Attachment A - Pricing Schedule 08-03-2023.xlsx

XLSX spreadsheet 351 KB Posted

Attached to
Public Assistance Technical Assistance Contracts V (PA TAC V) Federal contract opportunity
Solicitation number
70FB8023R00000011
Issued by
Federal Emergency Management Agency

About this file

This document contains a pricing schedule template for the Public Assistance Technical Assistance Contracts V (PA TAC V) solicitation from the Federal Emergency Management Agency. The template includes pricing tables to be completed by offerors for staff labor rates, mobilization costs, task order labor costs, travel expenses, miscellaneous costs, and Defense Base Act insurance. Offerors will provide pricing for four geographic zones covering all FEMA regions. The contract is a single-award IDIQ for a base period of one year with four one-year options. The template includes instructions for completing labor categories, assumptions, additional staff requirements, and surge capabilities. Pricing tables cover staffing levels, labor rates, deployment hours, travel expenses, and other direct costs.

View the file

Other files for this federal contract opportunity

Other files attached to Public Assistance Technical Assistance Contracts V (PA TAC V), newest first.
File Type Posted
SOLICITATION 70FB8023R00000011 (PA TAC V) 8.23.2023.pdf PDF
Amendment 0003 - 70FB8023R00000011.pdf PDF
Amendment 0002 - 70FB8023R00000011.pdf PDF
SOLICITATION 70FB8023R00000011 (PA TAC V) 8.17.2023.pdf PDF
Attachment 1 - Labor Category Qualifications PA TAC V 08.11.2023.xlsx XLSX spreadsheet
Attachment A - Pricing Schedule 08-14-2023 v1.xlsx XLSX spreadsheet
QA Site Inspection Job Aid (Reload).pdf PDF
Second Round of Q and A 8.17.23.xlsx XLSX spreadsheet
Attachment 2 - PRS PA-TAC V 08-11-2023 v4.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
QA Attachment B - DHS MD 0480.1.pdf PDF
QA Attachment C - Site Inspection Job Aid.pdf PDF
QA Attachment E1 - 1-Program Delivery Manager Position Assist.pdf PDF
QUESTIONS ANSWERS PATACV DATE-8-04-2023.xlsx XLSX spreadsheet
QA SI Crew Leader Position Assist.pdf PDF
QA Site Inspection Job Aid.pdf PDF
QA Attachment A - FEMA Personnel Standards of Conduct Directive FINAL.pdf PDF
QA Attachment F - Environmental Planning and Historic Preservation Advisor Position assist.pdf PDF
70FB8023R00000011 Amendment 0001.pdf PDF
SOLICITATION 70FB8023R00000011 (PA TAC V) 8.4.2023.pdf PDF
Attachment 2 - PRS - PA-TAC V (07-31-2023) v2 (FINAL).pdf PDF
QA Attachment D - PA Site Inspector Position Assist.pdf PDF
QA Attachment E2 - 2-Program Delivery Manager Position Assist Addendum.pdf PDF
QA Attachment G - Hazard Mitigation Specialist Position Assist.pdf PDF
QA Attachment H FEMA PAPPG.pdf PDF
Attachment B - Wage Determinations File 6.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment 1 - Labor Category Qualifications PA TAC V 03-29-2023.pdf PDF
Attachment 2 - PRS - PA-TAC V 03-09-2023 (FINAL).pdf PDF
Attachment 3 - Security and Badging.pdf PDF
Attachment A Pricing Schedule - PA-TAC V 07-06-2023.xlsx XLSX spreadsheet
Attachment B - Wage Determinations File 1.docx DOCX document
SOLICITATION 70FB8023R00000011 (PA TAC V).pdf PDF
Attachment 1 - Labor Category Qualifications PA TAC V 03-29-2023.xlsx XLSX spreadsheet
Attachment B - Wage Determinations File 4.docx DOCX document
Attachment B - Wage Determinations File 5.docx DOCX document
Attachment B - Wage Determination File 2.docx DOCX document
Attachment B - Wage Determinations File 3.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

