This document is a Requirements Document for a U.S. Coast Guard (USCG) Response Boat – Small (RB-S) Demonstrator. The primary objective is to procure one demonstrator boat with related services to support a three-month demonstration period. The boat must meet extensive technical specifications for maritime operations, including search and rescue, ports and waterways security, and drug/migrant interdiction missions.
Key requirements include a minimum top speed of 40 knots, operability in up to 6-foot seas, ability to carry 10 persons, and specific equipment such as two 4-stroke gasoline marine outboard engines, integrated communication systems, infrared camera, and navigation equipment. The contractor must deliver the boat within 90 days of contract award, provide comprehensive documentation, conduct extensive acceptance testing, offer two days of crew familiarization, and include a 12-month comprehensive warranty. The boat will be delivered to either Norfolk, VA or North Charleston, SC, with interim contractor logistics support provided during the demonstration period.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG Response Boat – Small (RB-S) Demonstrator Requirements Document
INTRO
• The primary requirement is the demonstrator boat be accepted in 90 days following award. The remaining requirements or attributes have flexibility. The closer a proposed boat is to the listed requirements and attributes, the more likely it will compete well for one of the four demonstrator boat contracts.
• The demonstrator boats will provide an opportunity to see if the requirements are achievable, and if some of the attributes are reasonable to include.
• Proposals that include features beyond what is listed in this document as requirements or attributes, that positively influence mission success to include crew endurance, will receive positive consideration to support verifying if the features or attributes actually contribute to mission success or crew endurance without unacceptably detracting from other requirements.
• The demonstrator boats are being purchased to explore the available designs and features that are achievable on a boat of this size, that would positively influence mission success.
• Elements in the requirements document are marked (R) Required, or (A) Attribute. A Required item must be fully met to be eligible for award. Proposals that include features or innovations beyond the minimum Required elements or Attributes will be rated more favorably, particularly if they convincingly enhance mission performance, reduce crew fatigue, or lower life-cycle costs.
1. SCOPE
1.1. Procure one Response Boat–Small (RB-S) Demonstrator, plus related services to support a demonstration period of three months.
1.2. The Contractor shall design, build, test, deliver, and provide all support necessary for U.S. Coast
Guard (USCG) acceptance.
1.3. The RB-S Demonstrator shall pass all Acceptance Tests before delivery.
1.4. Delivery: Deliver within 90 days of contract award to Combatant Craft Division, 1052
Pocahontas Street Naval Station Bldg. V-47, Norfolk, VA 23511 or USCG Base Charleston, 1050 Register St. North Charleston, SC 29405. The Contractor shall be notified at award which address to ship the RB-S Demonstrator.
1.5. The RB-S Demonstrator will be accepted at destination and shall be clean, undamaged from transit, with any test discrepancies corrected and demonstrated prior to acceptance.
2. RESPONSE BOAT – SMALL DEMONSTRATOR OPERATIONS
2.1. Search and Rescue (SAR): Conduct searches; tow other vessels astern; tow vessels alongside in calm conditions; transfer an incapacitated person and SAR equipment to/from other vessels and aircraft; recover persons in water (PIW); and deploy dewatering pumps
2.2. Ports, Waterways, and Coastal Security (PWCS): Conduct patrols; enforce security zones;
interdict and board vessels; requires speed, acceleration, and agility to outmaneuver hostile vessels and effective use of force to compel compliance or to disable hostile or evasive targets, trailerable for long-distance deployment to other operating areas
2.3. Drug Interdiction (DI) and Migrant Interdiction (MI): Conduct patrols; pursue, interdict, and board vessels; requires speed, acceleration, and agility to outmaneuver hostile vessels and effective use of force to compel compliance or to disable hostile or evasive targets; recovery of contraband and detain suspects
2.4. For the above operations, the RB-S Demonstrator needs to be able to:
2.4.1. Use various sensors to navigate, locate, identify, monitor, and detect objects and persons in and out of the water.
2.4.2. Communicate with Coast Guard command and control elements including stations, sectors, aircraft, and cutters as well as the persons or vessels in distress, and other vessels, persons, or agencies assisting in the operation.
3. PRINCIPAL CHARACTERISTICS
3.1. (R) Minimum Top Speed: 40 knots in calm weather condition
3.2. (A) Minimum Range: 150 nm with 10% fuel reserve in calm condition
3.3. (A) Decelerate from Top Speed to stationary in fewer than 12 seconds
3.4. (A) Able to tow other vessels (up to 10 tons) in calm weather
3.5. (A) Max length on trailer: 37 feet – from extreme forward point of trailer / boat combination to extreme aft point (engines lowered, taff rail deployed, fendering fully deployed, and engine guard rail deployed)
3.6. (R) Max width on trailer: 8 feet 6 inches – from outermost extremities with fendering fully deployed, including all appendages and fittings
3.7. (A) Max height on trailer: 11 feet 6 inches to the highest fixed point while on trailer
3.8. (R) Max draft: 3 feet, 3 inches with the engines lowered at full load weight condition
3.9. (R) Max Lightship weight plus full outfit, fuel, and trailer: 11,500 pounds
3.10. (A) Able to sustain operations of 600 hours per year for 15 years
4. OPERATING ENVIRONMENT
4.1. (R) Operability: up to 6 foot seas, 25 knots wind, night and day
4.2. (A) Water Temperatures: 29°F to 95°F (no ice)
4.3. (A) Air Temp: 0°F to 120°F
5. GENERAL ARRANGEMENTS
5.1. (R) Cabin to provide protection from wind, sea spray, sun exposure, and precipitation.
