7046_Cispus HFR_IFB.pdf

PDF 2 MB Posted

Attached to
Cispus Seed Orchard - Hazardous Fuels Reduction
Solicitation number
7046
Issued by
Washington

About this file

Summary of IFB #7046 - Cispus Seed Orchard Mechanical Fuels Reduction

This Invitation for Bid (IFB) is issued by the Washington State Department of Natural Resources (DNR) for mechanical fuels reduction services on federal land in the Gifford Pinchot National Forest under the Good Neighbor Authority. The project involves mechanical treatment and mastication of forest fuels on 29 acres within the Cispus Seed Orchard located in Skamania County, Washington. The contract scope requires the contractor to minimize damage to leave trees during mastication operations and specify equipment types and operational timelines. Bids are due by 11:59 PM PST on Friday, July 24, 2026, with the Apparent Successful Bidder to be announced on July 31, 2026. Contract work is expected to begin August 17, 2026, and must be completed by Monday, November 30, 2026. A pre-proposal conference is not required. The bidder must provide a minimum of one worker each business day and possess sufficient labor resources to complete all work prior to contract termination.

Bidders must submit a complete bid packet including the Bidder's Certification and Assurances Form, Bid Specification Form, AD-1048 Federal Debarment Form, Cost Proposal, and Plan of Operations. Costs must be fully weighted and include all expenses in U.S. dollars; Washington State sales and use taxes apply. The evaluation awards the contract to the lowest responsive and responsible bidder meeting specifications, with scoring based on references (40 points), cost proposal (60 points), and preferences for small/veteran businesses (10 points) and workers' rights compliance (5 points) for a maximum of 115 possible points. Bidders must be licensed to do business in Washington State and registered with WEBS. Insurance requirements include Commercial General Liability coverage of at least $1,000,000 per occurrence, Employer's Liability of $1,000,000, and Business Auto Policy of $1,000,000 per accident. The contract is funded with state dollars and contingent upon funding availability. All awarded contractors must comply with wage laws and provide certificates of insurance prior to contract execution.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOOD NEIGHBOR AUTHORITY, FEDERAL LANDS SECTION

INVITATION FOR BID (IFB) # 7046

Cispus Seed Orchard Mechanical Fuels Reduction Contract

Gifford Pinchot National Forest

TREATMENT ACRES: 29

Refer to the Maps and Unit Information section (Section II) in the included Draft Contact (Exhibit B) for detail on units needing treatment.

BID DELIVERY:

The Bidder shall prepare one complete bid packet for submission according to the Contents and Submittal Instructions (Section 3 of this IFB). A complete packet includes fully filled out forms available in Exhibit A and photocopies of state/federal Farm Labor Contractors licenses. Section

3.2 provides a checklist describing the parts needed for a complete bid.

The completed bid packet may be delivered using the following methods:

• Via an attachment to an email to the Bid Coordinator in the form of a scanned copy of original documentation submitted as a PDF or similar electronic document consistent with Section 3.1.

• Via mail to the address listed in Section 3.1 in its own envelope addressed to Bid Coordinator.

Delivery and confirmation of receipt of bid packets for both delivery methods is the responsibility of the Bidder.

BID DUE DATE: Bids will be accepted until 11:59PM (PST), on Friday, July 24, 2026

BID COORDINATOR:

Craig Bohan Forest Resources Division 360-789-9483 craig.bohan@dnr.wa.gov

Questions pertaining to this Invitation to Bid can be answered by contacting the Bid Coordinator.

DNR IFB: 7046

WA State Department of Natural Resources Page 2 of 39

INVITATION FOR BID (IFB)

Updated 5-20-2025

Individuals who wish to request special accommodations for the bid submission process or bid opening (e.g., sign language, interpreters, Braille, etc.) should contact the Bid Coordinator.

TABLE OF CONTENTS

1. INTRODUCTION AND SCHEDULE OF ACTIVITIES

1.1 PURPOSE

1.2 SCOPE

1.3 MINIMUM QUALIFICATIONS

1.4 PERIOD OF PERFORMANCE

1.5 ADDITIONAL SERVICES

1.6 BID COORDINATOR

1.7 SCHEDULE OF PROCUREMENT ACTIVITIES

2. GENERAL INFORMATION

2.1 DEFINITIONS

2.2 CONTRACTING RESTRICTIONS

2.3 PRE-PROPOSAL CONFERENCE

2.4 NOTIFICATION TO BIDDERS

2.5 COMPLAINT, DEBRIEF AND PROTEST PROCEDURES

2.6 PROPRIETARY INFORMATION/PUBLIC DISCLOSURE

2.7 REVISIONS TO THE SOLICITATION

2.8 SMALL AND DIVERSE BUSINESS PARTICIPATION

2.9 AMERICANS WITH DISABILITIES ACT (ADA)

2.10 ACCEPTANCE PERIOD

2.11 MOST FAVORABLE TERMS

2.12 CONTRACT AND GENERAL TERMS & CONDITIONS

2.13 COST TO PROPOSE

2.14 NO OBLIGATION TO CONTRACT

2.15 REJECTION OF BIDS

2.16 COMMITMENT OF FUNDS

2.17 DOING BUSINESS WITH THE STATE

2.18 REGISTATION WITH THE ‘WEBS’ SYSTEM

2.19 INSURANCE COVERAGE

3. CONTENTS AND SUBMITTAL INSTRUCTIONS

3.1 SUBMISSION OF BIDS

3.2 BIDDER CHECKLIST

3.3 SPECIFICATIONS

3.4 QUALIFICATIONS

3.5 FUNDING

3.6 COST PROPOSAL

4. EVALUATION AND AWARD

4.1 RESPONSIVENESS (PASS / FAIL)

4.2 RESPONSIBLE BIDDER CRITERIA

4.3 BIDDER’S CERTIFICATION FORM (PASS/FAIL)

4.4 WAGE LAW COMPLIANCE (PASS/FAIL)

4.5 PREFERENCE – EXECUTIVE ORDER 18-03 WORKER’S RIGHTS (SCORED)

4.6 PREFERENCE – SMALL & VETERAN BUSINESSES (SCORED)

4.7 EVALUATION WEIGHTING AND SCORING

5. SOLICITATION EXHIBITS

EXHIBIT A.1 – BIDDER’S CERTIFICATION AND ASSURANCES FORM

EXHIBIT A.2 – BID SPECIFICATION FORM

EXHIBIT A.3 – AD-1048 CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY

EXCLUSION

EXHIBIT A.4 – COST PROPOSAL

EXHIBIT B – DRAFT CONTRACT

WA State Department of Natural Resources Page 3 of 39

1. INTRODUCTION AND SCHEDULE OF ACTIVITIES

1.1 PURPOSE

The Washington State Department of Natural Resources, hereafter called “Agency/DNR”, is initiating this Solicitation for silvicultural land management services on Federal managed lands.

