Bid Tabs - Pave Levee Road.pdf

PDF 250 KB Posted

Attached to
AZ FTBR Levee Road (1) Pave Levee Road
Solicitation number
6982AF20B000038
Issued by

About this file

This is a bid tabulation report for a federal highway construction project. The report details 20 bids received in response to Solicitation 6982AF20B00038 issued by the Department of Transportation Federal Highway Administration. The project involves paving 2.642 miles of Levee Road located in Yuma County, Arizona on land under the jurisdiction of the Lower Colorado Basin, Region 8, Yuma Area Office. The tabulation provides unit pricing and total pricing for 70 line items across contractors. Required work includes roadway reconditioning, asphalt paving, guardrails, signage, and temporary traffic control. Lowest responsive bidder was Hauser Engineering Group at $1,426,713.90. Highest bid was from Intermountain West Civil Constructors at $2,544,298.10. The engineer's estimate for the project was $1,677,000. Award date is not provided.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 10/01/20

1 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF20B00038

Division: Central Federal Lands

State: AZ County: Yuma

Federal Land: Lower Colorado Basin, Region 8, Yuma Area Office Opened at: Lakewood Opened by:

Josephine Helms, Contract Specialist

Date: 09/30/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

$1,426,713.90

$1,453,622.09

$1,627,733.13

$1,735,984.58

$2,029,913.80

$2,074,577.78

$2,081,803.00

$2,146,968.56

$2,152,140.00

Hauser Engineering Group, LLC 9029 N 65th Ave Glendale, AZ 85302

Desert Talon Contracting, Inc.

1636 E 20th Street Yuma, AZ 85365

Gutierrez Canales Engineering, PC 1851 W. 24th Street, Suite 201 Yuma, AZ 85364

Show Low Construction, Inc.

PO Box 29 Show Low, AZ 85901

Stormwater Plans, LLC dba SWP Contracting and Paving 5624 N. 54th Avenue Glendale, AZ 85301

ARROW INDIAN CONTRACTORS, INC.

PO Box 2334 Scottsdale, AZ 85252

Standard Construction Company, Inc.

810 E. Western Avenue Avondale, AZ 85323

Desert Concepts Construction, Inc.

9029 N 65th Ave Glendale, AZ 85302

Monitor Construction Company, Inc.

8 Old Highway, PO Box 1327 Sonoita, AZ 85637

Intermountain West Civil Constructors, Inc.

1564 N. Alma School Road, Suite 200 Mesa, AZ 85201

$2,544,298.10

Engineer's Estimate $1,677,000.00

5 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0010 15101-0000 MOBILIZATION

Hauser Engineering Group, LLC Lump Sum $140,000.00 Desert Talon Contracting, Inc. Lump Sum $70,890.00 Gutierrez Canales Engineering, PC Lump Sum $13,097.00 Show Low Construction, Inc. Lump Sum $101,111.96 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $300,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $18,813.56 Standard Construction Company, Inc. Lump Sum $199,500.00 Desert Concepts Construction, Inc. Lump Sum $200,000.00 Monitor Construction Company, Inc. Lump Sum $215,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $162,166.50

A0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Hauser Engineering Group, LLC $12,000.00 $31,704.00 Desert Talon Contracting, Inc. $17,270.00 $45,627.34 Gutierrez Canales Engineering, PC $8,168.05 $21,579.99 Show Low Construction, Inc. $16,708.55 $44,143.99 Stormwater Plans, LLC dba SWP Contracting and Paving $20,000.00 $52,840.00

ARROW INDIAN CONTRACTORS, INC. $8,829.98 $23,328.81

Standard Construction Company, Inc. $10,000.00 $26,420.00 Desert Concepts Construction, Inc. $17,080.00 $45,125.36 Monitor Construction Company, Inc. $7,000.00 $18,494.00 Intermountain West Civil Constructors, Inc. $16,000.00 $42,272.00 Engineer's Estimate 2.642 MILE $3,500.00 $9,247.00

A0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Hauser Engineering Group, LLC $1,000.00 $2,000.00 Desert Talon Contracting, Inc. $1,600.00 $3,200.00 Gutierrez Canales Engineering, PC $13,000.00 $26,000.00 Show Low Construction, Inc. $620.00 $1,240.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $5,000.00

ARROW INDIAN CONTRACTORS, INC. $12,542.38 $25,084.76

Standard Construction Company, Inc. $4,500.00 $9,000.00 Desert Concepts Construction, Inc. $7,500.00 $15,000.00 Monitor Construction Company, Inc. $1,200.00 $2,400.00 Intermountain West Civil Constructors, Inc. $3,500.00 $7,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

6 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0040 15301-0000 CONTRACTOR QUALITY CONTROL

