QnA 9.14.2020.pdf
PDF 74 KB Posted
- Attached to
- NM 152(1), NM 152 Bridges Federal contract opportunity
- Solicitation number
- 6982AF20B000029
About this file
This document contains questions and answers from an advertisement for New Mexico Federal Lands Access Program Project Number NM FLAP 152(1), involving the replacement of two bridges on NM 152. The project includes replacing two single-lane truss bridges built in 1929 with new, wider bridges designed to accommodate two lanes of traffic as well as pedestrians, equestrians and bicyclists. A notice to proceed is anticipated in late October/early November. All rock from excavation measuring 27 cubic feet or smaller must be salvaged and transported to the New Mexico Department of Transportation maintenance yard in Hillsboro. An offsite testing laboratory is acceptable subject to approval, but the contractor cannot set up jobsite offices or facilities at the NMDOT yard or within existing rights-of-way due to space limitations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary NM 152.pdf | ||
| QnA 9.14.2020 cont..pdf | ||
| Amendment 002.pdf | ||
| QnA 9.1.2020.pdf | ||
| Amendment 001.pdf | ||
| NM_FLAP_152(1)_Bridges_Final-CrossSections.pdf | ||
| NM_FLAP_152(1)_Bridges_Final-Plans.pdf | ||
| NM FLAP 152(1) - Pavement Tech Memo.pdf | ||
| Hyd_NM152.pdf | ||
| 6982AF20B000029.pdf | ||
| NM FLAP 152(1) Geotech Rpt Final.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for NM FLAP 152(1), NM 152 Bridges
September 14, 2020
Questions Answers 1 The RFP mentions a completion date, but when does FHA anticipate issuing notice to proceed?
NTP is anticipated in late October/early November.
2 Section 203.05 Disposal of material lists particular items to be salvaged and turned over to NMDOT. Rock from excavation that is 27cuft or smaller is to salvaged. Please confirm that all rock excavated from the site meeting the size requirement will be transported to the NMDOT yard in Hillsboro become property of
NMDOT.
All Rock from excavation that is 27cuft or smaller is to be salvaged and returned to the New Mexico DOT Maintenance yard in Hillsboro.
3 Section 153 Contractor Quality Control, 153.05 (b) states that the contractor is to supply an onsite testing lab. Assuming all other specifications are followed, Is it acceptable to use an offsite testing lab in lieu of the onsite testing lab?
The contractor can supply a lab off site but subject to verifications of all certifications and approval of CO.
4 Will the contractor be allowed to setup a jobsite office trailer and the qc testing lab at the NMDOT Maintenance Yard?
NO
5 If the NMDOT Maintenance Yard Is not available for contractor’s jobsite office trailer, can the contractor setup up facilities within existing right of way, outside of the limits of construction?
This is not preferable due to limited ROW locations within the corridor.