Amendment 0002 70FB7021R00000015.pdf
PDF 668 KB Posted
- Attached to
- Air Evacuation Aviation Ground Support Services Federal contract opportunity
- Solicitation number
- 70FB7021R00000015
- Issued by
- Federal Emergency Management Agency
About this file
This is a solicitation for Air Evacuation Aviation Ground Support Services. The solicitation seeks to obtain aviation ground support services at designated airports to assist in the safe and timely precautionary mass evacuation of critical transportation needs populations from major disasters. Services include operational planning, training, exercises, equipment provision, and field support services for up to 10,000 evacuees over a 30-hour period. Planning will cover airports in all U.S. states and territories. The base period of performance is less than 12 months, with four 12-month option periods available. Pricing will be fixed price, time and materials, or cost reimbursement as determined in task orders. The minimum guaranteed value is $7,500 and maximum value is $52 million including all options. Award is expected by July 8, 2021.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD
4. TYPE OF SOLICITATION2. CONTRACT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)
ORDER UNDER DPAS (15 CFR 700)
6. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
NEGOTIATED (RFP)
SEALED BID (IFB)
5. DATE ISSUED
1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES
1 109
3. SOLICITATION NUMBER
70FB7021R00000015
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
10. FOR
INFORMATION
CALL:
CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the
SOLICITATION
9. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTRS., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICES/COSTS
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
11. TABLE OF CONTENTS
18. OFFER DATE17. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
15C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
15B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
14. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)
(See Section I, Clause No. 52.232.8)
13. DISCOUNT FOR PROMPT PAYMENT
designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
28. AWARD DATE
(Signature of Contracting Officer)
27. UNITED STATES OF AMERICA
25. PAYMENT WILL BE MADE BY
26. NAME OF CONTRACTING OFFICER (Type or print)
CODE 24. ADMINISTERED BY (If other than Item 7)
ITEM
(4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by government)
CODE
06/28/2021 X
70FB70
FEMA-INCIDENT SUPPORT SECTION
FEDERAL EMERGENCY MANAGEMENT AGENCY
500 C STREET SW
3RD FLOOR
WASHINGTON DC 20472
1100 ED 07/08/2021
Kimberly A Coakley 202 Kimberly.Coakley@fema.dhs
.gov664-9732
X
X
X
X
X
X
X
X
X
X
X
X
X
PAGE(S)
Kimberly A. Coakley
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (Rev. 9-97)
Prescribed by GSA - FAR (48 CFR) 53.214(c)
2-35
36-50 52-53 54-62 63-68
69-83
85-95
96-105
106-109
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____120_________ calendar days (60 calendar days unless a different period is inserted
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Solicitation Amendment 1 is a Full and Open
Multiple Award Solicitation is being issued under
FAR part 15 to procure Aviation Evacuation Air
Ground Support Services.
FOB: Destination
Change Item 0001 to read as follows(amount shown is the obligated amount):
0001 Preparedness Planning
Header CLIN
Change Item 0001AA to read as follows(amount shown is the obligated amount):
0001AA Airfield Surveys
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0001AB to read as follows(amount shown is the obligated amount):
0001AB Air Evacuation OPLANs
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
NSN 7540-01-152-8067
3 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Change Item 0002 to read as follows(amount shown is the obligated amount):
0002 Training
Header CLIN
Change Item 0002AA to read as follows(amount shown is the obligated amount):
0002AA Contractor Cadre/State Support Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0002AB to read as follows(amount shown is the obligated amount):
0002AB Aviation Ground Support VTC Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0003 to read as follows(amount shown
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
4 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F) is the obligated amount):
0003 Exercises
Header CLIN
Change Item 0003AA to read as follows(amount shown is the obligated amount):
0003AA Table Top Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0003AB to read as follows(amount shown is the obligated amount):
0003AB Functional Exercises
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
SME Aircraft Support
SME Ground Support
SME Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0003AC to read as follows(amount shown is the obligated amount):
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
5 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
0003AC Full Scale Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0004 to read as follows(amount shown is the obligated amount):
0004 Equipment
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
Other GSE Non-Powered Equipment
Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0005 to read as follows(amount shown is the obligated amount):
0005 Field Operational Support- Small Scale
Labor Mix Breakdown
Labor Category:
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
6 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0006 to read as follows(amount shown is the obligated amount):
0006 Field Operational Support- Large Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
7 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0007 to read as follows(amount shown is the obligated amount):
0007 Equipment- Operational Support
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
*Other GSE Non-Powered Equipment
*Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
Change Item 0008 to read as follows(amount shown is the obligated amount):
0008 Travel
Cost Reimbursement CLIN. All Travel will be reimbursed in accordance with the Federal Travel
Regulations and at the Task Order level.