1Pricing Schedule Spreadsheet:
The Pricing Schedule spreadsheet was developed for: (1) the contractor to submit their price proposal , (2) to enable a consistent price proposal evaluation, and (3) to determine the contract ceiling.
2Instructions for the contractors:
Follow the instructions listed (in red) on the top of each TAB - (1) "Start-Up Mob", (2) and "All Task Orders".
All assumptions are given and are listed at the bottom of each TAB.
The contractor shall provide input in the cells highlighted in "yellow" only.
No other fields or formulas need to be filled nor changed.
3Summary TAB:
The "Summary" TAB will automatically calculate the Base Period, all Option Years, and the Total as the ceiling for the contract.
4LCAT Rates TAB:
The "LCAT Rates" TAB shall be used to capture the contractor's Rates for their PMO and all Staff to be used during the contract periods of performance.
The contractor shall provide all Labor Rates in the cells highlighted in "yellow".
5Basis of Estimate (BOE):
The Contractor may provide their Basis of Estimate (BOE) with their price proposal.
6Acronyms: PDMG (Program Delivery Manager)
SI (Site Manager)
LCAT (Labor Category)
PMO (Program Management Office)
BI (Background Investigation)
TS (Technical Specialist)
EHP (Environmental and Historic Preservation)

LCAT Rates Contractor to provide the Labor Rates for the base and all options

Atlantic - FEMA Regions 1 and 2 East - FEMA Regions 3, 4, and HQ Central - FEMA Regions 5, 6, and 8 West - FEMA Regions 7, 9, and 10

Contractor PMO StaffBase PeriodOption
Year 1Option
Year 2Option
Year 3Option
Year 4Base PeriodOption
Year 1Option
Year 2Option
Year 3Option
Year 4Base PeriodOption
Year 1Option
Year 2Option
Year 3Option
Year 4Base PeriodOption
Year 1Option
Year 2Option
Year 3Option

Year 4

Labor CategoryQuantityLevelRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesLabor RatesOvertime Labor Rates
Program Manager (PM)1
Deputy Program Manager (DPM)1
Contracting Specialist III1
Computer Specialist III1
Planner I1
Program Coordinator II1
Program Coordinator III1
Senior Trainer3
Total PMO Staff10
Contractor Pool of StaffBase PeriodOption
Year 1Option
Year 2Option
Year 3Option
Year 4Base PeriodOption
Year 1Option
Year 2Option
Year 3Option
Year 4Base PeriodOption
Year 1Option
Year 2Option
Year 3Option
Year 4Base PeriodOption
Year 1Option
Year 2Option
Year 3Option

Year 4

Labor CategoryQuantityLevelRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesRegular Labor RatesOvertime Labor RatesLabor RatesOvertime Labor RatesLabor RatesOvertime Labor Rates
Construction Manager20Mid
Construction Manager10Senior
Project Manager10Mid
Project Manager10Senior
Construction or Building Inspector17Mid
Construction or Building Inspector3Senior
Architect2Mid
Architect2Senior
Civil Engineer15Mid
Civil Engineer20Senior
Coastal Engineer1Mid
Coastal Engineer2Senior
Electrical Engineer5Mid
Electrical Engineer10Senior
Environmental Engineer1Senior
Geologist1Senior
Health Scientist1Senior
Hydraulic Engineer1Senior
Hydrologist1Senior
Industrial Hygienist1Senior
Mechanical Engineer5Mid
Mechanical Engineer10Senior
Sanitary Engineer1Senior
Soil/Geotechnical Engineer1Mid
Soil/Geotechnical Engineer1Senior
Structural Engineer5Mid
Structural Engineer10Senior
Archaeologist2Mid
Archaeologist3Senior
Architectural Historian1Mid
Architectural Historian2Senior
Biologist2Mid
Biologist3Senior
Certified Floodplain Manager1Mid
Certified Floodplain Manager1Senior
Ecologist1Senior
Environmental Planner4Mid
Environmental Planner4Senior
Historic Architect1Mid
Historic Architect2Senior
Horticulturalist1Senior
Water Quality Specialist1Senior
Wetlands Specialist1Senior
Accountant4Mid
Accountant4Senior
Certified Public Accountant (CPA)3Mid
Certified Public Accountant (CPA)3Senior
Financial Analyst2Mid
Financial Analyst2Senior
Appraiser1Mid
Estimator2Mid
Estimator3Senior
Commercial Property Insurance Professional2Mid
Commercial Property Insurance Professional1Senior
Administrative Support Specialist5Mid
Administrative Support Specialist2Senior
Reports and Communication Specialist3Mid
Reports and Communication Specialist2Senior
General Planner2Mid
General Planner2Senior
Graphic Artist1Senior
Management Analyst (Program Strategist)1Mid
Management Analyst (Program Strategist)3Senior
Technical Writer1Mid
Technical Writer2Senior
Trainer2Mid
Trainer1Senior
Total Number of Staff250

