FAA IDIQ RFP Form

Aeronautical Center

Acquisition Services, AAQ-700 P.O. Box 25082

Oklahoma City, OK 73125

To: Multiple Award General Contractors:

Task Order Request for Proposal (TORFP)

WO# 17-027745, TPS Replace Door/Stair Treads

This letter is a request for a proposal to accomplish the potential project identified on page 2 of this letter in accordance with the terms and conditions of the contract, specifications and any attached drawing(s). The Government will not pay any proposal preparation costs associated with this solicitation. You may be asked for cost proposal details to allow a thorough examination of the proposed amounts. Your prices must remain valid for a period of not less than sixty (60) days after the proposal due date. Please be aware that this is a request for a proposal only and NOT an authorization to begin work. This request for proposal is subject to the availability of funds.

1. Proposal Due Date: Wednesday, April 18, 2018 at 5 p.m.

2. Project Performance Period: 56 Days (work must be performed midnight-6:00A.M. or on weekends)

3. List of attachments: 1) Bid Form, 2) Bid Set: 17-027745 Addendum 3.16.2018 (2 Pages) 3) WD OK49 (dated 1-12-18),

4. NAICS: 236220

5. PRE-BID SITE VISIT: See FAACO.FAA.GOV announcement for Site Visit Information

6. Submitting the proposal. Proposals are to be emailed to:

Wayne Watson, wayne.watson@faa.gov

7. All questions in reference to this RFP must be submitted in writing (by email) to the individuals listed above, ONLY.

Please do not communicate questions or other discussion, pertaining to this RFP, with any one else. Need to be able to provide all answers to questions to all the contractors. The response will be emailed to all the contractors.

Sincerely, Connie Houpt Contracting Officer, AAQ-731 mailto:wayne.watson@faa.gov

FAA IDIQ RFP Form

Task Order Request for Proposal (TORFP)

WO# 17-027745, TPS Replace Door/Stair Treads

The contractor shall furnish all labor, tools, materials, equipment, and supplies, necessary to accomplish the construction project set forth below in accordance with the documents provided with the Request for Proposal (RFP) and the terms, conditions, and provisions as set forth in the base contract.

WR#17-027745 Project Description:

In 027-TPS the following work will be performed:

• Install new storefront door assembly to covered walkway

• Install new doors at both side vestibules

• Install new rubber stair treads, landings, elevator floors

• Paint panel doors, atrium walls, vestibule walls, and door frames

• Clean walk-off entry floor grilles

• Install new wall cove base at entries

• Paint & add corner guards to stepped columns

BASE BID

(Brief Description of project)

FOR-THE-PROJECT $__________________________

Number of Amendments acknowledged ________________

Company Name: _____________________________________________

Authorized Signature: __________________________________________

Date: _________________________________

2018-04-02T14:19:17-0500
CONNIE M HOUPT

Other files

File Type Posted
Pre-Proposal Conference Sign-In Sheets 4-3-18.pdf PDF
11. DOL WH347 PAYROLL FORM.pdf PDF
5. Contractor's Release.pdf PDF
6. Prevailing Wage Rate Decision OK180049 1-12-18 OK49 EXAMPLE.pdf PDF
8. Past Performance Survey.pdf PDF
6973GH-18-R-00008.pdf PDF
Questions & Answers #3 4-11-18.pdf PDF
6973GH-18-R-00008; Amendment 0001.pdf PDF
4. SF25A Payment Bond.pdf PDF
2. Statement of Work (SOW) 05.11.2017.SOW —
11. DOL WH347 PAYROLL FORM.pdf PDF
Pre-Proposal Conference Sign-In Sheets 4-3-18.pdf PDF
7. Past Performance Information Form.pdf PDF
10. BID SET 17-027745 ADDENDUM 3.16.2018.pdf PDF
8. Past Performance Survey.pdf PDF
2. Statement of Work (SOW) 05.11.2017.SOW —
Questions & Answers#2 4-2-18.pdf PDF
3. SF25 Performance Bond.pdf PDF
Questions & Answers #1 3-29-18.pdf PDF
1. SOW Table of Contents.pdf PDF
11. DOL WH347 PAYROLL FORM.pdf PDF
9. Client Auth. Letter.pdf PDF
Questions & Answers#2 4-2-18.pdf PDF
8. Past Performance Survey.pdf PDF
10. Seed Project Proposal Form.pdf PDF
15. Contractor's Daily Construction Report.pdf PDF
6973GH-18-R-00008.pdf PDF
4. SF25A Payment Bond.pdf PDF
6. Prevailing Wage Rate Decision OK180049 1-12-18 OK49 EXAMPLE.pdf PDF
10. Seed Project Proposal Form (Amendment#1).Amendment#1 —
14. Pay App Sample.xls XLS spreadsheet
13. Submittal Log.xlsx XLSX spreadsheet
1. SOW Table of Contents.pdf PDF
11. DOL WH347 PAYROLL FORM.pdf PDF
6973GH-18-R-00008; Amendment 0001.pdf PDF
5. Contractor's Release.pdf PDF
13. Submittal Log.xlsx XLSX spreadsheet
6. Prevailing Wage Rate Decision OK180049 1-12-18 OK49 EXAMPLE.pdf PDF
8. Past Performance Survey.pdf PDF
9. Client Auth. Letter.pdf PDF
5. Contractor's Release.pdf PDF
12. RFI Log.xlsx XLSX spreadsheet
6973GH-18-R-00008.pdf PDF
14. Pay App Sample.xls XLS spreadsheet
8. Past Performance Survey.pdf PDF
15. Contractor's Daily Construction Report.pdf PDF
6. Prevailing Wage Rate Decision OK180049 1-12-18 OK49 EXAMPLE.pdf PDF
12. RFI Log.xlsx XLSX spreadsheet
6973GH-18-R-00008.pdf PDF
10. Seed Project Proposal Form.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it.