5.2. (R) Hull, hatches, decks, and watertight bulkheads shall be watertightness degree 1.
5.3. (A) Doors, cabin, windows, and console shall be minimum of watertightness degree 2.
5.4. (R) Forward and aft working decks, (A) each accommodating a weapon mount for a M240B light machine gun.
5.5. (R) Forward working deck recessed to provide a protected area for people forward of the cabin.
5.6. (A) Aft working deck to accommodate a 36-inch wide x 36-inch deep x 36-inch high, 150 lb.
container with four tie-down points. Aft deck shall have at least 40 square feet of space.
5.7. (A) A non-skid walking surface at least 6 inches wide shall be provided around the cabin's perimeter. Surfaces of the fender may be used to meet the requirement provided they are flat and have non-skid.
5.8. (R) Personnel: Operate with up to 10 persons onboard: a four person crew and six passengers.
5.9. Seating shall include a minimum of: (R) Four full-isolation shock-mitigating seats (A) in a two-by-two forward-facing configuration within the cabin with footrests (for occupants in a weight range of 110 to 300 lbs rated for up to 6Gs) and (R) an exterior fold-down seat facing aft with a clear sightline of the aft tow post.
5.10. (R) Coxswain’s visibility shall be in accordance with ABYC H-1, Field of Vision from the Helm Position without the use of mirrors (Section 1.7.1.2) or equipment such as cameras (Section 1.7.1.3).
6. DEFINITIONS
6.1. (R) Calm Condition – One-foot seas with wind speed up to 8 knots.
6.2. (R) Faying Surfaces – Contact surfaces of two materials forming a joint that may collect moisture.
6.3. (R) Propulsion System – System creating movement, including outboard engines, fuel delivery, speed and directional controls, steering, and performance sensors / displays.
6.4. (R) Watertightness Degree 1 – Shall be in accordance with ISO 12216 section 3.20.1, “protection against effects of continuous immersion in water.”
6.5. (R) Watertightness Degree 2 – Shall be in accordance with ISO 12216 section 3.20.2, “protection against effects of temporary immersion in water.”
6.6. (R) Lightship Weight Condition – The weight of the boat with outfit, and system lubricants at normal operating levels. Lightship weight does not include fuel or people.
6.7. (R) Performance Weight Condition – Lightship weight plus four crew members (220 lbs each, seated in the shock mitigating seats), full fuel, and 150 lbs of cargo.
6.8. (R) Full-Load Weight Condition – Performance weight plus six additional people (220 lbs each, located in designated location(s)), two weapons (30 lbs each), and four ammunition/containers (20 lbs each).
7. STANDARDS
7.1. (A) General: American Boat and Yacht Council (ABYC) Standards and Technical Information
Reports for Small Craft
7.2. (A) Stability: International Organization for Standardization (ISO) Std 12217-1: Small Craft
Stability and Buoyancy
7.3. (A) Hull Structure: ISO Std 12215: Small Craft – Hull Construction and Scantlings (parts 5 and
6)
7.4. (A) Material, aluminum: ASTM B179, B210, B221, B241, B928
7.5. (A) Material, stainless: ASTM A240/240M, A269, A276/276M, A312
7.6. (A) Aluminum Welding: AWS D3.7: Guide for Aluminum hull welding and AWS D1.2:
Structural welding code – Aluminum. In case of conflict, AWS shall supersede those of ISO 12215
7.7. (A) Cockpit Drainage: ISO Std 11812: Small Craft – Watertight or Quick-Draining Recesses and Cockpits
7.8. (A) Windows, Hatches, Watertightness: ISO Std 12216: Small craft – windows, portlights, hatches, deadlights, and doors – strength and watertightness requirements
7.9. (A) Human Factors Engineering: ASTM F1166: Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities
7.10. (A) Navigation Lights and Horn: USCG Navigation Rules International-Inland (NAVRULS)
COMDTINST M16672.
7.11. (A) Weapons Mounts: Small Craft Crew Served Weapons Integration Guidance and Certification Process (NSWCCD-23-TM-2009/63)
8. ORIGINAL EQUIPMENT MANUFACTURER (OEM) AND MISC
REQUIREMENTS
8.1. (R) All equipment shall be installed per OEM requirements and recommended for the intended service.
8.2. (R) All items on the RB-S Demonstrator shall be suitable and intended for extended exposure and operation in the marine environment.
8.3. (R) Materials emitting noxious fumes below 203°F after curing/drying, or containing isocyanate compounds, including TDI, HDI, or MDI shall not be used.
9. ACCESS (WITH PPE AND LE EQUIPMENT)
9.1. (R) The boat shall be designed to provide access via door or hatch to the forward and aft working decks.
9.2. (R) Window location, design, and configuration shall be suitable for emergency egress.
9.3. (A) Access shall be designed using the following measurements for USCG personal while wearing personal protection equipment (PPE) and law enforcement (LE) equipment:
9.3.1. Male (95th Percentile) Chest Depth – 15 inches;
9.3.2. Male (95th Percentile) Shoulder Breadth – 24 inches; and
9.3.3. Male (95th Percentile) Hip/Knee Breadth (seated) – 26 inches.
10. NOISE
10.1. (A) The onboard A-weighted noise level from idle speed to full speed, in calm condition or less, shall be less than 90 decibels (dBA) at head level for the four installed shock-mitigating seats.