Hauser Engineering Group, LLC Lump Sum $70,000.00 Desert Talon Contracting, Inc. Lump Sum $20,000.00 Gutierrez Canales Engineering, PC Lump Sum $34,000.00 Show Low Construction, Inc. Lump Sum $9,300.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $37,627.13 Standard Construction Company, Inc. Lump Sum $50,000.00 Desert Concepts Construction, Inc. Lump Sum $30,000.00 Monitor Construction Company, Inc. Lump Sum $90,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $175,000.00 Engineer's Estimate ALL LPSM Lump Sum $37,600.00

A0050 15401-0000 CONTRACTOR TESTING

Hauser Engineering Group, LLC Lump Sum $72,000.00 Desert Talon Contracting, Inc. Lump Sum $33,360.00 Gutierrez Canales Engineering, PC Lump Sum $32,500.00 Show Low Construction, Inc. Lump Sum $21,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $221,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $12,542.38 Standard Construction Company, Inc. Lump Sum $30,000.00 Desert Concepts Construction, Inc. Lump Sum $30,000.00 Monitor Construction Company, Inc. Lump Sum $28,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $325,000.00 Engineer's Estimate ALL LPSM Lump Sum $37,600.00

A0060 15501-0000 CONSTRUCTION SCHEDULE

Hauser Engineering Group, LLC Lump Sum $5,000.00 Desert Talon Contracting, Inc. Lump Sum $2,640.00 Gutierrez Canales Engineering, PC Lump Sum $4,250.00 Show Low Construction, Inc. Lump Sum $5,580.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $6,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $2,106.38 Standard Construction Company, Inc. Lump Sum $15,000.00 Desert Concepts Construction, Inc. Lump Sum $10,000.00 Monitor Construction Company, Inc. Lump Sum $5,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $12,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

7 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0070 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A

Hauser Engineering Group, LLC $350.00 $700.00 Desert Talon Contracting, Inc. $4,350.00 $8,700.00 Gutierrez Canales Engineering, PC $15,067.00 $30,134.00 Show Low Construction, Inc. $1,977.13 $3,954.26 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $1,000.00

ARROW INDIAN CONTRACTORS, INC. $6,145.77 $12,291.54

Standard Construction Company, Inc. $300.00 $600.00 Desert Concepts Construction, Inc. $15,000.00 $30,000.00 Monitor Construction Company, Inc. $500.00 $1,000.00 Intermountain West Civil Constructors, Inc. $3,500.00 $7,000.00 Engineer's Estimate 2 EACH $200.00 $400.00

A0080 15802-0000 WATERING FOR DUST CONTROL

Hauser Engineering Group, LLC Lump Sum $76,600.00 Desert Talon Contracting, Inc. Lump Sum $6,000.00 Gutierrez Canales Engineering, PC Lump Sum $20,616.00 Show Low Construction, Inc. Lump Sum $7,256.48 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $26,338.99 Standard Construction Company, Inc. Lump Sum $120,000.00 Desert Concepts Construction, Inc. Lump Sum $25,000.00 Monitor Construction Company, Inc. Lump Sum $65,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A0090 20301-2400 REMOVAL OF SIGN

Hauser Engineering Group, LLC $25.00 $300.00 Desert Talon Contracting, Inc. $250.00 $3,000.00 Gutierrez Canales Engineering, PC $320.67 $3,848.04 Show Low Construction, Inc. $93.00 $1,116.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $1,800.00

ARROW INDIAN CONTRACTORS, INC. $406.28 $4,875.36

Standard Construction Company, Inc. $250.00 $3,000.00 Desert Concepts Construction, Inc. $250.00 $3,000.00 Monitor Construction Company, Inc. $500.00 $6,000.00 Intermountain West Civil Constructors, Inc. $100.00 $1,200.00 Engineer's Estimate 12 EACH $300.00 $3,600.00

8 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 20302-1200 REMOVAL OF GUARDRAIL

Hauser Engineering Group, LLC $20.00 $2,000.00 Desert Talon Contracting, Inc. $24.00 $2,400.00 Gutierrez Canales Engineering, PC $62.92 $6,292.00 Show Low Construction, Inc. $18.72 $1,872.00 Stormwater Plans, LLC dba SWP Contracting and Paving $30.00 $3,000.00

ARROW INDIAN CONTRACTORS, INC. $34.35 $3,435.00

Standard Construction Company, Inc. $20.00 $2,000.00 Desert Concepts Construction, Inc. $85.00 $8,500.00 Monitor Construction Company, Inc. $25.00 $2,500.00 Intermountain West Civil Constructors, Inc. $95.00 $9,500.00 Engineer's Estimate 100 LNFT $20.00 $2,000.00

A0110 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

Hauser Engineering Group, LLC $3.60 $4,140.00 Desert Talon Contracting, Inc. $5.00 $5,750.00 Gutierrez Canales Engineering, PC $7.62 $8,763.00 Show Low Construction, Inc. $5.08 $5,842.00 Stormwater Plans, LLC dba SWP Contracting and Paving $10.00 $11,500.00

