70RFPW19QWA000002_0002.pdf

PDF 551 KB Posted

Attached to
Video Surveillance System (VSS) upgrade
Solicitation number
70RFPW19QWA000002
Issued by

About this file

Extend closing date. Update SOW and replace pages. See document.

View the file

Other files

File Type Posted
Q_and_A_signed.pdf PDF
70RFW19QWA000002_0001_PKG.pdf PDF
RFQ_PKG_70RFPW19QWA000002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

70RFPW19QWA000002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Auburn WA 98001 Cedric Bedgood

OPO/FPS/WEST CCG/R10

400 15th Street SW Ofc of Procurement Operations - FPS U.S. Dept. of Homeland Security NPPD/FPS/West CCG/Region 10

Auburn WA 98001 400 15th Street SW

OPO/FPS/WEST CCG/R10

Office of Procurement Operations Federal Protective Service U.S. Dept. of Homeland Security NPPD/FPS/West CCG/Region 10

05/02/20190002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/02/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FPS CS: Cedric Bedgood. 253-876-6829, cedric.bedgood@fps.dhs.gov

FPS CO: Maria De L. Santiago, 253-876-6840, Maria.santiago@fps.dhs.gov

I. The purpose of this amendment is to extend closing date from July 09, 2019 at 0900 PDT to July 17, 2019 0900 PDT.

II. Revise Statement of Work (SOW). The SOW page 9, Section B.2.5 Contractor Furnished list see yellow highlighted area; page 12 sections C.3.1 and C.3.2 see yellow highlighted area.

Please replace pages 9 0001 and 12 0001 with attached pages 9 0002 and 12 0002.

III. No further questions will be answered.

IV. There are no other changes as a result of this amendment.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Maria Santiago

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

70RFPW19QWA000002/0002

Attachment(s):

Sow page 9 0002, page 12 0002

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

FOR OFFICIAL USE ONLY (FOUO)

Law Enforcement Sensitive (LES) / For Official Use Only (FOUO)

B.2.5 Contractor Furnished Equipment

ITEM QUANTITY UNIT

IP PTZ Cameras 13 EA IP Fixed Cameras 8 EA Decoder 1 EA 28-inch HD Monitor 2 EA Custom mount for cameras at main entrance 1 EA Aiphone 1 EA Uninterrupted Power Supply 4 EA Network Switch 5 EA PoE+ Injector 18 EA Class 10 32 GB micro SDHC 18 EA Lockable Vented Wall Mounted Rack Enclosure (switch depth) 2 EA Optional Equipment/ Security Desk 1 EA 8TB hard drives 4 EA

C. SCOPE

C.1 General

C.1.1 As part of the pre-bid process, FPS may have a site visit and all interested Contractors are invited to attend. The purpose of the site visit is for Contractors to survey the site and review the requirements of this SOW. A site visit will be scheduled by the COR/FPS PM. All questions relevant to this SOW shall be submitted in writing to the COR/FPS PM. The Contractor shall not make or assume any changes to this SOW without written approval from the COR/FPS PM.

C.1.2 The Contractor shall be responsible for the removal, inventory, packaging for storage and return of all removed equipment to the FPS PM. All currently installed wire, cable, and fiber, which is not designated for reuse, shall be completely removed by the Contractor and properly disposed of.

C.1.3 The existing system shall remain fully functional and operational to the extent possible during the installation of the new surveillance system. The contractor shall cut over from the existing system to the new system in stages to minimize the number and duration of outages. The Contractor shall submit a system cutover plan in accordance with Section F Deliverables. The cutover plan shall be reviewed and approved in writing by the FPS PM.

C.1.4 The Contractor shall provide and install and configure the system as described and/or shown herein. The system shall include all connectors, adapters, terminators, and appurtenances to interconnect all equipment. The Contractor shall also supply all cabling and miscellaneous materials necessary to interconnect all equipment installed in accordance with this SOW.

70RFPW19QWA000002 0002

FOR OFFICIAL USE ONLY (FOUO)

Law Enforcement Sensitive (LES) / For Official Use Only (FOUO)

C.2.7 All ceiling tiles removed to accommodate installation shall be returned at the end of the work day.

C.2.8 The Contractor shall remove and haul debris from the project site daily and dispose of in a proper, acceptable manner in accordance with all federal, state and local laws and regulations, off the job site property. The debris created from this project shall not be disposed of at the job site, in Government dumpsters, or on Government property.

C.2.9 The Contractor shall install and configure cameras in accordance with manufactures recommendations and industry best practices for optimal live view and recording.

C.2.10 The Contractor shall verify all camera views with the FPS PM prior to installation.

C.2.11 The Contractor, when removing the existing cameras, cabling, and appurtenances in accordance with this SOW, shall ensure all openings or penetrations are sealed and/or patch accordingly to protect against weather exposure, unless otherwise designated for reuse. All openings or penetrations that are designated for reuse shall be sealed and/or patched accordingly to protect against weather exposure at the completion of installation. All penetrations that become exposed to weather during installation shall be protected from exposure throughout the installation period.

C.3 Video Storage Requirements

C.3.1 The Contractor shall purchase and install Class 10 32 GB micro SDHC in every camera installed. This is to include the existing 5 IP cameras, Automatic Network Replenishment (ANR) will need to be configured on all cameras to work properly with SD cards, C.3.2 Contractor shall purchase and install 4 new 8TB hard drives in the existing DIP 7000 to increase storage, C.3.3 The Contractor shall configure the installed VSS to function in a Network Domain environment, not as a workgroup.

C.3.4 The Contractor shall ensure all system devices are configured appropriately for time synchronization. All devices shall be configured for time synchronization with the NVMS Server.

C.3.5 The Contractor shall demonstrate to the COR/FPS PM that the completed installation complies with the contract requirements. Using an approved test procedure, all physical and functional requirements of the project shall be demonstrated and shown. The test procedure shall include techniques and requirements for validating all significant system functions. The Contractor shall provide all test equipment and personnel required for final testing.

C.4 Control Room Monitors

C.4.1 Contractor shall uninstall the two smaller monitors at PSO control room and give monitors to FPS PM. Contractor shall provide and install two 28inch monitors.

70RFPW19QWA000002 0002

File details come from the government source that posted it.