11. STABILITY AND BUOYANCY
11.1. (R) Shall meet ISO 12217-1:2015 Category C, Option 4.
11.2. (A) Only low-density material shall be used to meet the flotation elements in accordance with
ISO 12217-1 paragraph 6.8, Annex F, and Annex G.
11.3. (R) The ISO 6185-3 standard shall not be used to satisfy flotation requirements.
11.4. (R) The forward and aft working deck shall be “quick-draining cockpit or recess” per ISO
11812.
11.5. (R) Cockpit drains shall be sized to meet the Category A draining time requirement of ISO
11812 Tmax (maximum draining time) not to exceed 30 seconds.
11.6. (A) The weight of a crewmember or passenger is 220 lbs (100 kg).
11.7. (A) No surface of the boat except the actual fender shall be excluded from the crew area for the purposes of compliance with ISO 12217-1.
11.8. (A) Flotation material shall be packed foam in floatation bags secured in place in voids or in other spaces in the boat where it is not exposed to weather or damage.
12. STRUCTURE
12.1. (R) The hull structure material shall be aluminum and (A) comply with ISO 12215 design category B.
12.2. (A) Construction details shall meet ISO 12215 standards. Practices described in ISO 12215 as
"good practice" are required.
12.3. (A) The boat shall be considered a "craft with large deck openings" per ISO 12215-6, 6.2. The gunwales, upper topsides, and other hull structures above the neutral axis of the hull girder shall be checked for longitudinal strength, particularly regarding buckling (Annex D).
12.4. (R) All exposed plate edges and corners of structural components shall be dressed, ground, or radiused to prevent personnel injury. Sharp edges and corners presenting personnel hazards or potential equipment damage shall be protected or rounded.
13. MASTS
13.1. (R) A means shall be provided to fly a National Ensign and a USCG Ensign. The ensigns shall not interfere with any electronics or lights.
14. FENDERING SYSTEM
14.1. (R) Provide a fixed foam fendering system capable of absorbing impact at any point and angle.
14.2. (R) Extend around the complete perimeter of the boat but does not need to cover the stern.
15. PROPULSION
15.1. (R) Two 4-stroke gasoline marine outboard engines. Stainless steel propellors. Port and starboard engines shall be counter-rotating.
15.2. (R) Equipped with a physical lanyard emergency engine/propulsion cut-off device
15.3. (A) Capable of operating continuously, or when towing another vessel for 8 hours, at speeds of
5 knots or less without any adverse effect.
15.4. (A) Each outboard shall have single control lever (combined shift/throttle lever) at the helm station. The control levers shall be on a single binnacle control head.
15.5. (R) Provide OEM engine display panel(s) for each engine.
16. ELECTRICAL
16.1. (R) The alternators shall be sized to supply power to the boat’s DC system sufficient to power all
DC electrical loads and charge the batteries.
16.2. (A) The alternator shall be able to provide this amount of power over the entire operating speed range of the engine, including idle.
16.3. (R) Have a dedicated 12 Volt DC battery bank for starting each engine and a separate house battery bank.
16.4. (R) Battery parallel switch(es) shall be provided to connect the battery banks for emergency power or emergency engine starting.
16.5. (R) Disconnect switches shall be provided to isolate each battery bank. Switches shall be activated from outside the machinery spaces and spaces containing the batteries.
16.6. (R) Each battery shall be a marine Absorption Glass Mat (AGM) cell type, the same size and rating.
16.7. (A) Fuses shall not be used unless provided with OEM equipment.
17. LIGHTING AND ILLUMINATION
17.1. (A) All illuminated console controls, gauges, displays, and light switches shall be dimmable from 100 percent to 0 percent (no light emittance) for night operations.
17.2. (A) Console shall have a master black out switch that secures all console illumination to include console controls, gauges, displays, and light switches.
17.3. (A) Equipped with a blue flashing law enforcement light(s). The light(s) shall be marine grade, Light Emitting Diode (LED), and shall be located to provide near 360 degree visibility out to a minimum of 2 nautical miles during day or night.
17.4. (A) Equipped with four independently switched IP 65 or better LED flood lights that can be adjusted to illuminate the perimeter of the boat port, starboard, forward, and aft.
17.5. (A) Shall have a cabin mounted LED searchlight capable of electronic remote operation from the coxswain’s seat. Light shall have a minimum of 400,000 candelas and 2,000 foot range.
17.6. (A) Interior lighting fixtures with LED type fixtures that contain both white and red lights, control by dimmer switch(s), and dimmable from full intensity to off.
18. ANTHROPOMETRY REQUIREMENTS
18.1. (A) “Primary Viewable” (PV) shall be within 35 degrees left and right of center and 25 degrees above and 35 degrees below the horizontal line of sight for the seated positions.
18.2. (A) “Secondary Viewable” (SV) shall be within 60 degrees left and right of center and 50 degrees above and below the horizontal line of sight for the seated positions .
18.3. (A) “Reachable” (Reach) shall be within comfortable reach for the 5th percentile female (29.4 inches, measured from seat back at shoulder height) to 95th percentile male (38.4 inches, measured from seat back at shoulder height) while seated and restrained, in accordance with ASTM F1166-07, Table 15.
Component Crewmember A (FWD Port) Coxswain (FWD Starboard)
PV SV REACH PV SV REACH
APX 8500 X
GX 6000 X X
Crew Communications X X X X
Loud Hailer X
Navigation Multi-Functional Display X X X X
Component Crewmember A (FWD Port) Coxswain (FWD Starboard)
PV SV REACH PV SV REACH
Remote Information Display X X Lighting Controls
X X -Law Enforcement -Navigation -Flood
Dimmer Controls X X X X
Propulsion Controls X
Steering Controls X
Propulsion System Displays / Instruments and Alarms X X
Emergency Engine / Propulsion Cutoff X X
Remote Fuel Shut-off X
Mounted Searchlight Control X X X X IR Camera Control X Horn X X
Window Wiper Control X X
19. HELM CONTROL
19.1. (A) If a steering wheel type helm is provided, it shall have a maximum diameter of 16 inches, minimum diameter of 13 inches, maximum rim diameter of 1.125 inches, and minimum rim diameter of 0.75 inches. Spokes of the wheel shall have a minimum of 45-degree separation.
The helm should not require more than five turns, lock-to-lock.
19.2. (R) The Helm shall not be controlled with rocker switches or push buttons, a joystick is acceptable.
20. ELECTRONIC NAVIGATION SYSTEMS (equipment meeting the function is required with specific make and model having flexibility)
20.1. (R) The RB-S Demo will have a marine navigation system. It may include the following:
20.2. (A) Integrated USCG 2nd Generation Scalable Integrated Navigation System (SINS-2)
20.3. (A) Multiple (2 or 3) 12-inch Multifunctional Displays (MFDs), Part Number (PN) (E70372)
20.4. (A) Depth Transducer, one of the following PN (A80451), (A66098), (A66099) or (E66077)
20.5. (A) Heading Sensor, PN (E70096)
20.6. (A) Global Navigation Satellite System (GNSS) Receiver, PN (E70310)
20.7. (A) i70S remote information display, PN (E70327-S2)
20.8. (A) Radome 4KW 24” HD, PN (E92143)
21. ALARMS
21.1. (R) Be equipped with an alarm system(s) encompassing audible and visual alarms for bilge, fire and smoke, carbon monoxide, and propulsion alarms.
21.2. (R) Provide the ability for the operator to determine what type of alarm and indication of alarm location.
21.3. (R) Ability to be silenced and remain lit (visual alarm), and have a means to test.
22. INFRARED (IR) CAMERA SYSTEM
22.1. (R) Remote-controlled pan, tilt, and zoom function (minimum of 4X), and home control.
22.2. (R) Thermal/infrared with visible light / electro-optic camera capable of detecting a 30-foot vessel at range greater than one nautical mile in total darkness.
22.3. (R) Integrated so it displays on all the SINS-2 MFDs.
23. INTEGRATED COMMUNICATION SYSTEMS
23.1. (R) Two Motorola APX-8500 Tactical Radio Systems with O7 Control Heads, speakers, microphone, and triband antenna, integrated with the Boat Crew Communications Systems
(BCCS).
23.2. (R) One Standard Horizon GX-6000 DSC Class D radio with control heads, speakers, microphone, antenna, and integrated and displayed on the SINS-2 MFDs.
23.3. (R) Crew Communications System may be wired, wireless, or combination of both with four headsets that (A) are compatible with USCG Boat Crew Helmet: Galvion Batlskin Caiman Bump Helmet.
23.4. (R) If wired, the system shall have six connection points: one at each of the four shock mitigating seats, one at the bow weapon mount, and one at the aft weapon mount.
23.5. (R) If wireless, the system shall use Advanced Encryption Standard (AES) 256 bit encryption.
24. VISUAL AND AUDIBLE COMMUNICATION SYSTEMS
24.1. (R) Loud Hailer/Siren/Horn/Whistle capable of emitting automatic audible alarms/warning signals and external voice commands in all operating environments, meeting the requirements of the USCG Navigation Rules and Regulations Handbook; International Rules for Prevention of Collisions at Sea (72 COLREGS) Annex III and Inland Navigation Rules Annex III for sound signaling.
25. AUTOMATIC IDENTIFICATION SYSTEM (AIS)
25.1. (R) USCG Second Generation Automatic Identification System (AIS-2) integrated with SINS-2 comprised of Raymarine AIS5000 Transponder Bundle PN (E70529), VHF antenna PN (A80590), and Converter cable PN (A06045).
26. HEATING AND VENTILATION
26.1. (R) The cabin shall be provided with adequate ventilation and heating and shall not use gasoline.
27. DRAINAGE
27.1. (R) Scuppers shall be provided to ensure water does not flow back onto the working deck through the scuppers, even when backing or at rest, or dead in the water for extended periods.
This requirement applies to scuppers when in “closed” as well as in “activated” position.
27.2. (R) Drain plugs shall be installed at low points in all piping systems.
27.3. (R) All drains shall be readily accessible for operation and maintenance.
27.4. (R) Each bilge area shall have a submersible DC electric bilge pump, and if located in a compartment with oil, be arranged so any oil leaks are isolated from the open bilge.
27.5. (R) Bilge pump(s) control switch(es) shall be able to be manually turned on/off along with automatic operation associated with bilge levels and have an indicator light that illuminates when the corresponding bilge pump is operating.
28. ANCHOR KIT
28.1. (R) Provide the following with the items being arranged per the provided reference picture:
Item Quantity Figure #
Anchor: fluke-type (Danforth style), aluminum, weighing no more than 7 pounds 1 ea. Not Shown Anchor Shackle: 3/8”, screw pin 316 Stainless Steel (not attached) 2 ea. 5 Chain: 3/8”, 316 Stainless Steel 9 ft. 4 Thimble: for 3/4” dia. Double Braided Nylon line, 316 Stainless Steel 1 ea. 3 Anchor Line: 1/2” dia. Double Braided Nylon line 150 ft. Not Labeled Shackle: D Wide 304 SS 5/16" Captive Pin 2 ea. 1
Swivel: 1/2" 316 SS Jaw Eye 1 ea. 2
29. MOORING, TOWING, TIE DOWN, AND LIFTING FITTINGS
29.1. (R) All mooring and towing bitts, cleats, chocks, and eyes shall be sized to handle 2” circumference Double Braided Nylon (DBN) lines.
29.2. (R) At least three mooring fitting sets (forward, midship, and aft) installed symmetrically port and starboard along the centerline, allowing for towing, mooring, and anchoring.
29.3. (R) A bow anchor bitt and aft towing bitt shall be provided on the centerline on the bow and stern, respectively, of the boat.
29.4. (R) Equipped with tie down fittings to secure the boat to the trailer.
30. TOW REEL
30.1. (R) Aft towline reel with 150 feet of ¾ inch diameter, Double Braided Nylon Line readily accessible to the towing bitt.
31. OUTFIT
31.1. (R) Provide the following:
Item No. General Outfit Quantity Description Watertight
Stowage Open Stowage
1 Push-Button Portable Signal Horn 1 Air propellant X
2 Portable Signal Horn Propellant 1 Air propellant (spare) X
3 Flashlight 2 Explosion-proof, IP 67, and minimum of 100 lumens X
Item No. General Outfit Quantity Description Watertight
Stowage Open Stowage
4 Binoculars 2 7 x 50 marine waterproof X
5 Engine Ignition Kill Switch lanyard 2 X
6 Ensign, National (16”x24”) 1 NSN 8345-00-245-2040 or equal X
7 Ensign, US Coast Guard (15”x24”) 1 NSN 8345-00-242-0275 or equal X
8 First Aid Kit, 10 Person 1 NSN 6545-01-646-2623, Item # 80-0353 or equal X
CG Orange 24 ” Life Ring Buoy IAW 46 CFR § 180.70(d)
NSN 4220-00-275-3156 or equal, and NSN 9390-01-292- 6737 or equal, and 2" labels with the assigned identification number on the top half of the ring and “U.S. COAST GUARD” on the bottom half of the ring
X
10 Floating Marker Light with Stowage Bracket 1 NSN 6230-01-262-1812 or equal
(including batteries) X
11 Water Rescue Throw Bag 2
5340-01-560-9976 or equal and 75ft of ½” abrasion-resistant high-visibility floating water rescue rope. 3/8” and 7/16” rope is acceptable.
X
Snap Hook for Marker Light Lanyard & Throw Bag
2 NSN 5340-01-5609976 or equal X
13 Anchor Kit and Components 1 See Requirement Document X
Tool Kit and Onboard Repair Parts in Watertight cases
1 See Requirement Document X
Portable Bilge Pump, 5 gallons per minute minimum
1 Manually operated X
16 Mooring Lines 6 2” circumference DBN line, 30 feet in length with 12 inch eye X
17 Shackle, Screw Pin, 316 Stainless Steel 2
Sized with opening to accommodate 1-1/4 in diameter line
X
18 Portable Fire Extinguisher, B-1 2 USCG approved, refer to Section
555-1 X
19 Hand held Searchlight 1 12VDC, IP67, and minimum of 5000 lumens X
20 Fenders, Cylindrical 4 Minimum 5-1/2" diameter X 20 inch long with 10 foot x 3/8" diameter DBN tag line
X
21 Telescoping Boat Hook 1 Minimum 8' including mounting clamps
Item No. General Outfit Quantity Description Watertight
Stowage Open Stowage
22 Snap Hook and Clip 1 Stainless steel clip that mounts to the boat hook and is rated for 3200 lbf working load.
X
23 Towing Line 1
150 ft of ¾ inch diameter double braided white nylon line with 12 inch eyes spliced and lock stitched at both ends
X
24 Navigation Rules International-Inland 1 COMDTINST M16672.2 X
25 Slide Rule, Nautical 1 X 26 Search Pattern Slide Rule 1 X 27 Anemometer, Hand Held 1 X 28 Stop Watch, Hand Held 1 X
29 Penlight 1 Red light, explosion-proof, and
IP 67 X
30 Hand Held Magnetic Bearing Compass 1 X
31 Wind shield debris screen 1 X
32 Bungee cords for ammo cans 1 X
33 P-6 Tie down straps 1 X 34 Tow reel cover 1 X 35 Seat Covers 4 X
32. MARKING
32.1. (R) “U.S. COAST GUARD” and identification number (to be provided by the Coast Guard) in block letters that are 6 inches high on the fendering.
32.2. (R) Hull identification number (to be provided by the Coast Guard).
32.3. (A) Equipment installed or outfitted on the boat by the Contractor shall be labelled.
33. HANDHOLD
33.1. (R) Be outfitted with a minimum of two fixed handhold devices at each seat location.
33.2. (R) Handholds shall be located throughout the boat to allow a 5th percentile female to always reach two handholds while transiting anywhere on the boat.
34. WINDOWS
34.1. (R) All windows shall be designed with the following design pressures: Front Facing 5.0 psi, Others 2.5 psi and shall be in accordance with the below table:
Material Minimum Thickness, US (in) Monolithic Tempered Glass ¼ Multi-Ply Laminated & Tempered Glass 0.30 Polycarbonate (PC) 5/16 Poly (methyl) methacrylate (PMMA) 5/16
34.2. (R) Each forward-facing window (windshield) shall have a wiper system with a window washing system. Wipers shall have at least three speeds (intermittent, low, and high) and be self-parking.
Windows with wipers shall not be polycarbonate.
34.3. (R) Forward-facing windows shall be angled forward.
34.4. (R) The side and aft facing windows shall not open or close in a vertical direction.
35. COATING, FINISH, CATHODIC PROTECTION, AND DECK COVERING
35.1. (R) Exposed aluminum surface shall have uniform natural finish, clean finish free of nicks, grind, swirl, and other markings.
35.2. (R) All faying surfaces, including the hull area in contact with the fender, shall be coated for corrosion resistance.
35.3. (R) Have sacrificial anodes for cathodic protection installed and sized for a saltwater environment.
35.4. (R) All interior and exterior decks (including hatches, ladders, and steps and areas for routine maintenance and operations) shall be provided with non-skid surface meeting the requirements of MIL-PRF-24667C, Type XI, Composition PS and be dark gray in color.
36. STOWAGE AND STORAGE
36.1. (A) Watertight stowage shall be a Watertight Enclosure with an opening that is watertightness degree 1.
36.2. (A) Open stowage is non-watertight in which items stored within may be exposed to the elements.
36.3. (A) Have space in interior lockable storage for four small arms: M16/M4 Rifle w/M203 attachment and M870 Shotgun with a Trijicon model RX01-11 sighting scope.
36.4. (A) Interior lockable storage shall be provided for a minimum of four M19A1 ammunition containers. Each container is 11” x 3.812” x 7.25.” The weight of each container with ammunition approximately 20 lbs.
36.5. (A) Exterior lockable storage shall be provided for two M19A1 at each weapon mount.
37. ONBOARD TOOL KIT, REPAIR PARTS AND STOWAGE
37.1. (R) Be provided with a tool kit. The tool kit shall be contained in a watertight, airtight, dustproof, chemical resistant, corrosion proof case, approx. 14 inches x 12 inches x 6 inches, with inserts and shall at a minimum have the following tools:
• Metric Combination Wrench Set: 10mm, 11mm, 12mm, 13mm, 14mm, 15mm, 16mm, and
17mm in a durable case;
• SAE Combination Wrench Set: 1/4 in., 5/16 in., 3/8 in., 7/16 in., 1/2 in., 9/16 in., 5/8 in., and 11/16 in. in a durable case;
• 3/8 in. drive SAE 6 or 12-point Socket Set: 1/4 in., 5/16 in., 3/8 in., 7/16 in., 1/2 in., 9/16 in., 5/8 in., 11/16 in., and 3/4 in. in a durable hard plastic case;
• 3/8 in. drive Metric 6 or 12-point Socket Set 10mm, 12mm, 13mm, 14mm, 15mm, 16mm, 17mm, 18mm, and 19mm in a durable hard plastic case;
• 3/8 in. drive ratchet with 3 in. and 6 in. extension bar in a durable hard plastic case;
• 10 in. Adjustable Wrench;
• Strap Wrench Set (two Piece);
• 10 in. Curved Jaw Locking Pliers;
• 10 in. Straight Jaw Pushlock Pliers;
• 10 in. Straight Jaw Pliers;
• 10-in-1 Ratcheting Multi-bit Screwdriver Set;
• 1/8 in. x 1/8 in. x 7.5 in. black poly cable ties, 50 Pack;
• One roll (20 yards) of 2-in. wide duct tape; and
• Electrical Tape (20 yards, roll)
37.2. (R) Be provided with onboard repair parts:
Part Nomenclature QTY (Minimum)
Fuel Filters, Primary with Bowls 2 Fuel Filters/Strainer, Secondary 2 Alternators/Generators Belt Set 2 Fuses (OEM Required In-Line], Boat Set) 1
38. TRAILER
38.1. (R) U.S. Department of Transportation (DOT) certified and provided with a title.
38.2. (R) Configured to carry the RB-S Demonstrator at highway speeds without special permits or allowances.
38.3. (R) Constructed of a heavy-duty aluminum, with minimum 15-inch wheels and tires.
38.4. (R) Be fully equipped for submersion during marine launching and have a fully sealed watertight electrical system with watertightness degree 1.
38.5. (R) Include a ladder with hand grabs or rails to access the boat, secured to the trailer.
38.6. (R) Trailer shall be outfitted with the following:
• Retrieval winch with strap and hook.
• Two shackles, Anchor HD Galvanized 5/8”.
• A minimum of three boat tie-down points: one forward and two aft, for securing the boat during transport.
• Matching, mounted spare tire and wheel.
• Trailer mount for spare tire that does not interfere with launch and retrieval of the boat when the spare tire is mounted.
• One tie-down ratchet strap per tie-down point.
• Tongue jack with handle and jack foot.
• Lug nut wrench for removing wheel lug nuts.
• Bottle jack sized for changing a trailer tire with the boat on the trailer.
• Two pairs of wheel chocks.
• Trailer ball (2-5/16 inch ball).
• Safety chains.
• Stowage compartment/box for the above. Compartment/box shall be made of durable, non-corrosive material suitable for the marine environment. If non-metallic, it shall be UV and solvent resistant.
39. ACCEPTANCE TESTING (AT)
39.1. (R) The Contractor shall provide documentation of all acceptance testing events, any discrepancy(ies), and how discrepancy(ies) are addressed at acceptance.
39.2. (R) A minimum of two weeks notice shall be provided in writing to allow the USCG to attend
AT.
39.3. (R) The Contractor shall validate the boat’s compliance to the requirements document. As part of the validation, the Contractor shall conduct a walkthrough of the boat with the USCG to point out requirement documents compliance. Any discrepancies identified shall be corrected and may be re-verified by the USCG before acceptance.
39.4. (R) The Contractor shall demonstrate that all onboard systems operate as intended.
39.5. (R) The Contractor shall conduct a Drainage Test consistent with ABYC H-4, Cockpit
Drainage Systems AP4.2. The Drainage Test shall be considered failed if Tactual is greater than
Tmax.
39.6. (R) Start-Up Procedures – The Contractor shall demonstrate and perform start-up procedures while the boat is at the dock before getting underway
39.7. (R) Full Power and Endurance Test – The boat shall undergo a one hour full power and endurance test. Full power shall be demonstrated for 30 minutes. The endurance test shall be performed at varying speeds at or above the cruising speed for at least 30 minutes. During this test the Contractor shall demonstrate that all parts of the propulsion system, as well as all other equipment and systems, are in satisfactory operating condition.
39.8. (R) Speed Test – The Contractor shall undergo speed trials to demonstrate the boat will achieve the full speed. This speed test may be performed in calm conditions or above, provided that the full speed can be attained. OEM-required break in periods shall be conducted prior to speed tests. The speed tests shall be comprised of two runs, in opposite directions over a one nautical mile course, at a minimum, with the speeds for the two runs averaged.
39.9. (R) Steering Test – The satisfactory operation of the steering system and stability of the boat during turns shall be demonstrated. Test runs shall be made at cruising and full speed. Helm angles used shall be 35 degrees (hard over) at cruise speed and 15 degrees at full speed.
39.10. (R) Range Verification – The Contractor shall provide verification that the boat will achieve the range requirement.
39.11. (R) Maneuvering Testing – The Contractor shall conduct testing to demonstrate the boat meets the USCG operating maneuverer requirements such as quick throttle reversals, backing, and crash stop. The maneuvering testing shall be conducted across all speeds.
39.12. (R) Post-Underway Maintenance – The Contractor shall perform post-underway shut-down procedures and checks.
39.13. (R) Scale Weighing – A scale weighing shall be conducted at the defined Lightship Condition.
The Contractor shall include in the scale weighing report the procedure used to determine Lightship Weight. The scale weighing shall use a minimum of two lift points or load cells.
The as-built Longitudinal Center of Gravity (LCG) shall be calculated from the scale weighing.
39.14. (R) The Contractor shall conduct a noise test.
39.15. (R) The Contractor shall test watertightness degrees 1 through 3 in accordance with ISO 12216.
For watertightness degree 1 the pass criteria is zero.
40. INTERIM CONTRACTOR LOGISTICS SUPPORT (ICLS)
40.1. (R) Provide non-warranty technical support, material, and labor during the Demonstration Period planned to last up to three months and take place in Norfolk, VA or North Charleston, SC.
40.2. (R) Include analysis, studies, inspections, surveys, parts, on-site casualty response, maintenance, upgrades, software updates, or documentation.
40.3. (R) Make a dedicated technician immediately available on-site Monday through Friday, 0800 –
1600 (EST) to assist the boat operators to perform any required maintenance, repair, and corrective actions to minimize operational breaks.
40.4. (R) Provide any needed parts and consumables material.
40.5. (R) Provide casualty response within 24 hours of notification.
41. DRAWINGS AND MODEL (CONTRACTOR FORMAT – (PRINTABLE AND
LEGIBLE ON TABLOID SIZE PAPER)
41.1. (R) General Arrangement
41.2. (R) Inboard Profile
41.3. (R) Console Layout
41.4. (R) Propulsion System – General Arrangement
41.5. (R) Electrical System – DC Electrical One-Line Schematics
41.6. (R) Electrical System – Distribution Panel Details
41.7. (R) C4I System – Electrical Navigation Aids Schematic
41.8. (R) C4I System – Communications Systems Schematic
41.9. (R) Auxiliary Systems – Bilge System Schematic
41.10. (R) Trailer – General Arrangement
41.11. (R) STEP and native format 3D model of the boat
42. STANDARDS AND OEM CALCULATIONS
42.1. (R) OEM required worksheets, application forms, and supplemental information associated with boat (i.e., ISO 12215-5, Annex L Application form, ISO 12217-1, Annex J Worksheets).
43. OEM TECHNICAL MANUALS
43.1. (R) All OEM technical manuals offered by an OEM for equipment, components, and accessories. Hard copy(s) is required.
44. SAFETY DATA SHEET (SDS)
44.1. (R) For any hazardous material used on the RB-S Demonstrator, a soft and hard copy(s) is required.
45. BOAT INFORMATION BOOK (BIB)
45.1. (R) Description of the boat’s capacities and characteristics, including operating instructions for all systems, equipment, and components installed.
45.2. (R) System diagrams to supplement the written description.
45.3. (R) ABYC T-24 Owner / Operator’s Manuals shall be used as guidance when developing the content of the BIB.
45.4. (R) Hard copy(s) is required.
46. CREW FAMILIARIZATION (FAM)
46.1. (R) Two days of crew familiarization (FAM) at delivery, crew able to operate all controls, navigation, and communication equipment to safely pilot the boat.
46.2. (R) Concentrate on the safe use of the boat, basic operation of all boat controls and equipment, and maintenance.
46.3. (R) Provided at the delivery / acceptance location.
47. WARRANTY
47.1. (R) Provide a comprehensive, “stem-to-stern” warranty that remains in effect for 12 months after final acceptance. The contractor shall bear every cost necessary to correct defects during this period, including labor, travel, per diem, materials, replacement parts, shipping, freight, and any other associated expenses. When hot work is required at a Coast Guard station or base, the contractor must obtain gas-free certification from a qualified Marine Chemist, and all costs for that certification and the related safety measures are covered under the warranty. Hot work is any operation—such as welding, cutting, brazing, grinding, or soldering—that produces open flames, sparks, or sufficient heat to ignite combustible materials.
47.2. (R) Warrant workmanship, performance, and operation of each boat and every installed system or component; include the Contractor’s standard commercial warranty terms.
47.3. (R) Warranty remains in force even when USCG personnel perform repairs.
47.4. (R) Pass through to the USCG any commercial warranties that exceed the one-year terms and continue to administer them.
48. PACKING, HANDLING, STORAGE, AND TRANSPORTATION
48.1. (R) Clean the RB-S Demonstrator, freshwater-wash all exterior surfaces, dry bilges, and disconnect fully charged batteries.
48.2. (R) Preserve every system—including propulsion—per OEM cold-weather guidance and affix a helm plaque stating the boat is not to be operated until re-commissioned.
48.3. (R) Lower any vertical appendages that can be reset within 10 minutes without special tools.
48.4. (R) Create a detailed inventory of all non-mounted items.
48.5. (R) Shrink-wrap the boat from chine to full transom and secure all loose gear in numbered, latching weather-proof totes with internal inventory lists (oversized items protected and fastened on board).
| INTRO |
| The primary requirement is the demonstrator boat be accepted in 90 days following award. The remaining requirements or attributes have flexibility. The closer a proposed boat is to the listed requirements and attributes, the more likely it will co... |
| The demonstrator boats will provide an opportunity to see if the requirements are achievable, and if some of the attributes are reasonable to include. |
| Proposals that include features beyond what is listed in this document as requirements or attributes, that positively influence mission success to include crew endurance, will receive positive consideration to support verifying if the features or at... |
| The demonstrator boats are being purchased to explore the available designs and features that are achievable on a boat of this size, that would positively influence mission success. |
| 1. Scope |
| 2. Response Boat – small Demonstrator Operations |
| 3. Principal Characteristics |
| 4. Operating Environment |
| 5. General Arrangements |
| 6. Definitions |
| 7. Standards |
| 8. Original Equipment Manufacturer (OEM) and Misc Requirements |
| 9. Access (with ppe and LE equipment) |
| 10. Noise |
| 11. STABILITY AND BUOYANCY |
| 12. STRUCTURE |
| 13. Masts |
| 14. FENDERING SYSTEM |
| 15. PROPULSION |
| 16. Electrical |
| 17. Lighting and illumination |
| 18. Anthropometry Requirements |
| 19. Helm Control |
| 20. ELECTRONIC NAVIGATION SYSTEMS (equipment meeting the function is required with specific make and model having flexibility) |
| 21. ALARMS |
| 22. INFRARED (IR) CAMERA SYSTEM |
| 23. integrated COMMUNICATION SYSTEMS |
| 24. VISUAL AND AUDIBLE COMMUNICATION SYSTEMS |
| 25. AUTOMATIC IDENTIFICATION SYSTEM (AIS) |
| 26. HEATING and ventilation |
| 27. Drainage |
| 28. Anchor kit |
| 29. Mooring, Towing, Tie Down, and Lifting Fittings |
| 30. Tow Reel |
| 31. Outfit |
| 32. Marking |
| 33. Handhold |
| 34. Windows |
| 35. coating, FINISH, Cathodic PROTECTION, AND Deck Covering |
| 36. Stowage and storage |
| 37. Onboard tool kit, repair parts and stowage |
| 38. TRAILER |
| 39. Acceptance Testing (AT) |
| 40. INTERIM CONTRACTOR LOGISTICS SUPPORT (ICLS) |
| 41. Drawings and Model (Contractor format – (printable and legible on tabloid size paper) |
| 42. Standards and OEM Calculations |
| 43. OEM TECHNICAL MANUALS |
| 44. Safety Data Sheet (SDS) |
| 45. Boat Information Book (BIB) |
| 46. CREW FAMILIARIZATION (FAM) |
| 47. warranty |
| 48. Packing, Handling, Storage, and Transportation |
File details come from the government source that posted it. Updated .