ARROW INDIAN CONTRACTORS, INC. $18.81 $21,631.50

Standard Construction Company, Inc. $20.00 $23,000.00 Desert Concepts Construction, Inc. $4.50 $5,175.00 Monitor Construction Company, Inc. $30.00 $34,500.00 Intermountain West Civil Constructors, Inc. $18.00 $20,700.00 Engineer's Estimate 1,150 SQYD $10.00 $11,500.00

A0120 20402-0000 SUBEXCAVATION

Hauser Engineering Group, LLC $78.00 $7,800.00 Desert Talon Contracting, Inc. $130.00 $13,000.00 Gutierrez Canales Engineering, PC $256.67 $25,667.00 Show Low Construction, Inc. $114.92 $11,492.00 Stormwater Plans, LLC dba SWP Contracting and Paving $100.00 $10,000.00

ARROW INDIAN CONTRACTORS, INC. $250.85 $25,085.00

Standard Construction Company, Inc. $110.00 $11,000.00 Desert Concepts Construction, Inc. $200.00 $20,000.00 Monitor Construction Company, Inc. $87.00 $8,700.00 Intermountain West Civil Constructors, Inc. $150.00 $15,000.00 Engineer's Estimate 100 CUYD $50.00 $5,000.00

9 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0130 30202-2000 ROADWAY AGGREGATE, METHOD 2

Hauser Engineering Group, LLC $30.00 $139,980.00 Desert Talon Contracting, Inc. $26.00 $121,316.00 Gutierrez Canales Engineering, PC $38.05 $177,541.30 Show Low Construction, Inc. $74.59 $348,036.94 Stormwater Plans, LLC dba SWP Contracting and Paving $50.00 $233,300.00

ARROW INDIAN CONTRACTORS, INC. $18.81 $87,767.46

Standard Construction Company, Inc. $40.00 $186,640.00 Desert Concepts Construction, Inc. $45.00 $209,970.00 Monitor Construction Company, Inc. $36.00 $167,976.00 Intermountain West Civil Constructors, Inc. $36.00 $167,976.00 Engineer's Estimate 4,666.0 TON $60.00 $279,960.00

A0140 30301-6000 ROADWAY RECONDITIONING

Hauser Engineering Group, LLC $35,000.00 $92,470.00 Desert Talon Contracting, Inc. $109,000.00 $287,978.00 Gutierrez Canales Engineering, PC $34,379.64 $90,831.01 Show Low Construction, Inc. $17,344.61 $45,824.46 Stormwater Plans, LLC dba SWP Contracting and Paving $25,000.00 $66,050.00

ARROW INDIAN CONTRACTORS, INC. $54,797.33 $144,774.55

Standard Construction Company, Inc. $45,000.00 $118,890.00 Desert Concepts Construction, Inc. $103,000.00 $272,126.00 Monitor Construction Company, Inc. $19,000.00 $50,198.00 Intermountain West Civil Constructors, Inc. $117,500.00 $310,435.00 Engineer's Estimate 2.642 MILE $8,500.00 $22,457.00

A0150 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Hauser Engineering Group, LLC $84.50 $574,600.00 Desert Talon Contracting, Inc. $75.00 $510,000.00 Gutierrez Canales Engineering, PC $107.14 $728,552.00 Show Low Construction, Inc. $120.90 $822,120.00 Stormwater Plans, LLC dba SWP Contracting and Paving $92.00 $625,600.00

ARROW INDIAN CONTRACTORS, INC. $169.32 $1,151,376.00

Standard Construction Company, Inc. $138.00 $938,400.00 Desert Concepts Construction, Inc. $110.00 $748,000.00 Monitor Construction Company, Inc. $173.00 $1,176,400.00 Intermountain West Civil Constructors, Inc. $108.00 $734,400.00 Engineer's Estimate 6,800.0 TON $110.00 $748,000.00

10 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0160 40601-0000 FOG SEAL

Hauser Engineering Group, LLC $360.00 $9,000.00 Desert Talon Contracting, Inc. $580.00 $14,500.00 Gutierrez Canales Engineering, PC $590.00 $14,750.00 Show Low Construction, Inc. $1,240.00 $31,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $12,500.00

ARROW INDIAN CONTRACTORS, INC. $1,195.29 $29,882.25

Standard Construction Company, Inc. $750.00 $18,750.00 Desert Concepts Construction, Inc. $1,000.00 $25,000.00 Monitor Construction Company, Inc. $300.00 $7,500.00 Intermountain West Civil Constructors, Inc. $850.00 $21,250.00 Engineer's Estimate 25.0 TON $900.00 $22,500.00

A0170 41101-1000 PRIME COAT, METHOD 1

Hauser Engineering Group, LLC $360.00 $18,000.00 Desert Talon Contracting, Inc. $425.00 $21,250.00 Gutierrez Canales Engineering, PC $873.00 $43,650.00 Show Low Construction, Inc. $1,240.00 $62,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $25,000.00

