Attachment_1_-_Technical_Compliance_and_Pricing_Table.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Prefabricated Concrete Buildings
- Solicitation number
- 70T02018Q7NOTD448
About this file
Attachment 1 - Technical Compliance and Pricing Table
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70T02018Q7NOTD448_-_PreFabricated_Concrete_Building_RFQ.pdf | ||
| Attachment_2_-_Reps_and_Certs_Document.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Technical Compliance & Pricing Table
| Technical Compliance | Supporting Documentation Provided? | ||
| Clin No. | Description | Yes | No |
| 0001 | Two (2) Prefabricated Concrete Buildings in accordance with the Section 2 Statement of Work | ||
| * The concrete buildings must be 10x12x9 including precast concrete floor using 5,000 steel-reinforced | |||
| concrete. | |||
| * Roof and floor must be a minimum of 4” thick, steel reinforced, and post-tensioned concrete. | |||
| * Roof must have at least 3” overhang with ½ turned down drip edge. | |||
| * The concrete buildings must have a 6’x6’8” double insulated 18-gauge galvanized steel door with | |||
| tamper-proof hinges. Door must be centered and facing the roadway on the 12’ side. | |||
| * Buildings must include two (2) 12.5-gauge screen aluminum vents. They must be located on the sides | |||
| and back of building. They must be centered towards the top of the building on both sides and | |||
| the back. | |||
| * Buildings must be UL 752 level 4 bullet resistant. | |||
| * Must have a standard fire rating of 1.5 hours. | |||
| * Must have an earthquake resistant rating of seismic zone 4. | |||
| * Must be hurricane resistant up to 130 mph wind. | |||
| * Must be petrochemical blast resistant. | |||
| * Buildings must be placed south of the specified location on the gravel platform side by side and | |||
| assembled with the door facing the roadway. | |||
| AND | Yes | No | |
| Supporting documentation provided such as literature / design drawings / specifications / brochures / pictures | |||
| Vendor shall notify the POC at least 72 hours prior to delivery date and provide all unloading services |
| Reps and Certs | ||
| Vendor | Yes | No |
| Quoter has completed Attachment (2) Reps and Certs Document (FAR Provision 52.212-3) | ||
| Or | ||
| Vendor is in compliance with paragraph (b)(2) of the provision which states that the offers’ representations and certifications posted electronically at FAR 52.212-3 are current, accurate, complete, and applicable to this solicitation (including the business size standards applicable to the NAICS code referenced in the solicitation). |
| Pricing | |||||
| Clin No. | Description | Quantity | Unit of Issue | Unit Price | Total Price |
| 0001 | Two (2) Prefabricated Concrete Buildings in accordance with the Section 2 Statement of Work | 1 | EA | $ - 0 | $ - 0 |
| Total | $ - 0 |
Sheet2
Sheet3
File details come from the government source that posted it.