coast Guard business hours: Monday through Friday, between 8:15 AM and 4:00 PM.
· Federal Holidays: Service is not required on recognized Federal Holidays. If a scheduled pickup falls on a Federal Holiday, the contractor shall perform the collection on the next business day.
4.0 Places of Performance
Services shall be performed at the following physical locations:
| Location Designator |
| Physical Address |
| Location 1 (Sector Base) |
| 259 High St, South Portland, ME 04106 |
| Location 2 (Wrights Wharf) |
| Pier at end of Wrights Wharf (behind 350 Commercial St), Portland, ME 04101 |
Site1: 259 High St, South Portland, ME 04106 Site 2: Pier at end of Wrights Wharf 350 Commercial St, Portland, ME 04101
5.0 Security & Base Access Requirements
Due to heightened security protocols at military installations, the contractor must comply with the following:
· Personnel Identification: All contractor employees must possess and present a valid, unexpired government-issued photo ID (driver’s license, state ID, or passport) at the security gates.
· Vehicle Identification: All service vehicles must be clearly marked with the contractor’s corporate logo or name.
· Gate Delays: Delays at base security gates are normal and will not be considered a government-caused delay or justify additional service charges.
· Wrights Wharf Access Protocol: Location 2 is unstaffed. The contractor must contact the QAI or KO once contract is awarded to ensure procedures are understood.
6.0 Government-Furnished Property
The Government will not provide any equipment, tools, utilities, fuel, or information (GFE/GFP/GFI) for this contract.
7.0 Quality Assurance & Performance Standards
The QAI will monitor contractor performance. The contractor's performance will be deemed unsatisfactory if they fail to meet the following standards:
| Performance Indicator |
| Standard |
| Government Remedy for Non-Compliance |
| Timely Pickup |
| Routine collections completed on scheduled days. "As Needed" hauls completed within the specified response window. |
| Contractor must resolve missed pick-ups within 24 hours of notification at no extra cost. |
| Cleanliness |
| No trash spilled, dropped, or left around the immediate vicinity of the containers during the servicing process. |
| Contractor must return to clean the area within 24 hours of notification. |
| Container Condition |
| Lids operational to deter wildlife; no major leaks, holes, or structural damage. |
| Contractor must repair or replace defective containers within 5 business days of notification. |
8.0 Phase-In / Phase-Out Transition
To prevent any lapse in sanitary services, the incoming contractor shall coordinate the delivery of their containers with the QAI to ensure a seamless transition with the outgoing vendor. All new containers must be in place and fully operational by 08:00 AM on 01 July 2026.
9.0 Invoicing & IPP
Invoices shall be submitted monthly in arrears via the U.S. Department of the Treasury Invoice Processing Platform (IPP) at www.ipp.gov.
· The fixed monthly rates shall cover the 8-yard container rentals and regular dumping.
· The 30-yard construction container shall be invoiced based on the fixed monthly rental rate, plus the flat haul fee and actual disposal tonnage per occurrence, supported by landfill weight tickets.
· Copies of all landfill weight tickets for the 30-yard construction container must be uploaded in IPP.
10.0 Contact Information
All administrative and contractual inquiries must be directed to the Contracting Officer (KO). Operational and site coordination must be directed to the Quality Assurance Inspector (QAI).
| Role |
| Name |
| Phone |
| Contracting Officer (KO) |
| Mr. Douglas Cullins |
| (571) 607-1213 |
| Douglas.Cullins@uscg.mil |
| Quality Assurance Inspector (QAI) |
| MKC Tim Sparagna |
| N/A |
| timothy.d.sparagna@uscg.mil |
11.0 Clauses and Provisions
Please see the attached solicitation package for FAR/HSAR Clauses and Provisions applicable to this requirement.
12.0 Approval / Acknowledgment
By signing below, the parties agree that this Statement of Work accurately defines the technical requirements, deliverables, and performance standards required under this contract.
Requiring Activity:
Signature: _________________________________________ Printed Name: Tim Sparanga, MKC, USCG .
Title: Engineering, Sector Northern New England .
Date: _____________________________________________ Contracting Officer (KO):
Signature: _________________________________________________ Printed Name: Title: Contracting Officer, Sector Northern New England Date: 6/23/2026 .
Vendor Awarded): ___________________________________________ Signature: _________________________________________________ Printed Name: Title: _________________________________________ Date:______________________________________________________ image1.png image2.png
File details come from the government source that posted it. Updated .