Summary

This Tab is auto-populated with other Tabs as indicated below. No contractor input is required on this Tab
Atlantic and West zones include an estimate for Defense Based Act (DBA) Insurance due to overseas travel requirements.
East and Central zones do NOT include an estimate for Defense Based Act (DBA) Insurance - No overseas travel is required.
Total amount for the Start-up Mobilization Tasks for any zone shall not exceed $1 Million for the Base Period and $100,000 for Option Year 4.
The contractor ceiling shall be determined by the awarded zone.
Date:8/3/23
.
.CONTRACT SUMMARY
Atlantic - FEMA Regions 1 and 2Includes DBA Insurance Calculations for "PDMG & SI Task Orders"
West - FEMA Regions 7, 9, and 10
BaseOption Year 1Option Year 2Option Year 3Option Year 4Total
Num. of MonthsEst. 10 - Months12 - Months12 - Months12 - Months12 - Months4-Yrs, Est. 10 Mths
Period of Performance (POP)Date of Award -
Sep 30, 2024Oct 1, 2024 -
Sep 30, 2025Oct 1, 2025 -
Sep 30, 2026Oct 1, 2026 -
Sep 30, 2027Oct 1, 2027 -
Sep 30, 2028Date of Award -

Sep 30, 2028

TABs
.
.Start-Up Mobilization Tasks (One Time Payment)$0.00$0.00$0.00$0.00$100,000.00$100,000.00
.
.All Task Orders (Includes DBA Insurance)$0.00$0.00$0.00$0.00$0.00$0.00
.
.Contractor Ceiling - - - >$0.00$0.00$0.00$0.00$100,000.00$100,000.00
East - FEMA Regions 3, 4, and HQDoes NOT Includes DBA Insurance Calculations for "PDMG & SI Task Orders"
Central - FEMA Regions 5, 6, and 8
BaseOption Year 1Option Year 2Option Year 3Option Year 4Total
Num. of MonthsEst. 10 - Months12 - Months12 - Months12 - Months12 - Months4-Yrs, Est. 10 Mths
Period of Performance (POP)Date of Award -
Sep 30, 2024Oct 1, 2024 -
Sep 30, 2025Oct 1, 2025 -
Sep 30, 2026Oct 1, 2026 -
Sep 30, 2027Oct 1, 2027 -
Sep 30, 2028Date of Award -

Sep 30, 2028

TABs
.
.Start-Up Mobilization Tasks (One Time Payment)$0.00$0.00$0.00$0.00$100,000.00$100,000.00
.
.All Task Orders$0.00$0.00$0.00$0.00$0.00$0.00
.
.Contractor Ceiling - - - >$0.00$0.00$0.00$0.00$100,000.00$100,000.00

$0.0M

Table for AP

ZoneContract TypeContract ValuePeriod of PerformanceCompetitiveSet Aside
Northeast - FEMA Regions 1, 2, and 3Single IDIQERROR:#REF!1 Dec 2023 – 30 Sep 2028YesNo
Southeast - FEMA Region 4Single IDIQERROR:#REF!1 Dec 2023 – 30 Sep 2028YesNo
Central - FEMA Regions 5, 6, and 8Single IDIQ$0.0M1 Dec 2023 – 30 Sep 2028YesNo
West - FEMA Regions 7, 9, and 10Single IDIQ$0.0M1 Dec 2023 – 30 Sep 2028YesNo
TotalERROR:#REF!

Start-Up Mob

Contractor to provide input in cells highlighted in Yellow only.
Quantity of Staff already provided. No contractor input is required in these cells.
Hours for PMO and Training already provided. No contractor input is required in these cells.
Total amount for the Start-up Mobilization Tasks for any zone shall not exceed $1 Million for the Base Period and $100,000 for Option Year 4.
START UP MOBILIZATION TASKSBase PeriodOption Year 1Option Year 2Option Year 3Option Year 4
1 Zone = 250 StaffNum. of MonthsEst. 10 - Months12 - Months
POP = Est. 10-MonthsPOPDate of Award -
Sep 30, 2024Oct 1, 2024 -
Sep 30, 2025Oct 1, 2025 -
Sep 30, 2026Oct 1, 2026 -
Sep 30, 2027Oct 1, 2027 -
Sep 30, 2028Total
Includes Additional Staff (Up to 40%) for Attrition and Unavailability - Labor Hours for Security Training and Position Training (BI & eQIP included in CLIN 0001 PMO Task 2)$0.00$100,000.00.
.$100,000.00
Inflation Rate --- >
Task 1Task 2 (see below)Task 3Task 4Task 5Task 6 (see below)
.
PMO Tasks. See Assumptions below --->Key Personnel:
Availability (PM & DPM)Initial Taskers:

