ES-19-00876 SOW - HLG VOR Refurbishment.pdf
PDF 64 KB Posted
- Attached to
- SCREENING INFORMATION REQUEST/REQUEST FOR OFFER HLG VOR Roof Replacement in Wellsburg, WV.
- Solicitation number
- 6973GH-19-R-00225
About this file
ES-19-00876 SOW - HLG VOR Refurbishment (pdf)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ES-19-00876 Specs-HLG VOR 1509592 Roof.pdf | ||
| Performance Bond.pdf | ||
| 6973GH-19-R-00225 FINAL.pdf | ||
| Contractor's Release Form DOT F 4220.4.doc | DOC document | |
| Experience Information Form.pdf | ||
| WAGE DETERMINATION.pdf | ||
| Payment Bond.pdf | ||
| ES-19-00876 HLG-VOR Roof Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Wheeling VOR (HLG) Wellsburg, WV VOR Roof Refurbishment
JCN: 1509592
03/20/2019
The following is the proposed scope of work for the above referenced project:
Exterior:
• Remove the existing teepee, TACAN antenna, and monitor antennas.
• Replace existing monitor brackets with new, heavy-duty and adjustable brackets.
• Assist FAA in removal of the VOR equipment and store until ready for re-install.
• Remove existing roofing material, counterpoise, and existing membrane down to wood decking.
• Rotten portions of the wooden decking will need to be replaced with matching wood planks.
• Install nailers.
• Install vapor barrier over decking.
• Install plywood deck cover.
• Install new copper plate roof.
• Solder copper plate.
• Install new liquid applied elastomeric, urethane based membrane roof.
• Install new, plastic, perimeter flashing and termination bar, and ground flashing with continuous
#6 wire loop around entire counterpoise.
• Adjust monitor brackets and ground to #6 wire loop.
• Install refurbished teepee, TACAN antenna, and monitor antennas.
• Install flashing at teepee base and VOR antenna pedestals.
• Install walkways pads from ladder bracket to teepee, around the teepee, and at each monitor antenna.
• Install ladder support and safety sign.
Interior:
• Replace approximately 100 sq. ft. of ceiling tiles due to water damage.
• Inside and above the drop ceiling, approximately 100 sq. ft. of the ceiling panels to be treated for mold/mildew.
• The floor tiles to be stripped, waxed, and buffed.
File details come from the government source that posted it.