Specific information on work requirements and locations can be found in the included Draft Contract (Exhibit B). Bidders are advised to examine the treatment units prior to submitting a bid.

Work to be performed and/or services delivered in the county of: Skamania

1.2 SCOPE

The scope of this project includes Mechanical Fuels Reduction work within the Gifford Pinchot National Forest.

1.3 MINIMUM QUALIFICATIONS

A. Bidders must be licensed to do business in the State of Washington, or provide a commitment that it will become licensed to do business in Washington State prior to services rendered (if applicable):

• All in-state vendors must be licensed in Washington State; for more information contact Washington Department of Licensing.

• Out-of-state vendors should seek guidance from the Washington Department of

Licensing for specific requirements.

B. Bidders must meet the required specifications as outlined in Exhibit A.2 – Bid

Specifications Form.

Bidders who do not meet the minimum qualifications and/or the required specifications and qualifications as outlined in Exhibit A.2 – Bid Specifications Form, will be rejected as non-responsive and will not receive further consideration. Any bid rejected as non-responsive will not be evaluated or scored.

1.4 PERIOD OF PERFORMANCE

The term of the contract resulting from this solicitation shall be from the contract execution date through Monday, November 30, 2026, as defined in Exhibit B (Draft Contract), Section I-A, https://www.dol.wa.gov/ https://www.dol.wa.gov/

WA State Department of Natural Resources Page 4 of 39

General Provision A-33. The Agency requires completion of all work prior to the termination of the period of performance.

1.5 ADDITIONAL SERVICES

DNR reserves the right to add additional services within the scope of this solicitation, and within twenty-four (24) months of the original product order date. If additional services are required, they shall be documented in amendments to the applicable contract document(s). There is no guarantee to the Contractor additional services will be ordered.

1.6 BID COORDINATOR

The Bid Coordinator is the sole point of contact in the Agency for this procurement. All communication with the Agency regarding this solicitation shall be with the Bid Coordinator, as follows:

BID COORDINATOR

NAME: Craig Bohan

E-MAIL ADDRESS: craig.bohan@dnr.wa.gov

PHONE NUMBER: 360-789-9483

Any other communication will be considered unofficial and non-binding on the DNR. Vendors are to rely on written statements issued by the Bid Coordinator. Communication directed to parties other than the Bid Coordinator may result in disqualification of the Vendor.

All oral and written communications will be considered unofficial and non-binding on DNR.

Vendors should rely only on written amendments issued by the Bid Coordinator. Vendors are encouraged to make any inquiry as early in the process as possible to allow DNR to consider and respond; however, no response is required from the Bid Coordinator. If a Vendor does not notify DNR of an issue, exception, addition, or omission, DNR may consider the matter waived by the Vendor for protest purposes. If Vendor inquiries result in changes to the solicitation, written amendments will be issued and posted on WEBS.

WA State Department of Natural Resources Page 5 of 39

1.7 SCHEDULE OF PROCUREMENT ACTIVITIES

SCHEDULE OF PROCUREMENT ACTIVITIES

ISSUE SOLICITATION

DATE SOLICITATION IS POSTED IN WEBS July 6, 2026

PRE-PROPOSAL CONFERENCE

DATE SCHEDULED FOR PRE-PROPOSAL CONFERENCE IF APPLICABLE Not Required

COMPLAINTS DUE

DEADLINE FOR SUBMITTING UNRESOLVED ISSUES ABOUT THE PROCESS July 17, 2026

BIDS DUE AND EVALUATED

BIDS ARE GENERALLY EVALUATED IMMEDIATELY FOLLOWING THE

CONCLUSION OF THE BID ACCEPTANCE PERIOD

July 24, 2026

ANNOUNCE APPARENT SUCCESSFUL BIDDER

AWARD DATE

July 31, 2026

HOLD DEBRIEFINGS

DATE DEBRIEFING CONFERENCES TO BE HELD – IF REQUESTED

August 6, BEGIN CONTRACT WORK

DATE DNR EXPECTS THE WORK TO BEGIN

August 17, THE AGENCY RESERVES THE RIGHT TO REVISE THE ABOVE SCHEDULE.

If the Solicitation results in only one (1) Bidder and that Bidder is found responsive and responsible, the Agency reserves the right to accelerate the procurement schedule above.

WA State Department of Natural Resources Page 6 of 39

2. GENERAL INFORMATION

2.1 DEFINITIONS

Definitions for the purposes of this solicitation include:

AGENCY – Any state office or activity of the executive and judicial branches of state government, including state agencies, departments, offices, divisions, boards, commissions, institutions of higher education as defined in RCW 28B.10.016, and correctional and other types of institutions.

AGENT – Personnel authorized to act on behalf of the Agency for matters contained within.

APPARENT SUCCESSFUL BIDDER – Bidder whose bid provides the best value in meeting Agency needs and is selected to contract with DNR for the proposed solution, subject to completion of contract negations and execution of contract.

AWARD DATE – The announcement date of the Apparent Successful Bidder.

BID, QUOTATION and/or PROPOSAL – A formal offer, submitted by an individual or entity, in response to a solicitation issued for goods and/or services by the Agency.

BIDDER – An individual or entity who submits a bid in response to a solicitation issued for goods and/or services by the Agency.

BUSINESS DAYS – Monday through Friday, 8AM to 5PM, Pacific Standard Time, or, Pacific Daylight Time, Olympia, Washington, USA.

CALENDAR DAY – Midnight to midnight, any day of the week.

