Bridge Inspection Rpt_STR#5460-016P
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_Opening_-_NP-GRSM_15(1).pdf | ||
| Post_Assessment_Discovery_Of_Bats_Form.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| NEPA_CE.pdf | ||
| VETS-4212_Form.pdf | ||
| FP14_Eng.pdf | ||
| Programmatic_Biological_Agreement_for_Indiana_Bat_and_NLEB.pdf | ||
| IFB_Solicitation_-_GRSM_15(1).pdf | ||
| Plans_-_GRSM_15(1).pdf | ||
| Synopsis_-_NP_GRSM_15(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5460-016P
BOTE MOUNTAIN TUNNEL INSPECTION DATE: 6/20/18
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 13.2 FT (4.0 M)
SPRINGLINE LENGTH: ........ 30.0 FT (9.1 M) STRUCT. TOTAL LENGTH: ... 121.0 FT (36.9 M)
CURB TO CURB WIDTH: ..... 30.0 FT (9.1 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 000000000000 / NONE YEAR RECONSTRUCTED: ....N/A
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 2002 - ROADWAY AND APPROACHES RESURFACED. 2012 - POTHOLES PATCHED AND
PAVEMENT RESTRIPED.
LOCATION
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 1.15 (KM PT 1.85)
STATE: .................................. TENNESSEE LOCATION: 6.6 MI TO TOWNSEND WYE
FACILITY CARRIED: ............. LAUREL CREEK ROAD
FEATURE INTERSECTED: ... BOTE MOUNTAIN
STRUCTURE EVALUATION SUMMARY
This concrete lined tunnel is in poor condition overall. The main problems at this time are deterioration of the lining, including cracking with efflorescence and spalling; and deterioration of the drain chases, with leakage evident throughout the lining.
Additional problems include soil and debris accumulation along the tunnel lining; loose and fractured rocks near the northwest approach shoulder and above the portals; and a 15" deep drop-off along the east shoulder at the north approach. It should also be noted that there is loose concrete on the crown of the tunnel along the second construction joint from the south portal; this condition could pose a hazard to traffic passing through the tunnel.
Since the last inspection the roadway was resurfaced, centerline restriped and the drain inlets at the the north approach were cleaned.
Corrective action should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: B. BUMPERS, T. POWELL (VOLKERT, INC.)
CONDITION ASSESSMENT:
BRITT BUMPERS, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 11/8/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-016P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
B226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
59.4 REMOVE SOIL AND DEBRIS ALONG LINING. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
59.1,4 REPAIR CONCRETE TUNNEL LINING. REPLACE TUNNEL DRAINAGE
SYSTEM.
1 LS
223.5 FILL AND STABILIZE EROSION AT SOUTHEAST AND NORTH
APPROACH SHOULDERS. REMOVE LOOSE ROCKS NEAR WEST
SHOULDER IN NORTH APPROACH AND ABOVE PORTALS.
1 LS
59.1 REMOVE LOOSE CONCRETE FROM SPALLED AREA ON CROWN
ALONG SECOND CONSTRUCTION JOINT FROM SOUTH PORTAL.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN, AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-016P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 4
P1. LINING
F2. PORTALS
N3. CURBS AND SIDEWALKS
P4. DRAINS AND DRAINAGE
G5. WEARING SURFACE
G6. RIDEABILITY
N7. LIGHTING
N8. OTHER
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 6
N1. APPROACH SLABS
N2. RELIEF JOINTS
N3. APPROACH GUARDRAIL
G4. SURFACING
F5. EROSION
G6. SETTLEMENT
G7. SIGNS
G8. ALIGNMENT
N9. OTHER
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
ITEM REFERENCE AND REMARKS
59.1 MINOR TO MODERATE SPALLING AT SPRINGLINE. SEVERAL LARGE
VOIDS ALONG SPRINGLINE AT CONSTRUCTION JOINTS WITH
LEAKAGE. MINOR DELAMINATION OF EAST LINING NEAR SOUTH
PORTAL WITH 3.5' X 2' SPALLED AREA.
