Plans_-_NP-EVER_10(5),_900(1).pdf
PDF 21 MB Posted
- Attached to
- Everglades National Park - NP-EVER 10(5), 900(1)
- Solicitation number
- 693C73-19-B-000033
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_(ROBO)_-_NP-EVER_10(5),_900(1).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| VETS-4212_-_Form_-_2018.pdf | ||
| NEPA_CE.pdf | ||
| IFB_Solicitation_-_NP-EVER_10(5),_900(1).pdf | ||
| Pavement_report.pdf | ||
| Synopsis_-_NP-EVER_10(5),_900(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PMIS NPS STATE PROJECT
SHEET
NO. NO. NUMBER
205646 oo o o oo FL NP-EVER 10(5), 900(1) A04
234491
SECONDARY CONTROL POINTS (SOURCE: WOOLPERT GPS RTK TRAVERSE)
DATUM: US SPC NAD1983(CONUS) & NAVDBB
ZONE: FL E 0901
POINT NAME N E z POINT CODE STATION
GEOID: GEOID03(CONUS)
UNITS: US SURVEY FEET
3011 385763.954 792024. 746 4.383 PK 50+00
3012 387778.436 787503.045 4.546 PK 100+00 Survey: Roadway has been stationed in the field by
3013 390241.99 783154.849 4.625 PK 150+00 wheeling method with PK nails every 5000'.
3014 392711.484 778801.384 5.233 PK 200+00
See construction plans for control points.
3015 394095.473 774104.493 5.174 PK 250+00 ROW: All work will occur inside NPS property.
3016 393895. 975 769109.035 5.287 PK 300+00
3017 394721.172 764216.633 5.277 PK 350+00
3018 397526. 707 760119.633 5.557 PK 400+00
3021 400618.846 756230.489 5.952 PK 450+00
3022 401109. 556 751328. 702 5.376 PK 500+00
PRIMARY CONTROL POINTS (SOURCE: NGS)
POINT NAME N E z POINT CODE
C-433 366398.68 717340.17 3.5 MON
F-433 351529.927 722805.211 2.58 PK
FCE 380 3 296406.373 681793. 57 13.76 MON
M 432 394121.659 775070.648 5.37 MON
p-433 311290.16 692342.57 2.45 MON
T432 399638.676 742708.944 4.47 MON
THOMPSON AZ 330554.8 720292.64 1.68 MON
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
SURVEY INFORMATION
MAIN PARK ROAD
EXISTING
Existing asphalt concrete -pavement, 3 to 5 in. depth
Existing aggregate base/ - Fill material depth 3 to 5 ft re_
PROPOSED
2-inch GACP, ½ -inch NMSA, 0.3 to <3 Million ESAL, PG 67-22, Type I-A pavement roughness
- Tackcoat
- Mill existing asphalt concrete
Safety edge (typ.)
pavement, ½ -inch depth
See Detail A, Sheet 3 of 3 - - Construction baseline
Recondition shoulder (typ.) - See Note 1 �� �� existing slope existing slope 1,;
______ v���L��:����=�=�=��-�:�t-=====�11=====�:-t��-Sc}�-=�=::�:!
�:�t=-·� s l Existing ground
Grass shoulder
�----- ----�----------1
L----- ____ L __________ J 1.s ftj 11 ft ; 11 ft I1.s ft
1 Travel lane I Travel lane 1
Construction limits
MAIN PARK ROAD
234+00 to 506+ 78
PROPOSED
Grass shoulder
EXISTING
Existing asphalt concrete -pavement, 3 to 5 in. depth
2-inch GACP, ½ -inch NMSA, 0.3 to <3 Million ESAL, PG 67-22, Type IV pavement roughness
- Tackcoat
Existing fill material, - +/- 2 ft depth
Edge of travel lane (Construction baseline) -
- Mill existing asphalt concrete pavement, ½ -inch depth
Match existing slope
See Safety edge Detail A, Sheet 5of 5
Recondition shoulder
F::;;-�_:;_1;;;;;;:J�;;:::;J-(::;;j::;;;;;;:;;;;;;:�:��d�1�:..__,_ -� Existing ground
- ---------l
I
_________ _J +/- 13 ft I1.s ft Grass shoulder
Pulloff
PAVED PULLOFF
436+40 to 439+20 RT
NOTES:
PMIS NPS
NO. NO.