CONTRACT – An agreement between DNR and Contractor that includes terms and conditions, the solicitation, the bid, all appendices, and exhibits, associated Statements of Work (e.g. Services Contract or Purchase Order), and all amendments awarded pursuant to this solicitation.

CONTRACTOR – An individual or entity whose bid has been accepted and is awarded a contract with the Agency, and who is solely responsible to provide a good or perform a service.

DNR – Washington State Department of Natural Resources, an Agency of the State of Washington, and any division, section, office, unit or other entity of, or any of the officers or other officials lawfully representing the department.

WA State Department of Natural Resources Page 7 of 39

GOODS – Products, materials, supplies, or equipment provided by a Contractor.

MINORITY-OWNED BUSINESS – limited to firms certified by the Washington State Office of Minority and Women’s Business Enterprises (OMWBE) as a minority-owned business (MBE).

See, RCW 39.19.120 and WAC 326-20.

PURCHASE – The acquisition of goods or services, including the leasing or renting of goods.

SERVICES – Labor, work, analysis, or similar activities provided by a Contractor to accomplish a specific scope of work.

SOLICITATION – A documented formal process providing an equal and open opportunity to Bidders and culminating in a selection based on predetermined criteria.

VENDOR – Individual, firm, organization, company or other entity offering products and/or services.

VETERAN-OWNED BUSINESS – Limited to firms certified by the Washington State Department of Veterans Affairs (WDVA) as a Certified Veteran-Owned Business. See, RCW 43.60A.010(7) & RCW 43.60A.190

WASHINGTON SMALL BUSINESS – An in-state business, including a sole proprietorship, corporation, partnership, or other legal entity, that certify location, size and WEBS certification.

See RCW 39.26.010

WEBS – Washington’s Electronic Business Solution System.

WOMAN-OWNED BUSINESS – Limited to firms certified by the Washington State Office of Minority and Women’s Business Enterprises (OMWBE) as a woman-owned business (WBE).

See, RCW 39.19.120 and WAC 326-20

WORKING DAYS – Midnight to midnight, Monday through Friday, excluding Saturday, Sunday and state legal holidays.

https://omwbe.wa.gov/ https://app.leg.wa.gov/RCW/default.aspx?cite=43.60A.010 https://app.leg.wa.gov/RCW/default.aspx?cite=43.60A.190 https://apps.leg.wa.gov/rcw/default.aspx?Cite=39.26.010#:%7E:text=(22)%20%22Small%20business%22,Fifty%20or%20fewer%20employees%3B%20or

WA State Department of Natural Resources Page 8 of 39

2.2 CONTRACTING RESTRICTIONS

Specific restrictions apply to contracting with current or former state employees pursuant to Chapter 42.52 of the Revised Code of Washington. Bidders should familiarize themselves with the requirements prior to submitting a bid that includes current or former state employees.

2.3 PRE-PROPOSAL CONFERENCE

A Pre-Proposal Conference is NOT required under this solicitation.

2.4 NOTIFICATION TO BIDDERS

The Agency will notify the Apparent Successful Bidder of their selection in writing upon completion of the evaluation process. Individuals or firms whose bids were not selected for further negotiation or award will be notified separately with WEBS. To complete the process, the Apparent Successful Bidder will be identified in WEBS.

2.5 COMPLAINT, DEBRIEF AND PROTEST PROCEDURES

COMPLAINT PROCESS – PRIOR TO BID DUE DATE:

The purpose of a complaint process is to settle unresolved issues or concerns that either were not or could not be resolved during the question and answer period.

Any Bidder may submit a complaint regarding this solicitation based upon the following:

• The solicitation unnecessarily restricts competition;

• The evaluation/scoring process is unfair or flawed; or

• The requirements are inadequate or insufficient so that a response/bid is difficult to prepare.

Complaints not based on procedural matters will not be considered. Complaints will be rejected as without merit if they address issues such as: 1) an evaluator’s professional judgment on the quality of a proposal, or 2) Agency’s assessment of its own and/or other agencies needs or requirements.

If no complaint is filed, a Bidder cannot later file a protest based on one of the above complaint criteria.

Any complaint to the solicitation must be in writing and submitted to the Bid Coordinator no less than five (5) business days prior to the date when the bid is due, and shall clearly articulate the basis for the complaint and include a proposed remedy.

WA State Department of Natural Resources Page 9 of 39

Responses to complaints will be articulated in writing, including any resulting changes to the solicitation, and will be posted on WEBS, and the Agency head will be notified.

The Agency’s decision is final; no further administrative appeal is available.

DEBRIEFING OF UNSUCCESSFUL BIDDERS:

Any Bidder who has submitted a bid and been notified that they were not selected for contract award may request a debriefing. The request for a debriefing conference must be received by the Bid Coordinator within three (3) business days after the Unsuccessful Bidder notification is e-mailed to the Bidder. The debriefing must be held within three (3) business days of the request.

Discussion at the debriefing conference will be limited to the following:

• Evaluation and scoring of the Bidder’s bid;

• Critique of the bid based on the evaluation; and

• Review of Bidder’s final score in comparison with other final scores without identifying the other firms.

Comparisons between bids or evaluations of the other bids will not be allowed. Debriefing conferences may be conducted in person or on the telephone and will be scheduled for a maximum of one hour.

PROTEST PROCEDURE:

This procedure is available to Bidders who submitted a response to this solicitation and who have participated in a debriefing conference. Upon completing the debriefing conference, the Bidder is allowed five (5) business days to file a protest of the acquisition with the Bid Coordinator. Protests must be submitted in writing via e-mail and signed by the protesting party or an authorized Agent.

The protest must state the grounds for the protest with specific and complete statements of the action(s) being protested. A description of the relief or corrective action being requested should also be included.

Bidders protesting this procurement shall follow the procedures described below. Protests that do not follow these procedures shall not be considered. This protest procedure constitutes the sole administrative remedy available to Bidders under this procurement.

Only protests stipulating an issue of fact concerning the following subjects shall be considered:

• A matter of bias, discrimination or conflict of interest on the part of the evaluator;

• Errors in computing the score;

WA State Department of Natural Resources Page 10 of 39

• Non-compliance with procedures described in the solicitation document, or applicable state or federal laws or regulations.