MODERATE FULL-DEPTH SPALL (8' L X 1.5' W X 8" D) AT CROWN
ALONG SECOND CONSTRUCTION JOINT FROM SOUTH PORTAL;
SPALLED CONCRETE STILL ATTACHED POSES POTENTIAL RISK TO
MOTORISTS (EXPOSED REBAR COULD NOT BE VERIFIED DURING
THIS INSPECTION).
MINOR TO MODERATE CRACKING WITH EFFLORESCENCE AND
LEAKAGE ALONG CONSTRUCTION JOINTS. MODERATE
DETERIORATION ALONG DRAIN CHASES WITH CRACKING,
SPALLING, EFFLORESCENCE, AND WATER LEAKAGE. MINOR
CRACKING WITH EFFLORESCENCE AT OTHER LOCATIONS.
AREAS OF MINOR SCALING AT VERTICAL CONSTRUCTION JOINTS;
MODERATE SCALING THROUGHOUT LOWER PORTIONS OF LINING.
59.2 MODERATE LEAKAGE WITH MODERATE EFFLORESCENCE ON
NORTH PORTAL MASONRY. MODERATE EFFLORESCENCE ON
SOUTH PORTAL.
MODERATE MOSS, TREES, AND VEGETATION GROWTH IN RING
STONE MASONRY MORTAR JOINTS AND ABOVE BOTH PORTALS.
POTENTIAL LOOSE ROCKS ABOVE PORTALS.
59.4 POOR DRAINAGE DUE TO DETERIORATED AND CLOGGED DRAIN
CHASES. MINOR TO MODERATE SOIL AND DEBRIS ACCUMULATION,
UP TO 2" DEEP, ALONG LINING.
59.5, 222.4 EDGE OF ROADWAY STRIPING NOT PROVIDED.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-016P
ADDITIONAL ITEM REFERENCE AND REMARKS
222.5 DROP-OFF, UP TO 15" DEEP, AT SOUTHEAST AND NORTH APPROACH SHOULDERS. SHOULDER DROP-OFF (8' L X
4' W X 1.5' D) AT SOUTHEAST CORNER, 15' FROM STRUCTURE; ATTEMPTS MADE TO REPAIR.
FRACTURED AND LOOSE ROCKS AT NORTHWEST AND SOUTHWEST APPROACHES. UNDERMINED TREE AT
NORTHWEST APPROACH BANK APPROXIMATELY 30' FROM NORTH PORTAL.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-016P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... BOTE MOUNTAIN TUNNEL (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............3 - TUNNEL (3) COUNTY CODE: ........................ 009 - BLOUNT
(204) STRUCTURE NUMBER: ..... 5460-016P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 15 (6) FEATURES INTERSECTED:....... BOTE MOUNTAIN
(207) ROAD SECTION NO: ..........016P (7) FACILITY CARRIED: .................. LAUREL CREEK ROAD
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5460016P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 6.6 MI TO TOWNSEND WYE
(210) OPERATING UNIT: ............. N. DIST. (10) INV. RTE. - MIN. VERT. CLR: .. 14.20 FT (4.33 M)
(211) PROJECT NO(S): ................000000000000 (11) MILE POINT: .............................1.15 (KM PT 1.85)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
30.0 FT (9.1 M)
121.0 FT (36.9 M)
0 - UNKNOWN
0 - UNKNOWN
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-016P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°38'58.50"
(17) LONGITUDE: ......................... 83°42'54.90"
(19) DETOUR LENGTH: ............... 50 MI (80 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 0 - OTHER
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 3.7 FT (1.1 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
30.0 FT (9.1 M)
30.0 FT (9.1 M)
34.0 FT (10.4 M)
24.0 FT (7.3 M)
5.0 FT (1.5 M)
5.0 FT (1.5 M)
0 - NO MEDIAN
0 °
NO
30.0 FT (9.1 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - N/A
0 - N/A
0 - N/A
0.00 FT (0.00 M)
13.17 FT (4.01 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
B - MAJOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2002 - ROADWAY AND APPROACHES RESURFACED. 2012 - POTHOLES PATCHED AND PAVEMENT RESTRIPED.