Change Item 0009 to read as follows(amount shown is the obligated amount):
0009 Fuel
Cost Reimbursement CLIN, Actuals will be reimbursed
Change Item 0010 to read as follows(amount shown is the obligated amount):
0010 Other Direct Cost
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
8 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Cost Reimbursement CLIN, All ODC's will be determined at task order level and must be pre-approved by the Contracting Officer's
Representative and Contracting Officer at Task
Order level.
Change Item 1001 to read as follows(amount shown is the obligated amount):
1001 Preparedness Planning
Header CLIN
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1001AA to read as follows(amount shown is the obligated amount):
1001AA Airfield Surveys
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1001AB to read as follows(amount shown is the obligated amount):
1001AB Air Evacuation OPLANs
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
9 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1002 to read as follows(amount shown is the obligated amount):
1002 Training
Header CLIN
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1002AA to read as follows(amount shown is the obligated amount):
1002AA Contractor Cadre/State Support Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1002AB to read as follows(amount shown is the obligated amount):
1002AB Aviation Ground Support VTC Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
10 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1003 to read as follows(amount shown is the obligated amount):
1003 Exercises
Header CLIN
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1003AA to read as follows(amount shown is the obligated amount):
1003AA Table Top Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1003AB to read as follows(amount shown is the obligated amount):
1003AB Functional Exercises
Labor Mix Breakdown
Labor Category:
Project Director
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
11 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
SME Aircraft Support
SME Ground Support
SME Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1003AC to read as follows(amount shown is the obligated amount):
1003AC Full Scale Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1004 to read as follows(amount shown is the obligated amount):
1004 Equipment
Ground Power Unit(s)
Push/Pull Towing Tugs
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
12 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
Other GSE Non-Powered Equipment
Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1005 to read as follows(amount shown is the obligated amount):
1005 Field Operational Support- Small Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1006 to read as follows(amount shown
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
13 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F) is the obligated amount):
1006 Field Operational Support- Large Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1007 to read as follows(amount shown is the obligated amount):
1007 Equipment- Operational Support
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
*Other GSE Non-Powered Equipment
*Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
14 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F) at Task Order Award
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1008 to read as follows(amount shown is the obligated amount):
1008 Travel
Cost Reimbursement CLIN. All Travel will be reimbursed in accordance with the Federal Travel
Regulations and at the Task Order level.
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1009 to read as follows(amount shown is the obligated amount):
1009 Fuel
Cost Reimbursement CLIN, Actuals will be reimbursed
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 1010 to read as follows(amount shown is the obligated amount):
1010 Other Direct Cost
Cost Reimbursement CLIN, All ODC's will be determined at task order level and must be pre-approved by the Contracting Officer's
Representative and Contracting Officer at Task
Order level.