Upon receipt of a protest, a protest review will be held by the Agency. All available facts will be considered and a decision will be issued by the Commissioner of Public Lands or his/her delegate within five (5) business days of receipt of the protest. If additional time is required, the protesting party will be notified of the delay.

In the event a protest may affect the interest of another Bidder who submitted a bid, such Bidder will be given an opportunity to submit its views and any relevant information on the protest to the Bid Coordinator.

The final determination of the protest shall:

• Find the protest lacking in merit and uphold the Agency’s action; or

• Find only technical or harmless errors in the Agency’s acquisition process conduct and determine the Agency to be in substantial compliance and reject the protest; or

• Find merit in the protest and provide the Agency options which may include:

o Correct the errors and re-evaluate all bids, quotations and/or proposals; and/or o Reissue the solicitation document; and/or o Make other findings and determine other courses of action as appropriate.

If the Agency determines that the protest is without merit, the Agency will enter into a contract with the Apparent Successful Bidder.

The Agency protest decision is final and no appeal process will be required. If a protesting Bidder does not accept the Agency protest response, the Bidder may try to seek relief from Thurston County Superior Court.

2.6 PROPRIETARY INFORMATION/PUBLIC DISCLOSURE

Bids, quotations and/or proposals submitted in response to this solicitation shall become the property of the Agency. All bids, quotations and/or proposals received shall remain confidential until the contract, if any, resulting from this solicitation is signed by the Agency and the Apparent Successful Bidder; thereafter, the bids, quotations and/or proposals shall be deemed public records as defined in Chapter 42.56 of the Revised Code of Washington (RCW).

Any information in the bid, quotation and/or proposal that the Bidder desires to claim as proprietary and exempt from disclosure under the provisions of Chapter 42.56 RCW, or other state or federal law that provides for the nondisclosure of your document, must be clearly designated. The

WA State Department of Natural Resources Page 11 of 39 information must be clearly identified and the particular exemption from disclosure upon which the Bidder is making the claim must be cited. Each page containing the information claimed to be exempt from disclosure must be clearly identified by the words “Proprietary Information” printed on the lower right hand corner of the page. Marking the entire bid, quotation and/or proposal exempt from disclosure or as Proprietary Information will not be honored.

If a public records request is made for the information that the Bidder has marked as “Proprietary Information,” the Agency will notify the Bidder of the request and of the date that the records will be released to the requester unless the Bidder obtains a court order enjoining that disclosure. If the Bidder fails to obtain the court order enjoining disclosure, the Agency will release the requested information on the date specified. If a Bidder obtains a court order from a court of competent jurisdiction enjoining disclosure pursuant to Chapter 42.56 RCW, or other state or federal law that provides for nondisclosure, the Agency shall maintain the confidentiality of the Bidder information per the court order.

Pursuant to RCW 42.56.120, DNR uses the default fee schedule. However, records may be viewed in person for no fee. All requests for copies of identifiable records should be directed to the public disclosure office: publicdisclosure@dnr.wa.gov. Requests for information about this solicitation should be directed to the Solicitation Coordinator.

2.7 REVISIONS TO THE SOLICITATION

The Agency reserves the right to cancel or reissue all or part of this solicitation at any time as allowed by law without obligations or liability.

In the event that it becomes necessary to revise any part of this solicitation, an amendment will be posted in WEBS (Washington’s Electronic Business Solutions). Questions & Answers and any other pertinent information shall be provided as an amendment to the solicitation and will be posted in WEBS.

2.8 SMALL AND DIVERSE BUSINESS PARTICIPATION

DNR strongly encourages the participation of minority and women-owned businesses, Veteran owned businesses and small businesses, as prime Contractors or Subcontractors.

If you are a small business that needs assistance responding to this solicitation, help is available.

Please visit OMWBE Small Business Assistance at https://omwbe.wa.gov/small-business-assistance to see the services offered. The Washington Procurement Technical Assistance Center (PTAC) is also available with no cost, confidential technical assistance for small businesses doing business with state government.

mailto:publicdisclosure@dnr.wa.gov https://omwbe.wa.gov/small-business-assistance https://omwbe.wa.gov/small-business-assistance https://washingtonptac.org/

WA State Department of Natural Resources Page 12 of 39

Minority and Women-Owned Businesses In accordance with the legislative findings and policies set forth in Chapter 39.19 RCW, the State encourages participation in all of its contracts by firms certified by the Office of Minority and Women’s Business Enterprises (OMWBE). Participation may be either on a direct basis in response to this solicitation or on a Subcontractor basis. Bidders may go to https://omwbe.wa.gov/directory-certified-businesses to obtain information on certified firms.

No preference will be included in the evaluation of bids for the participation of minority and women-owned businesses. See section 4.6 Preference – Small & Veteran Businesses for information on preference points for small and veteran owned businesses.

2.9 AMERICANS WITH DISABILITIES ACT (ADA)

The Agency complies with the Americans with Disabilities Act (ADA). Vendors may contact the Bid Coordinator listed above for additional assistance.

2.10 ACCEPTANCE PERIOD

Bids must provide 180 calendar days for acceptance by Agency from the due date for receipt of bids.

2.11 MOST FAVORABLE TERMS

The Agency reserves the right to make an award without further discussion of the bid submitted.

Therefore, the bid should be submitted initially on the most favorable terms that the Bidder can propose. There will be no best and final offer procedure. The Agency does reserve the right to contact a Bidder for clarification of its bid.

The Apparent Successful Bidder should be prepared to accept this solicitation for incorporation into a contract resulting from this solicitation.

2.12 CONTRACT AND GENERAL TERMS & CONDITIONS

The awarded Apparent Successful Bidder is entering into a services contract with the Washington State Department of Natural Resources including but not limited to the terms and conditions outlined within the solicitation, bid, all appendices, all exhibits, associated Statements of Work, Purchase Orders, and all amendments awarded.

In addition to the terms and conditions of this solicitation, all Bidders should review the General Terms and Conditions in Section 1-A of the draft contract (Exhibit B) prior to submitting a bid.

https://omwbe.wa.gov/directory-certified-businesses

WA State Department of Natural Resources Page 13 of 39

All exceptions to the contract terms and conditions must be submitted as an attachment to EXHIBIT A.1 – Bidder’s Certification and Assurances Form.