2018 - ROADWAY AND APPROACHES RESURFACED WITH CENTERLINE RESTRIPED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://83�42'54.90 https://35�38'58.50
APPENDIX STRUCTURE NO. 5460-016P
PHOTOGRAPHS STRUCTURE NO. 5460-016P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL VIEW OF ROADWAY LOOKING NORTH; NOTE
RESURFACED ROADWAY
PHOTO #4 - GENERAL UNDERSIDE VIEW OF LINING LOOKING NORTH
PHOTO #5 - SHOULDER DROP-OFF AT EAST SHOULDER OF SOUTH
APPROACH
PHOTO #6 - LOOSE ROCK AT WEST SIDE OF SOUTH PORTAL
PHOTO #7 - VEGETATION GROWTH OVERHANGING ROADWAY AT
SOUTH PORTAL
PHOTO #8 - TYPICAL SPALLING OF LINING AT SPRINGLINE, EAST
LINING NEAR SOUTH PORTAL SHOWN; NOTE LEAKAGE
PHOTO #9 - SPALLING OF CROWN ALONG SECOND CONSTRUCTION
JOINT FROM SOUTH PORTAL
PHOTO #10 - CLOSE-UP OF SPALLING OF CROWN; NOTE SPALLED
CONCRETE STILL ATTACHED
PHOTO #11 - TYPICAL SPALLING OF LINING AT SPRINGLINE, EAST
LINING NEAR MID-LENGTH SHOWN; NOTE LEAKAGE
PHOTO #12 - GENERAL VIEW OF CRACKING WITH EFFLORESCENCE
ON EAST LINING; NOTE ACTIVE LEAKAGE
PHOTO #13 - TYPICAL CRACKING WITH EFFLORESCENCE ON LINING,
EAST LINING SHOWN
PHOTO #14 - TYPICAL CRACKING WITH EFFLORESCENCE AND RUST
STAINING ON LINING, CROWN OF LINING NEAR MID-LENGTH SHOWN
PHOTO #15 - TYPICAL SOIL AND DEBRIS ACCUMULATION ALONG
LININGS, EAST LINING SHOWN
PHOTO #16 - TYPICAL SPALLING OF LINING AT SPRINGLINE, WEST
LINING NEAR NORTH PORTAL SHOWN
PHOTO #17 - TYPICAL CRACKING WITH EFFLORESCENCE AND
LEAKAGE ON LINING, EAST LINING NEAR NORTH PORTAL SHOWN
PHOTO #18 - TYPICAL EFFLORESCENCE ON PORTAL RING STONES,
NORTH PORTAL SHOWN; NOTE LEAKAGE
PHOTO #19 - DEBRIS ACCUMULATION REMOVED FROM INLET AT EAST
SIDE OF NORTH PORTAL; NOTE SHOULDER DROP-OFF
PHOTO #20 - DEBRIS ACCUMULATION REMOVED FROM INLET AT WEST
SIDE OF NORTH PORTAL
PHOTO #21 - TYPICAL MOSS AND VEGETATION GROWTH ON PORTAL
RING STONES, NORTH PORTAL SHOWN
PHOTO #22 - TYPICAL POTENTIAL LOOSE ROCK ABOVE PORTALS,
NORTH PORTAL SHOWN
PHOTO #23 - FRACTURED ROCK AT NORTHWEST APPROACH
PHOTO #24 - UNDERMINED TREE AT NORTHWEST APPROACH BANK
APPROXIMATELY 30' FROM NORTH PORTAL