(Option Line Item)
Date Option to be Exercised 365 Days After Award
Change Item 2001 to read as follows(amount shown is the obligated amount):
2001 Preparedness Planning
Header CLIN
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
15 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Change Item 2001AA to read as follows(amount shown is the obligated amount):
2001AA Airfield Surveys
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2001AB to read as follows(amount shown is the obligated amount):
2001AB Air Evacuation OPLANs
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2002 to read as follows(amount shown is the obligated amount):
2002 Training
Header CLIN
(Option Line Item)
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
16 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Date Option to be Exercised 730 Days After Award
Change Item 2002AA to read as follows(amount shown is the obligated amount):
2002AA Contractor Cadre/State Support Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2002AB to read as follows(amount shown is the obligated amount):
2002AB Aviation Ground Support VTC Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2003 to read as follows(amount shown is the obligated amount):
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
17 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
2003 Exercises
Header CLIN
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2003AA to read as follows(amount shown is the obligated amount):
2003AA Table Top Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2003AB to read as follows(amount shown is the obligated amount):
2003AB Functional Exercises
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
SME Aircraft Support
SME Ground Support
SME Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
18 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Change Item 2003AC to read as follows(amount shown is the obligated amount):
2003AC Full Scale Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2004 to read as follows(amount shown is the obligated amount):
2004 Equipment
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
Other GSE Non-Powered Equipment
Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
19 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Change Item 2005 to read as follows(amount shown is the obligated amount):
2005 Field Operational Support- Small Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2006 to read as follows(amount shown is the obligated amount):
2006 Field Operational Support- Large Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
20 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2007 to read as follows(amount shown is the obligated amount):
2007 Equipment- Operational Support
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
*Other GSE Non-Powered Equipment
*Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2008 to read as follows(amount shown is the obligated amount):
2008 Travel
Cost Reimbursement CLIN. All Travel will be reimbursed in accordance with the Federal Travel
Regulations and at the Task Order level.
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
21 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Change Item 2009 to read as follows(amount shown is the obligated amount):
2009 Fuel
Cost Reimbursement CLIN, Actuals will be reimbursed
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 2010 to read as follows(amount shown is the obligated amount):
2010 Other Direct Cost
Cost Reimbursement CLIN, All ODC's will be determined at task order level and must be pre-approved by the Contracting Officer's
Representative and Contracting Officer at Task
Order level.
(Option Line Item)
Date Option to be Exercised 730 Days After Award
Change Item 3001 to read as follows(amount shown is the obligated amount):
3001 Preparedness Planning
Header CLIN
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3001AA to read as follows(amount shown is the obligated amount):
3001AA Airfield Surveys
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
22 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3001AB to read as follows(amount shown is the obligated amount):
3001AB Air Evacuation OPLANs
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3002 to read as follows(amount shown is the obligated amount):
3002 Training
Header CLIN
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3002AA to read as follows(amount shown is the obligated amount):
3002AA Contractor Cadre/State Support Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
23 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3002AB to read as follows(amount shown is the obligated amount):
3002AB Aviation Ground Support VTC Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3003 to read as follows(amount shown is the obligated amount):
3003 Exercises
Header CLIN
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3003AA to read as follows(amount shown is the obligated amount):
3003AA Table Top Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
24 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3003AB to read as follows(amount shown is the obligated amount):
3003AB Functional Exercises
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
SME Aircraft Support
SME Ground Support
SME Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3003AC to read as follows(amount shown is the obligated amount):
3003AC Full Scale Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
25 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Clerical Support Assistant
Accounting Support Staff
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3004 to read as follows(amount shown is the obligated amount):
3004 Equipment
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
Other GSE Non-Powered Equipment
Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3005 to read as follows(amount shown is the obligated amount):
3005 Field Operational Support- Small Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
26 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3006 to read as follows(amount shown is the obligated amount):
3006 Field Operational Support- Large Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
27 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Change Item 3007 to read as follows(amount shown is the obligated amount):
3007 Equipment- Operational Support
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
*Other GSE Non-Powered Equipment
*Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3008 to read as follows(amount shown is the obligated amount):
3008 Travel
Cost Reimbursement CLIN. All Travel will be reimbursed in accordance with the Federal Travel
Regulations and at the Task Order level.