ARROW INDIAN CONTRACTORS, INC. $1,881.36 $94,068.00

Standard Construction Company, Inc. $1,200.00 $60,000.00 Desert Concepts Construction, Inc. $900.00 $45,000.00 Monitor Construction Company, Inc. $300.00 $15,000.00 Intermountain West Civil Constructors, Inc. $750.00 $37,500.00 Engineer's Estimate 50.0 TON $900.00 $45,000.00

A0180 41105-0000 BLOTTER

Hauser Engineering Group, LLC $25.00 $7,500.00 Desert Talon Contracting, Inc. $45.00 $13,500.00 Gutierrez Canales Engineering, PC $30.50 $9,150.00 Show Low Construction, Inc. $43.40 $13,020.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15.00 $4,500.00

ARROW INDIAN CONTRACTORS, INC. $18.81 $5,643.00

Standard Construction Company, Inc. $50.00 $15,000.00 Desert Concepts Construction, Inc. $150.00 $45,000.00 Monitor Construction Company, Inc. $75.00 $22,500.00 Intermountain West Civil Constructors, Inc. $30.00 $9,000.00 Engineer's Estimate 300.0 TON $50.00 $15,000.00

11 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0190 41201-0000 TACK COAT

Hauser Engineering Group, LLC $360.00 $9,000.00 Desert Talon Contracting, Inc. $580.00 $14,500.00 Gutierrez Canales Engineering, PC $590.00 $14,750.00 Show Low Construction, Inc. $1,240.00 $31,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $12,500.00

ARROW INDIAN CONTRACTORS, INC. $1,066.10 $26,652.50

Standard Construction Company, Inc. $1,000.00 $25,000.00 Desert Concepts Construction, Inc. $700.00 $17,500.00 Monitor Construction Company, Inc. $555.00 $13,875.00 Intermountain West Civil Constructors, Inc. $900.00 $22,500.00 Engineer's Estimate 25.0 TON $900.00 $22,500.00

A0200 60201-0800 24-INCH PIPE CULVERT

Hauser Engineering Group, LLC $125.00 $11,250.00 Desert Talon Contracting, Inc. $315.00 $28,350.00 Gutierrez Canales Engineering, PC $271.56 $24,440.40 Show Low Construction, Inc. $129.88 $11,689.20 Stormwater Plans, LLC dba SWP Contracting and Paving $220.00 $19,800.00

ARROW INDIAN CONTRACTORS, INC. $231.31 $20,817.90

Standard Construction Company, Inc. $140.00 $12,600.00 Desert Concepts Construction, Inc. $220.00 $19,800.00 Monitor Construction Company, Inc. $110.00 $9,900.00 Intermountain West Civil Constructors, Inc. $350.00 $31,500.00 Engineer's Estimate 90 LNFT $120.00 $10,800.00

A0210 60404-0000 CATCH BASIN

Hauser Engineering Group, LLC $6,500.00 $13,000.00 Desert Talon Contracting, Inc. $8,600.00 $17,200.00 Gutierrez Canales Engineering, PC $19,026.56 $38,053.12 Show Low Construction, Inc. $3,935.29 $7,870.58 Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $10,000.00

ARROW INDIAN CONTRACTORS, INC. $5,637.31 $11,274.62

Standard Construction Company, Inc. $5,000.00 $10,000.00 Desert Concepts Construction, Inc. $10,000.00 $20,000.00 Monitor Construction Company, Inc. $3,500.00 $7,000.00 Intermountain West Civil Constructors, Inc. $12,000.00 $24,000.00 Engineer's Estimate 2 EACH $6,000.00 $12,000.00

12 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 61701-4100 GUARDRAIL SYSTEM CRG, TYPE 2, CLASS A

Hauser Engineering Group, LLC $55.00 $6,187.50 Desert Talon Contracting, Inc. $115.00 $12,937.50 Gutierrez Canales Engineering, PC $254.23 $28,600.88 Show Low Construction, Inc. $54.99 $6,186.38 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $6,750.00

ARROW INDIAN CONTRACTORS, INC. $124.86 $14,046.75

Standard Construction Company, Inc. $88.00 $9,900.00 Desert Concepts Construction, Inc. $88.00 $9,900.00 Monitor Construction Company, Inc. $40.00 $4,500.00 Intermountain West Civil Constructors, Inc. $105.00 $11,812.50 Engineer's Estimate 112.5 LNFT $75.00 $8,437.50

A0230 61702-0400 TERMINAL SECTION, TYPE G4-CRT

Hauser Engineering Group, LLC $5,500.00 $11,000.00 Desert Talon Contracting, Inc. $5,500.00 $11,000.00 Gutierrez Canales Engineering, PC $5,164.90 $10,329.80 Show Low Construction, Inc. $3,131.00 $6,262.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,500.00 $7,000.00

ARROW INDIAN CONTRACTORS, INC. $3,135.60 $6,271.20

Standard Construction Company, Inc. $4,000.00 $8,000.00 Desert Concepts Construction, Inc. $4,500.00 $9,000.00 Monitor Construction Company, Inc. $4,900.00 $9,800.00 Intermountain West Civil Constructors, Inc. $5,000.00 $10,000.00 Engineer's Estimate 2 EACH $4,000.00 $8,000.00

