Amendment 0002 Atlanta ARTCC Hampton, GA CPC Vault Fire-Stopping Project********
Solicitation number
697DCK-24-R-00190
Issued by

About this file

This document contains an amendment to a federal solicitation seeking proposals for fire stopping services at a Federal Aviation Administration facility in Georgia. Amendment 0002 provides answers to questions from potential offerors to clarify the scope of work. Services required include restoring fire resistance ratings to walls and fire stopping floor penetrations. The period of performance is to begin within five days of notice to proceed. The solicitation is set aside for small businesses and proposals are due by February 14, 2024. A pre-proposal site visit was held on January 31, 2024 to allow inspection of site conditions. Questions regarding the solicitation must be submitted by February 5, 2024 and answers will be posted to SAM.gov. Offerors must be registered in SAM and not debarred from government contracts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(If applicable)

0002 02 07 (If other than Item 6)

FEDERAL AVIATION ADMINISTRATION

AAQ-5 0 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

SAME AS BLOCK 6

(No., street, county, State and ZIP Code)

697DCK-

(SEE ITEM 11)

2 07

(SEE ITEM 13)

(If required)

(Specify authority)

(such as changes in paying office, appropriation data, etc.)

(Specify type of modification and authority)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

publish Answers, and Clarifications to RFIs. Please see attached.

No other changes or updates added.

(Type or print (Type or print)

Regina Singleton

(Signature of person authorized to sign) (Signature of Contracting Officer) 02 07(Signature of Contracting Officer)

Questions and Answers CPC Vault Fire-Stopping Project

697DCK-24-R-00190

• Can you provide the facility’s latest life safety drawings to assist with identifying the wall ratings and locations where work is needed?

Where access is not possible the only option is to fire-stop from only the accessible side, packing the annual space with the prescribed fire-stopping material and facing around the penetration with approved products – firestopping product manufacturers have engineered solutions they can recommend depending on the situation.

• After reviewing amendment #1, on the other side of the walls where these photos were taken is a difficult access point. There’s ceiling grid and tile in place, huge electrical standing generators, and a raised flooring system – all in place with limited access to the opposite side of conditions. It is very tough to fix and firestop the existing conditions. How would you like for us to get to it with limited access points?

Life Safety drawings will not be provided. The stated purpose of the project was to restore the room walls to a “1-hour fire resistance rating.” The through penetrations in the floor must be fire-stopped for a 2-hour rating.

697DCK-24-R-00190 CPC Vault Fire Stopping Project Amendment 0002
Questions and Answers