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3009 to read as follows(amount shown is the obligated amount):
3009 Fuel
Cost Reimbursement CLIN, Actuals will be reimbursed
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 3010 to read as follows(amount shown is the obligated amount):
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
28 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
3010 Other Direct Cost
Cost Reimbursement CLIN, All ODC's will be determined at task order level and must be pre-approved by the Contracting Officer's
Representative and Contracting Officer at Task
Order level.
(Option Line Item)
Date Option to be Exercised 1095 Days After Award
Change Item 4001 to read as follows(amount shown is the obligated amount):
4001 Preparedness Planning
Header CLIN
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4001AA to read as follows(amount shown is the obligated amount):
4001AA Airfield Surveys
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4001AB to read as follows(amount shown is the obligated amount):
4001AB Air Evacuation OPLANs
Labor Mix Breakdown
Labor Category:
Project Director
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
29 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4002 to read as follows(amount shown is the obligated amount):
4002 Training
Header CLIN
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4002AA to read as follows(amount shown is the obligated amount):
4002AA Contractor Cadre/State Support Training
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4002AB to read as follows(amount shown is the obligated amount):
4002AB Aviation Ground Support VTC Training
Labor Mix Breakdown
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
30 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4003 to read as follows(amount shown is the obligated amount):
4003 Exercises
Header CLIN
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4003AA to read as follows(amount shown is the obligated amount):
4003AA Table Top Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4003AB to read as follows(amount shown is the obligated amount):
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
31 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
4003AB Functional Exercises
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
SME Aircraft Support
SME Ground Support
SME Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4003AC to read as follows(amount shown is the obligated amount):
4003AC Full Scale Exercise
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Aircraft Support
Ground Support
Mechanical Support
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4004 to read as follows(amount shown is the obligated amount):
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
32 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
4004 Equipment
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Tractor (baggage)
Other GSE Non-Powered Equipment
Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4005 to read as follows(amount shown is the obligated amount):
4005 Field Operational Support- Small Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
33 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4006 to read as follows(amount shown is the obligated amount):
4006 Field Operational Support- Large Scale
Labor Mix Breakdown
Labor Category:
Project Director
Sr. Operational Planner
Planner
Documentation Support
Graphic Specialist
Analyst
Clerical Support Assistant
Accounting Support Staff
Ground Support Supervisor
Laborer
Desk Clerk
Material Handler
Forklift Operator
Aircraft Servicer
Aircraft Worker
GSE Mechanic
GSE Servicer
GSE Worker
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4007 to read as follows(amount shown is the obligated amount):
4007 Equipment- Operational Support
Ground Power Unit(s)
Push/Pull Towing Tugs
"Aircraft Tow Bar(s) narrow body"
Baggage Carts
"Main Deck Loader
(Truck Scissor Lift)"
Stairs
Cargo Belt Loader
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
34 109
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FB7021R00000015/0001
(A) (B) (C) (D) (E) (F)
Tractor (baggage)
*Other GSE Non-Powered Equipment
*Other GSE Powered Equipment
Firm Fixed Price or Time and Material determined at Task Order Award
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4008 to read as follows(amount shown is the obligated amount):
4008 Travel
Cost Reimbursement CLIN. All Travel will be reimbursed in accordance with the Federal Travel
Regulations and at the Task Order level.
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4009 to read as follows(amount shown is the obligated amount):
4009 Fuel
Cost Reimbursement CLIN, Actuals will be reimbursed
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
Change Item 4010 to read as follows(amount shown is the obligated amount):
4010 Other Direct Cost
Cost Reimbursement CLIN, All ODC's will be determined at task order level and must be pre-approved by the Contracting Officer's
Representative and Contracting Officer at Task
Order level.
(Option Line Item)
Date Option to be Exercised 1460 Days After Award
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
PART I - THE SCHEDULE
SECTION A – STANDARD FORM (SF) 33
See page one (1), cover page.