205646 000
234491 000000
STATE PROJECT
FL NP-EVER 10(5), 900(1)
1. Regrade shoulder to provide positive drainage and a maximum 1-inch dropoff after paving. Use aggregate base (limerock) to build up low areas.
2. Mill asphalt concrete pavement along curb and median sections to maintain the existing reveal.
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
TYPICAL SECTIONS
MAIN PARK ROAD
SCHEDULE A
SHEET 1 OF 5
SHEET
NUMBER
B01
NO. NO. NUMBER
205646 160 FL NP-EVER 10(5), 900(1) CO2
234491 150893
Estimated
Quantities
Line Item Pay Item Pay Item Description Unit
No. Number Bid Schedule
B0010 15101-0000 MOBILIZATION LPSM ALL
B0030 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
B0050 15401-0000 CONTRACTOR TESTING LPSM ALL
B0070 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 400
B0090 20301-2400 REMOVAL OF SIGN EACH 7
B0110 30101-0000 AGGREGATE BASE (LIMEROCK) TON 570
B0130 30302-2000 SHOULDER RECONDITIONING LNFT 25,000
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL
B0170 40101-0600 MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE I-A PAVEMENT TON 3,530
ROUGHNESS)
B0210 41201-0000 TACK COAT TON 22
B0230 41301-0000 ASPHALT PAVEMENT MILLING (1/2-INCH DEPTH) SQYD 29,000
B0250 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH SQYD 3,000
B0270 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 185
B0290 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING SQFT 45
B0310 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID LNFT 38,200
B0330 63401-1600 PAVEMENT MARKINGS, TYPE H, BROKEN LNFT 6,200
B0350 63406-0200 RAISED PAVEMENT MARKER, NON-PLOWABLE, BI-DIRECTIONAL REFLECTIVE EACH 320
B0370 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 19,000
B0390 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGG ER HOUR 590
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
TABULATION OF QUANTITIES
SCHEDULE B
SHEET 2 OF 5
NO. NO. NUMBER
205646
1lo l93 FL NP-EVER 10(5), 900(1) Cll 234491
PAVEMENT MARKING SUMMARY
Pay Item Pay Item Pay Item
63401-0300 63401-0400 63405-0850
Pavement
Pavement Markings, Pavement Markings, Type B, Solid Markings, Type B, Type B, Broken Accessibility
Symbol
Pay Item
63405-0050
Pavement
Markings, Type B, EV Charging Only
Word
Lnft Lnft Each Each
STATION White Yellow Green Yellow White Green
SCHEDULE D
Access Roads 4,000 2,000 180
Visitor Parking Area 2,189 60 5 2
Subtotal 8,249 180
Rounded Total Schedule D 8,700 200 5 2
SCHEDULE E
Access Road 550 560
Administrative Parking Area 1,065 160 100 2 4
Subtotal 2,435
Rounded Total Schedule E 2,600 2 4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
SUMMARIES AND SCHEDULES
SHEET 2 OF 2
ct:
L,J
L,J
2:' ::i: "'
� � 111 9
I
C, 0 a:: 0 a 0)
!:'l
�as ii, c;
h
CJ
L,J a ct:
('J a g:J �
('J
53+81 and 54+86 Clean and video inspect culverts
55+20 Remove and reset 2 20-foot speed bumps.
57+00 to 60+00 Remove and reset 3 frames and grates
Park Entrance Station
54+92 Replace vehicular loop at the entrance gate See details £636
82+00 to 82+52 Full depth patch, Type 1 52 ft X 22 ft
(J) 52+87 to 53+04, Partial depth patch, Type 3, 17 ft x 5 ft
® 53+00 to 53+06, Partial depth patch, Type 3, 6 ft x 18 ft
® 52+59 to 52+69, Partial depth patch, Type 3, 10 ft x 5 ft
@ 57+14 to 57+22, Partial depth patch, Type 3, 8 ft x 8 ft
® 57+60 to 57+68, Partial depth patch, Type 3, 8 ft x 8 ft
® 58+82 to 58+90, Partial depth patch, Type 3, 8 ft x 8 ft
(z) 59+42 to 59+52, Partial depth patch, Type 3, 10 ft x 10 ft
205646 160
234491 150893
FL
PROJECT
NP-EVER 10(5), 900(1)
0 100
SCALE IN FEET
SHEET
NUMBER
D02
0 100 200
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
CONSTRUCTION PLAN
MAIN PARK ROAD
SHEET 2 OF 13
C:
f c'
� M ::t ct: ,..
L,J
L,J
2:' ... "' w Cl w 6
0 9 0
I
C, a::
a 0)
!:'l
�as ii, c;
h
CJ
L,J a ct:
('J a g:J �
('J
105+68
109+19 Limit of work
END SCHEDULE C
BEGIN SCHEDULE B
111+80 to 114+50 RT Paved pulloff
Royal Palm Ranger Station t
117+05 Limit of work
See Royal Palm Intersection Improvement sheet for proposed work
121+85 Limit of work
205646 160
234491 150893
FL
PROJECT
NP-EVER 10(5), 900(1)
0 100
SCALE IN FEET
0 100
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
CONSTRUCTION PLAN
MAIN PARK ROAD
SHEET 3 OF 13
SHEET
NUMBER
D03 ct:
L,J L,J
2:'"' Cl
I
C, a::
a 0)
!:'l
�as ii, c;
h
CJ
L,J a ct:
a g:J � i ::i:
l'lj
163+95 to 164+65 Full depth patch, Type 1 70 ft X 22 ft
205646 160
234491 150893
FL
PROJECT
NP-EVER 10(5), 900(1)
0 100
SHEET
NUMBER
D04 f :i:
SCALE IN FEET
f
ITI
N
0 100
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
CONSTRUCTION PLAN
MAIN PARK ROAD
SHEET 4 OF 13
c' ct:
L,J ,,.
L,J
2:'"' Cl
I
C, a::
a 0)
!:'l
�as ii, c;
h
CJ
L,J a ct:
a g:J �
C\J rf :z:
I'll
234+00
END SCHEDULE B
BEGIN SCHEDULE A
Long Pine Key Campground
N
N
205646 160
234491 150893
FL
PROJECT
NP-EVER 10(5), 900(1)
0 100
SCALE IN FEET
0 100
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
CONSTRUCTION PLAN
MAIN PARK ROAD
SHEET 5 OF 13
SHEET
NUMBER
DOS
N
B-7 300
302+50 to 303+55 Full depth patch, Type 1 105 ft X 22 ft
205646 160
234491 150893
FL
PROJECT
NP-EVER 10(5), 900(1)
0 100
SCALE IN FEET
0 100
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
CONSTRUCTION PLAN
MAIN PARK ROAD
SHEET 6 OF 13
SHEET
NUMBER
DOG
p;ne/and
205646 160
234491 150893
FL
PROJECT
NP-EVER 10(5), 900(1)
0 100
SCALE IN FEET
0 100
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
CONSTRUCTION PLAN
MAIN PARK ROAD
SHEET 7 OF 13
SHEET
NUMBER
D07 c' l � ct: � L,J ,,. � L,J
2:' � "' Cl l'rj 6 ,Iii, � � 9
I 0 ·--, 0
C, a::
a 0)
!:'l
�as ii, c;
h
CJ
L,J a ct:
a g:J �
C\J
436+40 to 439+20 Paved pulloff
205646 160
234491 150893
FL
PROJECT
NP-EVER 10(5), 900(1)
0 100
SCALE IN FEET
0 100
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
CONSTRUCTION PLAN
MAIN PARK ROAD
SHEET 8 OF 13
SHEET
NUMBER
DOS
c' ct:
L,J
L,J
2:'"' Cl
I
C, a::
a 0)
!:'l
�as ii, c;
h
CJ
L,J a ct:
a g:J �
C\J rt ::i:
C) C)
483+60 to 484+25 Full depth patch, Type 1 65 ft X 22 ft
N
506+78
205646 160
234491 150893
FL
PROJECT
NP-EVER 10(5), 900(1)
0 100
SCALE IN FEET
END SCHEDULE A
END NP-EVER 10(5), 900(1)
0 100
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
EVERGLADES NATIONAL PARK
CONSTRUCTION PLAN
MAIN PARK ROAD
SHEET 9 OF 13
SHEET
NUMBER
D09
| A-sheets |
| B-sheets |
| C-sheets-revised |
| D-sheets-revised |
| M-sheets-revised |
| P-sheets-revised |
| S-sheets-revised |
| S01-05 |
| S06 |
| S06-27 |
File details come from the government source that posted it.