(1) Roster Min Qty Staff

(2) Manage & Submit Docs for BI & eQIP

(3) Manage Security/Privacy Trng Reports:

(1) Weekly Security Roster

(2) Annual Report

(3) Final Voucher & Close-out Plans:

(1) Management

(2) QCP

(3) QASP

(4) Training

(5) Kick OffInvoicing:
(1) Contract InvoicingPosition Training for:

(1) PDMG

(2) SI

(3) TS

(4) EHP

CLIN 0001 - MobilizationPositionLABOR CATEGORYQtyLabor RatesHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostTotal Hours / StaffExtended Cost
PMOProgram Manager*1225$0.0025$0.0015$0.0025$0.0020$0.0015$0.00325$0.00
PMODeputy Program Manager*1250$0.00100$0.0020$0.0030$0.0025$0.0020$0.00445$0.00
PMOContracting Specialist III175$0.0045$0.00$0.0010$0.0050$0.00$0.00180$0.00
PMOComputer Specialist III1$0.0050$0.0020$0.0015$0.0025$0.0010$0.00120$0.00
PMOPlanner I1$0.0050$0.0020$0.0050$0.00$0.0020$0.00140$0.00
PMOProgram Coordinator II1$0.0050$0.0020$0.0015$0.0025$0.0020$0.00130$0.00
PMOProgram Coordinator III1$0.0020$0.0020$0.0015$0.0025$0.0020$0.00100$0.00
3 TrainersPMOSenior Trainer3$0.00$0.00$0.00$0.00$0.00200$0.00200$0.003 Trainers
TotalTotalTotalTotalTotalTotal$0.00
.
.Total PMO Staff10550$0.00340$0.00115$0.00160$0.00170$0.00305$0.001,640$0.00<--- Total PMO Cost
*Key PersonnelVerified

Attrition and Unavailability Tables - Task 2 and Task 6 are calculated at No Greater Than 40% of the 250 Rostered Staff

Task 2Calculations for Max Staff allowed for BI & eQIP submittalNo cost associated with this part of Task 2. Cost and Effort to Manage & Submit Docs for BI & eQIP is already reflected under CLIN 0001 PMO.
(2) Manage & Submit Docs for BI & eQIPPositionLABOR CATEGORYRostered Qty
All PositionsAll LCATs250
Percentage above the 250 staff required ---->40%Contractor only allowed to submit no more than 40% of additional staff for BI.
Qty

Attrition and Unavailability ---> Additional staff allowed over the total pool ----> 100

Max staff allowed ----> 350

Task 2Cost for Contractor Staff to complete Security and Privacy Training
(3) Manage Security/Privacy Trng -
Staff Labor Cost to take TrainingPositionLABOR CATEGORYRostered QtyAvge RateHoursTotal Labor Cost
All PositionsAll LCATs2504$0.00
Percentage above the 250 staff required ---->40%
QtyAvge Rate
Attrition and Unavailability --->Additional staff allowed over the total pool ---->1004$0.00Sub-Total

Max staff allowed ----> 350 $0.00 Total Cost $0.00

Task 6Cost for Contractor Staff to attend Familiarization Training Course
Training for PDMG, SI, TS & EHP -
Staff Labor Cost to take Position TrainingPositionLABOR CATEGORYSpecific Qty of StaffAvge RateTraining HoursTotal Labor CostTotal Staff Excludes HQ Staff
PDMGVarious LCATs5014$0.00
SIVarious LCATs2014$0.00
TSVarious LCATs9614$0.00
EHPVarious LCATs3014$0.00
Total Staff (excluding HQ staff)196Total Hrs2,744$0.00Sub-Total
Percentage above the 250 staff required ---->40%
QtyAvge Rate
Attrition and Unavailability --->Additional staff allowed over the total pool ---->7814$0.00Sub-Total

Max staff allowed ----> 274 $0.00 Total Cost $0.00

Subtotal $0.00 $0.00 CLIN 0001

Total All CLINs$0.00
ADDITIONAL INFORMATION
Start-Up Mobilization Cost:For all Mobilization Tasks during the Base Period plus all Options - A fixed amount shall be paid equally per month during the Base Period.
For Final Voucher & Close-out - A fixed amount shall be paid in full in Option Year 4.

POP: Period of Performance is Est. 10-Months.

Labor Rates: Based on contractor proposal.

ODCs:No Travel Involved for BI. The BI applications are completed online.
No Travel Cost for Training since it is All Virtual (Online).

G&A: No G&A will be provided for T&M CLINs.

GFE: No GFE will be issued - Only Contractor-provided Equipment.

PMO TASKS: This table is for reference only. All Tasks & Deliverables shall be in accordance with (IAW) the PRS.

Task 1 Key Personnel The contractor shall Identify and submit their Key Personnel, Program Manager (PM) and Deputy Program Manager (DPM), as part of the base contract proposal.

Task 2 Personnel Roster Roster the minimum of qualified, skilled Labor Categories (LCAT) in the quantities identified in the PWS. The contractor shall submit their staff names as follows:

• 50% of staff submitted within 30 days of contract award

• 50% of staff submitted within 90 days of contract award Maintain their roster of active EOD staff for the duration of the contract .

Document Submittal for BI Checks & eQIP Submit Personnel Security documentation for vetting of rostered personnel to establish Entrance on Duty (EOD). The contractor shall submit the staff names and documentations for Background Investigation (BI) checks and QIP as follows:

• 50% of staff submitted within 30 days of contract award

• 50% of staff submitted within 90 days of contract award

eQIP ComplianceThe contractor shall ensure all submitted roster employees complete their eQIP within 7 business days.
Security & Privacy TrainingCertificate of training is required for all cleared contractor employees who are working with classified or unclassified information. All certificates must be sent to the assigned FEMA Contracting Officer Representative (COR), before the contractor or subcontractor is granted access to classified or unclassified information but no later than 30 calendar days after awarded contract. The contractor shall attend and complete all the Security and Privacy Training as described in the PWS.. For example, the contractor shall attend and complete the following courses:

• Security Training

• IT Security Training

• Privacy Training

• Safeguarding Sensitive Information

Task 3Roster ReportThe contractor shall develop and provide a template of their Roster Report no later than 15 calendar days after contract award. Upon Government approval, the report shall be submitted on a monthly basis. The report shall also include the staff status and availability to be assigned or deploy on a Task Order.
Weekly Security ReportThe contractor shall submit a weekly Security Report identifying all security-related information for rostered employees. Information shall include, but is not limited to, name, job title, date e-QIP was initiation, EOD, and other pertinent information identified by the COR. The report shall be submitted on a specific day of the week determined by the COR after base contract award.
Annual ReportThe contractor shall submit an annual report 15 days after the end of the Federal Government’s fiscal year. The report shall document and summarize the results of the entire contractual effort, including recommendations and conclusions. The annual report shall include tables, graphs, and other visual aids to comprehensively explain the results achieved under the contract.
Final Voucher and
Closeout PackageThe contractor shall submit a final voucher tracker and closeout package NLT 90 days following task order Period of Performance end date.
Task 4Management PlanThe contractor shall submit a Management Plan as part of its base contract proposal, and shall submit an updated Plan no later than 15 calendar days following exercise of Option Period. The Government may verify that the contractor is adhering to its proposed management processes for all task orders.
Quality Control Plan (QCP)The contractor shall submit a QCP as part of its base contract proposal, and shall submit an updated QCP no later than 15 calendar days following exercise of Option Period. The Government may verify that the contractor is adhering to its QCP procedures for all task orders.
Quality Assurance Surveillance Plan (QASP)The contractor shall develop and maintain the QASP based on this PWS and the requirements set forth by the CMB. The QASP shall identify what is going to be inspected, the inspection process, and who will do the inspecting. The results of those inspections will then be used to document contractor performance. The QASP is a “living” document and shall be reviewed as performance warrants. The contractor shall submit the plan within 30 calendar days after award and shall update it on a continual basis as needed.
Training PlanAs part of its base contract proposal, the contractor shall develop and submit a comprehensive training plan incorporating applicable Public Assistance-related materials as specified in this contract and shall submit an updated Plan no later than 15 calendar days following each exercise of Option Period.
Kick Off MeetingThe contractor shall participate and submit the kickoff meeting notes 5 calendar days after the meeting is held and after the base contract award.
Task 5Base Contract Invoicing
(PWS, page 11, Para 1.6.15)Contractor shall not bill any direct labor hours for invoice-related services. The Contractor shall submit all invoices no later than the last day of the subsequent month following delivery and acceptance of services. Invoices shall include all expenses (e.g., field & management labor hours, travel, etc.) incurred by the Contractor, including all Subcontractor costs, within the invoice’s Period of Performance, which shall not exceed the calendar month. FEMA will require a preliminary review of the expenses before Contractor submittal. Preliminary reviews will be conducted by the Technical Monitors, and review and approval procedures will be specified in the TOPR.
Task 6Provide Training

(PWS, page 5, section 1.6.2 Deliverables Under the Base Contract, para d. Training Plan) and (PWS, page 16, section 3.1 Task Order Process) (PWS, page 5, section 1.6.2 Deliverables Under the Base Contract, para d. Training Plan) - The contractor shall provide training for PDMG, SI, PA, GM, Other staff as required by the PWS in order to maintain a roster that shall be ready for Task Order assignments. All Task Order staff must have been issued training prior to the kickoff meeting of the Task Order. The training shall be a reduced version of the full FEMA-provided training for position certification. The contractor shall provide these training courses in a manner that the staff will be familiar with the duties and tasks for certain positions and gain knowledge in PA policy and systems.

(PWS, page 16, section 3.1 Task Order Process) - The contractor shall have from the TOPR notification to a Task Order award to train their staff in the respective positions as prescribed in the training plan.

All Task Orders

Contractor to provide input in cells highlighted in Yellow only.
Quantity of Staff already provided. No contractor input is required in these cells.
Hours for all LCATs already provided. No contractor input is required in these cells.
ALL TASK ORDERSBase PeriodOption Year 1Option Year 2Option Year 3Option Year 4Total
POP = Est. 10-Months & 12-MonthsNum. of MonthsEst. 10 - Months12 - Months12 - Months12 - Months12 - Months4-Yrs, Est. 10-Months
Based on Total Hours DeployedPOPDate of Award -
Sep 30, 2024Oct 1, 2024 -
Sep 30, 2025Oct 1, 2025 -
Sep 30, 2026Oct 1, 2026 -
Sep 30, 2027Oct 1, 2027 -
Sep 30, 2028Date of Award -

Sep 30, 2028

Includes Surge Capability (Up to 50% of PDMG, SI, TS, and EHP) - Labor Hours for Deployments, Security Training and Position Training.$0.00$0.00$0.00$0.00$0.00.
.$0.00
Inflation Rate --- >
Atlantic & West Only$0.00$0.00$0.00$0.00$0.00.
.$0.00Atlantic & West Only
Inflation Rate --- >
`
See assumptions belowSee assumptions below
Travel Hours
and CostDeployment Hours

and Cost

CLIN 0002 - Task Order Labor CategoriesLABOR CATEGORYStaff QtyLevelLabor RatesHours for TravelCost for Travel (Staff x Rate x Hrs)Hours Deployed Each StaffCost for Deployment
(Staff x Rate x Hours)Extended Cost
Construction Manager20Mid0$0.001,500$0.00$0.00
Construction Manager10Senior0$0.001,500$0.00$0.00
Project Manager10Mid0$0.001,500$0.00$0.00
Project Manager10Senior0$0.001,500$0.00$0.00
Construction or Building Inspector17Mid0$0.001,500$0.00$0.00
Construction or Building Inspector3Senior0$0.001,500$0.00$0.00
Architect2Mid0$0.001,500$0.00$0.00
Architect2Senior0$0.001,500$0.00$0.00
Civil Engineer15Mid0$0.001,500$0.00$0.00
Civil Engineer20Senior0$0.001,500$0.00$0.00
Coastal Engineer1Mid0$0.001,500$0.00$0.00
Coastal Engineer2Senior0$0.001,500$0.00$0.00
Electrical Engineer5Mid0$0.001,500$0.00$0.00
Electrical Engineer10Senior0$0.001,500$0.00$0.00
Environmental Engineer1Senior0$0.001,500$0.00$0.00
Geologist1Senior0$0.001,500$0.00$0.00
Health Scientist1Senior0$0.001,500$0.00$0.00
Hydraulic Engineer1Senior0$0.001,500$0.00$0.00
Hydrologist1Senior0$0.001,500$0.00$0.00
Industrial Hygienist1Senior0$0.001,500$0.00$0.00
Mechanical Engineer5Mid0$0.001,500$0.00$0.00
Mechanical Engineer10Senior0$0.001,500$0.00$0.00
Sanitary Engineer1Senior0$0.001,500$0.00$0.00
Soil/Geotechnical Engineer1Mid0$0.001,500$0.00$0.00
Soil/Geotechnical Engineer1Senior0$0.001,500$0.00$0.00
Structural Engineer5Mid0$0.001,500$0.00$0.00
Structural Engineer10Senior0$0.001,500$0.00$0.00
Archaeologist2Mid0$0.001,500$0.00$0.00
Archaeologist3Senior0$0.001,500$0.00$0.00
Architectural Historian1Mid0$0.001,500$0.00$0.00
Architectural Historian2Senior0$0.001,500$0.00$0.00
Biologist2Mid0$0.001,500$0.00$0.00
Biologist3Senior0$0.001,500$0.00$0.00
Certified Floodplain Manager1Mid0$0.001,500$0.00$0.00
Certified Floodplain Manager1Senior0$0.001,500$0.00$0.00
Ecologist1Senior0$0.001,500$0.00$0.00
Environmental Planner4Mid0$0.001,500$0.00$0.00
Environmental Planner4Senior0$0.001,500$0.00$0.00
Historic Architect1Mid0$0.001,500$0.00$0.00
Historic Architect2Senior0$0.001,500$0.00$0.00
Horticulturalist1Senior0$0.001,500$0.00$0.00
Water Quality Specialist1Senior0$0.001,500$0.00$0.00
Wetlands Specialist1Senior0$0.001,500$0.00$0.00

