709_University_Ave_-_Bid_Plans_and_Specs.pdf
PDF 12 MB Posted
- Solicitation number
- 816-0423 (Bid# 27-003)
- Issued by
- Santa Clara County, California
About this file
This is a bid plans and specifications document for the Town of Los Gatos Parks and Public Works Department's 709 University Avenue Storm Drain Replacement Project (Project No. 25-816-0423). The project involves the replacement of an existing storm drainage system along University Avenue and Winchester Boulevard in Los Gatos, California. The scope of work includes thirteen bid items: traffic control, erosion and sediment control, utility coordination, clearing and grubbing, potholing, excavation and installation of insertion/receiving pits with pre-CCTV inspection, installation of new 20-inch HDPE SDR17 pipe by open trench and sliplining methods, void backfill with pressurized grout, installation of new storm drain catch basins, AC conform and HMA pavement restoration, and backyard restoration. The project also encompasses comprehensive details on excavation and backfill procedures, dewatering systems, flow bypass systems, excavation safety and shoring, material disposal, compaction and testing, concrete improvements, traffic stripe and pavement markings, and stormwater quality measures. Electronic bids are due by Wednesday, October 28, 2026, at 2:00 p.m. via the Town's bidding portal at https://procurement.opengov.com/portal/losgatosca, at which time bids will be opened electronically.
The bid plans and specifications were prepared by Belleci & Associates, Inc., with design and engineering work completed by Thomas J. Hodge, Civil Engineer (License No. 82792, State of California), and reviewed by Gary Heap, PE, Town Engineer. The plans were drawn and plotted by Darren Choy on September 17, 2026, at a scale of 1:10. The project includes coordination with multiple utilities including gas, water, electricity, and telecommunications providers, as well as notification to homeowners associations at affected properties (709 and 711 University Avenue, 702 and 704 Winchester Boulevard, and 698 North Santa Cruz Avenue). The document specifies construction standards for storm drainage facilities, existing facilities management, stormwater quality requirements, and pollution prevention measures in accordance with applicable Town standards and regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 709_University_Avenue_Drainage_System_Replacement_Project.pdf | ||
| Submittals_List.pdf | ||
| Storm_Water_Pollution_Control_Ordinance.pdf | ||
| Labor_Performance_Bonds.pdf | ||
| CCTV_Photos_and_Videos.zip | ZIP file | |
| Blueprint_for_a_Clean_Bay.pdf | ||
| Sample_Contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRUCE AVE
UN
IV
ER
SI
TY
A
VE
W
IN
C H
ES
TE
R B
LV
D
PLEASANT VIEW AVE
FARLEY RD W
SHELBURNE WAY
DAVES AVE
VIA SERENO
D
D
D
ABBREVIATIONS:
VINICITY MAP
SCALE: NTS
PROJECT AREA
W
IN
C H
ESTER
BLVD
U N
IV
ER
SI
TY
A
VE
N U
E
PROJECT AREA
SYMBOL & LINETYPE LEGEND
DD
S
E E
GAS GAS
W W
TELE TELE
A N N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S T
IT
LE
S H E E T .D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:2
A M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E sa nb el l.c om
N
SAN
TA C
R
U
Z AVE
PROJECT SHEET INDEX
SHEET DISCRIPTION709 UNIVERSITY STORM DRAIN REPLACEMENT
GENERAL NOTES :
TOWN ENGINEER'S STATEMENT
THESE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE TOWN OF LOS GATOS AND ARE IN
GENERAL CONFORMANCE WITH THE SCOPE AND INTENT APPROVED IN THE CAPITAL
IMPROVEMENT PROGRAM. TOWN'S REVIEW OF THESE PLANS DOES NOT RELEASE, DIMINISH,
NOR REPLACE THE DESIGNER'S RESPONSIBILITY FOR THEIR WORK.
GARY HEAP, PE
TOWN ENGINEER
TOWN OF LOS GATOS
DATE
STANDARD PUBLIC IMPROVEMENT NOTES
A N N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
G E N E R A L.
D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
A N N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
G E N E R A L.
D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
TRAFFIC CONTROL (BID ITEM 1)
UTILITY, AGENCY, & HOA COORDINATION (BID ITEM 3)
EROSION AND SEDIMENT CONTROL (BID ITEM 2)
POTHOLING (BID ITEM 5)
INSTALL NEW 20" HDPE SDR17 BY OPEN TRENCH (BID ITEM 7)
EROSION AND SEDIMENT CONTROL (CONT.)
CLEARING AND GRUBBING (BID ITEM 4)
EXCAVATE INSERTION OR RECEIVING PIT AND PRE-CCTV (BID ITEM 6)
INSTALL NEW 20" HDPE SDR17 BY OPEN TRENCH (CONT.)
N N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
G E N E R A L.
D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
INSTALL NEW 20" HDPE SDR17 BY OPEN TRENCH (CONT.)
INSTALL NEW 20" HDPE SDR17 BY SLIPLINING (CONT.)
INSTALL NEW STORM DRAIN CATCH BASIN (CONT.)
INSTALL NEW 20" HDPE SDR17 BY SLIPLINING (BID ITEM 8)
AC CONFORM - 2" (BID ITEM 11)
VOID BACKFILL WITH PRESSURIZED GROUT (BID ITEM 9)
VOID BACKFILL WITH PRESSURIZED GROUT (CONT.)
INSTALL NEW STORM DRAIN CATCH BASIN (BID ITEM 10)
HMA (TYPE A) PG-64-10 (BID ITEM 12)
N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
G E N E R A L.
D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
COMPACTION AND TESTING
CONCRETE IMPROVEMENTS
BACKYARD RESTORATION (CONT.)
HMA (TYPE A) PG-64-10 (CONT.)
BACKYARD RESTORATION (BID ITEM 13)
STREET SECTION AND SIDEWALK CONSTRUCTION
STORMWATER QUALITY
STORM DRAINAGE
EXISTING FACILITIES
EXCAVATION AND BACKFILL
CONCRETE IMPROVEMENTS (CONT.)
STORM DRAINAGE (CONT.)
N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
G E N E R A L.
D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
A N N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
G E N E R A L.
D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
EXCAVATION AND BACKFILL (CONT.) EXCAVATION AND BACKFILL (CONT.)
TRAFFIC STRIPES, PAVEMENT MARKINGS, AND MARKERS
EXCAVATION AND BACKFILL (CONT.)
¾”
DEWATERING
GROUT
TRAFFIC STRIPES... (CONT.)
N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
G E N E R A L.
D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
A N N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
G E N E R A L.
D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
FLOW BYPASS SYSTEM (CONT.)
EXCAVATION SAFETY AND SHORING (CONT.)
EXCAVATION SAFETY AND SHORING
FLOW BYPASS SYSTEM
DEWATERING (CONT.)
DISPOSAL OF MATERIAL
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
702 WINCHESTER BLVD
APN 529-53-003
704 WINCHESTER BLVD
APN 529-53-004
711 UNIVERSITY AVE
APN 529-53-009
709 UNIVERSITY AVE
APN 529-53-010
PARK HILLVIEW APARTMENTS
698 N SANTA CRUZ AVE
APN 529-11-030
W W
W
W W
W
W W W W W W W W W W W W W W W W W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
E E
E E
E
E E E E E E E E E E E E E
E E
E E
E E
E E
E
E
E
E
E
E
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
W W
W W
W
W W
W W
W
E E
E E
E E
E E
E E
E E
E E
E
E TELE
TELE
TE
LE
TE
LE
TE
LE
TELE
TELE
TELE
E E E E E E E E E E E E E E E E E
GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
TE
LE
TE
LE
TE
LE
TE
LE
TE
LE
TE
LE
D
43 43
41 41 41 41
40 40
S
S
41 41
20 20 21 20
1+15 2+00 3+00 4+00 4+10
23 23
PLAN VIEW
A N N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
U N
IV
E R S
IT
Y
A V E N U E .D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:3
A M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
0907PROFILE VIEW
SLIPLINE FEASIBILITY NOTE
50 10 20
1:10
FEET
U N
IV
ER
SI
TY
A
VE
N U
E
W
IN
C H
ESTER
BLVD
CONSTRUCTION NOTES
N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
D E T A
IL
S .D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:5
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
D E T A
IL
S
N U A L S T O R M
D R A
IN
IM
P R O V E M E N T S
P R O
JE
C T
U N
IV
ER
SI
TY
S
TO
R M
D R
AI
N
R
EP
LA
C
EM
EN
T
T O W N
O F
LO
S
G A T O S P A R K S
A N D
P U B
LI
C
W O R K S
D E P A R T M E N T
P R O
JE
C T
N O
R E V
IS
IO
N S
B Y
D A T E
SHEET OF
T H
IS
D O C U M E N T T O G E T H E R
W
IT
H
T H E
C O N C E P T S
D E S
IG
N S
P R E S E N T E D
H E R E
IN
A S
A N
IN
S T R U M E N T
O F
S E R V
IC
E
IS
IN
T E N D E D
O N
LY
F O R
T H E
S P E C
IF
IC
P U R P O S E
C
LI
E N T
F O R
W H
IC
H
IT
W A S
P R E P A R E D B E
LL
E C C I
A S S O C
IA
T E S
IN
C S H A
LL
N O T
B E
LI
A B
LE
F O R
R E U S E A
LT
E R A T
IO
N M O D
IF
IC
A T
IO
N O R
IM
P R O P E R
R E
LI
A N C E
O N
T H
IS
D O C U M E N T
W
IT
H O U T
W R
IT
T E N
A U T H O R
IZ
A T
IO
N
E B A Y A R E A P R O
JE
C T
U N
IV
E R S
IT
Y
A V E D W G
P
LA
N
S H E E T S
D E T A
IL
S .D W G
P
LO
T T E D
B Y D A R R E N
C H O Y
:5
P M
REGISTERED
PR
OF
ES
S
IO
NA
L E
NGINEER
THOMAS
J
HO
DGE
C I V
I L
N O
Ex p.
STATE
O F
C A
LI
FO
RNIA
P R O
JE
C T
N O
S C A
LE
E N G R
C H E C K
D R A W N
D E S
IG
N
D A T E
S E P T
T
JH
R E B
T
JH
D G C
1:
M
IL
E S
A V E N U E
LO
S
G A T O S C A
U N
IV
E R S
IT
Y
A V E N U E el l.c om
P O
LL
U T
IO
N
P R E V E N T
IO
N
N O T E S
| Sheets and Views |
| 01 C1.0 |
| 02 C2.0 |
| 03 C2.1 |
| 04 C2.3 |
| 05 C2.3 |
| 06 C2.4 |
| 07 C3.0 |
| 08 C4.0 |
| 09 C4.1 |
File details come from the government source that posted it. Updated .