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 CONTRACT LINE ITEMS
This is a Multiple Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract from which task orders may be issued with a Fixed Price, Time and Material Labor Hour, and/or Cost Reimbursement line items, based on the situations that necessitates the order. Funding will be provided on a task order basis. Task Orders shall be issued in accordance with section G.7 entitled “Task Order Procedures”.
B.2 MINIMUM AND MAXIMUM AMOUNT
The combined guaranteed minimum for this contract is $7,500.00. The Contract(s) will expressly state that if the total value of all task orders awarded to all contractors cannot exceed $52,214,895.46 of the IDIQ including the base period and all option periods,. With respect to the maximum quantity of services, the total amount of services ordered under this IDIQ contract shall not exceed the total productive capacity of all vendors under this contract.
B.3 SERVICE CONTRACT ACT WAGE DETERMINATIONS
The contracts and all task orders may be subject to the Department of Labor (DOL) Service Contract Act. The Contractor shall utilize the wage determination applicable to the performance location specified within the task order.
B.4 TRAVEL
Travel shall be a cost-reimbursement CLIN included on task orders as applicable. Travel shall be in accordance with Federal Travel Regulations (FTR). Cost will be based on actual expenses incurred, as shown by receipts. Travel must be approved in advance and in writing by the Contracting Officer Representative (COR) prior to traveling. Travel expenses invoiced to the Government will be in accordance with FTR; the Government will not reimburse expenditures that exceed the FTR and are not in the documented Scope of Work outlined in this contract.
B.5 OTHER DIRECT COSTS
Other Direct Costs (ODCs) shall be Cost-Reimbursement CLINs included on task orders as applicable. All ODCs shall be pre-approved by the COR and CO. Cost reimbursements (Travel and ODC’s) will be based on actual expenses incurred, as shown by receipts.
B.6 AUTHORIZATIONS FOR WORK
Only the Contracting Officer (CO) can authorize work under this contract. FEMA will only pay for work authorized by a
CO.
B.7 PRICING SCHEDULE
The pricing schedule for this contract can be found in Attachment 1.
SECTION C - DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT
AIR EVACUATION
AVIATION GROUND SUPPORT
C.1 BACKGROUND
The Federal Emergency Management Agency’s (FEMA) extensive planning of evacuation procedures has the potential to prevent the unnecessary loss of life in the days prior to landfall of a hurricane or other major disaster. The planning and execution of an evacuation relies on many modes of transportation including ground, air, watercraft, and rail methods.
The purpose of this Performance Work Statement (PWS) is to obtain aviation ground support services at designated airports to assist in the safe and timely precautionary mass evacuation of the critical transportation needs (CTN) segment of the general (non-medical) population to pre-designated locations and/or Host States in the event of a major disaster. In the event of a declared emergency or major disaster, air evacuation operations will be conducted at designated airports.
FEMA, along with state and local authorities, will be responsible for transporting CTNs evacuees, to include individuals with disabilities and those with Access and Functional Needs (AFNs), to safe harbor locations outside of the disaster impacted area. CTNs are residents that do not have the means to self-evacuate. For the purpose of this PWS when CTNs is used in this document it shall also include, but not be limited to, all support services that shall be provided to individuals with disabilities and those within the AFN (non-medical) population.
In 2005, Hurricane Katrina devastated the Gulf Coast, particularly the City of New Orleans. This Category 3 storm resulted in the loss of over 3,000 lives. Based on lessons learned from this event, the Post-Katrina Emergency Management Reform Act of 2006 (PKEMRA) designated the Federal Emergency Management Agency (FEMA) as the lead Federal agency for the management of federally assisted evacuations. FEMA may be required to assist the State in the air evacuation of New Orleans and Jefferson Parishes by mission assigning and/or contracting all required personnel, equipment, and services that exceed the State’s and city’s ability to provide the necessary resources. Working with the State, parishes, and city, FEMA will coordinate the safe and timely evacuation of the at-risk parishes in southeastern Louisiana.
