This bid opening summary is for the Valley Day-Use Parking Phase II project to construct a 250-space parking lot and improve drainage and paving of an existing 350-space parking lot within Yosemite National Park, California. Five contractors submitted bids by the March 29, 2022 deadline, ranging from $3,184,127.50 to $7,468,141.95. The lowest responsive bid was submitted by S.T. Rhoades Construction, Inc. for $5,080,595.65. The second lowest bid was from George Reed, Inc. for $6,648,502.50. One bid was deemed non-responsive. The engineer's estimate for the project was $5,360,000. The solicitation for this project was number 6982AF22B000004 issued by the Department of Transportation Federal Highway Administration.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Valley Day-Use Parking Phase II Project Number: CA YOSE 1022(1) Bid Opening Date: 03/29/2022 Time: 1:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Eric Grosskreuz

Amendments: (1)___03/22/2022 ___ (2) _____________(3) (4)

Bidder’s Name Schedule A Option X BID TOTAL 1.Herback General Engineering, Minden, NV

$4,940,169.00 $2,527,972.95 $7,468,141.95

2.S.T. Rhoades Construction, Inc., Redding, CA

$3,184,127.50 $1,896,468.14 $5,080,595.65

3.Papich Construction Co. Inc., Arroyo Grande, CA

----------- ----------- Blank bid schedule, Non-responsive

4. George Reed, Inc., Modesto, CA

$4,505,824.00 $2,142,678.50 $6,648,502.50

5.

6.

7.

Engineer’s Estimate $3,113,000.00 $2,247,000.00 $5,360,000.00

*All bids are subject to verification.

Bid Opening Summary
Bid Opening Date: 03/29/2022 Time: 1:00 p.m. MST
*All bids are subject to verification.