Specs_and_Quote_Sheet.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- BG-8506 Fuel Barge Dry Dock
- Solicitation number
- 6991PE18Q000022
About this file
Additional Specs/Quote Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BG-8506_DDX_Spec_2018_R1_051618.doc | DOC document | |
| 6991PE18Q000022.pdf | ||
| RFQ_Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sq Fts
| Square footage calculation | L | W | Ea | Total |
| Underwater/Antifouling area | 6168 | |||
| Bottom | 125 | 33 | 1 | 4125 |
| Flat side | 69 | 7 | 2 | 966 |
| Rake side | 25.5 | 17 | 4 | 867 |
| Skegs | 15 | 7 | 4 | 210 |
| Freeboard Area | 1536 | |||
| Flat + Rake Side | 120 | 5.5 | 2 | 1320 |
| Bow/stern | 33 | 3 | 2 | 198 |
| Skegs | 3 | 3 | 4 | 18 |
| Deck | 4434 | |||
| Main Deck | 130 | 33 | 1 | 4290 |
| house top | 16 | 9 | 1 | 144 |
| Ullage/Expansion Domes | 336 | |||
| sides | 12 | 4 | 6 | 288 |
| top | 4 | 2 | 6 | 48 |
| Deck house | 224 | |||
| Port/stbd | 7 | 9 | 2 | 126 |
| fwd/aft | 7 | 7 | 2 | 98 |
| Pumproom Hatch | 33 | |||
| sides | 3 | 2 | 4 | 24 |
| hatch | 3 | 3 | 1 | 9 |
| Total | 12731 | |||
| 528 | ||||
| Center deck area | 20 | 8 | 3 | 480 |
| in between | 3 | 8 | 2 | 48 |
Quote Sheet
| BG-8506 FUEL BARGE Drydocking and Repair | ||
| CLIN | DESCRIPTION | Contractor Pricing |
1.1 Delivery/Towing
1.2 On-Board Container Removal
1.3 Defueling and Tank Cleaning
1.4 Drydocking (incl LayDays)
1.5 Hull, Deck & Deckhouse Cleaning & Inspection
1.6 Surface Preparation
1.7 Coating
1.8 Cathodic Protection
1.9 Tank Internal Inspection
1.10 ABS Requirements
| 2 | Supplemental Labor: __ per hour for 250 hours | |
| Supplemental Material | $ 9,000.00 |
GRAND TOTAL: $ 9,000.00
File details come from the government source that posted it.