The planning scenario (based on a Gulf Coastal Hurricane Scenario) for this contract requirement supporting an Air evacuation operation of up to 10,000 CTNs from the incident area conducted by federally contracted commercial aircraft, other Federal agency aircraft, or military aircraft. These aircraft will move evacuees from MSY to host state airports. The operational window will be 30 continuous hours, starting 48 hours and ending 18 hours in advance (depending upon the situation) of the arrival of tropical storm force winds on the coast in a hurricane scenario. This planning assumption is based on a 2012-2020 deliberate evacuation CTN planning documents for the State of Louisiana (Southeast Louisiana), inclusive of the City of New Orleans and surrounding parishes.
Additionally, in 2017, there was consideration by FEMA for the post storm evacuation of CTNs for the Commonwealth of Puerto Rico because of the devastating impact of Hurricanes Irma and Maria. While this evacuation did not materialize, there were plans implemented by FEMA Headquarters to gauge the number of CTNs that could be evacuated, if it would have been required.
In the State of Louisiana, MSY Airport will conduct the simultaneous evacuation of an expected surge of ticketed passengers (including tourists). The airline industry has pledged, at the highest levels, to fly all ticketed passengers out of MSY in the event of a required evacuation. This will be conducted by adding additional aircraft to the current flight schedule and/or aircraft with greater passenger capacity.
For all scenarios, all Department of Defense, Air Mobility Command (AMC) contracted aircraft planning, including command and control, will be done from an Incident Command Post (ICP). Projected aircraft turn time is 1.5 hours for narrow body aircraft, and two hours for wide body aircraft.
A planning scenario will identify an aircraft maximum on ground (MOG) and working MOG. Airport Authority Operations in coordination with the ICP and the Contractor shall determine parking spots for evacuation aircraft. ICP shall inform the TSA screening facility staging area to release a specified number of CTN passengers based on the aircraft’s available seats. CTN Passenger and baggage will load in 1.5 hours for narrow body aircraft and 2 hours for wide body. Aircraft will not delay takeoff for loading of baggage. Any baggage that cannot be loaded will be flowed on a later mission going to the same destination. Any baggage that is left behind at termination of operations shall be put into a storage area. Aircraft servicing is not planned to be provided at the evacuating airport. The airport should have enough parking space to sequence MOG to facilitate operations. The expected situation will be such that off-airport food, lodging, gas, supplies, etc. will probably not be available. The local airport workforce will be concerned with their own safety and the welfare of their families to include compliance with possible mandatory evacuation orders. The use of a workforce from outside of the potential impacted area will be a necessity. All evacuation support personnel must arrive totally self-sufficient. Coordination will be required with the airport authorities to find a lodging area on the airport grounds, but the Contractor will be responsible for sheltering and overall welfare of their on-site personnel.
A unified evacuation group (Federal/State/local) shall be responsible for the coordination of CTN evacuees departing the airport. This will be conducted in the TSA screening facility. The process includes:
Provision of reception area for hydration, food, restrooms, etc., prior to embarkation.
Security screening for air movement: TSA will employ appropriate screening techniques to ensure the safety of the air transportation system.
Aircraft passenger manifest: With the assistance of the Contractor, the evacuation group will coordinate the manifesting of the CTNs and provide boarding instructions. The evacuee luggage will be scanned by TSA and then moved to the appropriate aircraft. The manifest will be made available by email/fax upon departure, provided electronic transmittal is possible under conditions at hand, and/or a hard copy that shall be made available to designated person upon arrival.
Every attempt will be made to include individual registration information.
The evacuee luggage will be scanned by TSA and then moved to the appropriate aircraft. Screened luggage will remain segregated until arrival at the destination. Airport shuttle buses, escorted by appropriate local personnel, will move evacuees to aircraft for loading.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .