709_University_Ave_-_Bid_Plans_and_Specs.pdf

PDF 12 MB Posted

Attached to
709 University Avenue Drainage System Replacement Project
Solicitation number
816-0423 (Bid# 27-003)
Issued by
Santa Clara County, California

About this file

This is a bid plans and specifications document for the Town of Los Gatos Parks and Public Works Department's 709 University Avenue Storm Drain Replacement Project (Project No. 25-816-0423). The project involves the replacement of an existing storm drainage system along University Avenue and Winchester Boulevard in Los Gatos, California. The scope of work includes thirteen bid items: traffic control, erosion and sediment control, utility coordination, clearing and grubbing, potholing, excavation and installation of insertion/receiving pits with pre-CCTV inspection, installation of new 20-inch HDPE SDR17 pipe by open trench and sliplining methods, void backfill with pressurized grout, installation of new storm drain catch basins, AC conform and HMA pavement restoration, and backyard restoration. The project also encompasses comprehensive details on excavation and backfill procedures, dewatering systems, flow bypass systems, excavation safety and shoring, material disposal, compaction and testing, concrete improvements, traffic stripe and pavement markings, and stormwater quality measures. Electronic bids are due by Wednesday, October 28, 2026, at 2:00 p.m. via the Town's bidding portal at https://procurement.opengov.com/portal/losgatosca, at which time bids will be opened electronically.

The bid plans and specifications were prepared by Belleci & Associates, Inc., with design and engineering work completed by Thomas J. Hodge, Civil Engineer (License No. 82792, State of California), and reviewed by Gary Heap, PE, Town Engineer. The plans were drawn and plotted by Darren Choy on September 17, 2026, at a scale of 1:10. The project includes coordination with multiple utilities including gas, water, electricity, and telecommunications providers, as well as notification to homeowners associations at affected properties (709 and 711 University Avenue, 702 and 704 Winchester Boulevard, and 698 North Santa Cruz Avenue). The document specifies construction standards for storm drainage facilities, existing facilities management, stormwater quality requirements, and pollution prevention measures in accordance with applicable Town standards and regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRUCE AVE

UN

IV

ER

SI

TY

A

VE

W

IN

C H

ES

TE

R B

LV

D

PLEASANT VIEW AVE

FARLEY RD W

SHELBURNE WAY

DAVES AVE

VIA SERENO

D

D

D

ABBREVIATIONS:

VINICITY MAP

SCALE: NTS

PROJECT AREA

W

IN

C H

ESTER

BLVD

U N

IV

ER

SI

TY

A

VE

N U

E

PROJECT AREA

SYMBOL & LINETYPE LEGEND

DD

S

E E

GAS GAS

W W

TELE TELE

A N N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S T

IT

LE

S H E E T .D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:2

A M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E sa nb el l.c om

N

SAN

TA C

R

U

Z AVE

PROJECT SHEET INDEX

SHEET DISCRIPTION709 UNIVERSITY STORM DRAIN REPLACEMENT

GENERAL NOTES :

TOWN ENGINEER'S STATEMENT

THESE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE TOWN OF LOS GATOS AND ARE IN

GENERAL CONFORMANCE WITH THE SCOPE AND INTENT APPROVED IN THE CAPITAL

IMPROVEMENT PROGRAM. TOWN'S REVIEW OF THESE PLANS DOES NOT RELEASE, DIMINISH,

NOR REPLACE THE DESIGNER'S RESPONSIBILITY FOR THEIR WORK.

GARY HEAP, PE

TOWN ENGINEER

TOWN OF LOS GATOS

DATE

STANDARD PUBLIC IMPROVEMENT NOTES

A N N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

G E N E R A L.

D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

A N N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

G E N E R A L.

D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

TRAFFIC CONTROL (BID ITEM 1)

UTILITY, AGENCY, & HOA COORDINATION (BID ITEM 3)

EROSION AND SEDIMENT CONTROL (BID ITEM 2)

POTHOLING (BID ITEM 5)

INSTALL NEW 20" HDPE SDR17 BY OPEN TRENCH (BID ITEM 7)

EROSION AND SEDIMENT CONTROL (CONT.)

CLEARING AND GRUBBING (BID ITEM 4)

EXCAVATE INSERTION OR RECEIVING PIT AND PRE-CCTV (BID ITEM 6)

INSTALL NEW 20" HDPE SDR17 BY OPEN TRENCH (CONT.)

N N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

G E N E R A L.

D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

INSTALL NEW 20" HDPE SDR17 BY OPEN TRENCH (CONT.)

INSTALL NEW 20" HDPE SDR17 BY SLIPLINING (CONT.)

INSTALL NEW STORM DRAIN CATCH BASIN (CONT.)

INSTALL NEW 20" HDPE SDR17 BY SLIPLINING (BID ITEM 8)

AC CONFORM - 2" (BID ITEM 11)

VOID BACKFILL WITH PRESSURIZED GROUT (BID ITEM 9)

VOID BACKFILL WITH PRESSURIZED GROUT (CONT.)

INSTALL NEW STORM DRAIN CATCH BASIN (BID ITEM 10)

HMA (TYPE A) PG-64-10 (BID ITEM 12)

N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

G E N E R A L.

D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

COMPACTION AND TESTING

CONCRETE IMPROVEMENTS

BACKYARD RESTORATION (CONT.)

HMA (TYPE A) PG-64-10 (CONT.)

BACKYARD RESTORATION (BID ITEM 13)

STREET SECTION AND SIDEWALK CONSTRUCTION

STORMWATER QUALITY

STORM DRAINAGE

EXISTING FACILITIES

EXCAVATION AND BACKFILL

CONCRETE IMPROVEMENTS (CONT.)

STORM DRAINAGE (CONT.)

N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

G E N E R A L.

D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

A N N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

G E N E R A L.

D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

EXCAVATION AND BACKFILL (CONT.) EXCAVATION AND BACKFILL (CONT.)

TRAFFIC STRIPES, PAVEMENT MARKINGS, AND MARKERS

EXCAVATION AND BACKFILL (CONT.)

¾”

DEWATERING

GROUT

TRAFFIC STRIPES... (CONT.)

N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

G E N E R A L.

D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

A N N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

G E N E R A L.

D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

FLOW BYPASS SYSTEM (CONT.)

EXCAVATION SAFETY AND SHORING (CONT.)

EXCAVATION SAFETY AND SHORING

FLOW BYPASS SYSTEM

DEWATERING (CONT.)

DISPOSAL OF MATERIAL

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

702 WINCHESTER BLVD

APN 529-53-003

704 WINCHESTER BLVD

APN 529-53-004

711 UNIVERSITY AVE

APN 529-53-009

709 UNIVERSITY AVE

APN 529-53-010

PARK HILLVIEW APARTMENTS

698 N SANTA CRUZ AVE

APN 529-11-030

W W

W

W W

W

W W W W W W W W W W W W W W W W W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

GAS

G

AS

G

AS

G

AS

G

AS

G

AS

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

E E

E E

E

E E E E E E E E E E E E E

E E

E E

E E

E E

E

E

E

E

E

E

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

W W

W W

W

W W

W W

W

E E

E E

E E

E E

E E

E E

E E

E

E TELE

TELE

TE

LE

TE

LE

TE

LE

TELE

TELE

TELE

E E E E E E E E E E E E E E E E E

GAS GAS GAS GAS GAS GAS GAS GAS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

TE

LE

TE

LE

TE

LE

TE

LE

TE

LE

TE

LE

D

43 43

41 41 41 41

40 40

S

S

41 41

20 20 21 20

1+15 2+00 3+00 4+00 4+10

23 23

PLAN VIEW

A N N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

U N

IV

E R S

IT

Y

A V E N U E .D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:3

A M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

0907PROFILE VIEW

SLIPLINE FEASIBILITY NOTE

50 10 20

1:10

FEET

U N

IV

ER

SI

TY

A

VE

N U

E

W

IN

C H

ESTER

BLVD

CONSTRUCTION NOTES

N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

D E T A

IL

S .D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:5

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

D E T A

IL

S

N U A L S T O R M

D R A

IN

IM

P R O V E M E N T S

P R O

JE

C T

U N

IV

ER

SI

TY

S

TO

R M

D R

AI

N

R

EP

LA

C

EM

EN

T

T O W N

O F

LO

S

G A T O S P A R K S

A N D

P U B

LI

C

W O R K S

D E P A R T M E N T

P R O

JE

C T

N O

R E V

IS

IO

N S

B Y

D A T E

SHEET OF

T H

IS

D O C U M E N T T O G E T H E R

W

IT

H

T H E

C O N C E P T S

D E S

IG

N S

P R E S E N T E D

H E R E

IN

A S

A N

IN

S T R U M E N T

O F

S E R V

IC

E

IS

IN

T E N D E D

O N

LY

F O R

T H E

S P E C

IF

IC

P U R P O S E

C

LI

E N T

F O R

W H

IC

H

IT

W A S

P R E P A R E D B E

LL

E C C I

A S S O C

IA

T E S

IN

C S H A

LL

N O T

B E

LI

A B

LE

F O R

R E U S E A

LT

E R A T

IO

N M O D

IF

IC

A T

IO

N O R

IM

P R O P E R

R E

LI

A N C E

O N

T H

IS

D O C U M E N T

W

IT

H O U T

W R

IT

T E N

A U T H O R

IZ

A T

IO

N

E B A Y A R E A P R O

JE

C T

U N

IV

E R S

IT

Y

A V E D W G

P

LA

N

S H E E T S

D E T A

IL

S .D W G

P

LO

T T E D

B Y D A R R E N

C H O Y

:5

P M

REGISTERED

PR

OF

ES

S

IO

NA

L E

NGINEER

THOMAS

J

HO

DGE

C I V

I L

N O

Ex p.

STATE

O F

C A

LI

FO

RNIA

P R O

JE

C T

N O

S C A

LE

E N G R

C H E C K

D R A W N

D E S

IG

N

D A T E

S E P T

T

JH

R E B

T

JH

D G C

1:

M

IL

E S

A V E N U E

LO

S

G A T O S C A

U N

IV

E R S

IT

Y

A V E N U E el l.c om

P O

LL

U T

IO

N

P R E V E N T

IO

N

N O T E S

Sheets and Views
01 C1.0
02 C2.0
03 C2.1
04 C2.3
05 C2.3
06 C2.4
07 C3.0
08 C4.0
09 C4.1

File details come from the government source that posted it. Updated .