17-NJ379_-_SINGLELINE_NEW.pdf
PDF 2 MB Posted
- Attached to
- Replacement of DPW Backup Generator Federal contract opportunity
- Solicitation number
- 693JF717R00022
About this file
Singleloine
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specification_Transfer_Switch_1200_A.pdf | ||
| Specification_Generator_250_KW.pdf | ||
| 693JF717R00022_-_Generator_in_DPW.pdf | ||
| Specification_Generator_180_KW.pdf | ||
| Specification_Generator_150_KW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING GENERATOR
EXISTING UTILITY TRANSFORMER
EXISTING MDP C/T AND
1200 MAIN SWITCH
EXISTING UNDERGROUND FEEDERS
NEW PSEG LI TRANSFORMER
FEEDERS TO BE PHASE ISOLATED
NEW 180kW GENERATOR
SEE NOTE 3
NEW C/TNEW 1200A SERVICE
RATED ATS MAIN SWITCH
REPLACE EXISTING C/T, 1200A MAIN AND
MDP WITH NEW 1200A MAIN LUG ONLY MDP
GEN
NATURAL GAS STAND-BY GENERATOR
INCOMING ELECTRICAL
SERVICE FROM NEW PSE&G
UTILITY TRANSFORMER
CT'S
PT'S
FAULT CURRENT XX,XXXA
PER PSE&G X/X/2017
PSE&G
METER
INCOMING UTILITY PRIMARY SERVICE
NE
1200A ATS #1
MAIN SWITCH
NEMA 3R
1200AF
1200AT
SEE GROUND
DETAIL
65KAIC
180 KW = 2 SETS OF (4#350KCMIL+1#1G) IN (2) 3-1/2"C
3 SETS OF (4#600KCMIL IN (3) 4"C)
E.C. SHALL INTERCEPT EXISTING
FEEDERS AND CONDUIT AND
RE-ROUTE TO NEW ATS MAIN
SWITCH. SEE ELEVATION PLAN
THIS SHEET
1200A C/T
NEMA 3R
PSEG 10 PT
TEST METERTM
FAULT CURRENT XX,XXXA
PER PSE&G X/X/2017
PSE&G
METER
1200A
NEC 250.104(B)
ROOM WALL)
(ON ELECTRIC
FOOTING
REBAR 20' MINIMUM
3/0 COPPER WIRE.
KEY NOTES:
COPPERCLAD GROUND ROD.
3/4"X10' LOCATED 18" MINIMUM
BELOW FINISHED
GRADE.(TYPICAL) U.O.N.
CADWELD CONNECTION.
REINFORCING ROD
(1/2" DIAMETER MIN.)
OR #4 MIN. BARE
COPPER WIRE. (UFER
GROUND).
#3/0 CU AWG NEC 250.53(E)
(MIN.)
G
(2" THICK CONCRETE MIN.)
15'-0"
GENERAL NOTES:
1. THE GROUNDING SYSTEM IS DESIGNED FOR A MAXIMUM OF 25 OHMS WHEN
MEASURED FROM THE GROUND BUS TO THE SINGLE POINT GROUND LOCATED
OUTSIDE OF THE BUILDING ENVELOPE.
2. GROUNDING SHOWN SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED
EDITION OF THE N.E.C. ARTICLE 250.
3. BOND ACROSS WATER METERS, ETC.
G G
PRINCIPAL GROUND BUS
G
N
MAIN SWITCHBOARD MDP
LOCATED IN ELECTRIC ROOM
#3/0 CU AWG#3/0 CU AWG
BLDG STEEL @ BUILDING
#3/0 CU AWG
#3/0 CU AWG - 1" EMT
METER
DOMESTIC WATER MAIN @ BUILDING
WITHIN 5' FROM POINT OF ENTRY INTO
BUILDING
GROUND
TRIAD
@ PAD
UFER GROUND @ PAD
GAS PIPING @ BUILDING
EX
MAIN
EX
MDP
3 SETS OF (4#600KCMIL +1#3/0G IN (3) 4"C)
TRANSFORMER PAD/VAULT. PROVIDE
NEW IF REQUIRED BY PSEG LI
ELEC RM
EXISTING (3) SETS OF 4"C
WITH EXISTING FEEDERS
TO BE INTERCEPTED AND
RECONNECTED PHASE
ISOLATED.
EXISTING
TRANSFORMER TO
BE REPLACED
NEW 4" CONCRETE PAD
NEW C/T, METER, 1200A SERVICE ATS MAIN
NEW REROUTED
CONDUITS
TO C/T
NEW CONDUITS FROM ATS
INTO ELEC ROOM TO FEED
NEW 1200A MLO MDP
REMOVE EXISTING C/T
CABINET, 1200A MAIN AND
EXISTING MDP
INSTALL NEW MLO MDP WITH
BREAKERS AS NOTED
EXTEND FEEDERS TO NEW
BREAKERS VIA EXISTING
WIRE TROUGH
NEW HOUSE KEEPING PAD
4" MINIMUM
NEW MDP 208V. 3PH, 4W, 1200A MLO
PROVIDE NEW BREAKERS TO MATCH EXISTING:
· (2) 3P 100A
· (2) 3P 70A
· (1) 3P 300A
· (1) 3P 600A
· INSTALL NEW GROUNDING SYSTEM
E.C.SHALL USE EXISTING WIRE TROUGH TO
EXTEND FEEDERS TO NEW BREAKERS AS
REQUIRED.
NEW NATURAL GAS
STAND-BY
GENERATOR
EXTERIOR
GROUND
LEVEL
EXISTING
GENERATOR
TO BE REPLACED
SEE GENERATOR FEEDER SIZES ON SINGLE LINE
DIAGRAM THIS SHEET. PROVIDE ADDITIONAL 1"
CONDUIT FROM GENERATOR TO ATS FOR CONTROL
CMU WALL
EXISTING WIRE TROUGH
EQUIPMENT DEMOLITION PLAN
DEMOLITION AND NEW WORK ELEVATION PLAN
SATELLITE OVERVIEW
EXISTING CONDITIONS PLAN
RE-FEED PANEL DPA
INSTALL NEW GROUNDING
DURING CONSTRUCTION PROVIDE TEMPORARY
FEEDERS TO PANELS DPA AND DPB. DURING
PROPER PHASE RECONNECT FROM NEW MDP
MDP DPA
TO
DPB
NEW SINGLE LINE DIAGRAM
WEATHERPROOF, SOUND
ATTENUATION ENCLOSURE
40A ACCESSORY PANEL
FOR BATTERY CHARGER
AND GENERATOR HEATERS
FED FROM PANEL DPA
PROVIDE 40A, 2P, 3 WIRE
CIRCUIT TO GENERATOR
ACCESSORY PANEL
40A
NEW SYSTEM PLAN VIEW
NEW PSEG LI METER
EXTERIOR SERVICE ENTRANCE
INTERIOR ELECTRICAL ROOM
NTS
NTS
1. E.C. AND GENERATOR INSTALLER SHALL BE RESPONSIBLE TO VISIT THE SITE,
TAKE FIELD MEASUREMENTS AND ENSURE THAT ALL NEW EQUIPMENT SHALL
FIT IN LOCATIONS AS DESIGNATED AND INDICATED ON THESE PLANS.
2. E.C. SHALL COORDINATE WITH PLUMBING CONTRACTOR AND GENERAL
PROJECT MANAGER OR PROJECT COORDINATOR TO PROVIDE, PROPER GAS
LINE TO GENERATOR AND OBTAIN ALL PERMITS.
3. E.C. SHALL PROVIDE ADD ALTERNATE PRICES TO PROVIDE A 180KW & 250 KW
GENERATORS WITH INCREASED BREAKERS, FEEDERS & PAD SIZES AS
SHOWN INCLUDING ALL WORK FOR INSTALLATION.
4. CONTRACTOR WILL BE RESPONSIBLE TO CONSULT WITH ENERGY SQUARED
TO PROVIDE PERMT DOCUMENTS AT AN ADDITIONAL COST IF REQUIRED.
EXISTING FEEDERS TO BE PULLED BACK, TO BE
REUSED AS FEEDS TO NEW ATS MAIN SWITCH
INCOMING UTILITY
PRIMARY SERVICE
SEE ENLARGED VIEW THIS SHEET
15'-7"
30'
8'
8'
3'6' EXISTING PAD
3'-8"
4'-10"
7'
15'
2'-2"
150 KW DIMENSION
AND LAYOUT PLAN
(BASE BID)
GROUNDING DETAIL
15'-7"
30'
8'
8'
7'
4'-10"
NEW XFMR ON
EXISTING XFMR
PAD. CONFIRM
WITH PSEG LI
180KW GENERATOR
WITH 180 WEATHER
ENCLOSURE ON NEW
15' x 7' CONCRETE PAD
150KW GENERATOR
WITH 150 WEATHER
ENCLOSURE ON EXISTING
CONCRETE PAD
3'-1"
2'-4"
1200 ATS & CT CABINET
ON NEW CONCRETE PAD
1200A
ATS
1200A
CT
3'
3'
NEW XFMR ON EXISTING XFMR
PAD. CONFIRM WITH EXISTING
PAD IS ADEQUATE WITH PSEG LI.
PROVIDE NEW IF REQUIRED
EXTEND FENCED AREA
OUT 3' TO ACCOMMODATE
NEW GEN SET
3'-1"
2'-4"
1200 ATS & CT CABINET
ON NEW CONCRETE PAD
1200A
ATS
1200A
CT
3'
180 KW DIMENSION
AND LAYOUT PLAN
(ADD ALTERNATE)
BUILDING 'B'
BUILDING 'A'
BUILDING 'A'
180 KW 600AT FULLY RATED BREAKER (ADD ALTERNATE #1)
150 KW 500AT FULLY RATED BREAKER (BASE BID)
CONTRACTOR TO INSTALL NEW 1-1/4" GAS LINE FROM
EXISTING RISER TO NEW GENERATOR. 1-1/4" IS SIZED FOR
150KW, 180KW & 250KW GEN SET UP TO 150' FROM METER.
VERIFY EXACT LENGTH IN FIELD.
EXISTING 2" (2 PSI) GAS RISER.
150 KW = 2 SETS OF (4#250KCMIL+1#3G) IN (2) 3"C
(BASE BID)
CONTRACTOR TO INSTALL NEW SENSUS GAS
REGULATOR MODEL 243-8-6 WITH GAS COCK ON
1-1/4" 2 PSI SUPPLY LINE.
EXISTING
3'
15'-7"
30'
8'
8'
4'-10"
NEW XFMR ON
EXISTING XFMR
PAD. CONFIRM
WITH PSEG LI
EXTEND FENCED AREA
3' TO ACCOMMODATE
NEW GEN SET
3'-1"
2'-4"
1200 ATS & CT CABINET
ON NEW CONCRETE PAD
1200A
ATS
1200A
CT
3'
250 KW DIMENSION
AND LAYOUT PLAN
(ADD ALTERNATE)
14'-4 1/2"
3'
250KW GENERATOR
WITH 250 WEATHER
ENCLOSURE ON NEW
15' x 7' CONCRETE PAD
3'
(ADD ALTERNATE #1)
250 KW = 2 SETS OF (4#500KCMIL+1#1/0G) IN (2) 4"C
(ADD ALTERNATE #2)
250 KW 800AT FULLY RATED BREAKER (ADD ALTERNATE #2)
12' EXISTING PAD
PARKING AREA
TENNIS AREA
date: issue for:
sheet:
issue:
seal:
x. / xx title:
D P
W B
U
IL
D
IN
G G
E N
E R
A
TO
R A
N D
M A
IN
S
W
IT
C H
R E
P
LA
C E
M E
N T
U S
M E
R C
H A
N T
M A
R
IN
E A
C A
D E
M Y
KI
N
GS
P
O
IN
T, N
YC
, N
Y
Engineering Consultants
PH - (609) 751-9655
5 INDEPENDENCE WAY
ENGINEERING SUSTAINABLE
ENERGY SOLUTIONS
EnergySquared, LLC www.energysquaredllc.com
EnergySquared
Project No. 17-NJ213
PRINCETON, NJ 08540
SUITE 360
E-100.00