Total Staff for PDMG, SI, TS, and EHP surge capability 196

Accountant4Mid0$0.001,500$0.00$0.00
Accountant4Senior0$0.001,500$0.00$0.00
Certified Public Accountant (CPA)3Mid0$0.001,500$0.00$0.00
Certified Public Accountant (CPA)3Senior0$0.001,500$0.00$0.00
Financial Analyst2Mid0$0.001,500$0.00$0.00
Financial Analyst2Senior0$0.001,500$0.00$0.00
Appraiser1Mid0$0.001,500$0.00$0.00
Estimator2Mid0$0.001,500$0.00$0.00
Estimator3Senior0$0.001,500$0.00$0.00
Commercial Property Insurance Professional2Mid0$0.001,500$0.00$0.00
Commercial Property Insurance Professional1Senior0$0.001,500$0.00$0.00
TAC CoordinatorAdministrative Support Specialist5Mid0$0.001,500$0.00$0.00
TAC CoordinatorAdministrative Support Specialist2Senior0$0.001,500$0.00$0.00
Reports and Communication Specialist3Mid0$0.001,500$0.00$0.00
Reports and Communication Specialist2Senior0$0.001,500$0.00$0.00
General Planner2Mid0$0.001,500$0.00$0.00
General Planner2Senior0$0.001,500$0.00$0.00
Graphic Artist1Senior0$0.001,500$0.00$0.00
Management Analyst (Program Strategist)1Mid0$0.001,500$0.00$0.00
Management Analyst (Program Strategist)3Senior0$0.001,500$0.00$0.00
Technical Writer1Mid0$0.001,500$0.00$0.00
Technical Writer2Senior0$0.001,500$0.00$0.00
Trainer2Mid0$0.001,500$0.00$0.00
Trainer1Senior0$0.001,500$0.00$0.00

Total Staff - Other 54 Total Travel Cost $0.00 Total Extended Cost $0.00

Total Staff Combined 250

Tables for Additional Staff for Surge Capability

Surge Capability
Labor Hours for Surge CapabilityAssume FEMA will require an additional 50% of Staff for surge for PDMG, SI, TS, and EHP capabilities (Catastrophic/Multiple Disasters)Percentage of StaffSpecific Qty of StaffAverage Rate (from above)Hours for TravelCost for Travel (Staff x Rate x Hrs)Hours Deployed Each StaffCost for Deployment
(Staff x Rate x Hours)Extended Cost
Surge ---->PDMG, SI, TS, and EHPVarious LCATs50%98$0.000$0.001,500$0.00$0.00…Surge Capability
Security Training for Surge Capability
Security and Privacy Training - Staff Labor CostPositionLABOR CATEGORYPercentage of StaffSpecific Qty of StaffAverage Rate (from above)HoursTotal CostCost for Staff to complete Security and Privacy Training
Surge ---->PDMG, SI, TS, and EHPVarious LCATs50%98$0.004$0.00< ---- Surge$0.00…Surge Capability
Position Training for Surge Capability
Training for PDMG, SI, TS & EHP -
Staff Labor Cost to take Position TrainingPositionLABOR CATEGORY -
Various LCAT & QtyPercentage of StaffSpecific Qty of StaffAverage Rate (from above)Training HoursTotal CostCost for Staff to attend Familiarization Training Course
PDMG5050%25$0.0014$0.00
SI2050%10$0.0014$0.00
TS9650%48$0.0014$0.00
EHP3050%15$0.0014$0.00
Surge ---->Total Staff19698$0.00< ---- Surge$0.00…Surge Capability
Atlantic & West Only
Subtotal$0.00$0.00CLIN 0002$0.00
See assumptions below
CLIN 0003 -
Task Order PMO %Not to exceed 3% of CLIN 0002 - Task Order Labor CategoriesNTE Percentage
3%Atlantic & West Only
Subtotal$0.00$0.00CLIN 0003$0.00
CLIN 0004 -
TravelAssume 50% of Staff Travel by Air and the other 50% by POV# of StaffRate/FeeQtyUnitExtended Cost
Airfare (roundtrip)Half of the staff travel by Air0$750.001trips$0.00
Misc: Baggage Fees, Taxi, Metro0$30.001trips$0.00

POV Travel Mileage (roundtrip) Half of the staff travel by POV 0 $0.56 900 miles $0.00

Rental Car (weekly)Shared Rental Car0$485.0038weeks$0.00
Rental Car Fuel (weekly)Shared Rental Car0$50.0038weeks$0.00
Lodging (days)Lodging for All0$333.00263days$0.00
Lodging Tax (days)at10%0$33.00263days$0.00
M&IEM&IE for All0$79.00263days$0.00
M&IE (first / last day)0$19.252613/4 days$0.00
Subtotal$0.00
CLIN 0005 -
Miscellaneous (ODC)Contractor Furnished Equipment (CFE)# of StaffRate/FeeQtyUnitExtended Cost
Laptop15% of all staff0$1,200.001each$0.00
Cell Phone5% of staff0$500.001each$0.00
Monitor10% of staff0$200.001each$0.00
Software and computer maintenance15% of all staff0$180.001each$0.00
Subtotal$0.00
Atlantic & West Only
No added fees, including but not limited to G&A, shall be paid under this CLIN in accordance with FAR 16.302.Subtotal$0.00$0.00CLIN 0004$0.00
See assumptions belowAtlantic & West Only
CLIN 0006 -
Defense Based Act (DBA) InsuranceDBA Insurance applies to Atlantic & West Only for PR, Siapan, other Islands, and any other type of taxes. Assume 30% of Staff will Travel OverseasPercentage of StaffSpecific Qty of StaffAverage Rate (from above)Hours Deployed Each StaffExtended CostDBA Insurance Calculations - Atlantic & West OnlyNTE Percentage
Various LCATs30%59$0.001,500$0.00NTE 10% of "Extended Cost"10%
Total Extended Cost$0.00
Atlantic & West Only
$0.00Total All CLINs$0.00

ADDITIONAL INFORMATION

POP: Period of Performance is Est. 10-Months for the Base Period and 12-Months for all Option Years.

CLIN 0002 -
Labor Rates:Based on contractor proposal. The Government will reimburse up to eight (8) hours per day for contractor travel time, to include OCONUS travel. Labor hours for travel will be accounted for under CLIN 0002 and CLIN 0003 at the Task Order Level. The government will not reimburse for non-rotational travel time.
Surge CapablyAssume FEMA will require additional Staff for surge capabilities (Catastrophic/Multiple Disasters).

Travel Hours & Cost Assume :Zero" hours for Travel - the Government will reimburse up to eight (8) hours per day for contractor travel time, to include OCONUS travel. Labor hours for travel will be accounted for under CLIN 0002 and CLIN 0003 at the Task Order Level. The government will not reimburse for non-rotational travel time.

Deployment Hours & Cost Assuming not all contractors will be deployed for a full year. FEMA is using a 9-month (1,500 hour) deployment as the baseline.

CLIN 0003 -
PMO %:Not to exceed 3% of CLIN 0002.
CLIN 0004 -
Travel:Assume half of the staff will travel by air and half by POV.
For pricing purpose, all Travel ODCs are based on traveling from San Francisco to NYC.
CLIN 0005 -
Miscellaneous (ODC):For pricing purpose, assume only 15% of the staff will receive Laptops when/if required by FEMA.
Contractor Furnished Equipment (CFE) shall include:
• Laptops, software, etc…
• All property and materials
CLIN 0006 -
DBA Insurance:Applies to Atlantic & West Only Zones Only (PR, Saipan, and other Islands)
• Assume 30% of Staff will Travel Overseas (based on historical)
• NTE 10% of "Extended Cost"
G&A:No G&A will be provided for T&M CLINs

GFE: No GFE will be issued - Only Contractor Furnished Equipment.

Map image1.png