70Z02318RAHH00100 | Attachment A Statement of Work

MH-65E RADAR SENSOR SYSTEM (RSS)

STATEMENT OF WORK (SOW)

(14 November 2017)

1.0 General

1.1 Scope: A requirement exists for the United States Coast Guard (USCG) to purchase a RSS (production and spares) to produce and sustain its fleet of 98 MH-65E Short Range Recovery (SRR) helicopters. The contractor shall manufacture, assemble, integrate, test, certify, and deliver the required quantities of the Primus 700A. The RSS is a commercial item. The contractor shall also provide integrated logistical support service and engineering support services.

1.2 Background: The H-65 H-Conversion/Sustainment Program Discrete Segment (DS) 6 provides for a digital upgrade to the MH-65 with the install of a Common Avionics Architecture System (CAAS). One subsystem of that upgrade is the integration into CAAS and the MH-65 of a digital RSS. The Primus 700A has been in operational use on the USCG’s MH-60 fleet since 2009, has proven to be operationally suitable in all USCG areas of responsibility (AOR), and satisfies the current MH-60T requirements and the MH-65 requirements. The MH-65 operates in the same environmental conditions and flight profiles of the MH-60T.

1.3 Roles and Responsibilities

1.3.1 USCG Aviation Logistics Center (ALC), Elizabeth City NC: The ALC H-65 Product Line will serve as the primary airframe/system integrator for the DS6 components to include the RSS. ALC is the Government airworthiness authority for the H-65 Avionics System Development. The components will be received and installed by the USCG at the ALC during MH-65E modifications in a Programmed Depot Maintenance (PDM) cycle.

1.3.2 Rockwell Collins Incorporated (RCI): RCI currently serves as the avionics integrator for DS6 and the principle design authority for the CAAS Design. RCI will support RSS software integration for the MH-65E at the System Integration Laboratory (SIL) in Cedar Rapids, IA.

2.0 Applicable Documents

2.1 Government Documents: The following specifications, standards, and handbooks of the latest revision at the date of the original release of this SOW listed below form a part of this SOW to the extent specified herein.

2.1.1 USCG Instructions:

• CGTO 1H-65E-1 - H-65 Aircraft Flight Manual

• CGTO 1H-65E-2-1 - H-65 Maintenance Manual

• CGTO 1H-65E-2-2 - H-65 Wiring Manual

• CGTO 1H-65E-2-3 - H-65 Avionics Maintenance Manual

• CGTO 1H-65A-3 - H-65 Structural Repair Manual

• COMDTINST M3710.1 (Series) - USCG Air Operations Manual

2.1.2 Federal Aviation Administration (FAA):

• AC29-2C, Change 3, Certification of Transport Category Rotorcraft

• AC20-152, Design Assurance Guidance for Airborne Electronic Hardware

• FAR 21, Certification Procedures for Products and Parts

• FAR 29, Airworthiness Standards: Transport Category Rotorcraft

2.2 Commercial Documents: In addition to the documents listed below, and unless otherwise specified herein, the Contractor shall comply with its own internal written standards relative to design, quality, and configuration specifications.

• RTCA DO-160, Environmental Conditions and Test Procedures for Airborne Equipment

• RTCA DO-173, Minimum Operational Performance Standards for Airborne Weather and Ground

Mapping Pulsed Radars (Commercially available)

• RTCA DO-178, Software Considerations in Airborne Systems and Equipment Certification

• RTCA DO-254, Design Assurance Guidance for Airborne Electronic Hardware

3.0 Requirements

3.1 General: The contractor shall provide RSS components, related equipment, spare parts, software, integration support, test support, documentation, and product improvements.

3.1.1 Airworthiness: The contractor shall ensure that the aircraft safely perform all assigned missions in accordance with FAA Part 29 (14 CFR 29) Airworthiness Standards: Transport Category Rotorcraft (Amendment 16), Part 91 General Operating and Flight Rules and the USCG Air Operations Manual, COMDTINST M3710 (series). Modifications to the H-65 must be designed to meet or exceed the requirements of FAR 29 & FAR 21. Exceptions to FAR 29 & 21 requirements are allowed for public use aircraft.

Deviations from the FAR 29 & FAR 21 requirements must be approved by the USCG.

3.1.1.1 Crash Load Factors: Equipment installed in the cabin area shall be designed for the following load factors:

• 20 g’s forward and aft

• 10 g’s on the rotors

• 20 g’s on the helicopter bottom

• 10 g’s on either side

3.1.1.2 Wiring: The contractor shall ensure wiring conforms to the requirements of SAE AS50881, Rev D.

The contractor shall not use Kapton wiring.

3.2 RSS Production: The Contractor shall deliver all CLINs in accordance with the delivery schedule.

3.2.1 Deliveries: The contractor shall deliver a minimum of three (3) of each of the following items per month starting six (6) months after contract award. Early deliveries are authorized.

Part Name Part Number Antenna Drive MI-585467 Radar R/T 7009330-911 Antenna Array MI-585436-2 Radar R/T Tray Assembly

7031800-901

Control Panel 7008471-710

3.3 Warranty:

3.3.1 The Government requires a standard commercial warranty with optional extended warranties graduated out to five (5) years after installation. The contractor shall work with the USCG to certify/verify maintenance, repair, installation, handling, packaging, transportation, storage, and operations to ensure warranty requirements are met.

3.3.2 The contractor shall maintain a warranty program plan that ensures a warranty period commencing upon aircraft installation. The contractor shall, as part of the warranty program plan, track which items are purchased under this contract and apply the warranty as appropriate when said items are returned for service. The warranty program plan shall be accessible to the government upon request.

4.0 Integrated Logistics Support

4.1 Engineering Liaison: The contractor shall designate an engineering liaison for USCG technical and integration support. The engineering liaison shall have full access to all applicable manufacturers’ data and shall be authorized to speak for the manufacturer regarding technical issues. The engineering liaison shall be available to respond to USCG inquiries during normal working hours (M-F, 0800-0400 EST, excluding Federal Holidays, other times with prior arrangement) throughout the PoP of this contract.

4.2 Significant Component History Report (SCHR): The contractor shall ensure the SCHR remains with the corresponding part until returned to the USCG following repair.

4.3 Component Repair Record (CRR): The contractor shall maintain CRR records for the maintenance performed by the contractor on a serial number tracked component. The original copy of the CRR shall remain with the component until returned to the USCG. The contractor shall retain copies of the CRRs for ninety (90) calendar days after the item is shipped back to the USCG. The CRR shall be accessible to the government upon request.

4.4 Special Tools: The contractor shall provide any special tools required for field maintenance or testing. These tools will be owned and maintained by the USCG System Engineering and Integration.

4.4.1 Integration Support: The contractor shall provide technical support for the USCG MH-65E prototype and initial integration effort through deployment. The contractor shall coordinate with other OEMs to ensure optimal performance and airframe/avionics interface.

4.4.2 Operational and Developmental Test Efforts: The contractor shall provide technical support, as required, for the MH-65E developmental and operational test efforts to ensure optimal RSS performance and airframe/avionics interface in accordance with OEM integration requirements.

4.4.3 Interface Control Drawings: The contractor shall provide, within 30 days after contract award, Interface Control Drawings (ICDs) that clearly show the components, cable assemblies and interconnections, and installation components. The ICD shall include tables that clearly describe in full detail all input and output signal functions and descriptions and connector information that would be required by the Government for maintenance troubleshooting procedures or airframe integration. The ICD shall include any limitations of the length of the individual cable assemblies. The ICD will describe all software and electrical interface requirements for the RSS. The ICD should include form, fit and function data.

4.4.4 Technical Integration and Fleet Support: The contractor shall provide a minimum time between unscheduled removals (MBTUR). Additionally, the contractor shall provide root cause analysis in the event of failure of systems prior to the MBTUR.

4.5 Quality Assurance

4.5.1 Inspections and Tests: The contractor shall establish an inspection system in accordance with Federal Aviation Administration and/or Department of Defense procedures for all components. The USCG reserves the right to review the contractor operation and/or facilities at any time during the period of the contract.

4.5.2 Testing of Repaired Components: The contractor shall make available to the Government all acceptance test results and, as applicable, discrepancy reports with corrective actions taken for each component.

4.5.3 Final Inspection and Acceptance: Final inspection and acceptance of material under this contract shall be performed at destination (ALC) by local receiving personnel and will consist of count, condition and verification that all required documentation has been provided. ALC considers components Ready for Issue (RFI) upon acceptance.

Components determined to be non-RFI upon installation may be returned to the contractor with a Quality Deficiency Report.

4.5.4 Configuration Management Program: The contractor shall have an established Configuration Management Program with control systems in place for the referenced components including configuration identification of each hardware and software configuration item for the contract life. The contractor shall ensure hardware and software version consistency for all installed, repaired and spare systems. The contractor shall not change or modify any component software for the operating system, to include performance enhancement, and/or product improvement, etc.

without approval from the USCG. Changes other than Class II will not be made without approval from the Contracting Officer. The contractor shall provide a Configuration Management Plan that documents the Configuration Management Program, ninety (90) calendar days following contract award.

4.5.5 Notification: The contractor shall immediately notify the Contracting Officer’s Representative (COR) upon identification of any quality issue, failure, or situation that could possibly affect the reliability of the referenced components.

4.7 Service Bulletins: The Contractor shall provide a copy of all service bulletins to the Contracting Officer within 10 calendar days of release of service bulletins (or other instructions) that may affect USCG components. The Contracting Officer will notify the Contractor in writing when mandatory bulletins are required. Within 30 calendar days following receipt of notification from the Contracting Officer, the Contractor shall submit a detailed proposal for incorporation of service bulletin(s). This proposal shall include a listing of replacement parts and/or materials required, the time needed to effect the modification, an estimated price breakdown of each part and the number of labor hours required. The USCG will normally incorporate all mandatory service bulletins.

4.7.1 Optional Service Bulletins: The contractor will be notified via contract modification of the USCG’s desire to incorporate optional service bulletins. If additional funds will be required to incorporate optional service bulletins, the contractor shall advise the COR. The COR will forward his/her recommendation to the Contracting Officer. For service bulletins that require additional funds, the contractor shall submit a detailed proposal within 30 working days following receipt of notice from the Contracting Officer. This proposal shall include a list of required parts and associated prices based on contractor's current commercial catalog minus the best commercial discount or best commercial price (whichever results in the lower price to the Government). This proposal shall also address the turnaround time needed to effect the modification and the total number of labor hours required. Additional labor charges will not apply for incorporation of service bulletins if they do not result in any “over-and-above” contractor shop labor. The contractor shall not incorporate optional service bulletins prior to written notification from the Contracting Officer.

4.8 Product Improvement/Engineering Changes: The Contractor may develop designs and/or processes that will improve the reliability, maintainability, or operational performance of the RSS. These may be provided to the Contracting Officer for consideration and approval. A proposal shall also be provided that reflects development costs and an incremental charge to be assessed each time the Product Improvement Plan/Engineering Change Proposal (PIP/ECP) is incorporated into the component. The proposal shall include a breakdown of labor hours, material, and other costs. The labor rates will be as specified in the Schedule. Upon agreement of the price for incorporation of the change, the Contracting Officer will issue a modification to the contract to authorize and incorporate pricing for the change. The Contractor shall not incorporate proposed product improvements or engineering changes prior to receipt of written authorization from the Contracting Officer.

5.0 Technical Information

5.1 Technical performance information: The Contractor shall provide USCG personnel access to relevant RSS technical performance information developed by OEMs. Technical performance information includes information pertaining to flight safety, equipment reliability and delivery performance. Inquiries by USCG technical personnel shall be answered as soon as possible and not later than 24 hours after requested for flight safety issues. Access will be provided to review manufacturer quality assurance and engineering documentation as required to support USCG flight safety investigations.

5.2 Technical Publication:. The contractor shall provide, in electronic format and within 30 days after contract award and then 30 days after any updates or amendments during the period of the contract or established warranty period:

• Technical publications

• Training data for the RSS

• Updated copies of all OEM approved required publications including but not limited to:

o Pilot’s manual o Component maintenance manual with illustrated parts list o System description and installation manual

* Portions of some manuals may be combined into a single publication.

6.0 Special Instructions

6.0 Aircraft on Ground (AOG) Situations: Upon notification from the USCG that an AOG situation exists (meaning that a fleet aircraft is unable to perform its mission due to the contractor’s installed equipment), the contractor shall expedite the repair/modification and initiate shipment within seven (7) calendar days or less.

Material shipping methods will be determined based on severity of situation, using the most cost effective method.

The shipping container shall be marked on the outside in highly visible lettering "A.O.G." At the time the contractor is notified of an AOG requirement, the contractor shall advise the Contracting Officer if there are additional shipping charges. If approved, the Contracting Officer will provide special shipping instructions and authorization for reimbursement in these instances.

6.1 Disposition of RSS involved in Aircraft Accidents or Incidents: The contractor shall participate in mishap investigations as required by the direction of the National Transportation Safety Board whose rules and regulations delegate to the USCG such authority as is appropriate. Contractor participation in these proceedings will be determined by the president of each accident or incident board and directed by the Contracting Officer.

6.2 Other Performance Terms

6.2.1 Post Award Conference: The contractor shall attend a Post Award Conference to be held at ALC no later than 15 business days following the date of award. The USCG will determine the specific date for the Post Award Conference at time of contract award.