The Agency will review requested exceptions and accept or reject the requests at its sole discretion.

2.13 COST TO PROPOSE

The Agency will not be liable for any costs incurred by the Bidder in preparation of a bid submitted in response to this solicitation, in conduct of a presentation, or any other activities related to responding to this solicitation.

2.14 NO OBLIGATION TO CONTRACT

This solicitation does not obligate the State of Washington or the Agency to contract for services specified herein.

2.15 REJECTION OF BIDS

The Agency reserves the right at its sole discretion to reject all bids received without penalty and not to issue a contract as a result of this solicitation.

2.16 COMMITMENT OF FUNDS

The Commissioner of Public Lands or his/her delegate is the only individual who may legally commit the Agency to the expenditures of funds for a contract resulting from this solicitation. No cost chargeable to the proposed contract may be incurred before notice and acceptance of award.

2.17 DOING BUSINESS WITH THE STATE

The Agency requires all awarded bidders to be registered with the Washington Office of Financial Management (OFM). Addition information can be found on The Department of Enterprise Services Website https://des.wa.gov/sell/how-work-state

2.18 REGISTRATION WITH THE ‘WEBS’ SYSTEM

All bidders should be registered with the Department of Enterprise Services “Washington Electronic Business Solution” (WEBS) system. Failure to register on WEBS may result in a disqualified bid.

https://des.wa.gov/sell/how-work-state

WA State Department of Natural Resources Page 14 of 39

Please follow this link for more information on how to register https://fortress.wa.gov/ga/webs/

2.19 INSURANCE COVERAGE

Before using any of said rights granted herein and its own expense, Contractor shall purchase and maintain the insurance described within Section 1.A of the included Draft Contract (Exhibit B) for the entire duration of this Agreement. Failure to purchase and maintain the required insurance may result in the termination of the Agreement at DNR’s option.

All insurance provided in compliance with this Agreement shall be primary as to any other insurance or self-insurance programs afforded to, or maintained by, the State of Washington, Department of Natural Resources.

Upon notification of being chosen as the Apparent Successful Bidder, the Contractor shall provide DNR with certificates of insurance, executed by a duly authorized representative of each insurer, showing compliance with the insurance requirements specified before using any of said rights granted herein. The description section of the certificate shall contain the contract number and the name of the DNR Contract Manager. Contractor shall also provide renewal certificates as appropriate during the term of this Agreement.

Contractor shall include all Agents as insured under all required insurance policies or shall provide separate certificates of insurance for each Agent. Failure of Contractor to have its Agents comply with the insurance requirements contained herein does not limit Contractor’s liability or responsibility.

3. CONTENTS AND SUBMITTAL INSTRUCTIONS

Bidders are required to read and understand all information contained within this entire bid package including all exhibits. By responding to the solicitation, Bidder agrees they have read and understand all documents.

3.1 SUBMISSION OF BIDS

The bid must be received by the Bid Coordinator by the due date indicated within Section 1.7 Schedule of Procurement Activities of this solicitation, or any amendments.

All forms and documents submitted must have a signature of an individual within the organization authorized to bind the Bidder to the offer.

https://fortress.wa.gov/ga/webs/

WA State Department of Natural Resources Page 15 of 39

Bidders should allow sufficient time to ensure timely receipt of the bid by the Bid Coordinator.

Late bids will not be accepted and will be automatically disqualified from further consideration, unless the Agency’s e-mail is found to be at fault. All bids and any accompanying documentation become the property of the Agency and will not be returned.

Confirmation of receipt of bid packets for both delivery methods is the responsibility of the Bidder.

ELECTRONIC SUBMISSION

Bids may be submitted electronically as an attachment to an e-mail to the Bid Coordinator, at the e-mail address listed in Section 1.6 (Bid Coordinator). The Agency does not assume responsibility for problems with Bidder’s e-mail. If the Agency’s e-mail is not working, appropriate allowances will be made. The Bid Coordinator may request original documentation be submitted at any time.

Attachments to e-mail shall be in Microsoft Word format or PDF. Maximum file size for an e-mail attachment is 30MB. Zipped files cannot be received by the Agency and cannot be used for submission of bids, quotations and/or proposals.

MAILED IN SUBMISSION

For bids submitted using physical mail, each bid envelope should be prepared in the following manner:

Mailing address:

Washington State Department of Natural Resources Craig Bohan Forest Resources Division P.O. Box 47017 Olympia, WA 98504-7017

Upper left corner: Bidder’s Name Bidder's Address

Lower left corner: Craig Bohan Cispus Seed Orchard Hazardous Fuels Reduction Contract Invitation to Bid #7046

Bidders choosing to mail proposals should allow normal mail delivery time to ensure timely receipt of their proposals by the Bid Coordinator. Bidders assume the risk for the method of delivery chosen. The DNR assumes no responsibility for delays caused by any delivery service. Any direct

WA State Department of Natural Resources Page 16 of 39 hand deliveries of Bid Documents should be sealed and prepared as described above and delivered to the applicable DNR Region Office during regular business hours (Monday through Friday 8:00am-5:00pm).

3.2 BIDDER CHECKLIST

Submit the following applicable documents to the Bid Coordinator by the due date indicated within the Schedule of Procurement Activities (Section 1.7) of this solicitation, or any amendments, to the schedule. Failure to comply may result in rejection of the bid as non-responsive. The Agency reserves the right at its sole discretion to waive minor administrative irregularities.

3.3 SPECIFICATIONS

Exhibit A.2 – Bid Specifications Form must be completed and returned to the Bid Coordinator in order for DNR to determine the lowest responsive and responsible Bidder.

3.4 QUALIFICATIONS

Exhibit A.2 – Bid Specifications Form, must be completed and returned to the Bid Coordinator in order for DNR to determine the lowest responsive and responsible Bidder.

3.5 FUNDING

Purchase of services resulting from this Solicitation are funded by State dollars. Terms and conditions for funding source are included in Sections I-A and I-C of the included Draft Contract (Exhibit B).

Any contract awarded as a result of this solicitation is contingent upon the availability of funding.

BIDDER CHECKLIST

EXHIBIT A.1 – BIDDER’S CERTIFICATION AND ASSURANCES FORM �

EXHIBIT A.2 – BID SPECIFICATION FORM �

EXHIBIT A.3 – AD-1048 FEDERAL DEBARMENT FORM �

EXHIBIT A.4 – COST PROPOSAL & PLAN OF OPERATIONS �

WA State Department of Natural Resources Page 17 of 39

3.6 COST PROPOSAL & PLAN OF OPERATIONS

The Bidder’s cost proposal will be included as part of Exhibit A.4 which will be part of their completed bid packet in order to be considered responsive to this solicitation. The cost proposal shall include fully weighted costs for services rendered as requested within. Attached to the cost proposal, Bidder will include a Plan of Operations that addresses the following questions:

• How do you intend to minimize damage to leave trees? Explain strategy to protect leave trees during mastication operation.

• What type(s) of equipment will be used? Please specify type and size of machine, and masticating head.

• When do you intend to start the operations? How long do you expect the job will take, factoring in some time for possible delays due to breakdowns or fire weather restrictions?

IDENTIFICATION OF COSTS

All costs shall be in U.S. dollars including expenses to be charged to accomplish the tasks and to produce the deliverables under this contract. Bidders are required to collect and pay Washington state sales and use taxes, as applicable.

COMPUTATION OF COSTS

The score for the cost proposal will be computed by dividing the lowest cost bid received by the Bidders total cost. Then the resultant number will be multiplied by the maximum possible points and rounded to the nearest whole number for the cost section.

WA State Department of Natural Resources Page 18 of 39

4. EVALUATION AND AWARD

The evaluation process is designed to award this procurement not necessarily to the Bidder of least cost, but rather to the Bidder whose bid best meets the requirements of this solicitation. However, Bidders are encouraged to submit bids that are consistent with state government efforts to conserve state resources.

The Agency will award the contract to the lowest responsive and responsible Bidder that meets the specifications as determined by the Agency. The Agency will post awarded bids and bid award documents for each competitive procurement for public review.

The Agency may reject the bid of any firm who has failed to perform satisfactorily on a previous contract with the state.

Responsive bids will be evaluated strictly in accordance with the requirements stated in this solicitation and any amendments issued. The evaluation of bids shall be accomplished by an evaluation team, to be designated by the Agency, which will determine the ranking of the bids, quotations and/or proposals.

The Agency reserves the right to select and enter into contract(s) with the Bidder whose bid is deemed to be in the best interest of the Agency and the State of Washington.

If this procurement is estimated to be less than $150,000. The Agency intends to award the contract to the lowest responsive and responsible bid from a small business (as defined in RCW 39.26.010(22)(a) or veteran-owned business, (as defined in RCW 43.60A.190) unless none of these businesses are responsible and responsive to this solicitation. The Agency will verify small and veteran owned business status through WEBS certification and if applicable bidder must provide certification documentation to the Washington Department of Veterans’ Affairs WDVA and be certified by WDVA and listed as such on WDVA’s website

It is the intent of the Agency to enter into a contract for the completion of silvicultural services as described herein.

4.1 RESPONSIVENESS (PASS / FAIL)

All bids will be reviewed by the Bid Coordinator to determine compliance with administrative requirements and instructions specified in this solicitation. The Bidder is specifically notified that failure to comply with any part of the solicitation may result in rejection of the bid as non-responsive.

WA State Department of Natural Resources Page 19 of 39

The Agency reserves the right at its sole discretion to waive minor administrative irregularities.

4.2 RESPONSIBLE BIDDER CRITERIA

Exhibit A.2 – Bid Specifications Form must be completed in order for DNR to determine the lowest responsive and responsible Bidder.

In determining whether the Bidder is a responsible Bidder, the Agency must consider the following elements (RCW 39.26.160(2)):

a. The ability, capacity, and skill of the Bidder to perform the contract or provide the service required;

b. The character, integrity, reputation, judgment, experience, and efficiency of the Bidder;

c. Whether the Bidder can perform the contract within the time specified;

d. The quality of performance of previous contracts or services;

e. The previous and existing compliance by the Bidder with laws relating to the contract or services;

f. Whether, within the three-year period immediately preceding the date of the bid solicitation, the Bidder has been determined by a final and binding citation and notice of assessment issued by the department of labor and industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW; and

g. Such other information as may be secured having a bearing on the decision to award the contract.

In determining the lowest responsive and responsible Bidder, an Agency may consider best value criteria, including but not limited to (RCW 39.26.160(3)):

a. Whether the bid satisfies the needs of the state as specified in the solicitation documents;

b. Whether the bid encourages diverse Contractor participation;

c. Whether the bid provides competitive pricing, economies, and efficiencies;

d. Whether the bid considers human health and environmental impacts;

e. Whether the bid appropriately weighs cost and noncost considerations; and

f. Life-cycle cost.

The Agency’s determination that a Bidder is not qualified may result in rejection of the submitted bid.

4.3 BIDDER’S CERTIFICATION FORM (PASS/FAIL)

All Bidders must submit Exhibit A.1 – Certifications and Assurances Form, signed by an individual authorized to bind the Bidder contractually. DNR will evaluate the information and https://apps.leg.wa.gov/rcw/default.aspx?cite=39.26.160 http://app.leg.wa.gov/RCW/default.aspx?cite=49.48.082 http://app.leg.wa.gov/RCW/default.aspx?cite=49.46 http://app.leg.wa.gov/RCW/default.aspx?cite=49.52 https://apps.leg.wa.gov/rcw/default.aspx?cite=39.26.160

WA State Department of Natural Resources Page 20 of 39 may, at its sole discretion, reject the Bidder’s Response if the information indicates that completion of a Contract resulting from this IFB may be jeopardized by selection of the Bidder.

4.4 WAGE LAW COMPLIANCE (PASS/FAIL)

Prior to awarding a contract, agencies are required to determine that a Bidder is a 'Responsible Bidder.' See RCW 39.26.160(2)(f) and (4). Pursuant to legislative enactment in 2017, the Responsible Bidder Criteria include a Contractor Certification that the Contractor has not willfully violated Washington's wage laws. See Chap. 258, 2017 Laws (enacting SSB 5301). All Bidders must submit Exhibit A.1 – Certifications and Assurances Form, signed by an individual authorized to bind the Bidder contractually. A Bidder’s failure to comply with the required Wage Law Compliance certification means that the Bidder is not responsible and therefore will not be evaluated. See RCW 39.26.160(2)(f) & (4).

4.5 PREFERENCE – EXECUTIVE ORDER 18-03 WORKER’S RIGHTS (SCORED)

FIRMS WITHOUT MANDATORY INDIVIDUAL ARBITRATION FOR EMPLOYEES

Pursuant to RCW 39.26.160(3) (best value criteria) and consistent with Executive Order 18-03 – Supporting Workers’ Rights to Effectively Address Workplace Violations (dated June 12, 2018), A. A preference of 5 percent will be given to any Bidder who certifies, pursuant to the certification attached as Exhibit A.1 – Bidder’s Certification and Assurances Form that their firm does NOT require its employees, as a condition of employment, to sign or agree to mandatory individual arbitration clauses or class or collective action waiver

4.6 PREFERENCE – SMALL & VETERAN BUSINESSES (SCORED)

Department of Natural Resources, in accordance with Washington law, encourages small and diverse businesses to compete for and participate in state procurements as contractors and as subcontractors to awarded bidders. See, e.g., RCW 43.60A.200 (WDVA Certified Veteran- Owned Businesses); and RCW 39.26.005 (Washington Small Businesses).

Washington State Certified Veteran-Owned Businesses In accordance with Chapter 43.60A.200 RCW, the State encourages participation in all of its contracts by firms certified by the Washington State Department of Veterans’ Affairs (DVA).

For questions regarding the above go to http://www.dva.wa.gov/.

A. A preference of 10 percent will be given to any Bidder who provides evidence as set forth in Exhibit A.1 – Certifications and Assurances Form that the that Bidder qualifies as a Washington Department of Veterans’ Affairs Certified Veteran-Owned Business. Note:

This preference does not apply if federal funds are being used. See section 3.5 Funding for funding source information.

http://apps.leg.wa.gov/Rcw/default.aspx?cite=39.26 http://lawfilesext.leg.wa.gov/biennium/2017-18/Pdf/Bills/Session%20Laws/Senate/5301-S.SL.pdf https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fapp.leg.wa.gov%2FRCW%2Fdefault.aspx%3Fcite%3D43.60A.200&data=05%7C01%7CBeth.Hughes%40dnr.wa.gov%7C0d8bc287255247fbf7df08daededc6de%7C11d0e217264e400a8ba057dcc127d72d%7C0%7C0%7C638083902739291565%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=aoL%2BJ7PN4UZF2OtEKHO%2Fk7uW%2BIADiMnpjXtyvZQmGxI%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fapp.leg.wa.gov%2FRCW%2Fdefault.aspx%3Fcite%3D39.26.005&data=05%7C01%7CBeth.Hughes%40dnr.wa.gov%7C0d8bc287255247fbf7df08daededc6de%7C11d0e217264e400a8ba057dcc127d72d%7C0%7C0%7C638083902739291565%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=poiVbIOH1dz18n6dIHd0mwXpeCdlXiEaiAYRWCZgS3g%3D&reserved=0 http://www.dva.wa.gov/

WA State Department of Natural Resources Page 21 of 39

Washington State Certified Small Businesses In accordance with the intent of Chapter 39.26.005 RCW, the State encourages the purchases of goods and services from Washington small businesses. Small business, mini-business, and micro-business are defined in RCW Chapter 39.26.010 (22), (17), and (16) respectively. Go to http://apps.leg.wa.gov/RCW/default.aspx?cite=39.26.010. All qualified state small business types are encouraged to register and identify themselves in the Washington Electronic Business Solution (WEBS). https://des.wa.gov/sell/how-work-state/register-bid-opportunities

A. A preference of 10 percent will be given to any Bidder who provides evidence as set forth in Exhibit A.1 – Certifications and Assurances Form that the that Bidder qualifies as a Washington State Small Business. Note: This preference does not apply if federal funds are being used. See section 3.5 Funding for funding source information.

4.7 EVALUATION WEIGHTING AND SCORING

CRITERIA MAXIMUM

POINTS

RESPONSIVENESS

SECTION 1.3 – MINIMUM QUALIFICATIONS PASS/FAIL

SECTION 4.3– BIDDER’S CERTIFICATION AND ASSURANCES FORM (EXHIBIT A.1) PASS/FAIL

SECTION 4.4 – WAGE COMPLIANCE LAW (EXHIBIT A.1) PASS/FAIL

SECTION 4.1 – RESPONSIVENESS PASS/FAIL

SPECIFICATIONS

EXHIBIT A.2 SOLICITATION SPECIFICATIONS FORM – REQUIRED PASS/FAIL

QUALIFICATIONS

EXHIBIT A.2 SOLICITATION SPECIFICATIONS FORM – CURRENT/FORMER STATE

EMPLOYEE

PASS/FAIL

EXHIBIT A.2 SOLICITATION SPECIFICATIONS FORM – REFERENCES 40

COST PROPOSAL

SECTION 3.6 – TOTAL COST 60

SUB-TOTAL 100

PREFERENCES

SECTION 4.5 – EXECUTIVE ORDER 18-03 WORKER’S RIGHTS (EXHIBIT A.1) 5

SECTION 4.6 – SMALL BUSINESS PREFERENCE (EXHIBIT A.1) 10

TOTAL POSSIBLE W/PREFERENCES 115

http://apps.leg.wa.gov/RCW/default.aspx?cite=39.26.010 https://des.wa.gov/sell/how-work-state/register-bid-opportunities

WA State Department of Natural Resources Page 22 of 39

5. SOLICITATION EXHIBITS

EXHIBIT A.1 – Bidder’s Certification and Assurances Form EXHIBIT A.2 – Bid Specification Form EXHIBIT A.3 – AD-1048 Federal Debarment Form EXHIBIT A.4 – Cost Proposal EXHIBIT A.5 – Plan of Operations EXHIBIT B – Draft Contract

WA State Department of Natural Resources Page 23 of 39

EXHIBIT A.1 – BIDDER’S CERTIFICATION AND ASSURANCES FORM

BIDDER INFORMATION

Business Name:

Name of Authorized Representative:

Address:

City:

State: Zip:

Cell Phone:

Office Phone:

Statewide Vendor Number (optional)

E-mail:

TIN (Tax Identification Number):

Internal Revenue Service

WA UBI (Unified Business Identifier):

WA Department of Licensing

WA Labor & Industries Account #:

WA State Farm Labor Contractors License #:

Expiration Date:

United States Department of Labor Farm Labor Contractors License #:

Expiration Date:

ALL IN-STATE VENDORS MUST BE LICENSED TO DO BUSINESS IN WASHINGTON STATE.

OUT-OF-STATE VENDORS SHOULD SEEK GUIDANCE FROM WA DEPARTMENT OF LICENSING FOR

SPECIFIC UBI REQUIREMENTS.

https://ofm.wa.gov/it-systems/accounting-systems/statewide-vendorpayee-services https://www.irs.gov/individuals/international-taxpayers/taxpayer-identification-numbers-tin https://www.dol.wa.gov/ https://www.lni.wa.gov/ https://lni.wa.gov/licensing-permits/other-licenses-permits/farm-labor-contractor-licensing https://www.dol.gov/agencies/whd/forms/wh530 https://www.dol.gov/agencies/whd/forms/wh530

WA State Department of Natural Resources Page 24 of 39

Bidder makes the following certifications and assurances as a required element of the bid to which it is attached, understanding that the truthfulness of the facts affirmed here and the continuing compliance with these requirements are conditions precedent to the award or continuation of the related contract(s):

1. UNDERSTANDING. Bidder certifies that Bidder has read, thoroughly examined, and fully understands all of the provisions in the Competitive Solicitation (including all exhibits) and the terms and conditions of the Contract and any amendments or clarifications to the Competitive Solicitation, and agrees to abide by the same.

2. ACCURACY. Bidder declares that all answers and statements made in the bid are true and correct.

3. NO COLLUSION OR ANTI-COMPETITIVE PRACTICES. The prices and/or cost data have been determined independently, without consultation, communication, or agreement with others for the purpose of restricting competition. However, Bidder may freely join with other persons or organizations for the purpose of presenting a single bid.

4. FIRM OFFER. The attached bid is a firm offer for a period of 90 calendar days following receipt, and it may be accepted by the Agency without further negotiation (except where obviously required by lack of certainty in key terms) at any time within the 90-day period.

5. CONFLICT OF INTEREST. In preparing this bid, Bidder has not been assisted by any current or former employee of the State of Washington whose duties relate (or did relate) to this bid or prospective contract, and who was assisting in other than his or her official, public capacity. (Any exceptions to these assurances are described in full detail on a separate page and attached to this document.)

6. NO REIMBURSEMENT. Bidder understands that the Agency will not issue reimbursement for any costs incurred in the preparation of this bid. All bids become the property of the Agency, and the Bidder claim no proprietary right to the ideas, writings, items, or samples, unless so stated in this bid.

7. DISCLOSURE. Unless otherwise required by law, the prices and/or cost data that have been submitted have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the bidder prior to award, directly or indirectly to any other Bidder or to any competitor.

8. PERFORMANCE. Bidder agrees that submission of bid documents, quotation and/or proposal constitutes acceptance of the solicitation contents, including all attached or linked terms and conditions. If there are any exceptions to these terms and conditions, the Bidder has described those exceptions in detail on a page attached to Bidder’s submission documents.

WA State Department of Natural Resources Page 25 of 39

9. HARASSMENT. DNR CONTRACTORS hereby have access to DNR’s Policies:

Per RCW 43.01.135, Sexual harassment in the workplace, DNR contractors hereby have access to DNR Policy PO01-052 Sexual Harassment, linked below:

https://www.dnr.wa.gov/publications/em_harassment_prevention_policy.pdf

DNR’s Policy PO01-051 Safe and Respectful Workplace, linked below, outlines DNR’s commitment and the expectations for contractors:

www.dnr.wa.gov/publications/em_safe_respectful_workplace_policy.pdf

DNR’s Policy PO01-037 Harassment Prevention, linked below, outlines DNR’s commitment and the expectations for contractors:

www.dnr.wa.gov/publications/em_harassment_prevention_policy_037.pdf

10. RESTRICTING COMPETITION. No attempt has been made or will be made by the Bidder to persuade any other person or firm to submit or not to submit a bid for the purpose of restricting competition.

11. REFERENCES. Bidder grants the Agency the right to contact references and others, who may have pertinent information regarding the Bidder’s prior experience and ability to perform the goods delivered or services rendered contemplated in this procurement.

12. LICENSED IN WASHINGTON STATE. Bidder will become licensed to do business in the State of Washington (if applicable) prior to providing delivered goods or rendered services to

DNR.

13. PREVIOUS STATE EMPLOYEES. If any staff member(s) who will perform work on this contract has retired from the State of Washington under the provisions of the 2008 Early Retirement Factors legislation, list their name(s) on a separately attached page. WAC

415.02.325 RCW 41.50.139

14. DEBARMENT. Bidder certifies as follows (must check one):

☐ NO DEBARMENT. Bidder and/or its principals are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from contracting with any federal, state, or local governmental entity.

OR

☐ DEBARRED. As detailed on the attached explanation (Bidder to provide), Bidder and/or its principals presently are debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from contracting with a federal, state, or local governmental entity.

15. CRIMINAL OFFENSE. Bidder certifies as follows (must check one):

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fapp.leg.wa.gov%2FRCW%2Fdefault.aspx%3Fcite%3D43.01.135&data=05%7C02%7CBeth.Hughes%40dnr.wa.gov%7C2580815300b74509b21208dc2cb35c89%7C11d0e217264e400a8ba057dcc127d72d%7C0%7C0%7C638434396063830802%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=GMmTvMe6cM8n9VOGPXKs%2Fkl6yOqFwshn12foqGaXVf8%3D&reserved=0 https://www.dnr.wa.gov/publications/em_harassment_prevention_policy.pdf http://www.dnr.wa.gov/publications/em_safe_respectful_workplace_policy.pdf…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .