RFP_Attachment_J.1_-_COST_PRICE_PROPOSAL_WORKSHEET.xls
XLS spreadsheet 28 KB Posted
- Solicitation number
- 693JJ318R000024
About this file
This document contains a cost/price proposal worksheet template and information regarding a related federal contract opportunity for the Infrastructure Research and Technology Deployment Program. The cost/price proposal worksheet template includes five columns for direct labor rates by labor category for a base year and four option years. The direct labor categories include Project Manager, Senior Engineer, Junior Engineer, Graphics Designer, Administrative Assistant, Instructional Systems Designer, Technical Writer and Editor, Senior Technical, and Senior Administrative Support. The template also includes cells for direct labor fringe, direct labor and fringe total, direct labor overhead and the overhead application rate, total direct labor through overhead, the G&A base and rate, profit/fee, travel, and other direct costs (ODCs). The federal contract opportunity is solicitation number 693JJ318R000024 from the Department of Transportation Federal Highway Administration for the Infrastructure Research and Technology Deployment Program. No other details are provided regarding the products, services, or terms required under the opportunity.
Revised attachment J.1
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule 1
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
| Direct Labor | Direct Labor | Direct Labor | Direct Labor | Direct Labor | |
| Labor Category | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr |
| Project Manager | |||||
| Senior Engineer | |||||
| Junior Engineer | |||||
| Graphics Designer | |||||
| Administrative Assistant | |||||
| Instructional Systems Designer (ISD) | |||||
| Technical Writer and Editor | |||||
| Senior Technicial | |||||
| Senior Administrative Support | |||||
| Direct Labor Fringe @ | |||||
| Total Direct Labor and Fringe | |||||
| Direct Labor Overhead @ | |||||
| Total Direct Labor through Overhead | |||||
| Total G&A Base | |||||
| G&A @ | |||||
| Profit/Fee @ | |||||
| Travel | |||||
| ODC | |||||
| The Contractor shall modify the Cost/Price Proposal Template as needed to provide the required information. | |||||
| The direct labor rates are based on the actual rates as of (insert date) and escalated by (insert percentage) percent each year. | |||||
| The supporting data and rate calculations are located in file _____________________________and is available immediately upon request. | |||||
| The Indirect Rates (fringe, Labor Overhead, Material Overhead and G&A) are based on our current Forward Pricing Rate Agreement (FPRA). | |||||
| The FPRA is attached to the proposal. | |||||
| ODCs shall be reimbursed at cost. |
&CDirect Labor and Indirect Costs &L&"Times New Roman,Regular"&A
File details come from the government source that posted it. Updated .