A0240 61702-0800 TERMINAL SECTION TYPE TANGENT (G4)

Hauser Engineering Group, LLC $5,600.00 $11,200.00 Desert Talon Contracting, Inc. $8,600.00 $17,200.00 Gutierrez Canales Engineering, PC $7,178.80 $14,357.60 Show Low Construction, Inc. $3,968.00 $7,936.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,500.00 $9,000.00

ARROW INDIAN CONTRACTORS, INC. $2,508.47 $5,016.94

Standard Construction Company, Inc. $6,500.00 $13,000.00 Desert Concepts Construction, Inc. $4,500.00 $9,000.00 Monitor Construction Company, Inc. $4,000.00 $8,000.00 Intermountain West Civil Constructors, Inc. $5,000.00 $10,000.00 Engineer's Estimate 2 EACH $5,500.00 $11,000.00

13 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0250 61901-2100 FENCE, CHAIN LINK, 96-INCH HEIGHT (WITH BARBED WIRE)

Hauser Engineering Group, LLC $60.00 $1,440.00 Desert Talon Contracting, Inc. $125.00 $3,000.00 Gutierrez Canales Engineering, PC $109.60 $2,630.40 Show Low Construction, Inc. $129.17 $3,100.08 Stormwater Plans, LLC dba SWP Contracting and Paving $25.00 $600.00

ARROW INDIAN CONTRACTORS, INC. $81.53 $1,956.72

Standard Construction Company, Inc. $101.00 $2,424.00 Desert Concepts Construction, Inc. $200.00 $4,800.00 Monitor Construction Company, Inc. $42.00 $1,008.00 Intermountain West Civil Constructors, Inc. $650.00 $15,600.00 Engineer's Estimate 24 LNFT $25.00 $600.00

A0260 61902-3100 GATE, CHAIN LINK, 8 FEET WIDTH (ROLLING WITH BARBED WIRE)

Hauser Engineering Group, LLC $2,800.00 $5,600.00 Desert Talon Contracting, Inc. $1,000.00 $2,000.00 Gutierrez Canales Engineering, PC $1,096.00 $2,192.00 Show Low Construction, Inc. $2,121.64 $4,243.28 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $2,400.00

ARROW INDIAN CONTRACTORS, INC. $2,508.47 $5,016.94

Standard Construction Company, Inc. $3,000.00 $6,000.00 Desert Concepts Construction, Inc. $5,000.00 $10,000.00 Monitor Construction Company, Inc. $1,800.00 $3,600.00 Intermountain West Civil Constructors, Inc. $6,000.00 $12,000.00 Engineer's Estimate 2 EACH $2,500.00 $5,000.00

A0270 61920-2000 REMOVE AND RESET GATE

Hauser Engineering Group, LLC $1,400.00 $1,400.00 Desert Talon Contracting, Inc. $3,350.00 $3,350.00 Gutierrez Canales Engineering, PC $910.00 $910.00 Show Low Construction, Inc. $1,860.00 $1,860.00 Stormwater Plans, LLC dba SWP Contracting and Paving $600.00 $600.00

ARROW INDIAN CONTRACTORS, INC. $2,508.47 $2,508.47

Standard Construction Company, Inc. $1,500.00 $1,500.00 Desert Concepts Construction, Inc. $2,500.00 $2,500.00 Monitor Construction Company, Inc. $900.00 $900.00 Intermountain West Civil Constructors, Inc. $3,500.00 $3,500.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00

14 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0280 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

Hauser Engineering Group, LLC $105.00 $4,200.00 Desert Talon Contracting, Inc. $125.00 $5,000.00 Gutierrez Canales Engineering, PC $112.17 $4,486.80 Show Low Construction, Inc. $109.52 $4,380.80 Stormwater Plans, LLC dba SWP Contracting and Paving $110.00 $4,400.00

ARROW INDIAN CONTRACTORS, INC. $156.78 $6,271.20

Standard Construction Company, Inc. $188.00 $7,520.00 Desert Concepts Construction, Inc. $72.05 $2,882.00 Monitor Construction Company, Inc. $120.00 $4,800.00 Intermountain West Civil Constructors, Inc. $105.00 $4,200.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00

A0290 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

Hauser Engineering Group, LLC $23.00 $920.00 Desert Talon Contracting, Inc. $102.00 $4,080.00 Gutierrez Canales Engineering, PC $107.97 $4,318.80 Show Low Construction, Inc. $81.60 $3,264.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $5,600.00

ARROW INDIAN CONTRACTORS, INC. $137.97 $5,518.80

Standard Construction Company, Inc. $143.00 $5,720.00 Desert Concepts Construction, Inc. $49.55 $1,982.00 Monitor Construction Company, Inc. $80.00 $3,200.00 Intermountain West Civil Constructors, Inc. $95.00 $3,800.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00

A0300 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Hauser Engineering Group, LLC $72.00 $2,880.00 Desert Talon Contracting, Inc. $185.00 $7,400.00 Gutierrez Canales Engineering, PC $180.00 $7,200.00 Show Low Construction, Inc. $135.77 $5,430.80 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $6,000.00

ARROW INDIAN CONTRACTORS, INC. $150.51 $6,020.40

Standard Construction Company, Inc. $226.00 $9,040.00 Desert Concepts Construction, Inc. $165.90 $6,636.00 Monitor Construction Company, Inc. $120.00 $4,800.00 Intermountain West Civil Constructors, Inc. $125.00 $5,000.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00

15 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0310 62301-0000 GENERAL LABOR

Hauser Engineering Group, LLC $48.00 $1,920.00 Desert Talon Contracting, Inc. $44.00 $1,760.00 Gutierrez Canales Engineering, PC $36.00 $1,440.00 Show Low Construction, Inc. $33.54 $1,341.60 Stormwater Plans, LLC dba SWP Contracting and Paving $65.00 $2,600.00

ARROW INDIAN CONTRACTORS, INC. $70.21 $2,808.40

Standard Construction Company, Inc. $60.00 $2,400.00 Desert Concepts Construction, Inc. $29.49 $1,179.60 Monitor Construction Company, Inc. $40.00 $1,600.00 Intermountain West Civil Constructors, Inc. $40.00 $1,600.00 Engineer's Estimate 40 HOUR $65.00 $2,600.00

A0320 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Hauser Engineering Group, LLC $60.00 $2,400.00 Desert Talon Contracting, Inc. $106.00 $4,240.00 Gutierrez Canales Engineering, PC $102.00 $4,080.00 Show Low Construction, Inc. $186.00 $7,440.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $8,000.00

ARROW INDIAN CONTRACTORS, INC. $169.32 $6,772.80

Standard Construction Company, Inc. $150.00 $6,000.00 Desert Concepts Construction, Inc. $75.00 $3,000.00 Monitor Construction Company, Inc. $200.00 $8,000.00 Intermountain West Civil Constructors, Inc. $150.00 $6,000.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00

A0330 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Hauser Engineering Group, LLC $125.00 $5,000.00 Desert Talon Contracting, Inc. $200.00 $8,000.00 Gutierrez Canales Engineering, PC $180.00 $7,200.00 Show Low Construction, Inc. $186.00 $7,440.00 Stormwater Plans, LLC dba SWP Contracting and Paving $180.00 $7,200.00

ARROW INDIAN CONTRACTORS, INC. $210.63 $8,425.20

Standard Construction Company, Inc. $215.00 $8,600.00 Desert Concepts Construction, Inc. $90.00 $3,600.00 Monitor Construction Company, Inc. $200.00 $8,000.00 Intermountain West Civil Constructors, Inc. $150.00 $6,000.00 Engineer's Estimate 40 HOUR $210.00 $8,400.00

16 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 63301-0000 SIGN SYSTEM

Hauser Engineering Group, LLC $500.00 $10,000.00 Desert Talon Contracting, Inc. $1,120.00 $22,400.00 Gutierrez Canales Engineering, PC $1,092.00 $21,840.00 Show Low Construction, Inc. $1,216.63 $24,332.60 Stormwater Plans, LLC dba SWP Contracting and Paving $1,100.00 $22,000.00

ARROW INDIAN CONTRACTORS, INC. $1,314.25 $26,285.00

Standard Construction Company, Inc. $600.00 $12,000.00 Desert Concepts Construction, Inc. $450.00 $9,000.00 Monitor Construction Company, Inc. $1,200.00 $24,000.00 Intermountain West Civil Constructors, Inc. $775.00 $15,500.00 Engineer's Estimate 20 EACH $600.00 $12,000.00

A0350 63308-0000 OBJECT MARKER

Hauser Engineering Group, LLC $400.00 $2,400.00 Desert Talon Contracting, Inc. $780.00 $4,680.00 Gutierrez Canales Engineering, PC $808.30 $4,849.80 Show Low Construction, Inc. $843.88 $5,063.28 Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $4,500.00

ARROW INDIAN CONTRACTORS, INC. $1,314.25 $7,885.50

Standard Construction Company, Inc. $390.00 $2,340.00 Desert Concepts Construction, Inc. $180.00 $1,080.00 Monitor Construction Company, Inc. $175.00 $1,050.00 Intermountain West Civil Constructors, Inc. $95.00 $570.00 Engineer's Estimate 6 EACH $500.00 $3,000.00

A0360 63309-0000 DELINEATOR (ADOT S1W)

Hauser Engineering Group, LLC $200.00 $15,000.00 Desert Talon Contracting, Inc. $480.00 $36,000.00 Gutierrez Canales Engineering, PC $468.00 $35,100.00 Show Low Construction, Inc. $109.12 $8,184.00 Stormwater Plans, LLC dba SWP Contracting and Paving $100.00 $7,500.00

ARROW INDIAN CONTRACTORS, INC. $531.70 $39,877.50

Standard Construction Company, Inc. $90.00 $6,750.00 Desert Concepts Construction, Inc. $75.00 $5,625.00 Monitor Construction Company, Inc. $110.00 $8,250.00 Intermountain West Civil Constructors, Inc. $65.00 $4,875.00 Engineer's Estimate 75 EACH $80.00 $6,000.00

17 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0370 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Hauser Engineering Group, LLC $0.14 $18,782.40 Desert Talon Contracting, Inc. $0.25 $33,540.00 Gutierrez Canales Engineering, PC $0.42 $56,347.20 Show Low Construction, Inc. $0.18 $24,148.80 Stormwater Plans, LLC dba SWP Contracting and Paving $0.18 $24,148.80

ARROW INDIAN CONTRACTORS, INC. $0.50 $67,080.00

Standard Construction Company, Inc. $0.20 $26,832.00 Desert Concepts Construction, Inc. $1.00 $134,160.00 Monitor Construction Company, Inc. $0.40 $53,664.00 Intermountain West Civil Constructors, Inc. $0.11 $14,757.60 Engineer's Estimate 134,160 LNFT $0.20 $26,832.00

A0380 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Hauser Engineering Group, LLC $0.09 $2,430.00 Desert Talon Contracting, Inc. $0.25 $6,750.00 Gutierrez Canales Engineering, PC $0.42 $11,340.00 Show Low Construction, Inc. $0.10 $2,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.18 $4,860.00

ARROW INDIAN CONTRACTORS, INC. $0.44 $11,880.00

Standard Construction Company, Inc. $0.20 $5,400.00 Desert Concepts Construction, Inc. $1.50 $40,500.00 Monitor Construction Company, Inc. $0.50 $13,500.00 Intermountain West Civil Constructors, Inc. $0.12 $3,240.00 Engineer's Estimate 27,000 LNFT $0.15 $4,050.00

A0390 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Hauser Engineering Group, LLC $200.00 $2,600.00 Desert Talon Contracting, Inc. $600.00 $7,800.00 Gutierrez Canales Engineering, PC $260.00 $3,380.00 Show Low Construction, Inc. $138.88 $1,805.44 Stormwater Plans, LLC dba SWP Contracting and Paving $180.00 $2,340.00

ARROW INDIAN CONTRACTORS, INC. $68.99 $896.87

Standard Construction Company, Inc. $419.00 $5,447.00 Desert Concepts Construction, Inc. $250.00 $3,250.00 Monitor Construction Company, Inc. $250.00 $3,250.00 Intermountain West Civil Constructors, Inc. $300.00 $3,900.00 Engineer's Estimate 13 EACH $400.00 $5,200.00

18 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0400 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Hauser Engineering Group, LLC $50.00 $1,000.00 Desert Talon Contracting, Inc. $0.65 $13.00 Gutierrez Canales Engineering, PC $65.00 $1,300.00 Show Low Construction, Inc. $11.16 $223.20 Stormwater Plans, LLC dba SWP Contracting and Paving $20.00 $400.00

ARROW INDIAN CONTRACTORS, INC. $56.44 $1,128.80

Standard Construction Company, Inc. $106.00 $2,120.00 Desert Concepts Construction, Inc. $50.00 $1,000.00 Monitor Construction Company, Inc. $30.00 $600.00 Intermountain West Civil Constructors, Inc. $70.00 $1,400.00 Engineer's Estimate 20 EACH $30.00 $600.00

A0410 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

Hauser Engineering Group, LLC $100.00 $2,000.00 Desert Talon Contracting, Inc. $1.25 $25.00 Gutierrez Canales Engineering, PC $130.00 $2,600.00 Show Low Construction, Inc. $11.16 $223.20 Stormwater Plans, LLC dba SWP Contracting and Paving $45.00 $900.00

ARROW INDIAN CONTRACTORS, INC. $112.88 $2,257.60

Standard Construction Company, Inc. $210.00 $4,200.00 Desert Concepts Construction, Inc. $450.00 $9,000.00 Monitor Construction Company, Inc. $15.00 $300.00 Intermountain West Civil Constructors, Inc. $150.00 $3,000.00 Engineer's Estimate 20 EACH $35.00 $700.00

A0420 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Hauser Engineering Group, LLC $100.00 $4,000.00 Desert Talon Contracting, Inc. $1.25 $50.00 Gutierrez Canales Engineering, PC $130.00 $5,200.00 Show Low Construction, Inc. $106.02 $4,240.80 Stormwater Plans, LLC dba SWP Contracting and Paving $75.00 $3,000.00

ARROW INDIAN CONTRACTORS, INC. $188.13 $7,525.20

Standard Construction Company, Inc. $210.00 $8,400.00 Desert Concepts Construction, Inc. $150.00 $6,000.00 Monitor Construction Company, Inc. $100.00 $4,000.00 Intermountain West Civil Constructors, Inc. $180.00 $7,200.00 Engineer's Estimate 40 EACH $60.00 $2,400.00

19 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0430 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

Hauser Engineering Group, LLC $50.00 $1,000.00 Desert Talon Contracting, Inc. $0.65 $13.00 Gutierrez Canales Engineering, PC $65.00 $1,300.00 Show Low Construction, Inc. $13.39 $267.80 Stormwater Plans, LLC dba SWP Contracting and Paving $25.00 $500.00

ARROW INDIAN CONTRACTORS, INC. $50.17 $1,003.40

Standard Construction Company, Inc. $106.00 $2,120.00 Desert Concepts Construction, Inc. $60.00 $1,200.00 Monitor Construction Company, Inc. $75.00 $1,500.00 Intermountain West Civil Constructors, Inc. $50.00 $1,000.00 Engineer's Estimate 20 EACH $55.00 $1,100.00

A0440 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

Hauser Engineering Group, LLC $50.00 $500.00 Desert Talon Contracting, Inc. $0.65 $6.50 Gutierrez Canales Engineering, PC $65.00 $650.00 Show Low Construction, Inc. $13.39 $133.90 Stormwater Plans, LLC dba SWP Contracting and Paving $25.00 $250.00

ARROW INDIAN CONTRACTORS, INC. $56.44 $564.40

Standard Construction Company, Inc. $106.00 $1,060.00 Desert Concepts Construction, Inc. $65.00 $650.00 Monitor Construction Company, Inc. $75.00 $750.00 Intermountain West Civil Constructors, Inc. $200.00 $2,000.00 Engineer's Estimate 10 EACH $55.00 $550.00

A0450 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Hauser Engineering Group, LLC $50.00 $2,750.00 Desert Talon Contracting, Inc. $0.65 $35.75 Gutierrez Canales Engineering, PC $65.00 $3,575.00 Show Low Construction, Inc. $72.54 $3,989.70 Stormwater Plans, LLC dba SWP Contracting and Paving $225.00 $12,375.00

ARROW INDIAN CONTRACTORS, INC. $238.31 $13,107.05

Standard Construction Company, Inc. $106.00 $5,830.00 Desert Concepts Construction, Inc. $450.00 $24,750.00 Monitor Construction Company, Inc. $75.00 $4,125.00 Intermountain West Civil Constructors, Inc. $50.00 $2,750.00 Engineer's Estimate 55 EACH $300.00 $16,500.00

20 out of 20Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTBR LEVEE ROAD(1)

Project Name: Pave Levee Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0460 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Hauser Engineering Group, LLC $44.00 $10,560.00 Desert Talon Contracting, Inc. $52.00 $12,480.00 Gutierrez Canales Engineering, PC $58.50 $14,040.00 Show Low Construction, Inc. $43.40 $10,416.00 Stormwater Plans, LLC dba SWP Contracting and Paving $65.00 $15,600.00

ARROW INDIAN CONTRACTORS, INC. $84.26 $20,222.40

Standard Construction Company, Inc. $60.00 $14,400.00 Desert Concepts Construction, Inc. $29.49 $7,077.60 Monitor Construction Company, Inc. $50.00 $12,000.00 Intermountain West Civil Constructors, Inc. $39.00 $9,360.00 Engineer's Estimate 240 HOUR $65.00 $15,600.00

A0470 63701-0000 FIELD OFFICE

Hauser Engineering Group, LLC $12,500.00 $12,500.00 Desert Talon Contracting, Inc. $6,700.00 $6,700.00 Gutierrez Canales Engineering, PC $10,000.00 $10,000.00 Show Low Construction, Inc. $4,201.06 $4,201.06 Stormwater Plans, LLC dba SWP Contracting and Paving $50,000.00 $50,000.00

ARROW INDIAN CONTRACTORS, INC. $18,813.56 $18,813.56

Standard Construction Company, Inc. $30,000.00 $30,000.00 Desert Concepts Construction, Inc. $15,000.00 $15,000.00 Monitor Construction Company, Inc. $20,000.00 $20,000.00 Intermountain West Civil Constructors, Inc. $12,000.00 $12,000.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00

Total Schedule - All Items

Hauser Engineering Group, LLC $1,426,713.90 Desert Talon Contracting, Inc. $1,453,622.09 Gutierrez Canales Engineering, PC $1,627,733.13 Show Low Construction, Inc. $1,735,984.58 Stormwater Plans, LLC dba SWP Contracting and Paving $2,029,913.80

ARROW INDIAN CONTRACTORS, INC. $2,074,577.78

Standard Construction Company, Inc. $2,081,803.00 Desert Concepts Construction, Inc. $2,146,968.56 Monitor Construction Company, Inc. $2,152,140.00 Intermountain West Civil Constructors, Inc. $2,544,298.10 Engineer's Estimate $1,677,000.00