6.2.2 Airworthiness Certification: The contractor shall:

• Maintain OEM and FAA certifications for the repair of all components related to the RSS for the contract Period of Performance (POP).

• Immediately notify the Contracting Officer of the loss of either certification.

• Ensure software versions are noted distinctly on all repair documents, inventory management documents and any reports required by the SOW.

• Furnish a Certificate of Conformance in accordance with FAR Clause 52.246-15 for all components.

6.2.3 After a warranty repair, tag each component returned with a DD Form 1574 Serviceable Condition Code Tag, completed in its entirety. These forms shall be packaged with each component and copies shall be included with the invoice.

6.2.4 Data Management: Unless otherwise specified, the contractor shall prepare and deliver all data deliverables in electronic format compatible with Coast Guard Standard Workstation (Windows Server 2007 and Microsoft Office 2007 or later). Data not required to be revised may be provided in Adobe Acrobat 8 (Standard) by Adobe Systems, Inc. Due to USCG Internet restrictions, electronic mail attachments over 5 MB in size cannot be accepted. The Contractor shall provide all deliverables exceeding the 5 MB file size on Compact Disk (CD) or Digital Video Disk (DVD) with read/write capability and/or via a suitable large file upload server. Electronic Format: The contractor shall provide electronic copies of the technical data delivered in accordance with this SOW. The electronic copy will include the current publication's xml file, graphics files, folder structure, DTD and FOSIs. When feasible, documents and graphics shall be formatted to facilitate translation into USCG standard publications using the ALC compatible software as described below.

6.2.5 Documents: Documents that are primarily text shall be delivered as follows:

• XML file linked to applicable graphics in Autotrol Technical Illustrator-derived .cgm files that shall be capable of being accurately viewed, printed, and modified using Arbortext Editor version 5.3M090 [if the document will be delivered after March 2012, use version 6.0M020], and o Adobe .pdf files that are electronically searchable.

o Graphics associated with these documents shall also be delivered separately per the following paragraphs.

o The USCG will accept the COTS Tech Manuals (e.g. in Microsoft Word format).

6.2.6 Graphics: Graphics (drawing, wiring diagram, or illustration) shall be delivered as follow: Drawings or wiring diagrams shall be capable of being accurately viewed, printed, and modified in:

• CoCreate Drafting 2008, or

• earlier compatible version of One Space Designer in .mi file format; or

• the latest version of Autotrol Technical Illustrator in .dg format.

6.2.7 Illustrations: Illustrations other than drawings or wiring diagrams shall be capable of being accurately viewed, printed, and modified using the latest version of Autotrol Technical Illustrator in .dg format.

7.0 Period of Performance

7.1 The Government anticipates a five (5) year firm fixed price (FFP) contract to include one (1) twelve (12) month base period and, if exercised, four (4) twelve (12) month option periods.

8.0 Contract Deliverables

8.1 General: This section describes the contract deliverables for the tasks specified in the above sections. The contractor’s format of all deliverables is acceptable except as noted above. All documents will be delivered with Government Purpose Rights. The government shall accept or reject the indicated CDRL by giving written notice to Contractor following receipt.

8.2 Contract Deliverables:

CDRL Title Frequency Delivery Method

Acceptance Required Timing SOW Data

Rights

1 Interface Control Drawings (to include Once Electronic X 30-days post award 3.2.3 4.4.2

Limited Rights in

Form, Fit and Function Data) accordance with

52.227-14 (b)

2 Configuration Management Plan Once Electronic X 90-days post award 3.3.4 4.4.2

Limited Rights in accordance with

52.227-14 (b)

3 Pilots Manual Once Electronic X 30-days post award

4.3 4.4.2

Limited Rights in accordance with

52.227-14 (b)

Component Maintenance Manual with Illustrated

Parts List Once Electronic X 30-days post award 4.3

4.4.2

Limited Rights in accordance with 52.227-14 (b)

5 System Description and Installation Manual Once Electronic X 30-days post award 4.3

4.4.2

Limited Rights in accordance with

52.227-14 (b)

6 Service Bulletins As produced Electronic X 30 days after release

TBD IAW

52.227-14

(b)

STATEMENT OF WORK (SOW)
(14 November 2017)
1.0 General
1.3 Roles and Responsibilities
4.4 Special Tools: The contractor shall provide any special tools required for field maintenance or testing. These tools will be owned and maintained by the USCG System Engineering and Integration.
8.0 Contract Deliverables
8.1 General: This section describes the contract deliverables for the tasks specified in the above sections. The contractor’s format of all deliverables is acceptable except as noted above. All documents will be delivered with Government Purpose Right...
8.2 Contract Deliverables: