Fort Collins QA.pdf
PDF 65 KB Posted
- Solicitation number
- 70RFPW20QW8000003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70RFPW20QW8000003 0005.pdf | ||
| 70RFPW20QW8000003 Amendment 4.pdf | ||
| 70RFPW20QW8000003 0003.pdf | ||
| 70RFPW20QW8000003 0002.pdf | ||
| 70RFPW20QW8000003 0001.pdf | ||
| 70RFPW20QW8000003 Solicitation PKG.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – Fort Collins Federal Building
70RFPW20QW8000003
Number Reference Question
1. C.4.1, D.1.2, E.1.1.2 Section C.4.1 says that the equipment will have no web access but Sections D.1.2 and E.1.1.2 both require that the system have remote viewing. Please confirm that the government will allow the NVR to have a web connection for remote viewing.
ANSWER: No part of the VSS shall have access to any other network, including the internet. Please see revised SOW provided with Amendment 0005, sections B.2 subsection B.2.1 and C.4 subsection C.4.1. The equipment shall have the capability for remote access however. Section E.1.1.2 does not exist in the SOW.
2. Attachment B
Please provide the ceiling type for the building – drop? Sheetrock? Exposed?
ANSWER: Please see revised SOW provided with Amendment 0005, section C.2, subsection C.2.13.
3. Attachment B Is there an existing conduit/chaise/path to run the wires between the floors? If yes, please provide the locations of these paths.
ANSWER A: Yes
ANSWER B: Please see revised SOW provided with Amendment 0005, section C.2, subsection C.2.14.
4. B.2.2, Attachment B Please confirm that the offeror provided rack will be installed in Room B05. Does the Government plan to install existing equipment in the rack or to add additional equipment in the future?
ANSWER A: See Attachment B, provided with original documents Second Floor for description and location.
ANSWER B: Yes.
5. D.2.3 Please clarify if offerors should provide the Government with STD licensing or ENT enterprise level software?
ANSWER: D.2.3 does not refer to licensing. Please see revised SOW provided with Amendment 0005, section C.2, subsection C.2.4.
6. D.5.1 Please confirm that the requested monitors should be wall mounted.
ANSWER: Please see revised SOW provided with Amendment 0005, section D.5, subsection D.5.1.
7. E.9.3 Please confirm that the three training sessions will take place concurrently with installation, inspection and approval of the system.
ANSWER: No. Please see revised SOW provided with Amendment 0005, section E.9, subsection E.9.3.
8. D.2.4 2x VGA outputs are requested, but the desired NVR only has
1. Since VGA ports won’t be used for monitors, please confirm that you will accept the specified NVR as provided by the manufacturer.
ANSWER: Please see revised SOW provided with Amendment 0005, section D.2, subsection D.2.4
9. D.3.4 The 1.0C-H4PTZ-DP45 PTZ camera requested has a lens that goes from 4.3mm to 129mm instead of the 4.3mm to 135mm requested lens. Please confirm that this will be acceptable.
ANSWER: Please see revised SOW provided with Amendment 0005, section D.3, subsection D.3.4
10. D.4 The WS-C3850 requested POE switch is nearly EOL. Please confirm that an equivalent replacement of C9300 will be suitable.
ANSWER: Refer to salient characteristics in revised SOW provided with Amendment 0005, section D.4 subsections a and b.
11. Can we reuse existing wire?
ANSWER: No. Please see revised SOW provided with Amendment 0005, section E.3, subsection E.3.1.
12. Will the site provide drawings of the building so the contractor can make wiring schematics and as-built drawings?
ANSWER: Please see revised SOW provided with Amendment 0005, section C.1, subsections C.1.12 a.
13. Where is the Server Rack located on the second floor?
ANSWER: See answer #4.